Professional Documents
Culture Documents
Jan 5 2 1
Feb 2 2 2
Mar 1 1 2 2 3
Apr 2 1 4 1
May 2 4
June 5 5 3 4 2
July 4 7 1 1
Aug 10 9 11 1
Sept 5 2
Oct 3 10 2 2
Nov 3 1
Dec 2 5 1 1
Jan'17 3 6
Feb'17 6 4 1
March '17 1 10 6 4
April '17 2 3 4
Grand Total 44 73 47 16 1 6
Monthly Cou
35
30
25
25
20 19 19
15
13
10
10 9
8
0
Jan Feb Mar Apr May June July
Monthly BUCKETIZ
Monthly BUCKETIZ
10
6
3
5
3 4
2
1
2 6
3 10
4
5
2
6
10 9 1
1
2
4 7 11
5 4
5 1
2 3 2
2 4 1
1 4 1 1 1
1
2 1 4 1 2 1
1 2 2 2 1
1 1
5 2 2 1 1 4
2 1 2 1 3 3 3 2 1
r
n
k er re SC LS 0
4
te BN SR D
M
P
Li Fi
b l u cB M X
1 u P C A
e ai M M Ro M cy S
av K F E RE er 0 RE en TS A
w LT v e
AR
A 0 A g C
ro s si C
C
n
ip X
6 C er
ic Pa C Em
M Ju
ei /
aw E //
u
-H
N
A
R
IP
April '17 March '17 Feb'17 Jan
E///
IPRAN -Huawei CARE MPBN Emergency TSS ADM CARE RNC WANANCHI
CX 600 Router CSR
3 1 2
1 1
2
1 1
1
4
1 2 1
3
2 1
1
1
1
5 5 7 8 3 2
Monthly Count of Big Outages Jan 1st '16- April 23rd '17
31
25
20
19
12
11
10
9
6
Monthly BUCKETIZED Count of Big Outages Jan 1st '16 -April 23rd '17
Monthly BUCKETIZED Count of Big Outages Jan 1st '16 -April 23rd '17
1 1
1
2 1
1
1 4 1 1 1
2 1 2 2 2 1 1
1 1 1 1 1 1 1 1 1 1
C I a e
SR M N H M
ny SC M LU ps SW 2
G er
C A
D R C CO Ke
B D fA La
_ b IO
cy E N A x W B A
N Fi
SS AR
A SE ss Fl
e D LS ty IU R W
en T C AN e LC P
vi
n
g
cc RE P M to
er W
A A K t li
m C ac So
ed
n
l an
P
'17 Feb'17 Jan'17 Dec Nov Oct Sept Aug July June May Apr Mar Feb
KPLC Planned activity
SEACOM Access Kenya CARE Flex BSC MPLS fALU
DWDM Lapse
1 1
1 1
1
1 1
2
1 1
3 1 3 1 3 2
26
12 12
11
1 1 1
1 1 1 1 1
JTL Enterprise link Orange Fiber Grand Total
19
8
13
10
9
25
19
31
10
20
2 6
9
11
12
2 26
1 12
1 4 240
Start Time End Time
Start Date End Date
S.No OPCO Months (HH:MM (HH:MM
(DD/MM/YY) (DD/MM/YY)
AM/PM) AM/PM)
50% GI Data Traffic drop for 180mins due to 93 % PDP actvaton failure
SDP1A -(3-2012) is isolated from PKSHLR2 & NKUHR1
SDP2B -(3-2013) is isolated from VPKSTP1, PKSSTP1 & NKUHLR2
PKSA6 -AIR (3-2208) is isolated from NKUHLR2,PKSHLR2 & PKSHLR3
30:03:00 RFO: Ericsson Emergency CSR team recommended restart of m1s3 Board on E/// Emergency CSR
SAPC to resolve the problem. This board was observed to have had high CPU
load.
KTIBSC1(KITUI) WITH 65-2G SITES LOST 100% TRAFFIC
COMPLETE GB LINKS (3/3)OF KTIBSC1 IS ALSO DOWN.
SUPERVISION LOST FOR KTIBSC1
65-2G Sites and 38-3G Sites in Nairobi Region were intermittently failing.
RFO: Ruaraka<>Runda & Village Market<>Forest road Ceragon link failures
0:01:32 were affected by rain fading. Services restored after heavy rains subsided. Microwave Link
Open Ring to be closed
Multple corporate E1s were down towards JTL down from PKSMSC5. (Total
count 30)
1:43 JTL Enterprise link
RFO: Transmission fault caused by commercial power outage and backup
generator failed to automatcally switch. Manual DG switching was done.
Airtel/Eaton No Closed
Gachau No Closed
Airtel/Eaton No Closed
Orutwa No Closed
Gunjan No closed
Orutwa No Closed
Orutwa No open
Orutwa No Open
Gachau No Open
Gachau No Closed
Gachau No open
Gachau No Open
Orutwa No Open
In summary, assuming we have 1500 sites throughout the week, we will be Red, Amber Green when the count is