Quantity of material required for the Constr

In PCC
Member Nos. L B H Volume
P.C.C 1 7 3.5 0.15 3.675 5.660
Member

Quantity in Cum Base


Cement Sand Aggregate Beams
0.43 1.72 3.45 Column
Stirrups

Material Quantity
member Nos. L B H Volume Wet Vol. Total Vol
Base 1 7 3.5 0.15 3.68 5.66
Beam(B1) 4 7 0.25 0.25 1.75 2.70
Beam(B2) 4 3.5 0.25 0.25 0.88 1.35 10.47

Column 4 2 0.25 0.25 0.50 0.77

Cement(1) Sand(2) Aggregate(4)


1.55 3.10 6.21

Cement Sand Mortar Bricks(1:5)

Cement 0.42 Number of bricks for Half Brick 2200


Sand 3 wall(Packet Brick)
d for the Construction of Water Tank

Steel Reinforcement
Along Longer span Along shorter span total
Dia Weight(Kg) Amount
No of Bars Length Nos Length Length
10mm 9 7.5 18 4 135.6 84.0875 4961.2
10mm 16 7 16 3.5 168.0 104.16 6145.4
10mm 16 2 0 0 32.0 19.84 1170.6
5.5mm 250 0.88 220 45 2700.0
14977.2

Total Material Combined


Total Total
S.No Material Unit
Quantity Amount
1 Cement 69.7 Bags 27865.5
2 Sand 7.83 Cum 6260.7
3 Aggregate 9.65 Cum 20268.9
4 Steel 253.0875 Kgs 14977.2
5 Bricks 3000 Number 33000.0
Total Amount 102372.3