CLIENT:

CEYLON ELECTRICITY BOARD


SRI LANKA

LOA NO.: PROJECT TITLE:


CEB / PM / KK / 220TR / TEC KERAWALAPITIYA – KOTUGODA TRANSMISSION
– LOT B DATED 19.02.2007 PROJECT – LOT B, 220KV TRANSMISSION LINE
OECF LOAN NO.: SL – P78 BETWEEN KERAWALAPITIYA AND KOTUGODA
KEC WORK ORDER NO.: N41
ENGINEER: IN ASSOCIATION WITH: CONTRACTOR:
KEC INTERNATIONAL
LIMITED, GURGAON,
HARYANA, INDIA
APPROVED BY THE ENGINEER ON
SCALE: STANDARD

DATE NAME TITLE OF DRAWING:

ESTABL. “S2” TYPE FOUNDATION


CHECKED FOR 1M RAISED CHIMNEY FOR
APPROVED “TD3 –3M, +0M, +3M, +6M, +9M &
+12M” TOWERS
DATE DRAWING NO. PAGES REV
D S – 1 3 0 1 11 A