: loyds Energy - Upstream
BISEEL Comment Response Sheet
CUENT PROECT ORFF,
PROTECT CRS NUMBER T001-04-002-08-05-001-
01 Updated
CENT CONTRACTNO, | 711065 CRSSTATUS ‘Open
CLENT TRANSMITTAL | PSNCGN-TR-OWOS PROWCT PREF
“RETENTION paul.wilson@enquesticom PROJECT CONTROL NO. [ABNI291801
COPEDTO johnathan bird@enquest.com | CONTROLNO, "ABNIZ91601 /008
(E&l & INST)
PAGE ot
DOCUMENT APPRAISAL DETANS
WORKINSTRUCTION: | 1L001-04-002-03-01-001/002/003
SUBJECT ESP-DEV PI
The document(s) below has/have been examined in accordance with the Work Instructions referenced above and
is/are assigned the status codes indicated, subject to the following comments:
Document No. Rev, | Title Status
"THO8545-EL-BD-O01 C5 | Blectrical Cable Block Diagram Electrical Submersible | A
Pumps Main HV Cables
"THO8545-IN-SM-051 Bi | Thistle Alpha PP2103 Wellhead Pilot Panel Schematic | _Q
Diagram
TD = Significant Finding Non Correspondence
= More idence Required
[5 = Approved/Condton of Aceptance at
a. cl
11. EXDocument Number. THOS545-FL-BD-O01. Rev, C5.No Comments
12. XDocument Number. TH08545-IN-SM-051. Rev. B1, No Comments
‘The above documents have been reviewed and are considered acceptable for the applications intended,
‘The documents are assigned Status Code ‘A’ Accepted.
2 E&l COMMENTS
13. EiDocument Number. TH08545-EL-BD-001. Rev. C5. No Comments,
14, EiDocument Number. TH08545-IN-SM-051. Rev. B1. No Comments
FINAL ACCEPTANCE DEPENDS ON SATISFACTORY SURVEY AND TESTING
Loyel’s Register its affiliates and subsidiaries and their respective fiers, employees or agents are individually and collectively, referred to in
this clause asthe ‘Lloyd's Register Group’. The Lloy’s Register Group assumes no responsibility and shall not be Hable to any person for any loss,
‘damage or expense caused by reliance on the information or advice inthis document or howsoever provided, unless that person has signed &
contract with the relevant Lloyd's Register Group entity forthe provision ofthis information or advice and in that case any responsibility or
liability is exclusively on the terms and conditions set out in that contrat.lo IS Energy - Upstream
EOiSCEP Comment Response Sheet
CRS number Project Control No, ConitralNo- Page
Looi-n-oo2-o40s001 | ABNIZNI801 ‘ABNI291801 /003 2085
Upsiated (E&I & INST)
3. PPM COMMENTS:
1.5. ElDocument Number. TH08545-EL-BD-001. Rev. C5. reviewed & No Comments.
1.6. ElDocument Number. TH08545-IN-SM-051. Rev. BI.
‘There appears to be no hardwired interface between the Master hydraulic shutdown panel from|
PSL Instrument
(PSL-2113/1) and the Wellhead pilot panel (PP2103). Please see Asbuilt P&ID no. THO8545-
PR-PD-001 Rev F. Please Advise
‘Approved/ Accepted
Queries
Tn preparing this report, the undersigned surveyor is acting as an Independent person in accordance with the
applicable policy on conflict of interest
Surveyor toHoyd'sRegister | J Sinclair/T Snaith/M,bom Gued :
EMEA M Pritchard /F Burgess eee eee
ae Jordan Gallacher
Client 7 Contractor Response
Comment 1.6 THO8545-IN-SM-051. Rev. B1. Doesn't have PSL-2113/1
‘THO8545- PR-PD-001 Rev F — Not sure where you got Ref F as on the signed Transmittal it was Rev C2:~
Ref, PSN-GN-TR-0405 Signed
‘Assumed from THO8545-IN-SM-051 that PSL-2113/1 was this: -
12-PSL~
210342
FINAL ACCEPTANCE DEPENDS ON SATISFACTORY SURVEY AND TESTING
Lloyd's Register, its afiliates and subsidiaries and their respective officers, employees or agen ae, individually and collectively, refered to in
this clause as the ‘Lloyd's Register Group’. The Lloyd's Register Group assumes no responsibility and shall not be liable to any person for any loss,
damage or expense caused by reliance onthe information or advice inthis document or howsoever provided, unless that person has signed a
contract with the relevant Lloyd's Register Group entity for the provision ofthis information or advice and in that case any responsibility or
Liability i exclusively on the terms and conditions set out in that contract
Form 495 (2010.12)~ Poyd’s — tnergy - upstream
BISEEL Comment Response Sheet
CRSnamber Projet Control No, Control No, Page
Looi-o1-002-0405.001.01 | ABNI291801 ‘ABNI291801 003 3of5
Updated (@&1 &INST)
In which case :~
Ref THOESAS-PR-PD-001 (C2)
(C&E: - :
5) (9
ell |
lela] |?
‘PRODUCTION WELLHEAD SYSTEM 2 |
EEE) Helles
FMA
BORG HMA
alate! |elelslalal (é
aA
ros 1 io r
ci mae BE
FLOWLINE PRESSURE ow ana |
a faa pawn
eT a Fa et
sears bare Beef
en nn + AAA +
Ref, THO8S45-PR-CA-005-002 (C1)
FINAL ACCEPTANCE DEPENDS ON SATISFACTORY SURVEY AND TESTING
Loyd’ Register, its afiiates and subsidiaries and their respective officers, employees or agents are, individually and collectively referred to in
this clause as the ‘Lloyd's Register Group’. The Lloy's Register Group assumes no responsibility and shall not be Hable to any person for any loss,
damage or expense caused by reliance onthe information or advice in this document or howsoever provide, unless that person has signed &
contract with the relevant Lloyd's Register Group entity fr the provision ofthis information or advice and in that ease any responsibility oF
liability is exclusively on the terms and conditions set out in that contract
orn 649 01052)lo IS Energy - Upstream
ISCEP Comment Response Sheet
CRSmamber rojed Control Noy ContralNo. Page
oo1-04-002-01.05-001.01 | ABNI291801 ABN291801/003 4085,
Updated (F&a & INST)
‘This is the hydraulic S/D panel: -
Pe os
ag
WASTER WrORAUA
SruFo0mN Pane
FINAL ACCEPTANCE DEPENDS ON SATISFACTORY SURVEY AND TESTING
Lloyd's Register, its affiliates and subsidiaries and ther spective officers, employees or agent are, individually and collectively, referred 0 in
this clause as the ‘Lloyd's Register Group’. The Lloy’s Register Group assumes no responsibility and shall not be lable to any person for any loss,
‘damage or expense caused by reliance on the information or advice inthis document or howsoever provided, unless that person has signed a
contract with the relevant Lloyd's Register Group entity for the provision of this information or advice and in that case any responsiblity or
liability i exclusively on the terms and conditions set out in that contract
orm 6495 010.12)| IS Energy - Upstream
‘gy - Up
Comment Response Sheet
i Ps
CRSnamber Project Control No, ContvoINo. Pare
Looi-o4.002-0605.00.01 | ABNIZ9I801 ABN1291801/0083 Bots
Updated (E&I &INST)
Bach of these are identified like this: ~
Piz. DENOTES DELTA V E80 SYSTEM FUNCTION.
Ref, TH08545-PR-PD-001
Each of these are also shown on C&E TH08545-PR-CA-005-002 (C1)
Please ensure all comments are reviewed and agreed prior to being issued and tag numbers and references are
correct.
oe
FINAL ACCEPTANCE DEPENDS ON SATISFACTORY SURVEY AND TESTING
Lioyd's Register, its affiliates and subsidiaries and ther respective oficers, employees ar agents are, individually and collectively, referred to in
this clause as the ‘Lloyd's Register Group’. The Lloyd's Register Group assumes no responsibility and shall not be liable to any person for any los,
damage or expense caused by reliance on the information or advice in this document or howsoever provide, unless that person has signed &
contract with the relevant Lloyd's Register Group entity for the provision of this information or advice and in that case any responsiblity or
ability i exclusively om the terme and conditions set out in that contract,