CHECK LIST FOR GENERAL DRAWINGS

DRAWING CHECK Line Number

Following items taken into account


Are the following aspect correct:

Verify that the drawing information is sufficient for the issue purpose.
Verify that the drawing drafting check has been performed i.e. checklist has
been completed and signed off
Verify that drawing information meets required regulatory and classification
codes, rules, and regulations.
Verify drawing meets contract requirements.
Verify concurrence with design requirements.
Verify that critical dimensions are correct
Verify that interface data is correctly represented and identified
Verify that information is consistent with analytical calculations
Verify that analytical calculations are contained in a calculation book per
company procedures
Verify that all comments have been incorporated.
Verify all revisions are correctly identified per procedure.
Verify references (drawings, specifications, codes) identified and accurate.
Verify welding details are called out or referenced.
Verify materials are specified or referenced.
Verify that NDE and other testing are specified or referenced.
Verify that the approval dates have been added for AFC drawings.
Verify that notes are correct and appropriate.
Verify AFD design changes have been logged in the Change Register
Verify AFD hazard review and change HAZID have been completed.
Verify P.E. Stamping requirements.
Other