Contract Identification No.

:
NAME OF PROJECT:

Tables
of
Content.......................................................................................
........................... 1
List
of
Figures.......................................................................................
................................ 2
I. QUALITY ASSURANCE......................................................................................................................3
1.1

INTRODUCTION.................................................................................................................................3

1.2

DEFINITIONS.....................................................................................................................................3

1.3

QUALITY ASSURANCE FLOW CHART...........................................................................................4

1.4

QUALITY MANUAL..........................................................................................................................11

1.5

DRAWING AND SPECIFICATION....................................................................................................11

1.6

QUALITY ASSURANCE...........................................................................................................11
2.6.1 Site Clearance...................................................................................................................11
2.6.2 Earthwork in Excavation (for foundation):........................................................11
2.6.3 Concreting Work:.............................................................................................................11
2.6.4 False Work and Formwork...........................................................................................12
2.6.5 Steel Reinforcement work:.........................................................................................12
2.6.6 Platering Works.................................................................................................................12
2.6.7 Painting Works...................................................................................................................13
2.6.8 Water Supply and sanitary Work............................................................................13
2.6.9 Bio-engineering Works.................................................................................................13

1.7

ROAD WORKS................................................................................................................................14
2.7.1 ROADWAY EXCAVATION IN SOIL.............................................................14
2.7.2 SUB GRADE PREPARATION.........................................................................15
2.7.3 GRAVEL SUB-BASE............................................................................................15
2.7.4 CRUSHED STONE MATERIAL FOR BASE...........................................16
2.7.5 SURFACE DRESSING.........................................................................................16

II.

1.8

ORGANIZATION BREAKDOWN STRUCTURE..............................................................17

1.9

ALLOCATION OF RESPONSIBILITIES: IN RESPECT OF QUALITY CONTROL..........................18

1.10

WORK INSTRUCTIONS..................................................................................................................19

1.11

INSPECTION, TESTING..................................................................................................................19

1.12

ORGANIZATION CHART FOR WORK IMPLEMENTATION...........................................................20

1.13

ROLES AND RESPONSIBILITIES OF PROJECT PERSONNELS.................................................21

1.14

PARTERNER-INCHARGE................................................................................................................21

1.15

TRAFFIC CONTROL AND SAFETY MEASURES..........................................................................22

1.16

AMENDMENT TO QUALITY PLAN................................................................................................22

SUMMARY.......................................................................................................................................23

Contractor Name: -

Page 1

Contract Identification No.:


NAME OF PROJECT:

LIST OF FIGURES
Figure 1: Materials Quality Control Flow Chart...........................5-6
Figure 2: Quality Control of Structural/cutting Work Flow chart7-9
Figure 3: Quality control of Backfilling and Pavement Layers Flow
Chart.................................................................................................9-10
Figure 4: Quality control of Concrete Works Flow Chart.............11
Figure 5: Quality Control through Supervisory Staffs.................17
Figure 6 : Material Quality Control (Through Store)....................18
Figure 7: Organization chart for work implementation...............20

Contractor Name: -

Page 2

Contract Identification No.:


NAME OF PROJECT:

I.

QUALITY ASSURANCE
I.1

INTRODUCTION

Planning and controlling standards for quality are fundamental in both the
design and construction phases of a project. This aspect of a project, while
closely interrelated with costs, schedule, procurement, and value
engineering, deserves its own amplification.
This sheet begins with a definition of Quality Assurance. It will then
describe the different Quality Assurance flow diagrams presenting clear
steps for achieving the required quality standards. Then there will be brief
working procedures of different items, test descriptions, quality standards
and quality controls. Allocation of responsibility is equally important for
attaining required quality standards and hence it describes the
responsibility of different key personals and organizational break down
structures near the end for clear understanding of line of command or flow
of information. A brief description of inspection and frequency of testing to
be performed presented at the end will be valuable controls for assuring
required quality standards.
I.2

DEFINITIONS

Quality Assurance - It involves the use of all standards and


procedures to ensure that a product or a facility meets or exceeds desired
performance criteria. It also usually includes the documentation necessary
to verify that all steps in the procedures have been satisfactorily
completed.
Quality assurance is all the planned and systematic activities
implemented within the quality system to provide confidence that the
project will satisfy the relevant quality standards and it should be provided
throughout the project.

Contractor Name: -

Page 3

Contract Identification No.:


NAME OF PROJECT:

I.3

QUALITY ASSURANCE FLOW CHART


Figure 1: Materials Quality Control Flow Chart

Material
Sources
Identification

Contractors
Representative

Sampling
materials
testing

for

Engineers
Representative

Transportation to
testing site

Contractors
Representative

Contractor Name: -

Testing of materials

Engineers
Representative

Page 4

Contract Identification No.:


NAME OF PROJECT:

Alternate Source

NO

Test results meet the


Requirements

YES
Source Approval
A

Transportation
Aof material
to Store, Yard or
Stockpile

Contd...

Factory Made
Submit Manufacturer's
test Certificate.

Quarry Material
Testing at stock
yard/Stock pile

Rectify to meet
the requirement

NO

Test results
meet the
Requirements

Test results
meet
Requirements
YES
YES
Remove
from site

Proper
Storage

Contractor Name: -

Page 5

Approval of

Contract Identification No.:


NAME OF PROJECT:

NO

Contractor Name: -

Page 6

Contract Identification No.:


NAME OF PROJECT:

Figure 2: Quality Control of Structural/cutting Work Flow chart


Structural Work / Cutting

Setting out

Contractors
Representative

Rectify to
meet
the
requirement

Check line and level

Engineers
Representative

Line Level as
per Drawing

NO

YES
Foundation
Excavation
Check Foundation
Level

Contractors
Representative

Engineers
Representative

Rectify to meet the


requirement

NO

Line Level
as per
Design
YES
B

Contractor Name: -

Page 7

Contract Identification No.:


NAME OF PROJECT:

Contd...

Contractors
Representative

Material Sampling

Engineers
representative

Rectify to meet
the requirement
NO

Test results meet


the requirement

Start Construction Works


YES

Contractors
Representative

Control of
Workmanship

Engineers
representative

Completion of Works

Checking Final Line and


Level

Rectify to
the

Reauire
ment

NO

Line Level
as per
Design
YES

Contractor Name: -

Page 8

Contract Identification No.:


NAME OF PROJECT:

Contd.

Care of
Works

Contractors
Representative

Engineers
Representative

Final Joint
measurement

END

Control MC of
material to attend
OMC

Spread material
thickness specified

as

Rolling each layer in specified


manner to meet required FD and
check line and level as per
Drawing and Design

Contractors
Representative

Check FD

Engineers
Representative

FD meets the
Figure 3: Quality controlrequirement
of Backfilling and Pavement Layers Flow
NO

Chart

Contractor Name: -

YES

Page 9

Contract Identification No.:


NAME OF PROJECT:

YES

Contd.

Final Joint
Measurement

END

Contractor Name: -

Page 10

Contract Identification No.:


NAME OF PROJECT:

Figure 4: Quality control of Concrete Works Flow Chart


Rectify

Checking
of
ingredients

No

quality

of

Yes
Reject and Rectify

No

Mix design
Yes

Rectify

No

Checking of formworks, placement


of steel reinforcement as per
design
Yes
Pre concreting inspection
1. Final cleanup
2. Provision for curing
Yes
Concrete mixing
Yes
Concrete Placement
Yes
Making cubes for compressive
strength test
Yes
Checking Line and level
Yes
Curing at least 7 days
Yes
Compressive strength test
Yes
Final Joint Measurement
End

Contractor Name: -

Page 11

Contract Identification No.:


NAME OF PROJECT:

I.4

QUALITY MANUAL

There is no as such quality manual is available, however a brief and


concise description of quality requirement and quality procedure have
been produced according to the Standard and special specification of the
Contract Document.
I.5

DRAWING

AND SPECIFICATION

Drawing and specification are provided by the Engineer: ICT in association


with FBC JV. The Contract Documents clearly shows the quality
requirement of the project and hence will be strictly followed during
construction period as best as practicable

I.6

QUALITY ASSURANCE

Working Procedures
I.

SITE CLEARANCE

Demarcation of the debris deposited area such as from culverts and


side drains
Excavation and transportation to the spoil area or the area where it
can be used or the stock area.
Use, spoil or stock as per EMAP
II.

EARTHWORK

IN

EXCAVATION (FOR

FOUNDATION):

Identification of structure to be excavated.


Define the dimensions of cut.
Approval of drawings for the slope and depth of cuttings.
Identify the methods of cutting-blasting or hydraulic hammering.
Preparing surface for excavation.
Proceed the excavation work as per Specification.
Approval of the completed section.

III.

CONCRETING WORK:

Testing and approval of the stock of the ingredients of the specified


grade of Concrete.
Contractor Name: -

Page 12

Contract Identification No.:


NAME OF PROJECT:

Proportioning of the ingredients as determined from the design mix


of the concrete in the laboratory and as instructed by the engineer.
Checking centering and shuttering before pouring the concrete.
Preparation, transportation, pouring in place and compaction as per
Specification and drawing.
Making cubes for testing.
Curing of the completed section as per specification.
Testing of compressive strength on 7 and 28 days
Approval of the completed section.

IV.

FALSE WORK

AND

FORMWORK

Design and prepare the drawings of false work and Formwork for the
said work.
Approval of the drawings.
Approval of the type, grade and condition of the material used for
the work.
Construction of False work and Formwork as per the Specification.
Removal of False work and Formwork as per the Specification.

V.

STEEL REINFORCEMENT

WORK:

Approve the sources and type of the reinforcement to be used.


Prepare and approve the Bar bending schedule.
Cutting and bending the reinforcing steel as per the Specification.
Place in position as shown in the approved drawing / as per the
specification.
Approval before pouring the concrete.
VI.

PLATERING WORKS

Approve the source and type of sand gradation to be used.


Testing of cement, sand, Mortar as per the specification.
Approval of the type and condition of the material used for the work.
Preparation, transportation, pouring in place as per Specification
and drawing.
Contractor Name: -

Page 13

Contract Identification No.:


NAME OF PROJECT:

Curing of the completed section as per specification.


Approval of the completed section.

VII.

PAINTING WORKS

Define the materials and workmanship for painting and color


washing of Internal
and External surface as per to the
Specification.
Get approval of the materials to be applied for the work.
Preparation of the area for this work as specified in the
Specification.
Application of the Paint as per standard specification.
Curing and protection of work.

VIII.

WATER SUPPLY

AND SANITARY

WORK

Use first quality of all the Pipe and fitting.


Use all the Pipe, fittings and sanitary work as per specification.
Approval of sample.
Placing all the Pipes and fittings as per drawing and specification.

IX.

BIO-ENGINEERING WORKS

Define the area for grassing, and trees and shrub planting.
Preparation of the area for this work as specified in the
Specification.
Transportation of the approved grass, trees and shrubs to the
planting site.
Planting grass, trees and shrubs as per the specification.
Care of the work throughout the Construction and Defect Liability
period.

Contractor Name: -

Page 14

Contract Identification No.:


NAME OF PROJECT:

2.6.11

PAVEMENT WORKS FOR ROAD

Carry out the cross-section work of the existing road with level
Machine.
Carry out the base line survey with Total-Station.
Draw the existing ground cross section along with the plan and
longitudinal profile.
Get approval of the final design of the stretch of existing Asphalt
concrete level before the excavation of the existing Asphalt
Concrete.
Remove the existing Asphalt Concrete and if required the base, subbase and the capping layer to the required depth.
Take the joint level of the surface and carry out the watering and
rolling to get the formation level.
Add the approved material for Capping layer, Sub-base and Base
layer as per the design requirement and get the level of the
individual layer jointly.
Take the final level of the base surface with adequate watering and
rolling fulfilling the compacted density as per the specification
and maintaining the design level as per the approved design and
drawing. Maintain level sheet jointly signed by the Contractors
and Engineers Representative.
Carryout the brushing and cleaning works with compressor and
wired brush.
Apply prime coat with cutback bitumen as per the specification and
leave the surface untouched for 3-4 days.
Apply tack coat to the dry surface as per the specification and
overlay Asphalt concrete over the surface with the Paver and
compact the surface by PTR and then by Tandem roller to the
compaction required.

After the completion or the Asphalt Concrete Pavement lay base to


the shoulder area with adequate watering and rolling to maintain
the design level as per the specification and take the level of the
surface jointly.

Carry out the priming work to the shoulder as per the specification
and leave it to dry for few days (3-4) days.
When the surface is dry spray the cutback bitumen with distributor
and consequently spray the first coat of aggregates and carry out
the compaction with the PTR roller and finally with still roller.
Carry out the back rolling for 2-3 days consequently.
Contractor Name: -

Page 15

Contract Identification No.:


NAME OF PROJECT:

After 3-4 weeks remove the unstacked aggregates and again spray
bitumen to the surface and spray the second layer of the
aggregates.
Carry out the rolling works with the PTR and Still roller and after 2-3
weeks remove the unstacked aggregates.
Finally take the level of the Shoulder and the Carriageway.
I.7

ROAD WORKS
1. ROADWAY EXCAVATION IN SOIL

Detail joint survey of the section.


Preparation and approval of the Working drawings.
Layout in the field.
Check and verify layout by the engineer.
Precede excavation to the line, levels and slopes.
Transportation of the excavated material to the spoil tips and stock
suitable
materials for further use at space available near side of
the road without disturbing traffic movement.
Identify areas to spoil unsuitable material.
Check cut line, levels and slopes as per drawings.
Repeat if necessary until the approval of the section.

2. SUB GRADE PREPARATION


The Preparation of sub grade includes all the operations before the
pavement structure could be laid over it and compacted. Thus
operation of the sub grade would include site clearance, grading
(embankment or cut section) and compaction.
Prepare the road surface with the help of motor Grader to achieve
design gradient and cross slope.
Compaction by Roller (in filling-layer wise compaction will be made
by maintaining OMC to get maximum dry density as per the
Specification.
Check the line, level, cross slope and density of sub grade.
After approval notify to the Engineer to proceed the laying of the
sub-base.
Contractor Name: -

Page 16

Contract Identification No.:


NAME OF PROJECT:

3. GRAVEL SUB-BASE
Sub-base materials will be stockpiled in the stockpile yard and notify
the Engineer for necessary checking.
After the approval of the material, the gravel sub base will be
transportation and dumped on the approved sub grade layer.
Mixing of sub-base material on road with the help of grader at site.
Oversize particles will be either break manually or pickup at site
with the help of labors.
Spraying of water close to the OMC by water browser and check the
moisture content.
If water content is more than OMC, leave to sundry until it comes to
OMC and if water content is less than OMC add water to bring to
OMC.
Spreading of the sub-base material to the required shape, grade and
depth.
Rolling started from edge to centre on straight section and from
inner edge to outer edge on the super elevated section
Checking of field density as per the specification.
Checking of line and levels of the finished surface.
The approved gravel sub-base layer will be partly covered by on
coming layer of CRM.
Approval of the completed section.
4. CRUSHED STONE MATERIAL FOR BASE
Approval of the source of rock stone for producing CRM.
Production of the CRM in the crusher plant.
Testing of CRM material as per test frequency presented in the
appendix and approval of the stockpile.
After the approval of the material, the CRM sub base will be
transportation and dumped on the approved sub grade layer.
Mixing of sub-base material on road with the help of grader at site.
Spraying of water close to the OMC by water browser and check the
moisture content.
If water content is more than OMC, leave to sundry until it comes to
OMC and if water content is less than OMC add water to bring to
OMC.
Contractor Name: -

Page 17

Contract Identification No.:


NAME OF PROJECT:

Spreading of the sub-base material to the required shape, grade and


depth.
Rolling started from edge to centre on straight section and from
inner edge to outer edge on the super elevated section
Checking of field density as per the specification.
Checking line and levels of the finished surface.
Approval of the completed section.

5. SURFACE DRESSING
This section includes supply and laying of Surface Dressing surface
treatment with approved cutback bitumen and aggregate.
Materials
Aggregate As-dug gravel medium graded aggregate will be screen
from approval quarries. Aggregate used in Surface Dressing will be
medium graded aggregate and gradation and strength shall be as
per the Specification.

I.8

ORGANIZATION BREAKDOWN STRUCTURE

Human resource is the key factor for controlling other resources in any
industry or in any business environment. Properly organized and managed
human resources produce the best output results. As both contracts as in
continuous alignment we are intended to work with single management
which has been even approved by the Engineer. In this project, a Quality
Control engineer will be appointed for the project period and he will be
fully responsible for maintaining the overall quality of materials and work.
He will visit site and laboratories frequently. Though laboratory
establishment is being our obligation, we will have own lab technician,
who will record all tests at site and collect documents. Quality control
during construction and store entry and storing of materials is equally on
site and the line of command will be as shown in the OBS Fig. 5. Similarly,
experienced storekeepers will be appointed so that they will be fully aware
of storing the materials and checking before entry. The OBS for the store is
shown in Fig 2. However, the overall responsibility of quality goes to the
Contractors representative and he will issue the necessary instructions
for maintaining quality standards time to time.

Contractor Name: -

Page 18

Contract Identification No.:


NAME OF PROJECT:

Figure 5: Quality Control through Supervisory Staffs

Contactors
Representative
Site Engineer

Surveyor/Overseers

Asst. Engineer

Survey Assistants

Supervisors

There will be numbers of Asst. Engineers, Surveyors/Overseers as per site


requirement.

Figure 6 : Material Quality Control (Through Store)


Site Engineer

Storekeeper

Assistants/Helpers

I.9

ALLOCATION

OF

RESPONSIBILITIES: IN

RESPECT OF QUALITY

CONTROL

Contactors Representative:
Overall Planning, Scheduling, Monitoring and Controlling.
Contractor Name: -

Page 19

Contract Identification No.:


NAME OF PROJECT:

Procuring reliable suppliers / vendors for supplying quality


materials and sub-contractors for quality works.
Recruiting and allocating qualified personals for different works.
Maintaining proper coordination among site staff, store staff and
lab. Staff.
Timely instructions and decisions.

Site Engineer:

Day to day planning of site works.


Planning and allocating right people to right place.
Control of workmanship through subordinates.
Care of works.

Surveyor / Overseer:
All survey works (Line, levels, cut slopes etc.)
Documenting survey data and updating if any change.
Day to day supervision of works.

Lab. Technician:
Daily material testing and process control.
Maintaining up to date lab. Records.
Store Keeper:
Receiving quality materials from suppliers and vendors.
Proper storage of construction materials.
Maintaining proper records of material entering and outgoing
from store.

I.10

WORK INSTRUCTIONS

Work instructions will be issued at different stages when required. Unusual


section of work area will be identified and considered as the work
requiring work instructions. Work instructions will be issued with the
signature of Contractors Representative.

Contractor Name: -

Page 20

Contract Identification No.:


NAME OF PROJECT:

I.11

INSPECTION, TESTING

Contractors Representative will issue inspection and test plans.


Standard forms and formats for keeping various types of test
records will be adopted.

List of Formats
Gradation of sand for concrete works
Gradation of sand for masonry works
Gradation of coarse aggregate for concrete works (M 20/20)
Gradation of coarse aggregate for concrete works (M 25/20)
Gradation of coarse aggregate for concrete works (M 10/40)
Gradation of capping layer material
Gradation of crushed stone material for base
Aggregate impact value
Los Angeles abrasion value
Water absorption and specific gravity
Compressive Strength of mortar
Compressive Strength of concrete
Compaction
Atterbergs limit
Penetration and softening point of bitumen
Zinc coating
Liquid Limit and Plastic Limit
Soundness test of aggregates
Degradability

Contractor Name: -

Page 21

Contract Identification No.:


NAME OF PROJECT:

I.12

ORGANIZATION CHART

FOR WORK IMPLEMENTATION

Figure 7: Organization chart for work implementation


Contractors
Representative

Site/Material
Engineer

Surveyor/Civil
Overseers

Site Supervisors

Administrative
Section

Marketing Officer/
Accountant

Material
Technician

Storekeeper

Material
Supervisor

Material/Quality
Supervisor-2

Site Supervisors1

I.13
I.14

Site Supervisors-2

ROLES

AND

Site Supervisors3

RESPONSIBILITIES

Site Supervisors4

OF

Traffic Supervisors-5

PROJECT PERSONNELS

PARTERNER-INCHARGE

Co-ordinate with Contractors Representative and instruct to sub-ordinates


run whole activities of the project.
Contractors Representative

Contractor Name: -

Page 22

Contract Identification No.:


NAME OF PROJECT:

Co-ordinate with Technical and Administrative section shall be deal and


run the whole activities (Technical and Financial problems) of the project.

Deputy Contractors Representative


Co-ordinate with Technical and Administrative section shall be deal and
run the whole activities and deals with the IPC of the project.
Site Engineer/Material Engineer
Deal about the technical problems occurred at site and also handle the
technical activities as well as he shall be responsible for providing
qualitative construction materials at site to gain good quality. He shall be
responsible for overall management of technical works
Senior Surveyor
He is responsible for quantity survey and layout of structures as required
line and level as well as supervision and quality control of works.
Overseer
They are responsible for quantity survey and layout of structures as
required line and level as well as supervision and quality control of works.
Surveyor/ Sub-Overseer

They are responsible for quantity survey and layout of structures as


required line and level as well as supervision.
Supervisors
All supervisors will be present at site at any time during the working hours
and also will be responsible to maintain the quality and traffic control
measures.
Lab Technician

He is responsible for overall material testing and reporting to


according to the test result.

Asst. Lab Technician


He is responsible for overall material sampling, testing and
reporting according to the test result.
Accountant/Store Keeper/Computer Operator
He is responsible of all the administrative works, account works and store.
Contractor Name: -

Page 23

Contract Identification No.:


NAME OF PROJECT:

I.15

TRAFFIC CONTROL

AND

SAFETY MEASURES

a.

The working sector will be provided with proper traffic control and
safety measures. The proper traffic control devices such as traffic
signs, traffic markings and traffic signals are provided at required
locations. The one-way traffic should not be exceeded by length of
500 m.

b.

The flags, flag-men and signboards will be provided at the start and
end of working sector prohibiting the speed of the vehicle to get
attention that the work is going on.

c.

All the workers at site will be provided with helmet, shoes and hand
globes for safety.

d.

All the traffic devices used will be designed as instructed and


specified.

I.16

AMENDMENT

TO

QUALITY PLAN

Review of quality plan will be one of the agenda of quarterly meeting. It


will be reissued when significant changes occur.

Contractor Name: -

Page 24

Contract Identification No.:


NAME OF PROJECT:

II.

SUMMARY

Quality of product in any construction industry is meant the fulfillment of


the requirements of the owner described by the Drawing and Specification
that are the part of Contract Documents.

Providing
well
experienced
engineers,
assistant
engineers,
surveyors/overseers, foremen, laboratory technicians, supervisors and
other technical staff, identifying the responsibilities of the key staff,
providing precise instrument and equipment and, setting working
guidelines and requires quality standards, the company will ensure
adequate supervision and control of works and material at all times. In
this way the Company will assure the quality of materials and works.

Contractor Name: -

Page 25