NAME OF PROJECT:
Tables
of
Content.......................................................................................
........................... 1
List
of
Figures.......................................................................................
................................ 2
I. QUALITY ASSURANCE......................................................................................................................3
1.1
INTRODUCTION.................................................................................................................................3
1.2
DEFINITIONS.....................................................................................................................................3
1.3
1.4
QUALITY MANUAL..........................................................................................................................11
1.5
1.6
QUALITY ASSURANCE...........................................................................................................11
2.6.1 Site Clearance...................................................................................................................11
2.6.2 Earthwork in Excavation (for foundation):........................................................11
2.6.3 Concreting Work:.............................................................................................................11
2.6.4 False Work and Formwork...........................................................................................12
2.6.5 Steel Reinforcement work:.........................................................................................12
2.6.6 Platering Works.................................................................................................................12
2.6.7 Painting Works...................................................................................................................13
2.6.8 Water Supply and sanitary Work............................................................................13
2.6.9 Bio-engineering Works.................................................................................................13
1.7
ROAD WORKS................................................................................................................................14
2.7.1 ROADWAY EXCAVATION IN SOIL.............................................................14
2.7.2 SUB GRADE PREPARATION.........................................................................15
2.7.3 GRAVEL SUB-BASE............................................................................................15
2.7.4 CRUSHED STONE MATERIAL FOR BASE...........................................16
2.7.5 SURFACE DRESSING.........................................................................................16
II.
1.8
1.9
1.10
WORK INSTRUCTIONS..................................................................................................................19
1.11
INSPECTION, TESTING..................................................................................................................19
1.12
1.13
1.14
PARTERNER-INCHARGE................................................................................................................21
1.15
1.16
SUMMARY.......................................................................................................................................23
Contractor Name: -
Page 1
LIST OF FIGURES
Figure 1: Materials Quality Control Flow Chart...........................5-6
Figure 2: Quality Control of Structural/cutting Work Flow chart7-9
Figure 3: Quality control of Backfilling and Pavement Layers Flow
Chart.................................................................................................9-10
Figure 4: Quality control of Concrete Works Flow Chart.............11
Figure 5: Quality Control through Supervisory Staffs.................17
Figure 6 : Material Quality Control (Through Store)....................18
Figure 7: Organization chart for work implementation...............20
Contractor Name: -
Page 2
I.
QUALITY ASSURANCE
I.1
INTRODUCTION
Planning and controlling standards for quality are fundamental in both the
design and construction phases of a project. This aspect of a project, while
closely interrelated with costs, schedule, procurement, and value
engineering, deserves its own amplification.
This sheet begins with a definition of Quality Assurance. It will then
describe the different Quality Assurance flow diagrams presenting clear
steps for achieving the required quality standards. Then there will be brief
working procedures of different items, test descriptions, quality standards
and quality controls. Allocation of responsibility is equally important for
attaining required quality standards and hence it describes the
responsibility of different key personals and organizational break down
structures near the end for clear understanding of line of command or flow
of information. A brief description of inspection and frequency of testing to
be performed presented at the end will be valuable controls for assuring
required quality standards.
I.2
DEFINITIONS
Contractor Name: -
Page 3
I.3
Material
Sources
Identification
Contractors
Representative
Sampling
materials
testing
for
Engineers
Representative
Transportation to
testing site
Contractors
Representative
Contractor Name: -
Testing of materials
Engineers
Representative
Page 4
Alternate Source
NO
YES
Source Approval
A
Transportation
Aof material
to Store, Yard or
Stockpile
Contd...
Factory Made
Submit Manufacturer's
test Certificate.
Quarry Material
Testing at stock
yard/Stock pile
Rectify to meet
the requirement
NO
Test results
meet the
Requirements
Test results
meet
Requirements
YES
YES
Remove
from site
Proper
Storage
Contractor Name: -
Page 5
Approval of
NO
Contractor Name: -
Page 6
Setting out
Contractors
Representative
Rectify to
meet
the
requirement
Engineers
Representative
Line Level as
per Drawing
NO
YES
Foundation
Excavation
Check Foundation
Level
Contractors
Representative
Engineers
Representative
NO
Line Level
as per
Design
YES
B
Contractor Name: -
Page 7
Contd...
Contractors
Representative
Material Sampling
Engineers
representative
Rectify to meet
the requirement
NO
Contractors
Representative
Control of
Workmanship
Engineers
representative
Completion of Works
Rectify to
the
Reauire
ment
NO
Line Level
as per
Design
YES
Contractor Name: -
Page 8
Contd.
Care of
Works
Contractors
Representative
Engineers
Representative
Final Joint
measurement
END
Control MC of
material to attend
OMC
Spread material
thickness specified
as
Contractors
Representative
Check FD
Engineers
Representative
FD meets the
Figure 3: Quality controlrequirement
of Backfilling and Pavement Layers Flow
NO
Chart
Contractor Name: -
YES
Page 9
YES
Contd.
Final Joint
Measurement
END
Contractor Name: -
Page 10
Checking
of
ingredients
No
quality
of
Yes
Reject and Rectify
No
Mix design
Yes
Rectify
No
Contractor Name: -
Page 11
I.4
QUALITY MANUAL
DRAWING
AND SPECIFICATION
I.6
QUALITY ASSURANCE
Working Procedures
I.
SITE CLEARANCE
EARTHWORK
IN
EXCAVATION (FOR
FOUNDATION):
III.
CONCRETING WORK:
Page 12
IV.
FALSE WORK
AND
FORMWORK
Design and prepare the drawings of false work and Formwork for the
said work.
Approval of the drawings.
Approval of the type, grade and condition of the material used for
the work.
Construction of False work and Formwork as per the Specification.
Removal of False work and Formwork as per the Specification.
V.
STEEL REINFORCEMENT
WORK:
PLATERING WORKS
Page 13
VII.
PAINTING WORKS
VIII.
WATER SUPPLY
AND SANITARY
WORK
IX.
BIO-ENGINEERING WORKS
Define the area for grassing, and trees and shrub planting.
Preparation of the area for this work as specified in the
Specification.
Transportation of the approved grass, trees and shrubs to the
planting site.
Planting grass, trees and shrubs as per the specification.
Care of the work throughout the Construction and Defect Liability
period.
Contractor Name: -
Page 14
2.6.11
Carry out the cross-section work of the existing road with level
Machine.
Carry out the base line survey with Total-Station.
Draw the existing ground cross section along with the plan and
longitudinal profile.
Get approval of the final design of the stretch of existing Asphalt
concrete level before the excavation of the existing Asphalt
Concrete.
Remove the existing Asphalt Concrete and if required the base, subbase and the capping layer to the required depth.
Take the joint level of the surface and carry out the watering and
rolling to get the formation level.
Add the approved material for Capping layer, Sub-base and Base
layer as per the design requirement and get the level of the
individual layer jointly.
Take the final level of the base surface with adequate watering and
rolling fulfilling the compacted density as per the specification
and maintaining the design level as per the approved design and
drawing. Maintain level sheet jointly signed by the Contractors
and Engineers Representative.
Carryout the brushing and cleaning works with compressor and
wired brush.
Apply prime coat with cutback bitumen as per the specification and
leave the surface untouched for 3-4 days.
Apply tack coat to the dry surface as per the specification and
overlay Asphalt concrete over the surface with the Paver and
compact the surface by PTR and then by Tandem roller to the
compaction required.
Carry out the priming work to the shoulder as per the specification
and leave it to dry for few days (3-4) days.
When the surface is dry spray the cutback bitumen with distributor
and consequently spray the first coat of aggregates and carry out
the compaction with the PTR roller and finally with still roller.
Carry out the back rolling for 2-3 days consequently.
Contractor Name: -
Page 15
After 3-4 weeks remove the unstacked aggregates and again spray
bitumen to the surface and spray the second layer of the
aggregates.
Carry out the rolling works with the PTR and Still roller and after 2-3
weeks remove the unstacked aggregates.
Finally take the level of the Shoulder and the Carriageway.
I.7
ROAD WORKS
1. ROADWAY EXCAVATION IN SOIL
Page 16
3. GRAVEL SUB-BASE
Sub-base materials will be stockpiled in the stockpile yard and notify
the Engineer for necessary checking.
After the approval of the material, the gravel sub base will be
transportation and dumped on the approved sub grade layer.
Mixing of sub-base material on road with the help of grader at site.
Oversize particles will be either break manually or pickup at site
with the help of labors.
Spraying of water close to the OMC by water browser and check the
moisture content.
If water content is more than OMC, leave to sundry until it comes to
OMC and if water content is less than OMC add water to bring to
OMC.
Spreading of the sub-base material to the required shape, grade and
depth.
Rolling started from edge to centre on straight section and from
inner edge to outer edge on the super elevated section
Checking of field density as per the specification.
Checking of line and levels of the finished surface.
The approved gravel sub-base layer will be partly covered by on
coming layer of CRM.
Approval of the completed section.
4. CRUSHED STONE MATERIAL FOR BASE
Approval of the source of rock stone for producing CRM.
Production of the CRM in the crusher plant.
Testing of CRM material as per test frequency presented in the
appendix and approval of the stockpile.
After the approval of the material, the CRM sub base will be
transportation and dumped on the approved sub grade layer.
Mixing of sub-base material on road with the help of grader at site.
Spraying of water close to the OMC by water browser and check the
moisture content.
If water content is more than OMC, leave to sundry until it comes to
OMC and if water content is less than OMC add water to bring to
OMC.
Contractor Name: -
Page 17
5. SURFACE DRESSING
This section includes supply and laying of Surface Dressing surface
treatment with approved cutback bitumen and aggregate.
Materials
Aggregate As-dug gravel medium graded aggregate will be screen
from approval quarries. Aggregate used in Surface Dressing will be
medium graded aggregate and gradation and strength shall be as
per the Specification.
I.8
Human resource is the key factor for controlling other resources in any
industry or in any business environment. Properly organized and managed
human resources produce the best output results. As both contracts as in
continuous alignment we are intended to work with single management
which has been even approved by the Engineer. In this project, a Quality
Control engineer will be appointed for the project period and he will be
fully responsible for maintaining the overall quality of materials and work.
He will visit site and laboratories frequently. Though laboratory
establishment is being our obligation, we will have own lab technician,
who will record all tests at site and collect documents. Quality control
during construction and store entry and storing of materials is equally on
site and the line of command will be as shown in the OBS Fig. 5. Similarly,
experienced storekeepers will be appointed so that they will be fully aware
of storing the materials and checking before entry. The OBS for the store is
shown in Fig 2. However, the overall responsibility of quality goes to the
Contractors representative and he will issue the necessary instructions
for maintaining quality standards time to time.
Contractor Name: -
Page 18
Contactors
Representative
Site Engineer
Surveyor/Overseers
Asst. Engineer
Survey Assistants
Supervisors
Storekeeper
Assistants/Helpers
I.9
ALLOCATION
OF
RESPONSIBILITIES: IN
RESPECT OF QUALITY
CONTROL
Contactors Representative:
Overall Planning, Scheduling, Monitoring and Controlling.
Contractor Name: -
Page 19
Site Engineer:
Surveyor / Overseer:
All survey works (Line, levels, cut slopes etc.)
Documenting survey data and updating if any change.
Day to day supervision of works.
Lab. Technician:
Daily material testing and process control.
Maintaining up to date lab. Records.
Store Keeper:
Receiving quality materials from suppliers and vendors.
Proper storage of construction materials.
Maintaining proper records of material entering and outgoing
from store.
I.10
WORK INSTRUCTIONS
Contractor Name: -
Page 20
I.11
INSPECTION, TESTING
List of Formats
Gradation of sand for concrete works
Gradation of sand for masonry works
Gradation of coarse aggregate for concrete works (M 20/20)
Gradation of coarse aggregate for concrete works (M 25/20)
Gradation of coarse aggregate for concrete works (M 10/40)
Gradation of capping layer material
Gradation of crushed stone material for base
Aggregate impact value
Los Angeles abrasion value
Water absorption and specific gravity
Compressive Strength of mortar
Compressive Strength of concrete
Compaction
Atterbergs limit
Penetration and softening point of bitumen
Zinc coating
Liquid Limit and Plastic Limit
Soundness test of aggregates
Degradability
Contractor Name: -
Page 21
I.12
ORGANIZATION CHART
Site/Material
Engineer
Surveyor/Civil
Overseers
Site Supervisors
Administrative
Section
Marketing Officer/
Accountant
Material
Technician
Storekeeper
Material
Supervisor
Material/Quality
Supervisor-2
Site Supervisors1
I.13
I.14
Site Supervisors-2
ROLES
AND
Site Supervisors3
RESPONSIBILITIES
Site Supervisors4
OF
Traffic Supervisors-5
PROJECT PERSONNELS
PARTERNER-INCHARGE
Contractor Name: -
Page 22
Page 23
I.15
TRAFFIC CONTROL
AND
SAFETY MEASURES
a.
The working sector will be provided with proper traffic control and
safety measures. The proper traffic control devices such as traffic
signs, traffic markings and traffic signals are provided at required
locations. The one-way traffic should not be exceeded by length of
500 m.
b.
The flags, flag-men and signboards will be provided at the start and
end of working sector prohibiting the speed of the vehicle to get
attention that the work is going on.
c.
All the workers at site will be provided with helmet, shoes and hand
globes for safety.
d.
I.16
AMENDMENT
TO
QUALITY PLAN
Contractor Name: -
Page 24
II.
SUMMARY
Providing
well
experienced
engineers,
assistant
engineers,
surveyors/overseers, foremen, laboratory technicians, supervisors and
other technical staff, identifying the responsibilities of the key staff,
providing precise instrument and equipment and, setting working
guidelines and requires quality standards, the company will ensure
adequate supervision and control of works and material at all times. In
this way the Company will assure the quality of materials and works.
Contractor Name: -
Page 25