K.K. ASSOCIATES SHEET NO.

1
DEDICATED FREIGHT CORRIDOR - EASTERN CORRIDOR,
BHAUPUR TOKHURJA CONTRACT C 101, 102 & 103,
UTTAR PRADESH

CLIENT
DEDICATED FREIGHT CORRIDOR CORPORATION OF INDIA
( A GOVERNMENT OF INDIA UNDERTAKING)

DOCUMENT NAME:- Design of Reaction Piles (600 MM dia) and Method Statement for
Initial Lateral Load Test at Major Bridge -'Culvert-304'- At CH-1054/17-19 of Slice 101
DOCUMENT NO. :- KKA/TATA-ALDESA JV/INITIAL LATERAL LOAD TEST/1
SHEET NOS :- 1 TO 14
DATE :- 16-01-2014

CONSULTANT
STUP CONSULTANTS P. LTD.

MAIN CONTRACTOR
TATA PROJECTS LIMITED & ALDESA JV

PILING CONTRACTOR
ANINDYA INFRATECH PVT.LTD.

SUBMITTED BY:-
TESTING AGENCY
M/S K.K. ASSOCIATES
M-521, FIRST FLOOR, GURUHARKISHAN NAGAR,
NEW DELHI-110087, PH.:-011-25276993, 09312671818
E-MAIL:- bee_gupta@yahoo.co.in, sg_iitd@yahoo.com
Testing Agency (K.K. Associates) Contractor
Designed by Checked by

Kautilliya Kumar Saurabh Kr. Gupta

DOCUMENT NO. :- KKA/TATA-ALDESA JV/INITIAL LATERAL LOAD TEST/1


K.K. ASSOCIATES SHEET NO. 2
INDEX

Sr. Description page


No. no.
1. Introduction 3
2. Terminology 3
3. Test Particulars 4
4. Test Set-up for Initial Lateral Pile Load Test 5
5. Arrangement for the Initial Lateral Pile Load Test 6
6. Test Procedure for Initial Lateral Pile Load Test 7
7. Computation of Lateral Reaction Available for Lateral Load Test 8
8. Recording Data Sheet 11
9. Drawing No. KKA/TATA-ALDESA JV/CULVERT-304/TP-1 27

DOCUMENT NO. :- KKA/TATA-ALDESA JV/INITIAL LATERAL LOAD TEST/1


K.K. ASSOCIATES SHEET NO. 3
DESIGN OF REACTION PILES (600 MM DIA) AND METHOD
STATEMENT FOR INITIAL LATERAL LOAD TEST AT MAJOR
BRIDGE -'CULVERT-304'- AT CH-1054/17-19 OF SLICE 101

1. Introduction
Initial pile load test shall be conducted on Test Pile as per I.S. 2911 (PART IV)-1985
CODE OF PRACTICE FOR DESIGN AND CONSTRUCTION OF PILE
FOUNDATION PART 4 LOAD TEST ON PILES.

2. Terminology
a. Cut-Off Level - The level where the installed pile is cut-off to support the pile
caps or beams or any other structural components at that level.
b. Datum Bar - A rigid bar placed on immovable supports.
c. Factor of Safety - The ratio of the ultimate load capacity of a pile to the safe load
of a pile.
d. Initial Test - It is carried with a view to determine the safe load capacity.
e. Net Displacement - Net movement of the pile top from the original position after
the pile has been subjected to a test load and subsequently
released.
f. Routine Test - It is carried out on a working pile with a view to check whether
pile is capable of taking the working load assigned to it.
g. Test Pile - A pile which is meant for initial test.
h. Total Displacement - The total movement of the pile top under a given load.
i. Safe Load - It is a load on a pile derived by applying a factor of safety on
ultimate load capacity of pile as determined by load test.
j. Working Load - The load assigned to a pile according to design.
k. Working Pile - A pile forming part of foundation of a structural system which
may be used for routine load test.

DOCUMENT NO. :- KKA/TATA-ALDESA JV/INITIAL LATERAL LOAD TEST/1


K.K. ASSOCIATES SHEET NO. 4
3. Test Particulars
a. Type of Test - Initial Lateral Load Test
b. Dia. of Pile - 1000 mm
c. Test Load - 16 Ton
d. Arrangement Required – 16 x 1.25 = 20.00 Ton
e. Least count of Pressure Gauge - 1 Division = 20 Kg/cm2 (Range 0 to 700
Kg/cm2)
f. Dial Gauges - 1 Nos. at cut-off level having least count 0.01mm
g. Hydraulic Jack - 1 Nos.

DOCUMENT NO. :- KKA/TATA-ALDESA JV/INITIAL LATERAL LOAD TEST/1


K.K. ASSOCIATES SHEET NO. 5
4. Test Set-up for Initial Lateral Pile Load Test
a. For Test, the Pile shaft shall be finished smooth by chipping off uneven concrete of the
side of the Pile as far as practicable.
b. A bearing plate at the Test Pile shaft shall be fixed for the Jack to give reaction.
c. For applying the load, Hydraulic jack with calibrated pressure gauge and pump shall
be used.
d. The reaction shall be taken from the 2 Nos. Anchor Piles (600 mm diameter and 22
meter length below COL).
e. A Girder shall be lowered reacting against the Anchor Piles and jack shall be inserted
reacting against the test Pile and Girders with suitable packing.
f. To record the settlements, one Dial Gauge of 0.01 mm sensitivity shall be positioned
in the opposite direction of Jack to measure the displacement directly at COL.
g. The dial gauge shall be held by magnetic holder attached to Datum bar which shall be
resting on immovable support.

DOCUMENT NO. :- KKA/TATA-ALDESA JV/INITIAL LATERAL LOAD TEST/1


K.K. ASSOCIATES SHEET NO. 6

Fig. No.1 :- Arrangement for the Initial Lateral Pile Load Test

Note :- Anchor Piles installed for the Vertical Load Test shall be used as reaction
piles for lateral resistance

DOCUMENT NO. :- KKA/TATA-ALDESA JV/INITIAL LATERAL LOAD TEST/1


K.K. ASSOCIATES SHEET NO. 7
5. Test Procedure for Initial Lateral Pile Load Test
a. The test shall run in general as per procedures laid down in I.S. 2911 (PART-IV)-1985.
b. The pressure gauge of Jack and Dial Gauges shall be set to zero before application of
any load.
c. The load shall be applied in increment of about 1/5 of the Safe Load and shall be
maintained till the rate of settlement/ deflection is less than 0.1 mm per 30 minutes.
d. Further next increment shall be applied and shall be maintained as stated in c above.
Increment shall be given till the Final Test Load is achieved and same shall be
maintained for 24 hrs, settlement shall be recorded at the interval of 1 hour (during the
period of 24 hours of maintaining the load).
e. Final Test load shall be unloaded in the same decrement and rebound shall be recorded
at the intervals of 15 minutes.
For K.K. Associates

Saurabh Gupta
M.Tech Geotechnical Engineering
M.Tech Structural Engineering (IIT Delhi)

DOCUMENT NO. :- KKA/TATA-ALDESA JV/INITIAL LATERAL LOAD TEST/1


K.K. ASSOCIATES SHEET NO. 8
6. Computation of Lateral Reaction Available for Lateral Load Test

Lateral Test load = 16 Ton


Arrangement required (25 % extra) = 20 Ton = (16*1.25)

Lateral Support/Reaction will be obtained by the following:-

1. Lateral resistance of 2 nos. Anchor Piles = 21.40 Ton*2 = 42.80 (from page no.-10 & 11)
>> 20.00 Ton
(Hence Safe)

DOCUMENT NO. :- KKA/TATA-ALDESA JV/INITIAL LATERAL LOAD TEST/1


K.K. ASSOCIATES SHEET NO. 9
a) Lateral resistance of Anchor Piles (600 mm dia)

D = 600 mm fck = 20 N/mm2


cover 50 mm d’/d = 50/600 = 0.0833
Steel = 10 nos. of 25 mm φ Fe 500
p = (10*0.785*25*25)/(0.785*600*600) * 100 = 1.736 %
p/fck = 1.736/20 = 0.0868
Pu = vertical load = 0
Pu/fck * (D*D) = 0
Mu/fck(D*D*D)= 0.080 from page no. 144 and 145 of S.P. 16
Mu = 0.085*20*600*600*600
= 36.72 Ton. Meter
Moment of resistance of pile shaft = 36.72 Ton. Meter

DOCUMENT NO. :- KKA/TATA-ALDESA JV/INITIAL LATERAL LOAD TEST/1


K.K. ASSOCIATES SHEET NO. 10
Determination of depth of fixity
Dia of Pile = 600 mm
Grade of concrete = M 20
E = 5000√20 N/mm2
E = 22360.68 N/mm2,
E = 22360.68 X 1000 kN/m2,
I = (Л/64) *0.64 = 6.361 X 10-3 m4

T = 5√(EI/nh) = 161.05 cm
T = 1.95 meter
L1 = 0
From fig. 4 on page 15 appendix c of 2911 part 1 section 2
Lf/T = 2.2
Lf = 2.2*1.95 = 4.29 meter
Mf = Q(L1+ Lf)
M = m(Mf)
m = 0.4 (from fig. 3A)
Moment of resistance of pile shaft from Previous page
36.72 = Q*0.4 (0+4.29)
Q = 21.40 Ton
Lateral Load Resistance of Two Piles = 21.40 x 2 = 42.80 say 40 Ton > 16 Ton (Test
Load for Lateral Load Test.

DOCUMENT NO. :- KKA/TATA-ALDESA JV/INITIAL LATERAL LOAD TEST/1


K.K. ASSOCIATES SHEET NO. 11
Form 1:- Test Details
Abstract of Initial Lateral Load Test conducted of Pile No. TP , at Km …
Name of Work:-

Client =
Contractor = Sub-contractor=
1. Pile identification no.
2. Date of casting of pile
3. Date of load test
4. Type of test
5. Loading method
6. No. of hydraulic jacks used
7. Ram dia. of jacks
8. Ram Area (cm2)
9. Pressure gauges
10. Nos. of Dial Gauges of sensitivity 1 if deflection is measured at
COL 2 if Deflection is
0.01mm measured above COL

11. Dia of pile


12. Length of pile
13. Grade of concrete
14. Reinforcement in pile
15. Working load/ Safe Load
16. Test load
17. Test load applied
18. Total settlement
19. Rebound settlement
20. Net settlement

DOCUMENT NO. :- KKA/TATA-ALDESA JV/INITIAL LATERAL LOAD TEST/1


K.K. ASSOCIATES SHEET NO. 12
Form 2- Settlement Record
Name of Work Sheet No.
Client Dia of Pile
Contractor Length below COL
Sub-Contractor Grade of Concrete M-35
Ram Dia. cm Safe Load
Increment of Load Ton Test Load
Pile No. Ram Area
Test No Sheet No.
Average
Press-
Settlement (mm) Settlement Signature Remarks
Sr. Time ure Load
(mm)
No (Hrs) (kg/cm (Ton)
2) DG-A DG-B Client Cont

DOCUMENT NO. :- KKA/TATA-ALDESA JV/INITIAL LATERAL LOAD TEST/1


K.K. ASSOCIATES SHEET NO. 13
Sheet No.
Average
Press-
Settlement (mm) Settlement Signature Remarks
Sr. Time ure Load
(mm)
No (Hrs) (kg/cm (Ton)
2) DG-A DG-B Client Cont

DOCUMENT NO. :- KKA/TATA-ALDESA JV/INITIAL LATERAL LOAD TEST/1