DEDICATED FREIGHT CORRIDOR - EASTERN CORRIDOR,
BHAUPUR TOKHURJA CONTRACT C 101, 102 & 103,
UTTAR PRADESH
CLIENT
DEDICATED FREIGHT CORRIDOR CORPORATION OF INDIA
( A GOVERNMENT OF INDIA UNDERTAKING)
DOCUMENT NAME:- Design of Reaction Piles (600 MM dia) and Method Statement for
Initial Lateral Load Test at Major Bridge -'Culvert-304'- At CH-1054/17-19 of Slice 101
DOCUMENT NO. :- KKA/TATA-ALDESA JV/INITIAL LATERAL LOAD TEST/1
SHEET NOS :- 1 TO 14
DATE :- 16-01-2014
CONSULTANT
STUP CONSULTANTS P. LTD.
MAIN CONTRACTOR
TATA PROJECTS LIMITED & ALDESA JV
PILING CONTRACTOR
ANINDYA INFRATECH PVT.LTD.
SUBMITTED BY:-
TESTING AGENCY
M/S K.K. ASSOCIATES
M-521, FIRST FLOOR, GURUHARKISHAN NAGAR,
NEW DELHI-110087, PH.:-011-25276993, 09312671818
E-MAIL:- bee_gupta@yahoo.co.in, sg_iitd@yahoo.com
Testing Agency (K.K. Associates) Contractor
Designed by Checked by
1. Introduction
Initial pile load test shall be conducted on Test Pile as per I.S. 2911 (PART IV)-1985
CODE OF PRACTICE FOR DESIGN AND CONSTRUCTION OF PILE
FOUNDATION PART 4 LOAD TEST ON PILES.
2. Terminology
a. Cut-Off Level - The level where the installed pile is cut-off to support the pile
caps or beams or any other structural components at that level.
b. Datum Bar - A rigid bar placed on immovable supports.
c. Factor of Safety - The ratio of the ultimate load capacity of a pile to the safe load
of a pile.
d. Initial Test - It is carried with a view to determine the safe load capacity.
e. Net Displacement - Net movement of the pile top from the original position after
the pile has been subjected to a test load and subsequently
released.
f. Routine Test - It is carried out on a working pile with a view to check whether
pile is capable of taking the working load assigned to it.
g. Test Pile - A pile which is meant for initial test.
h. Total Displacement - The total movement of the pile top under a given load.
i. Safe Load - It is a load on a pile derived by applying a factor of safety on
ultimate load capacity of pile as determined by load test.
j. Working Load - The load assigned to a pile according to design.
k. Working Pile - A pile forming part of foundation of a structural system which
may be used for routine load test.
Fig. No.1 :- Arrangement for the Initial Lateral Pile Load Test
Note :- Anchor Piles installed for the Vertical Load Test shall be used as reaction
piles for lateral resistance
Saurabh Gupta
M.Tech Geotechnical Engineering
M.Tech Structural Engineering (IIT Delhi)
1. Lateral resistance of 2 nos. Anchor Piles = 21.40 Ton*2 = 42.80 (from page no.-10 & 11)
>> 20.00 Ton
(Hence Safe)
T = 5√(EI/nh) = 161.05 cm
T = 1.95 meter
L1 = 0
From fig. 4 on page 15 appendix c of 2911 part 1 section 2
Lf/T = 2.2
Lf = 2.2*1.95 = 4.29 meter
Mf = Q(L1+ Lf)
M = m(Mf)
m = 0.4 (from fig. 3A)
Moment of resistance of pile shaft from Previous page
36.72 = Q*0.4 (0+4.29)
Q = 21.40 Ton
Lateral Load Resistance of Two Piles = 21.40 x 2 = 42.80 say 40 Ton > 16 Ton (Test
Load for Lateral Load Test.
Client =
Contractor = Sub-contractor=
1. Pile identification no.
2. Date of casting of pile
3. Date of load test
4. Type of test
5. Loading method
6. No. of hydraulic jacks used
7. Ram dia. of jacks
8. Ram Area (cm2)
9. Pressure gauges
10. Nos. of Dial Gauges of sensitivity 1 if deflection is measured at
COL 2 if Deflection is
0.01mm measured above COL