Professional Documents
Culture Documents
Meter and Read Details (* Latest MCO is shown in case of multiple MCO in one billing cycle)
Meter Reading Date Period Meter Reading Consumed Billed Bill Read Mtr
Meter No. MDI Unit M.F.
Old New Days Old New Units Units Basis Rmrk Sts
0.00
17665 10/09/2017 04/11/2017 55 KWH 26937 27291 1 354 354 OK OK A
(KW)
Arrears Outstanding for the Financial Year (`) Slab Calculation Connection Details
Description Previous Current Total (`) Unit Rate Amount (`) Tariff Category DS
SOP Charges 0.00 0.00 0.00 275 4.500 1237.50 Flats in BS (DS) NA
F.S.A. 0.00 0.00 0.00 79 5.250 414.75 Supply Voltage(kV) 0.40 KV
Surcharge 0.00 291.00 291.00 Total 1652.25 Sanctioned Load (kW) 11.00
E. Duty 0.00 0.00 0.00 Applicable Tariff on Read Date: MMC(`) 1695.83
M. Tax 0.00 0.00 0.00 Cons. Security (`) 5500.00
Fixed Charges 0.00 0.00 0.00 Meter Security (`) 0.00
Excess Credit 0.00 -290.81 -290.81 Meter Ownership/MDI Meter CM/
Secure Meter Ltd. /3-PH-
Total Arrear 0.00 0.19 0.19 Meter Make/Meter Type
MTR
Details of Charges for Current Cycle Details of Amount Payable Last Payment Details
Description Amount (`) Description Amount (`) Amount(`) 10236.00
Fixed Charges 0.00 Current Cycle Charges 1899.66 Receipt No 912037056136
Energy Charges 1652.25 Arrears/Outstanding Dues 0.19 Receipt Date 27/10/2017
MMC/FC for Reconnection 0.00 Sundry Charges/Allowances 290.81/0.00 Mode of Payment
Amount to cover MMC 63.33 Provisional Adjustment/BR Adj. 0.00 Previous Consumption Pattern
Fuel Surcharge Adjustment 130.98 LPS Adjustment -290.81 Units Units
Bill month MDI Status
Reliability Charges 0.00 Other Non-Energy Charges 0.00 (KWH) (KVAH)
Excess Load Surcharge 0.00 Net Payable Amount Sep-2016 1445 0 0 OK
1900.00 Nov-2016 1280 0 0 OK
Capacitor Surcharge 0.00 On Or Before Due Date(`)
Meter Service Charges 0.00 Surcharge(`) 55.00 Jan-2017 1022 0 0 OK
Line Service Charges 0.00 Gross Amount Payable After Mar-2017 1797 0 0 OK
Due Date(`) 1955.00 Jun-2017 751 0 0 OK
Capacitor Service Charges 0.00
Solar Rebate / BS Rebate 0.00/ Brief details of Sundry charges /allowances* Sep-2017 1705 0 0 OK
Women Rebate 0.00 In case of bill is not paid within 7 days of due date the supply
Transfer Adjustment from Over Payment shall be liable to be disconnected without any further notice.
Electricity Duty 35.40
Transfer Adjustment from Over Payment Date from which bill other than "OK" Reason:
Municipal Tax 17.70
Total Current Cycle is being issued:
1899.66
Charges (`)
Page 1 of 1