Day 1 Look through the site plan, architectural plan and structural plans.
Site walk by following site supervisors (John, Shahril, Riduan)
Wear harness, helmet and boots Day 2 Learn Pre RFI Check and inspect the column formwork using plumb bob Subcon meeting 18/ 6/ 2018 Clear water, check and inspect rebar for beams 19/ 6/ 2018 Look BQ, post RFI, supervise slab casting, clearing water 20 Check cracking, verticality, ask labours to fill up the cracks using combextra, inspect beam rebar
Learn water tank, capacity and case study
21/ Subcon meeting Check cracking 22/ Water clearance 23 Looking schedule of column 25 Water clearing Housekeeping Post RFI Site Walk with Main Con IJM Strong Mixed come check and discuss on cracking Subcon meeting with concretor and carpenter Environmental officer from IJM come inspect Zoning for surveillance of mosquito breeding