INSTITUTE OF THE
PHILIPPINES
CE507/CE51FB2
Course/Section
For a-1
Given:
a = 713.4007 T = 50 yrs
b = 230.2591 L = 2.5 km
103−96 7
N = 0.6414 S= =
2500 2500
K = 11.1 C = 0.5
V = 2 m/s
Solution:
For Sheet Flow,
0.02 𝐿0.77 0.2 (2500)0.77
tsheet = = 7 0.385 = 79.4855 𝑚𝑖𝑛 = D
𝑆 0.385 ( )
2500
𝑚𝑚 1𝑚 1ℎ𝑟 𝑚
i = 107.2459 (1000𝑚𝑚) (3600𝑠) = 2.9791𝑥10−5
ℎ𝑟 𝑠
𝑚3
Q = 29.7905 𝑠
LARDIZABAL, WILHELMN PAUL B. UMALI, JOHN CARL ANGELO G.
POSTRE, CLARISSE ANGELA C. VISCO, JULIUS
SRA, NAVINDER S.
A = 14.8953 m2
For b-2
Given
a = 713.4007 T = 50 yrs
b = 230.2591 L = 3 km
103−96 7
N = 0.6414 S= =
3000 3000
K = 11.1 C = 0.5
V = 2 m/s
Solution:
For Sheet Flow,
0.02 𝐿0.77 0.02 (3000)0.77
tsheet = = 7 0.385 = 98.1166 𝑚𝑖𝑛 = D
𝑆 0.385 ( )
3000
𝑚𝑚 1𝑚 1ℎ𝑟 𝑚
i =79.4270 (1000𝑚𝑚) (3600𝑠) = 2.2063𝑥10−5
ℎ𝑟 𝑠
𝑚3
Q = 22.0631 𝑠
A = 11.0316 m2
LARDIZABAL, WILHELMN PAUL B. UMALI, JOHN CARL ANGELO G.
POSTRE, CLARISSE ANGELA C. VISCO, JULIUS
SRA, NAVINDER S.
For c-3
Given:
a = 713.4007 T = 50 yrs
b = 230.2591 L = 2.5 km
103−96 7
N = 0.6414 S= =
2500 2500
K = 11.1 C = 0.2
V = 2 m/s
Solution:
For Sheet Flow,
0.02 𝐿0.77 0.02 (2500)0.77
tsheet = = 7 0.385 = 79.4855 𝑚𝑖𝑛 = D
𝑆 0.385 ( )
2500
𝑚𝑚 1𝑚 1ℎ𝑟 𝑚
i =107.2459 ℎ𝑟 (1000𝑚𝑚) (3600𝑠) = 2.9791𝑥10−5 𝑠
𝑚3
Q = 11.9164 𝑠
A = 5.9582 m2
For d-6
Given:
a = 713.4007 V = 2 m/s
b = 230.2591 T = 50 yrs
N = 0.6414 L = 5.5 km
103−77 13
K = 11.1 S= =
5500 2750
LARDIZABAL, WILHELMN PAUL B. UMALI, JOHN CARL ANGELO G.
POSTRE, CLARISSE
LARDIZABAL, ANGELA
WILHELMN C. B.
PAUL VISCO,
UMALI, JULIUS
JOHN CARL ANGELO G.
SRA, NAVINDER
POSTRE, S. ANGELA C.
CLARISSE VISCO, JULIUS
C = 0.2 S.
SRA, NAVINDER
Solution:
For Sheet Flow,
0.02 𝐿0.77 0.02 (5500)0.77
tsheet = = 13 0.385 = 119.2296 𝑚𝑖𝑛 = D
𝑆 0.385 ( )
2750
𝑚𝑚 1𝑚 1ℎ𝑟 𝑚
i = 70.9150 (1000𝑚𝑚) (3600𝑠) = 1.9699𝑥10−5
ℎ𝑟 𝑠
𝑚3
Q = 68.9465 𝑠
A = 34.4733 m2
Solution:
For Sheet Flow,
tsheet(a-1) = 79.4855 min
tsheet(b-2) = 98.1166 min
LARDIZABAL, WILHELMN PAUL B. UMALI, JOHN CARL ANGELO G.
POSTRE, CLARISSE ANGELA C. VISCO, JULIUS
SRA, NAVINDER S.
96−77 19 1 19 1
S(1-4) = = ; 100 > 3500 >
3500 3500 200
𝑚
V=3 𝑠
𝐿 3500 𝑚 1𝑚𝑖𝑛
tchannel(1-4) = 𝑉 = = 1166.6667 sec (60𝑠𝑒𝑐) = 19.4444 min
3 𝑚/𝑠
96−77 19 19 1
S(2-4) = = ; 4000 <
4000 4000 200
𝑚
V = 2.1 𝑠
𝐿 4000 𝑚 1𝑚𝑖𝑛
tchannel(2-4) = 𝑉 = = 1904.7619 sec (60𝑠𝑒𝑐) = 31.7460 min
2.1 𝑚/𝑠
𝑚𝑚 1𝑚 1ℎ𝑟 𝑚
i = 67.4359 (1000𝑚𝑚) (3600𝑠) = 1.8732𝑥10−5
ℎ𝑟 𝑠
𝑚3
Q = 56.196 𝑠
A = 28.098 m2
LARDIZABAL, WILHELMN PAUL B. UMALI, JOHN CARL ANGELO G.
POSTRE, CLARISSE ANGELA C. VISCO, JULIUS
SRA, NAVINDER S.
For 3-5
Given:
a = 713.4007 T = 50 yrs
b = 230.2591 L(3-5) = 3.5km
96−77 19
N = 0.6414 S= =
3500 3500
K = 11.1 C = 0.9
V = 2 m/s
Solution:
For Sheet Flow,
tsheet(c-3) = 79.4855 min
96−77 19 1 19 1
S(3-5) = = ; > >
3500 3500 100 3500 200
𝑚
V=3 𝑠
𝐿 3500 𝑚 1𝑚𝑖𝑛
tchannel(3-5) = 𝑉 = = 1166.6667 sec (60𝑠𝑒𝑐) = 19.4444 min
3 𝑚/𝑠
𝑚𝑚 1𝑚 1ℎ𝑟 𝑚
i = 79.0450 (1000𝑚𝑚) (3600𝑠) = 2.1957𝑥10−5
ℎ𝑟 𝑠
𝑚3
Q = 59.2839 𝑠
LARDIZABAL, WILHELMN PAUL B. UMALI, JOHN CARL ANGELO G.
POSTRE, CLARISSE ANGELA C. VISCO, JULIUS
SRA, NAVINDER S.
A = 29.6420 m2
Solution:
For Sheet Flow,
ttotal(b-4) = 129.8626 min
ttotal(c-5) = 98.9299 min
tsheet(d-6) = 119.2296 min
77−55 11 1 11 1
S(4-7) = = ; > 1250 >
2500 1250 100 200
𝑚
V=3 𝑠
𝐿 2500 𝑚 1𝑚𝑖𝑛
tchannel(4-7) = 𝑉 = = 833.3333 sec (60𝑠𝑒𝑐) = 13.8889 min
3 𝑚/𝑠
77−55 11 11 1
S(5-7) = = ; 1000 >
2000 1000 100
𝑚
V = 3.5 𝑠
𝐿 2000 𝑚 1𝑚𝑖𝑛
tchannel(5-7) = 𝑉 = = 571.4286 sec (60𝑠𝑒𝑐) = 9.5238 min
3.5 𝑚/𝑠
77−55 11 1 11 1
S(6-7) = = ; 100 > 1250 >
2500 1250 200
𝑚
V=3 𝑠
𝐿 2500 𝑚 1𝑚𝑖𝑛
tchannel(6-7) = 𝑉 = = 833.3333 sec (60𝑠𝑒𝑐) = 13.8889 min
3 𝑚/𝑠
ttotal(b-7) = 129.8626 min + 13.8889 min = 143.7515 min
ttotal(c-7) = 98.9299 min + 9.5238 min = 108.4537 min
ttotal(d-7) = 119.2296 min + 13.8889 min = 133.1185 min
143.7515 min > 133.1185 min > 108.4537 min
Therefore, D = 143.7515 min
𝑚𝑚 1𝑚 1ℎ𝑟 𝑚
i = 63.4914 ( )( ) = 1.7637𝑥10−5
ℎ𝑟 1000𝑚𝑚 3600𝑠 𝑠
𝑚3
Q = 79.0138 𝑠
A = 39.5069 m2
LARDIZABAL, WILHELMN PAUL B. UMALI, JOHN CARL ANGELO G.
POSTRE, CLARISSE ANGELA C. VISCO, JULIUS
SRA, NAVINDER S.
For a-1
Given:
a = 374.8833 T = 50 yrs
b = 151.1427 L = 2.5 km
N = 0.3661 S = 0.006
K = 1.8 C = 0.8
V = 2 m/s
Solution:
For Sheet Flow,
0.02 𝐿0.77 0.02 (2500)0.77
tsheet = = = 59.2728174 𝑚𝑖𝑛 = D
𝑆 0.385 (0.006)0.385
𝑚𝑚 1𝑚 1ℎ𝑟 𝑚
i = 83.8726 ( )( ) = 2.3298𝑥10−5
ℎ𝑟 1000𝑚𝑚 3600𝑠 𝑠
A = 18.6384 m2
For 2-3
Given:
a = 374.8833 T = 50 yrs
b = 151.1427 L = 2.5 km
N = 0.3661 S = 0.006
K = 1.8 C = 0.7
V = 2 m/s
Solution:
For Sheet Flow,
0.02 𝐿0.77 0.02 (2500)0.77
tsheet = = = 59.2728174 𝑚𝑖𝑛 = D
𝑆 0.385 (0.006)0.385
𝑚𝑚 1𝑚 1ℎ𝑟 𝑚
i = 83.8726 (1000𝑚𝑚) (3600𝑠) = 2.3298𝑥10−5
ℎ𝑟 𝑠
𝑚3
Q = 114.1602 𝑠
A = 57.0801 m2
LARDIZABAL, WILHELMN PAUL B. UMALI, JOHN CARL ANGELO G.
POSTRE, CLARISSE ANGELA C. VISCO, JULIUS
SRA, NAVINDER S.