S.No. Description Unit Nos Typ. Nos L B D Quantity T.

Quantity Rate Amount

1 PRELIMINARIES                        ‐

1.1 Demolition Item 1 1                        ‐

2 EARTH WORKS              3,048.24

2.1 Excavation M3 6 1 2.7 2.7 2.3 100.602 100.602           15.50              1,559.33

2.2 Back Filling M3 6 1 2.7 2.7 1.9 83.106 83.106           14.40              1,196.73

2.3 Disposal M3 17.496 17.496           16.70                 292.18

3 Water Proofing M2           12,310.50

3.1 Anti Termite M2 6 1 3 3 134 134             4.00                 536.00

3.2 2 Layer horizontal Water Proofing M2 34.32 34.32           97.80              3,356.50


Plinth Beams 1 1 36 0.2 0.5 3.6
Footings 6 1 1.6 1.6 30.72

3.3 Vertical Protection Board M2 73.2 73.2        115.00              8,418.00


Plinth Beams 2 1 36 0.6 43.2
Footings 6 1 1.5 1.5 0.3 10.8
Neck column 6 1 0.5 0.5 1.6 19.2

4 Concrete M3           56,731.99

Corete Works Which Include Concreting,Shuttering & 
Rteinforcement

4.1 Sub‐Structure

4.1.1 PCC M3 3.174 3.174        609.00              1,932.97


Footing 6 1 1.7 1.7 0.1 1.734
Plinth 1 1 36 04
0.4 01
0.1 1 44
1.44

4.1.2 Footings M3 6 1 1.5 1.5 0.5 6.75 6.75     1,464.80              9,887.40


Neck columns M3 6 1 0.6 0.6 1.6 3.456 3.456     1,464.80              5,062.35
Plith Beams M3 1 1 36 0.2 0.5 3.6 3.6     1,464.80              5,273.28
Slab On Grade M3 1 1 80 0.25 20 20     1,464.80            29,296.00

4.2 Super‐Structure
4.2.1 Top Slab (100mm Screed only) M3 1 1 80 0.1 8 8        660.00              5,280.00

5 Steel Works Item 1 1            64,000.00

1 Primary Steel ( Rafters & Columns ) Tonnes 1 8 8000            64,000.00


2 Sand Witch Panal Item 1 1 10000            10,000.00

6 Blockwork           21,297.60

1 200mm Thk Solid Blockwork at Ground Floor M2 1 1 36 2.5 90 90           98.60              8,874.00


2 200mm Thk Solid Blockwork at Ground Floor M2 1 1 36 3.5 126 126           98.60            12,423.60

7 FINISHING           70,002.08

Flooring
1 Epoxy paint ‐ At parking area M2 1 1 60 60 60           59.80              3,588.00
2 Tiles (at Mezzanine Floors) M2 1 1 60 60 60        135.70              8,142.00

Skirting
1 Tile Skirting at Mezzzanine M 1 1 36 36 36           48.00              1,728.00

Wall Finish
1 Anti carbonation Paint‐ at Parking raea M2 1 1 36 2.5 90 90           98.00              8,820.00
2 Emulsion Paint at Mezzanine Floor M2 1 1 36 3.5 126 126           92.00            11,592.00
3 External Paint M2 1 1 36.8 6.5 239.2 239.2        104.90            25,092.08

False Ceiling
1 Mezzanine Floor M2 1 1 80 80 80        138.00            11,040.00

Total         227,390.41