DAILY ACTIVITY REPORT

Date Site / Project Name Quarry Granit, Kacang Butor, Belitung


Fuel Consumption
DESCRIPTION Previous Today Until Today No Unit Today Until
Previous
Time Shift 1 Time Shift 2 Today
I Production Progress 1 Excavator 1 -
1 Blasting Progress 2 Excavator 2 -
a. Holes (Qty) 3 Excavator 3 -
b. Depth (Meters) 4 Excavator 3A -
c. Estimaed Volume (Bcm) 5 Excavator 5 -
2 Blasting Boulders 6 Excavator 6 -
Estimaed Volume (Bcm) 7 Wheel Loader -
3 Blasting Secondary 8 PS 220 DT -
a. Holes (Qty) 9 PS 125 DT -
b. Depth (Meters) 10 Drilling -
c. Estimaed Volume (Bcm) 11 Blasting -
4 Breaker 12 Genset 1 -
a. Shift 1 13 Genset 2 -
b. Shift 2 Total -
5 Hauling
Working Hours Working Hour Equipment
No Unit Rit Qty (M3)
Start Stop TH No Unit Shift 1 Shift 2 Until
Previous
1 Hopper Start Finish Start Finish Today
2 Stock Rom 1 Excavator 1
3 Stock Produk 350 2 Excavator 2
6 Crusher Production Previous Today Until Today 3 Excavator 3
a. Hopper M 3
4 Excavator 3A
b. 3-5 M3 300 5 Excavator 5
c. 2-3 M 3
1800 6 Excavator 6
d. 1-2 M 3
1300 7 Wheel Loader
e. 1-1 M3 0 8 PS 220 DT
f. 0,5-1 M 3
600 9 PS 125 HD
g. Abu Batu M3 850 10 Drilling
II Sale Progress 11 Blasting
No Customer Name Type Qty (M3) Status 12 Genset 1
13 Genset 2
Breakdown Unit
Times/Day
No Unit Remarks
Start Finish
Document Revision
Weather Condition

07 - 08 18 - 19

08 - 09 19 - 20

09 - 10 20 - 21

10 - 11 21 - 22

11 - 12 22 - 23

12 - 13 24 - 01

13 - 14 01 - 02

14 - 15 02 - 03

15 - 16 03 - 04

16 - 17 04 - 05

17 - 18 05 - 06

Fuel Stock
Previous
IN
Total

Used
Stock
Approved by