G50 MIX DESIGN CHANGES LOG

Cement diff. 10mm diff. Sand diff. RS233 diff


6-Sep 440 870 866 0.7
7-Sep 440 0 816 -54 920 54 0.7 0
4hours 440 0 736 -80 1000 80 0.7 0
8-Sep
Overnight 400 -40 736 -80 1000 80 0.7 0
4hours 440 0 592 -144 1145 145 0.7 0
13-Sep
Overnight 400 0 592 -144 1145 145 0.7 0
4hours 440 0 592 0 1145 0 0.8 0.1
20-Sep
Overnight 400 0 592 0 1145 0 0.8 0.1
25-Sep 420 -20 640 48 1100 -45 0.9 0.1
26-Sep 420 0 680 40 1060 -40 0.9 0
4hours 440 20 720 40 1000 -60 0.9 0
27-Sep
Overnight 400 -20 740 60 1020 -40 0.9 0
4hours 440 0 595 -125 1125 125 0.8 -0.1
30-Sep
Overnight 400 0 595 -145 1125 105 0.8 -0.1
P3GE diff Water diff Weight W/C S/A
1.8 135 2314 0.31 1.00
1.8 0 135 0 2314 0.31 1.13
1.8 0 135 0 2314 0.31 1.36
1.8 0 135 0 2234 0.34 1.36
1.8 0 135 0 2316 0.31 1.93
1.8 0 135 0 2276 0.34 1.93
1.8 0 135 0 2315 0.31 1.93
1.8 0 135 0 2275 0.34 1.93
1.8 0 130 -5 2276 0.31 1.72
1.8 0 130 0 2293 0.31 1.56
1.8 0 132 2 2295 0.30 1.39
1.8 0 128 -2 2291 0.32 1.38
1.8 0 132 0 2295 0.30 1.89
1.8 0 132 4 2215 0.33 1.89
Cement 4 hours 1 day
4-Sep 445 27.78
445 37.78
445 37.33
5-Sep 445 30.96
445 33.45
6-Sep 440 34.67
440 45.11 **New design S/A=1
7-Sep 440 49.12
440 62.00
440 23.78 **New design (test only)
440 52.45
440 46.56
8-Sep 400 26.23
11-Sep 440 27.78
12-Sep 440 22.33
14-Sep 440 17.33
15-Sep 440 16.00
19-Sep 440 21.44
20-Sep 440 26.15
21-Sep 440 25.11
22-Sep 440 32.34
23-Sep 440 34.00
25-Sep 440 21.11
26-Sep 420 23.00
27-Sep 420 15.11
28-Sep 440 28.11
29-Sep 440 14.22
esign (test only)