1. Complete the installation for secondary DUW; at this stage do not connect the
IDL and CPRI cable in-between DUW.
6. Connect thin client to the primary DUW, open the EM, perform “Export cabinet
and site equipment”, and do not perform the DELETE.
7. At the exported cabinet.xml file , edit the climate system to “Extended” and radio
building block to “RBB 12_1A” and save the file. This edited cabinet file will be
used later.
Refer to below illustration for cabling between primary DUW and secondary DUW This
example is for RBS6601 main remote.
For the RBS 6201, secondary DUW EC cable must be connected to port “A5” at SHU
and Port “A5” must be “enable”.
Note: For RBS 6201 please do necessary editing for cabinet and site equipment
parameter in example the number of PDU, climate type depend on the actual hardware