Guidelines for adding secondary DUW30

1. Complete the installation for secondary DUW; at this stage do not connect the
IDL and CPRI cable in-between DUW.

2. Power on the secondary DUW

3. Perform format c2 and d harddisk using hyperterminal


Eg. reload –, formathd /c2, formathd /d

4. Switch off the secondary DUW

5. Connect you thin client to primary DUW ( Moshell and EM).


Create new CV (i.e : Before_adding_DUW)

6. Connect thin client to the primary DUW, open the EM, perform “Export cabinet
and site equipment”, and do not perform the DELETE.

7. At the exported cabinet.xml file , edit the climate system to “Extended” and radio
building block to “RBB 12_1A” and save the file. This edited cabinet file will be
used later.

8. Complete the cabling in-between Primary DUW to secondary DUW, do not


power on the secondary DUW at this stage

Refer to below illustration for cabling between primary DUW and secondary DUW This
example is for RBS6601 main remote.
For the RBS 6201, secondary DUW EC cable must be connected to port “A5” at SHU
and Port “A5” must be “enable”.

9. Connect EM and Moshell at the primary DUW


10. Load the supplied modify scripts for adding second DUW by using EM ( Wizard)
11. Switch on the 2nd DUW whenever the EM notify “waiting for plug-in unit”
12. After successfully loaded the modify scripts, check the status of the DUW at EM / Moshell
13. Create new CV and restart the node
At moshell give the command below.
> cabx ( observe that 2nd DUW is in “Standbywiriting”
14. Wait till 2nd DUW in “ Standby Ready” status ( it will take 10mins to 20mins for the
2nd . DUW to be in “Standby Ready”
15. Once the “Standby Ready” achieved, make a new CV.

16. Perform the Export and Delete at the Primary DUW.


17. Load back the modified cabinet file by using EM(wizard).
18. Load back the site equipment (Using wizard) and add the 3rd carrier at this stage
by using wizard
19. Make a new CV
20. Check any alarm appeared and clear the alarms.
21. Call OSS/RNC to do the necessary i.e, load back the parameter base line
on the newly node B configuration.
22. Perform call test with OSS personnel.

Note: For RBS 6201 please do necessary editing for cabinet and site equipment
parameter in example the number of PDU, climate type depend on the actual hardware
installed at the node.