PIONIRBETON INDUSTRI
CRUSHING TEST SCHEDULE
Total
18-Jul
19-Jul
20-Jul
21-Jul
22-Jul
23-Jul
24-Jul
25-Jul
26-Jul
27-Jul
28-Jul
29-Jul
30-Jul
31-Jul
Date of Code
Location Contractor Grade Sampl Remarks
Pouring Sample
e 7 Days 28 Days
21-Jun-18 2054 UPL CB 02#34 #35 MES - BAM Fc' 36.0 9 28-Jun-18 19-Jul-18 28D
23-Jun-18 2055 TBEAM LT01#73 MES - BAM Fc' 36.0 9 30-Jun-18 21-Jul-18 28D
23-Jun-18 2056 HEADSTOCK CB02#36 MES - BAM Fc' 36.0 9 30-Jun-18 21-Jul-18 28D
23-Jun-18 2057 HEADSTOCK CB04A#03 MES - BAM Fc' 36.0 9 30-Jun-18 21-Jul-18 28D
23-Jun-18 2058 UPL PILECAP PC01#05, UPL CB04A#04 - #05 MES - BAM Fc' 36.0 9 30-Jun-18 21-Jul-18 28D
23-Jun-18 2059 HEADSTOCK CB 04A #06 #07 HEADSTOCK CB04A#08 #09 , UPL LB 04A#05 MES - BAM Fc' 36.0 9 30-Jun-18 21-Jul-18 28D
23-Jun-18 2060 HEADSTOCK CB01(4/3)#57 MES - BAM Fc' 36.0 9 30-Jun-18 21-Jul-18 28D
25-Jun-18 2061 LC ESP, LC WWTP SLUDGE HOLDING TANK, LC TURBIN 5 MES Fc' 15.0 9 02-Jul-18 23-Jul-18 28D
25-Jun-18 2062 PHT WWTP CLARIFIER, PHT WWTP AERATION BASIN, PHT NEUT SUMP, MES Fc' 30.0 9 02-Jul-18 23-Jul-18 28D
25-Jun-18 2063 SLAB PS 01#10 - 11 MES - BAM Fc' 36.0 9 02-Jul-18 23-Jul-18 28D
25-Jun-18 2064 TBEAM LT03#07 MES - BAM Fc' 36.0 9 02-Jul-18 23-Jul-18 28D
25-Jun-18 2065 CROSS BEAM CB02#37 - 38 MES - BAM Fc' 36.0 9 02-Jul-18 23-Jul-18 28D
25-Jun-18 2066 INSITU GRID #74 - 75 MES - BAM Fc' 36.0 9 02-Jul-18 23-Jul-18 28D
25-Jun-18 2067 SLAB CB06(4/3)#02 MES - BAM Fc' 36.0 9 02-Jul-18 23-Jul-18 28D
25-Jun-18 2068 HEADSTOCK CB01(4/3)#58 MES - BAM Fc' 36.0 9 02-Jul-18 23-Jul-18 28D
25-Jun-18 2069 CURB LT01#169-170 MES - BAM Fc' 36.0 9 02-Jul-18 23-Jul-18 28D
25-Jun-18 2070 UPL PC02B#09 MES - BAM Fc' 36.0 9 02-Jul-18 23-Jul-18 28D
26-Jun-18 2071 LC PONDASI CHIMNEY MES Fc' 15.0 9 03-Jul-18 24-Jul-18 28D
26-Jun-18 2072 LC TURBIN 6 MES Fc' 15.0 9 03-Jul-18 24-Jul-18 28D
26-Jun-18 2073 LC WTP DEMIN DESAL, LC ESP, LC THRUST BLOCK F8 MES Fc' 15.0 9 03-Jul-18 24-Jul-18 28D
26-Jun-18 2074 COVER BOX CULVERT T22, PHT TURBIN 5, COVER BOX CULVERT T15B MES Fc' 30.0 9 03-Jul-18 24-Jul-18 28D
26-Jun-18 2075 WWTP GRAVITY FILTERED TANK MES Fc' 30.0 9 03-Jul-18 24-Jul-18 28D
26-Jun-18 2076 LINE 4 500 KV MES Fc' 30.0 9 03-Jul-18 24-Jul-18 28D
26-Jun-18 2077 LINE 4 500 KV MES Fc' 30.0 9 03-Jul-18 24-Jul-18 28D
26-Jun-18 2078 WALL TURBIN 5 MES Fc' 30.0 9 03-Jul-18 24-Jul-18 28D
26-Jun-18 2079 WHARF PILECAP PC02B#10 MES Fc' 36.0 9 03-Jul-18 24-Jul-18 28D
26-Jun-18 2080 TBEAM LT01#74 MES - BAM Fc' 36.0 9 03-Jul-18 24-Jul-18 28D
26-Jun-18 2081 TBEAM LT01#75 MES - BAM Fc' 36.0 9 03-Jul-18 24-Jul-18 28D
26-Jun-18 2082 HEADSTOCK CB01#59 MES - BAM Fc' 36.0 9 03-Jul-18 24-Jul-18 28D
26-Jun-18 2083 WHARF PILECAP PC02B#11, TOWER PILECAP PC01#05 MES - BAM Fc' 36.0 9 03-Jul-18 24-Jul-18 28D
26-Jun-18 2084 CURB MES - BAM Fc' 36.0 9 03-Jul-18 24-Jul-18 28D
26-Jun-18 2085 CROSS BEAM CB02#39 - 40 MES - BAM Fc' 36.0 9 03-Jul-18 24-Jul-18 28D
28-Jun-18 2086 LC WTP DEMIN DESAL, LC TURBIN 6, LC 500 KV, LC FOUNDATION CHIMNEY MES Fc' 15.0 9 05-Jul-18 26-Jul-18 28D
28-Jun-18 2087 BOILR 5 PA FAN B, PHT TURBIN 5 MES Fc' 30.0 9 05-Jul-18 26-Jul-18 28D
28-Jun-18 2088 CCB SLAB ELEV 8000 MES Fc' 30.0 9 05-Jul-18 26-Jul-18 28D
28-Jun-18 2089 SLAB AERATION BASIN MES Fc' 30.0 9 05-Jul-18 26-Jul-18 28D
28-Jun-18 2090 SLAB AERATION BASIN MES Fc' 30.0 9 05-Jul-18 26-Jul-18 28D
28-Jun-18 2091 SLAB AERATION BASIN MES Fc' 30.0 9 05-Jul-18 26-Jul-18 28D
PT. PIONIRBETON INDUSTRI
CRUSHING TEST SCHEDULE
Total
18-Jul
19-Jul
20-Jul
21-Jul
22-Jul
23-Jul
24-Jul
25-Jul
26-Jul
27-Jul
28-Jul
29-Jul
30-Jul
31-Jul
Date of Code
Location Contractor Grade Sampl Remarks
Pouring Sample
e 7 Days 28 Days
28-Jun-18 2092 WHARF SLAB PS04N#01-02 MES - BAM Fc' 36.0 9 05-Jul-18 26-Jul-18 28D
28-Jun-18 2093 WHARF SLAB PS01#13-14 MES - BAM Fc' 36.0 9 05-Jul-18 26-Jul-18 28D
28-Jun-18 2094 FENDER BLOCK SLAB FP01#03 MES - BAM Fc' 36.0 9 05-Jul-18 26-Jul-18 28D
28-Jun-18 2095 INSITU GRID 77 - 78 MES - BAM Fc' 36.0 9 05-Jul-18 26-Jul-18 28D
28-Jun-18 2096 HEADSTOCK CB01#60 MES - BAM Fc' 36.0 9 05-Jul-18 26-Jul-18 28D
28-Jun-18 2097 TBEAM LT02#08 MES - BAM Fc' 36.0 9 05-Jul-18 26-Jul-18 28D
28-Jun-18 2098 HEADSTOCK CB06#02 WALL MES - BAM Fc' 36.0 9 05-Jul-18 26-Jul-18 28D
28-Jun-18 2099 CROSS BEAM CB02#41 - 42 MES - BAM Fc' 36.0 9 05-Jul-18 26-Jul-18 28D
28-Jun-18 2100 TOWER PILECAP PC01#06, TOWER CROSS BEAM CB03#01 MES - BAM Fc' 36.0 9 05-Jul-18 26-Jul-18 28D
28-Jun-18 2101 INSITU GRID 74 MES - BAM Fc' 36.0 9 05-Jul-18 26-Jul-18 28D
LC TURBIN 6, LC FOUNDATION CHIMNEY , LC FGD UBIT 6 MCC ROOM, LC COMMON FGD ELECTRICAL
29-Jun-18 2102 HOUSE, LC 500 KV, LC WWTP REG.IREG MES Fc' 15.0 9 06-Jul-18 27-Jul-18 28D
PHT FGD UNIT 6 MCC ROOM, TOP COVER BOX CULVERT T22, PHT WWTP SLUDGE THICKNENER,
29-Jun-18 2103 COLOUMN WTP DEHYDRATOR ROOM MES Fc' 30.0 9 06-Jul-18 27-Jul-18 28D
29-Jun-18 2104 LONGITUDINAL BEAM LBA04#06 MES - BAM Fc' 36.0 9 06-Jul-18 27-Jul-18 28D
29-Jun-18 2105 WHARF SLAB PS04N#03-04 MES - BAM Fc' 36.0 9 06-Jul-18 27-Jul-18 28D
29-Jun-18 2106 INSITU GRID 75 MES - BAM Fc' 36.0 9 06-Jul-18 27-Jul-18 28D
29-Jun-18 2107 CROSS BEAM CB04A#10-11 MES - BAM Fc' 36.0 9 06-Jul-18 27-Jul-18 28D
29-Jun-18 2108 TBEAM LT04#07 MES - BAM Fc' 36.0 9 06-Jul-18 27-Jul-18 28D
29-Jun-18 2109 CURB LT02#09 MES - BAM Fc' 36.0 9 06-Jul-18 27-Jul-18 28D
29-Jun-18 2110 TOWER CROSS BEAM CB02#43 MES - BAM Fc' 36.0 9 06-Jul-18 27-Jul-18 28D
29-Jun-18 2111 CROSS BEAM CB04A#12 MES - BAM Fc' 36.0 9 06-Jul-18 27-Jul-18 28D
29-Jun-18 2112 INSITU GRID 79 MES - BAM Fc' 36.0 9 06-Jul-18 27-Jul-18 28D
29-Jun-18 2113 FENDER BLOCK FB 01A#04 MES - BAM Fc' 36.0 9 06-Jul-18 27-Jul-18 28D
LC WTP DEMIN DESAL, LC ESP, LC WWTP REG. IREG , LC FGD UNIT 6 MCC ROOM, LC DUCT BANK CDB 21-22, LC
30-Jun-18 2114 WWTP FOUNDATION TANGGA WATER SLUDGE DEWATERING MES Fc' 15.0 9 07-Jul-18 28-Jul-18 28D
PHT WWTP SLUDGE THICKENER, COLOUMN WTP DEMIN DESAL, COLOUMN PEDESTAL AERATION BLOWER 5,
30-Jun-18 2115 PHT COMMON FGD ELECTRICAL HOUSE MES Fc' 30.0 9 07-Jul-18 28-Jul-18 28D
30-Jun-18 2116 SLAB TURBIN 5 MES Fc' 30.0 9 07-Jul-18 28-Jul-18 28D
30-Jun-18 2117 SLAB TURBIN 5 MES Fc' 30.0 9 07-Jul-18 28-Jul-18 28D
30-Jun-18 2118 SLAB TURBIN 5 MES Fc' 30.0 9 07-Jul-18 28-Jul-18 28D
30-Jun-18 2119 SLAB CCB MEZZANINE ELV 8000 MES Fc' 30.0 9 07-Jul-18 28-Jul-18 28D
30-Jun-18 2120 BOLIER 6 STAGE 2T MES Fc' 30.0 9 07-Jul-18 28-Jul-18 28D
30-Jun-18 2121 BOLIER 6 STAGE 2T MES Fc' 30.0 9 07-Jul-18 28-Jul-18 28D
30-Jun-18 2122 BOLIER 6 STAGE 2T MES Fc' 30.0 9 07-Jul-18 28-Jul-18 28D
30-Jun-18 2123 BOLIER 6 STAGE 2T MES Fc' 30.0 9 07-Jul-18 28-Jul-18 28D
30-Jun-18 2124 BOLIER 6 STAGE 2T MES Fc' 30.0 9 07-Jul-18 28-Jul-18 28D
30-Jun-18 2125 BOLIER 6 STAGE 2T MES Fc' 30.0 9 07-Jul-18 28-Jul-18 28D
30-Jun-18 2126 BOLIER 6 STAGE 2T MES Fc' 30.0 9 07-Jul-18 28-Jul-18 28D
30-Jun-18 2127 BOLIER 6 STAGE 2T MES Fc' 30.0 9 07-Jul-18 28-Jul-18 28D
30-Jun-18 2128 FENDER PILECAP FPC01#03 WALL MES - BAM Fc' 36.0 9 07-Jul-18 28-Jul-18 28D
30-Jun-18 2129 INSITU GRID 77 MES - BAM Fc' 36.0 9 07-Jul-18 28-Jul-18 28D
30-Jun-18 2130 WHARF SLAB PS01N#01,02 &03 MES - BAM Fc' 36.0 9 07-Jul-18 28-Jul-18 28D
PT. PIONIRBETON INDUSTRI
CRUSHING TEST SCHEDULE
Total
18-Jul
19-Jul
20-Jul
21-Jul
22-Jul
23-Jul
24-Jul
25-Jul
26-Jul
27-Jul
28-Jul
29-Jul
30-Jul
31-Jul
Date of Code
Location Contractor Grade Sampl Remarks
Pouring Sample
e 7 Days 28 Days
30-Jun-18 2131 HEADSTOCK CB01(4/3)#29 MES - BAM Fc' 36.0 9 07-Jul-18 28-Jul-18 28D
30-Jun-18 2132 TBEAM LT03#08 MES - BAM Fc' 36.0 9 07-Jul-18 28-Jul-18 28D
30-Jun-18 2133 INSITU GRID 80 MES - BAM Fc' 36.0 9 07-Jul-18 28-Jul-18 28D
30-Jun-18 2134 CROSS BEAM CB04A#13 , CROSS BEAM CB02#44 MES - BAM Fc' 36.0 9 07-Jul-18 28-Jul-18 28D
30-Jun-18 2135 CURB LC01#173-174 MES - BAM Fc' 36.0 9 07-Jul-18 28-Jul-18 28D
01-Jul-18 2136 LC FGD UNIT 6 MCC ROOM, LC TURBIN 5 MES Fc' 15.0 9 08-Jul-18 29-Jul-18 28D
01-Jul-18 2137 INSITU GRID 81 MES Fc' 36.0 9 08-Jul-18 29-Jul-18 28D
01-Jul-18 2138 MORTAR 5% MES
MORTAR 5% 9 08-Jul-18 29-Jul-18 28D
02-Jul-18 2139 LC WTP DEMIN DESAL MES Fc' 15.0 9 09-Jul-18 30-Jul-18 28D
02-Jul-18 2140 PHT WWTP SLUDGE THICKENER, WWTP ELECTRICAL CONTROL HOUSE AREA, PHT TURBIN 6 MES Fc' 30.0 9 09-Jul-18 30-Jul-18 28D
02-Jul-18 2141 LINE 6 STAGE 2 500 KV MES Fc' 30.0 9 09-Jul-18 30-Jul-18 28D
02-Jul-18 2142 WHARF SLAB CROSS BEAM CB02#45, PS03N#01,03,04 MES - BAM Fc' 36.0 9 09-Jul-18 30-Jul-18 28D
02-Jul-18 2143 WHARF PILECAP PC02B#12#07 MES - BAM Fc' 36.0 9 09-Jul-18 30-Jul-18 28D
02-Jul-18 2144 TBEAM MT01#76 MES - BAM Fc' 36.0 9 09-Jul-18 30-Jul-18 28D
02-Jul-18 2145 TBEAM MT01#77 MES - BAM Fc' 36.0 9 09-Jul-18 30-Jul-18 28D
02-Jul-18 2146 INSITU GRID 79 MES - BAM Fc' 36.0 9 09-Jul-18 30-Jul-18 28D
02-Jul-18 2147 HEADSTOCK CB01A(4/3)#30 MES - BAM Fc' 36.0 9 09-Jul-18 30-Jul-18 28D
02-Jul-18 2148 PILECAP PC01#08, CROSS BEAM CB04#01 MES - BAM Fc' 36.0 9 09-Jul-18 30-Jul-18 28D
02-Jul-18 2149 CURB MES - BAM Fc' 36.0 9 09-Jul-18 30-Jul-18 28D
02-Jul-18 2150 INSITU GRID 79, 82. 83 MES - BAM Fc' 36.0 9 09-Jul-18 30-Jul-18 28D
03-Jul-18 2151 LC 500 KV, LC BOILER , TURBIN 5 MES Fc' 15.0 9 10-Jul-18 31-Jul-18 28D
03-Jul-18 2152 PHT FOUNDATION CHIMNEY MES Fc' 30.0 9 10-Jul-18 31-Jul-18 28D
03-Jul-18 2153 SLAB TURBIN 5 MES Fc' 30.0 9 10-Jul-18 31-Jul-18 28D
03-Jul-18 2154 SLAB TURBIN 5 MES Fc' 30.0 9 10-Jul-18 31-Jul-18 28D
03-Jul-18 2155 SLAB TURBIN 5 MES Fc' 30.0 9 10-Jul-18 31-Jul-18 28D
03-Jul-18 2156 SLAB CCB EL. 12300 MES Fc' 30.0 9 10-Jul-18 31-Jul-18 28D
03-Jul-18 2157 COVER WALL BOX CULVERT T3A, WTP DEMIN DESAL, MH BOILER 5 MES Fc' 30.0 9 10-Jul-18 31-Jul-18 28D
03-Jul-18 2158 SLAB THRUST BLOCK MES Fc' 30.0 9 10-Jul-18 31-Jul-18 28D
03-Jul-18 2159 COMMON FGD ELECTRICAL HOUSE MES Fc' 30.0 9 10-Jul-18 31-Jul-18 28D
03-Jul-18 2160 WHARF PILECAP CROSS BEAM CB04A#15-16, LONGITUDINAL BEAM LB-A04#07 MES Fc' 36.0 9 10-Jul-18 31-Jul-18 28D
03-Jul-18 2161 TOWER CROSS BEAM CB05#01 MES Fc' 36.0 9 10-Jul-18 31-Jul-18 28D
03-Jul-18 2162 WHARF P[ILECAP CB02B#13-14 MES Fc' 36.0 9 10-Jul-18 31-Jul-18 28D
03-Jul-18 2163 TBEAM LT02#09 MES Fc' 36.0 9 10-Jul-18 31-Jul-18 28D
03-Jul-18 2164 INSITU GRID 84 MES Fc' 36.0 9 10-Jul-18 31-Jul-18 28D
03-Jul-18 2165 CURB MES Fc' 36.0 9 10-Jul-18 31-Jul-18 28D
03-Jul-18 2166 HEADSTOCK CB01(4/3)#61 MES Fc' 36.0 9 10-Jul-18 31-Jul-18 28D
03-Jul-18 2167 UPL - CROSS BEAM CB01#05-06 MES Fc' 36.0 9 10-Jul-18 31-Jul-18 28D
03-Jul-18 2168 WALL CW INTAKE PH MES Fc' 36.0 9 10-Jul-18 31-Jul-18 28D
PT. PIONIRBETON INDUSTRI
CRUSHING TEST SCHEDULE
Total
18-Jul
19-Jul
20-Jul
21-Jul
22-Jul
23-Jul
24-Jul
25-Jul
26-Jul
27-Jul
28-Jul
29-Jul
30-Jul
31-Jul
Date of Code
Location Contractor Grade Sampl Remarks
Pouring Sample
e 7 Days 28 Days
Total
18-Jul
19-Jul
20-Jul
21-Jul
22-Jul
23-Jul
24-Jul
25-Jul
26-Jul
27-Jul
28-Jul
29-Jul
30-Jul
31-Jul
Date of Code
Location Contractor Grade Sampl Remarks
Pouring Sample
e 7 Days 28 Days
07-Jul-18 2208 WALL WTP FILTERED WATER TANK MES Fc' 30.0 9 14-Jul-18 04-Aug-18
07-Jul-18 2209 SLAB CCB ELEV 12300 MES Fc' 30.0 9 14-Jul-18 04-Aug-18
07-Jul-18 2210 DUCT BANK BOILER 6 MES Fc' 30.0 9 14-Jul-18 04-Aug-18
07-Jul-18 2211 WALL COVER BOX CULVERT T15B, COLUMN FGD UNIT 5 MCC ROOM MES Fc' 30.0 9 14-Jul-18 04-Aug-18
07-Jul-18 2212 WHARF FENDER PILECAP FPC01#04 MES - BAM Fc' 36.0 9 14-Jul-18 04-Aug-18
07-Jul-18 2213 WHARF CROSS BEAM CB04#06 MES - BAM Fc' 36.0 9 14-Jul-18 04-Aug-18
07-Jul-18 2214 INSITU GRID 49 MES - BAM Fc' 36.0 9 14-Jul-18 04-Aug-18
07-Jul-18 2215 TBEAM LT04#08 MES - BAM Fc' 36.0 9 14-Jul-18 04-Aug-18
07-Jul-18 2216 TBEAM LT03#09 MES - BAM Fc' 36.0 9 14-Jul-18 04-Aug-18
07-Jul-18 2217 WHARF PILECAP PC02B#15-16 MES - BAM Fc' 36.0 9 14-Jul-18 04-Aug-18
08-Jul-18 2218 LC AMONIA REMOVAL MES Fc' 15.0 9 15-Jul-18 05-Aug-18
08-Jul-18 2219 WHARF SLAB PS01B#01, PS01#01, PS07N#02, PS07N#04 MES - BAM Fc' 36.0 9 15-Jul-18 05-Aug-18
08-Jul-18 2220 CURB MES - BAM Fc' 36.0 9 15-Jul-18 05-Aug-18
08-Jul-18 2221 WHARF SLAB PS02#01, PS07N#03 MES - BAM Fc' 36.0 9 15-Jul-18 05-Aug-18
09-Jul-18 2222 LC GGH 5, LC 500 KV, LC WTP DEMIN DESAL, LC CHIMNEY, LC CDB, MES Fc' 15.0 9 16-Jul-18 06-Aug-18
09-Jul-18 2223 PHT FOUNDATION CHIMNEY MES Fc' 30.0 9 16-Jul-18 06-Aug-18
09-Jul-18 2224 WALL WTP COAGULATION TANK MES Fc' 30.0 9 16-Jul-18 06-Aug-18
09-Jul-18 2225 WALL TURBIN 5 MES Fc' 30.0 9 16-Jul-18 06-Aug-18
09-Jul-18 2226 SLAB TURBIN 5 MES Fc' 30.0 9 16-Jul-18 06-Aug-18
PHT WWTP AERATION BASIN, PHT WWTP REG IRREG, COLUMN FGD UNIT 5 MCC ROOM, WALL WWTP
09-Jul-18 2227 ELECTRICAL CONTROL HOUSE, PHT TURBIN 6, COLUMN WTP DEHYDRATOR, PHT AMONIA REMOVAL MES Fc' 30.0 9 16-Jul-18 06-Aug-18
09-Jul-18 2228 WWTP FOUNDATION GRAFITY FILTERED WATER TANK MES Fc' 30.0 9 16-Jul-18 06-Aug-18
09-Jul-18 2229 UPL - PS 06#03 , UPL PS07N#04 , TTW - PS 03B#01 MES - BAM Fc' 36.0 9 16-Jul-18 06-Aug-18
09-Jul-18 2230 TBEAM LT02#10 MES - BAM Fc' 36.0 9 16-Jul-18 06-Aug-18
09-Jul-18 2231 INSITU GRID 76 MES - BAM Fc' 36.0 9 16-Jul-18 06-Aug-18
09-Jul-18 2232 HEADSTOCK CB01#64 MES - BAM Fc' 36.0 9 16-Jul-18 06-Aug-18
09-Jul-18 2233 UPL PS05#05-06 , UPL - PS01#15-16 MES - BAM Fc' 36.0 9 16-Jul-18 06-Aug-18
09-Jul-18 2234 UPL - CB4#07 , TTW CB07#01 MES - BAM Fc' 36.0 9 16-Jul-18 06-Aug-18
09-Jul-18 2235 CURB MES - BAM Fc' 36.0 9 16-Jul-18 06-Aug-18
09-Jul-18 2236 UPL - LBA04#12 , UPL CB04A#20-21 MES - BAM Fc' 36.0 9 16-Jul-18 06-Aug-18
09-Jul-18 2237 UPL - CB04#08 , TTW - CB06#01 MES - BAM Fc' 36.0 9 16-Jul-18 06-Aug-18
LC CHIMNEY, LC ESP, LC WWTP REG IRREG, LC AMONIA REMOVAL, LC WTP DEMIN DESAL, LC
10-Jul-18 2238 SWITCGEAR MES Fc' 15.0 9 17-Jul-18 07-Aug-18
10-Jul-18 2239 PILECAP & TBEAM FGD UNIT 6 MCC ROOM MES Fc' 30.0 9 17-Jul-18 07-Aug-18
10-Jul-18 2240 PARAPET WTP ELECTRICAL ROOM, COLUMN PEDESTAL AERATION BLOWER 6 MES Fc' 30.0 9 17-Jul-18 07-Aug-18
10-Jul-18 2241 SLAB TURBIN 5 MES Fc' 30.0 9 17-Jul-18 07-Aug-18
10-Jul-18 2242 PILECAP & TBEAM COMMON FGD ELECTRICAL HOUSE MES Fc' 30.0 9 17-Jul-18 07-Aug-18
10-Jul-18 2243 BOILER 6 STAGE 11B MES Fc' 30.0 9 17-Jul-18 07-Aug-18
10-Jul-18 2244 BOILER 6 STAGE 11B MES Fc' 30.0 9 17-Jul-18 07-Aug-18
10-Jul-18 2245 BOILER 6 STAGE 11B MES Fc' 30.0 9 17-Jul-18 07-Aug-18
10-Jul-18 2246 BOILER 6 STAGE 11B MES Fc' 30.0 9 17-Jul-18 07-Aug-18
PT. PIONIRBETON INDUSTRI
CRUSHING TEST SCHEDULE
Total
18-Jul
19-Jul
20-Jul
21-Jul
22-Jul
23-Jul
24-Jul
25-Jul
26-Jul
27-Jul
28-Jul
29-Jul
30-Jul
31-Jul
Date of Code
Location Contractor Grade Sampl Remarks
Pouring Sample
e 7 Days 28 Days
Total
18-Jul
19-Jul
20-Jul
21-Jul
22-Jul
23-Jul
24-Jul
25-Jul
26-Jul
27-Jul
28-Jul
29-Jul
30-Jul
31-Jul
Date of Code
Location Contractor Grade Sampl Remarks
Pouring Sample
e 7 Days 28 Days
Total
18-Jul
19-Jul
20-Jul
21-Jul
22-Jul
23-Jul
24-Jul
25-Jul
26-Jul
27-Jul
28-Jul
29-Jul
30-Jul
31-Jul
Date of Code
Location Contractor Grade Sampl Remarks
Pouring Sample
e 7 Days 28 Days
17-Jul-18 2323 UPL-PS01S#03/04, UPL-PS07N#05/06, UPL-LB-A011#1 MES-BAM Fc' 36.0 9 24-Jul-18 14-Aug-18 7D
17-Jul-18 2324 HEADSTOCK CB01#68 MES-BAM Fc' 36.0 9 24-Jul-18 14-Aug-18 7D
17-Jul-18 2325 UPL-FPC01#05 WALL, CURB MES-BAM Fc' 36.0 9 24-Jul-18 14-Aug-18 7D
17-Jul-18 2326 UPL-LBA05#10 MES-BAM Fc' 36.0 9 24-Jul-18 14-Aug-18 7D