You are on page 1of 8

PT.

PIONIRBETON INDUSTRI
CRUSHING TEST SCHEDULE

PLANT : TANJUNG JATI - JEPARA

Total

18-Jul

19-Jul

20-Jul

21-Jul

22-Jul

23-Jul

24-Jul

25-Jul

26-Jul

27-Jul

28-Jul

29-Jul

30-Jul

31-Jul
Date of Code
Location Contractor Grade Sampl Remarks
Pouring Sample
e 7 Days 28 Days

21-Jun-18 2054 UPL CB 02#34 #35 MES - BAM Fc' 36.0 9 28-Jun-18 19-Jul-18 28D
23-Jun-18 2055 TBEAM LT01#73 MES - BAM Fc' 36.0 9 30-Jun-18 21-Jul-18 28D
23-Jun-18 2056 HEADSTOCK CB02#36 MES - BAM Fc' 36.0 9 30-Jun-18 21-Jul-18 28D
23-Jun-18 2057 HEADSTOCK CB04A#03 MES - BAM Fc' 36.0 9 30-Jun-18 21-Jul-18 28D
23-Jun-18 2058 UPL PILECAP PC01#05, UPL CB04A#04 - #05 MES - BAM Fc' 36.0 9 30-Jun-18 21-Jul-18 28D
23-Jun-18 2059 HEADSTOCK CB 04A #06 #07 HEADSTOCK CB04A#08 #09 , UPL LB 04A#05 MES - BAM Fc' 36.0 9 30-Jun-18 21-Jul-18 28D
23-Jun-18 2060 HEADSTOCK CB01(4/3)#57 MES - BAM Fc' 36.0 9 30-Jun-18 21-Jul-18 28D
25-Jun-18 2061 LC ESP, LC WWTP SLUDGE HOLDING TANK, LC TURBIN 5 MES Fc' 15.0 9 02-Jul-18 23-Jul-18 28D
25-Jun-18 2062 PHT WWTP CLARIFIER, PHT WWTP AERATION BASIN, PHT NEUT SUMP, MES Fc' 30.0 9 02-Jul-18 23-Jul-18 28D
25-Jun-18 2063 SLAB PS 01#10 - 11 MES - BAM Fc' 36.0 9 02-Jul-18 23-Jul-18 28D
25-Jun-18 2064 TBEAM LT03#07 MES - BAM Fc' 36.0 9 02-Jul-18 23-Jul-18 28D
25-Jun-18 2065 CROSS BEAM CB02#37 - 38 MES - BAM Fc' 36.0 9 02-Jul-18 23-Jul-18 28D
25-Jun-18 2066 INSITU GRID #74 - 75 MES - BAM Fc' 36.0 9 02-Jul-18 23-Jul-18 28D
25-Jun-18 2067 SLAB CB06(4/3)#02 MES - BAM Fc' 36.0 9 02-Jul-18 23-Jul-18 28D
25-Jun-18 2068 HEADSTOCK CB01(4/3)#58 MES - BAM Fc' 36.0 9 02-Jul-18 23-Jul-18 28D
25-Jun-18 2069 CURB LT01#169-170 MES - BAM Fc' 36.0 9 02-Jul-18 23-Jul-18 28D
25-Jun-18 2070 UPL PC02B#09 MES - BAM Fc' 36.0 9 02-Jul-18 23-Jul-18 28D
26-Jun-18 2071 LC PONDASI CHIMNEY MES Fc' 15.0 9 03-Jul-18 24-Jul-18 28D
26-Jun-18 2072 LC TURBIN 6 MES Fc' 15.0 9 03-Jul-18 24-Jul-18 28D
26-Jun-18 2073 LC WTP DEMIN DESAL, LC ESP, LC THRUST BLOCK F8 MES Fc' 15.0 9 03-Jul-18 24-Jul-18 28D
26-Jun-18 2074 COVER BOX CULVERT T22, PHT TURBIN 5, COVER BOX CULVERT T15B MES Fc' 30.0 9 03-Jul-18 24-Jul-18 28D
26-Jun-18 2075 WWTP GRAVITY FILTERED TANK MES Fc' 30.0 9 03-Jul-18 24-Jul-18 28D
26-Jun-18 2076 LINE 4 500 KV MES Fc' 30.0 9 03-Jul-18 24-Jul-18 28D
26-Jun-18 2077 LINE 4 500 KV MES Fc' 30.0 9 03-Jul-18 24-Jul-18 28D
26-Jun-18 2078 WALL TURBIN 5 MES Fc' 30.0 9 03-Jul-18 24-Jul-18 28D
26-Jun-18 2079 WHARF PILECAP PC02B#10 MES Fc' 36.0 9 03-Jul-18 24-Jul-18 28D
26-Jun-18 2080 TBEAM LT01#74 MES - BAM Fc' 36.0 9 03-Jul-18 24-Jul-18 28D
26-Jun-18 2081 TBEAM LT01#75 MES - BAM Fc' 36.0 9 03-Jul-18 24-Jul-18 28D
26-Jun-18 2082 HEADSTOCK CB01#59 MES - BAM Fc' 36.0 9 03-Jul-18 24-Jul-18 28D
26-Jun-18 2083 WHARF PILECAP PC02B#11, TOWER PILECAP PC01#05 MES - BAM Fc' 36.0 9 03-Jul-18 24-Jul-18 28D
26-Jun-18 2084 CURB MES - BAM Fc' 36.0 9 03-Jul-18 24-Jul-18 28D
26-Jun-18 2085 CROSS BEAM CB02#39 - 40 MES - BAM Fc' 36.0 9 03-Jul-18 24-Jul-18 28D
28-Jun-18 2086 LC WTP DEMIN DESAL, LC TURBIN 6, LC 500 KV, LC FOUNDATION CHIMNEY MES Fc' 15.0 9 05-Jul-18 26-Jul-18 28D
28-Jun-18 2087 BOILR 5 PA FAN B, PHT TURBIN 5 MES Fc' 30.0 9 05-Jul-18 26-Jul-18 28D
28-Jun-18 2088 CCB SLAB ELEV 8000 MES Fc' 30.0 9 05-Jul-18 26-Jul-18 28D
28-Jun-18 2089 SLAB AERATION BASIN MES Fc' 30.0 9 05-Jul-18 26-Jul-18 28D
28-Jun-18 2090 SLAB AERATION BASIN MES Fc' 30.0 9 05-Jul-18 26-Jul-18 28D
28-Jun-18 2091 SLAB AERATION BASIN MES Fc' 30.0 9 05-Jul-18 26-Jul-18 28D
PT. PIONIRBETON INDUSTRI
CRUSHING TEST SCHEDULE

PLANT : TANJUNG JATI - JEPARA

Total

18-Jul

19-Jul

20-Jul

21-Jul

22-Jul

23-Jul

24-Jul

25-Jul

26-Jul

27-Jul

28-Jul

29-Jul

30-Jul

31-Jul
Date of Code
Location Contractor Grade Sampl Remarks
Pouring Sample
e 7 Days 28 Days

28-Jun-18 2092 WHARF SLAB PS04N#01-02 MES - BAM Fc' 36.0 9 05-Jul-18 26-Jul-18 28D
28-Jun-18 2093 WHARF SLAB PS01#13-14 MES - BAM Fc' 36.0 9 05-Jul-18 26-Jul-18 28D
28-Jun-18 2094 FENDER BLOCK SLAB FP01#03 MES - BAM Fc' 36.0 9 05-Jul-18 26-Jul-18 28D
28-Jun-18 2095 INSITU GRID 77 - 78 MES - BAM Fc' 36.0 9 05-Jul-18 26-Jul-18 28D
28-Jun-18 2096 HEADSTOCK CB01#60 MES - BAM Fc' 36.0 9 05-Jul-18 26-Jul-18 28D
28-Jun-18 2097 TBEAM LT02#08 MES - BAM Fc' 36.0 9 05-Jul-18 26-Jul-18 28D
28-Jun-18 2098 HEADSTOCK CB06#02 WALL MES - BAM Fc' 36.0 9 05-Jul-18 26-Jul-18 28D
28-Jun-18 2099 CROSS BEAM CB02#41 - 42 MES - BAM Fc' 36.0 9 05-Jul-18 26-Jul-18 28D
28-Jun-18 2100 TOWER PILECAP PC01#06, TOWER CROSS BEAM CB03#01 MES - BAM Fc' 36.0 9 05-Jul-18 26-Jul-18 28D
28-Jun-18 2101 INSITU GRID 74 MES - BAM Fc' 36.0 9 05-Jul-18 26-Jul-18 28D
LC TURBIN 6, LC FOUNDATION CHIMNEY , LC FGD UBIT 6 MCC ROOM, LC COMMON FGD ELECTRICAL
29-Jun-18 2102 HOUSE, LC 500 KV, LC WWTP REG.IREG MES Fc' 15.0 9 06-Jul-18 27-Jul-18 28D
PHT FGD UNIT 6 MCC ROOM, TOP COVER BOX CULVERT T22, PHT WWTP SLUDGE THICKNENER,
29-Jun-18 2103 COLOUMN WTP DEHYDRATOR ROOM MES Fc' 30.0 9 06-Jul-18 27-Jul-18 28D
29-Jun-18 2104 LONGITUDINAL BEAM LBA04#06 MES - BAM Fc' 36.0 9 06-Jul-18 27-Jul-18 28D
29-Jun-18 2105 WHARF SLAB PS04N#03-04 MES - BAM Fc' 36.0 9 06-Jul-18 27-Jul-18 28D
29-Jun-18 2106 INSITU GRID 75 MES - BAM Fc' 36.0 9 06-Jul-18 27-Jul-18 28D
29-Jun-18 2107 CROSS BEAM CB04A#10-11 MES - BAM Fc' 36.0 9 06-Jul-18 27-Jul-18 28D
29-Jun-18 2108 TBEAM LT04#07 MES - BAM Fc' 36.0 9 06-Jul-18 27-Jul-18 28D
29-Jun-18 2109 CURB LT02#09 MES - BAM Fc' 36.0 9 06-Jul-18 27-Jul-18 28D
29-Jun-18 2110 TOWER CROSS BEAM CB02#43 MES - BAM Fc' 36.0 9 06-Jul-18 27-Jul-18 28D
29-Jun-18 2111 CROSS BEAM CB04A#12 MES - BAM Fc' 36.0 9 06-Jul-18 27-Jul-18 28D
29-Jun-18 2112 INSITU GRID 79 MES - BAM Fc' 36.0 9 06-Jul-18 27-Jul-18 28D
29-Jun-18 2113 FENDER BLOCK FB 01A#04 MES - BAM Fc' 36.0 9 06-Jul-18 27-Jul-18 28D
LC WTP DEMIN DESAL, LC ESP, LC WWTP REG. IREG , LC FGD UNIT 6 MCC ROOM, LC DUCT BANK CDB 21-22, LC
30-Jun-18 2114 WWTP FOUNDATION TANGGA WATER SLUDGE DEWATERING MES Fc' 15.0 9 07-Jul-18 28-Jul-18 28D
PHT WWTP SLUDGE THICKENER, COLOUMN WTP DEMIN DESAL, COLOUMN PEDESTAL AERATION BLOWER 5,
30-Jun-18 2115 PHT COMMON FGD ELECTRICAL HOUSE MES Fc' 30.0 9 07-Jul-18 28-Jul-18 28D
30-Jun-18 2116 SLAB TURBIN 5 MES Fc' 30.0 9 07-Jul-18 28-Jul-18 28D
30-Jun-18 2117 SLAB TURBIN 5 MES Fc' 30.0 9 07-Jul-18 28-Jul-18 28D
30-Jun-18 2118 SLAB TURBIN 5 MES Fc' 30.0 9 07-Jul-18 28-Jul-18 28D
30-Jun-18 2119 SLAB CCB MEZZANINE ELV 8000 MES Fc' 30.0 9 07-Jul-18 28-Jul-18 28D
30-Jun-18 2120 BOLIER 6 STAGE 2T MES Fc' 30.0 9 07-Jul-18 28-Jul-18 28D
30-Jun-18 2121 BOLIER 6 STAGE 2T MES Fc' 30.0 9 07-Jul-18 28-Jul-18 28D
30-Jun-18 2122 BOLIER 6 STAGE 2T MES Fc' 30.0 9 07-Jul-18 28-Jul-18 28D
30-Jun-18 2123 BOLIER 6 STAGE 2T MES Fc' 30.0 9 07-Jul-18 28-Jul-18 28D
30-Jun-18 2124 BOLIER 6 STAGE 2T MES Fc' 30.0 9 07-Jul-18 28-Jul-18 28D
30-Jun-18 2125 BOLIER 6 STAGE 2T MES Fc' 30.0 9 07-Jul-18 28-Jul-18 28D
30-Jun-18 2126 BOLIER 6 STAGE 2T MES Fc' 30.0 9 07-Jul-18 28-Jul-18 28D
30-Jun-18 2127 BOLIER 6 STAGE 2T MES Fc' 30.0 9 07-Jul-18 28-Jul-18 28D
30-Jun-18 2128 FENDER PILECAP FPC01#03 WALL MES - BAM Fc' 36.0 9 07-Jul-18 28-Jul-18 28D
30-Jun-18 2129 INSITU GRID 77 MES - BAM Fc' 36.0 9 07-Jul-18 28-Jul-18 28D
30-Jun-18 2130 WHARF SLAB PS01N#01,02 &03 MES - BAM Fc' 36.0 9 07-Jul-18 28-Jul-18 28D
PT. PIONIRBETON INDUSTRI
CRUSHING TEST SCHEDULE

PLANT : TANJUNG JATI - JEPARA

Total

18-Jul

19-Jul

20-Jul

21-Jul

22-Jul

23-Jul

24-Jul

25-Jul

26-Jul

27-Jul

28-Jul

29-Jul

30-Jul

31-Jul
Date of Code
Location Contractor Grade Sampl Remarks
Pouring Sample
e 7 Days 28 Days

30-Jun-18 2131 HEADSTOCK CB01(4/3)#29 MES - BAM Fc' 36.0 9 07-Jul-18 28-Jul-18 28D
30-Jun-18 2132 TBEAM LT03#08 MES - BAM Fc' 36.0 9 07-Jul-18 28-Jul-18 28D
30-Jun-18 2133 INSITU GRID 80 MES - BAM Fc' 36.0 9 07-Jul-18 28-Jul-18 28D
30-Jun-18 2134 CROSS BEAM CB04A#13 , CROSS BEAM CB02#44 MES - BAM Fc' 36.0 9 07-Jul-18 28-Jul-18 28D
30-Jun-18 2135 CURB LC01#173-174 MES - BAM Fc' 36.0 9 07-Jul-18 28-Jul-18 28D
01-Jul-18 2136 LC FGD UNIT 6 MCC ROOM, LC TURBIN 5 MES Fc' 15.0 9 08-Jul-18 29-Jul-18 28D
01-Jul-18 2137 INSITU GRID 81 MES Fc' 36.0 9 08-Jul-18 29-Jul-18 28D
01-Jul-18 2138 MORTAR 5% MES
MORTAR 5% 9 08-Jul-18 29-Jul-18 28D
02-Jul-18 2139 LC WTP DEMIN DESAL MES Fc' 15.0 9 09-Jul-18 30-Jul-18 28D
02-Jul-18 2140 PHT WWTP SLUDGE THICKENER, WWTP ELECTRICAL CONTROL HOUSE AREA, PHT TURBIN 6 MES Fc' 30.0 9 09-Jul-18 30-Jul-18 28D
02-Jul-18 2141 LINE 6 STAGE 2 500 KV MES Fc' 30.0 9 09-Jul-18 30-Jul-18 28D
02-Jul-18 2142 WHARF SLAB CROSS BEAM CB02#45, PS03N#01,03,04 MES - BAM Fc' 36.0 9 09-Jul-18 30-Jul-18 28D
02-Jul-18 2143 WHARF PILECAP PC02B#12#07 MES - BAM Fc' 36.0 9 09-Jul-18 30-Jul-18 28D
02-Jul-18 2144 TBEAM MT01#76 MES - BAM Fc' 36.0 9 09-Jul-18 30-Jul-18 28D
02-Jul-18 2145 TBEAM MT01#77 MES - BAM Fc' 36.0 9 09-Jul-18 30-Jul-18 28D
02-Jul-18 2146 INSITU GRID 79 MES - BAM Fc' 36.0 9 09-Jul-18 30-Jul-18 28D
02-Jul-18 2147 HEADSTOCK CB01A(4/3)#30 MES - BAM Fc' 36.0 9 09-Jul-18 30-Jul-18 28D
02-Jul-18 2148 PILECAP PC01#08, CROSS BEAM CB04#01 MES - BAM Fc' 36.0 9 09-Jul-18 30-Jul-18 28D
02-Jul-18 2149 CURB MES - BAM Fc' 36.0 9 09-Jul-18 30-Jul-18 28D
02-Jul-18 2150 INSITU GRID 79, 82. 83 MES - BAM Fc' 36.0 9 09-Jul-18 30-Jul-18 28D
03-Jul-18 2151 LC 500 KV, LC BOILER , TURBIN 5 MES Fc' 15.0 9 10-Jul-18 31-Jul-18 28D
03-Jul-18 2152 PHT FOUNDATION CHIMNEY MES Fc' 30.0 9 10-Jul-18 31-Jul-18 28D
03-Jul-18 2153 SLAB TURBIN 5 MES Fc' 30.0 9 10-Jul-18 31-Jul-18 28D
03-Jul-18 2154 SLAB TURBIN 5 MES Fc' 30.0 9 10-Jul-18 31-Jul-18 28D
03-Jul-18 2155 SLAB TURBIN 5 MES Fc' 30.0 9 10-Jul-18 31-Jul-18 28D
03-Jul-18 2156 SLAB CCB EL. 12300 MES Fc' 30.0 9 10-Jul-18 31-Jul-18 28D
03-Jul-18 2157 COVER WALL BOX CULVERT T3A, WTP DEMIN DESAL, MH BOILER 5 MES Fc' 30.0 9 10-Jul-18 31-Jul-18 28D
03-Jul-18 2158 SLAB THRUST BLOCK MES Fc' 30.0 9 10-Jul-18 31-Jul-18 28D
03-Jul-18 2159 COMMON FGD ELECTRICAL HOUSE MES Fc' 30.0 9 10-Jul-18 31-Jul-18 28D
03-Jul-18 2160 WHARF PILECAP CROSS BEAM CB04A#15-16, LONGITUDINAL BEAM LB-A04#07 MES Fc' 36.0 9 10-Jul-18 31-Jul-18 28D
03-Jul-18 2161 TOWER CROSS BEAM CB05#01 MES Fc' 36.0 9 10-Jul-18 31-Jul-18 28D
03-Jul-18 2162 WHARF P[ILECAP CB02B#13-14 MES Fc' 36.0 9 10-Jul-18 31-Jul-18 28D
03-Jul-18 2163 TBEAM LT02#09 MES Fc' 36.0 9 10-Jul-18 31-Jul-18 28D
03-Jul-18 2164 INSITU GRID 84 MES Fc' 36.0 9 10-Jul-18 31-Jul-18 28D
03-Jul-18 2165 CURB MES Fc' 36.0 9 10-Jul-18 31-Jul-18 28D
03-Jul-18 2166 HEADSTOCK CB01(4/3)#61 MES Fc' 36.0 9 10-Jul-18 31-Jul-18 28D
03-Jul-18 2167 UPL - CROSS BEAM CB01#05-06 MES Fc' 36.0 9 10-Jul-18 31-Jul-18 28D
03-Jul-18 2168 WALL CW INTAKE PH MES Fc' 36.0 9 10-Jul-18 31-Jul-18 28D
PT. PIONIRBETON INDUSTRI
CRUSHING TEST SCHEDULE

PLANT : TANJUNG JATI - JEPARA

Total

18-Jul

19-Jul

20-Jul

21-Jul

22-Jul

23-Jul

24-Jul

25-Jul

26-Jul

27-Jul

28-Jul

29-Jul

30-Jul

31-Jul
Date of Code
Location Contractor Grade Sampl Remarks
Pouring Sample
e 7 Days 28 Days

LC ESP, LC TURBIN 5, LC GGH#06, LC FOUNDATION CHIMNEY, LC WTP CHLORINATION , LC AERATION


04-Jul-18 2169 BASIN, LC TURBIN 6 MES Fc' 15.0 9 11-Jul-18 01-Aug-18
COLUMN WTP DEHYDRATOR ROOM AREA, WALL WTP ELECTRICAL CONTROL HOUSE, COLUMN TURBIN
04-Jul-18 2170 5, WALL WTP COAGULATION TANK, WTP NEUTRALIZATION BASIN, WALL BOX CULVERT T15B MES Fc' 30.0 9 11-Jul-18 01-Aug-18
04-Jul-18 2171 LINE 3 500 KV MES Fc' 30.0 9 11-Jul-18 01-Aug-18
04-Jul-18 2172 LINE 3 500 KV MES Fc' 30.0 9 11-Jul-18 01-Aug-18
04-Jul-18 2173 CURB MES - BAM Fc' 36.0 9 11-Jul-18 01-Aug-18
04-Jul-18 2174 WHARF SLAB PS05#02, PS02N#02/03/04 MES - BAM Fc' 36.0 9 11-Jul-18 01-Aug-18
04-Jul-18 2175 INSITU GROD 85-86 MES - BAM Fc' 36.0 9 11-Jul-18 01-Aug-18
04-Jul-18 2176 HEADSTOCK CB06(4/3)#03 SLAB MES - BAM Fc' 36.0 9 11-Jul-18 01-Aug-18
04-Jul-18 2177 TBEAM LT01#78 MES - BAM Fc' 36.0 9 11-Jul-18 01-Aug-18
04-Jul-18 2178 WHARF PILECAP CROSS BEAM CB04A#15-16, LONGITUDINAL BEAM LB-A04#07-08 MES - BAM Fc' 36.0 9 11-Jul-18 01-Aug-18
04-Jul-18 2179 HEADSTOCK CB01#62 MES - BAM Fc' 36.0 9 11-Jul-18 01-Aug-18
04-Jul-18 2180 WALL CW INTAKE PH MES - BAM Fc' 36.0 9 11-Jul-18 01-Aug-18
LC 500 KV, LC WTP DEMIN DESAL, LC WTP CHLORINATION, LC GGH#6, LC WWTP REG IRREG, LC CDB 03,
05-Jul-18 2181 LC AERATION BASIN, LC FOUNDATION CHIMNEY, LC GGH 5 MES Fc' 15.0 9 12-Jul-18 02-Aug-18
05-Jul-18 2182 PHT TURBIN5, COLUMN FGD UNIT 5 MCC ROOM, PARAPET WTP ELECTRICAL ROOM, MES Fc' 30.0 9 12-Jul-18 02-Aug-18
05-Jul-18 2183 CCB SLAB ELEV. 12300 MES Fc' 30.0 9 12-Jul-18 02-Aug-18
05-Jul-18 2184 WALL WTP PRETEATMENT MES Fc' 30.0 9 12-Jul-18 02-Aug-18
05-Jul-18 2185 WALL TURBIN 5 MES Fc' 30.0 9 12-Jul-18 02-Aug-18
05-Jul-18 2186 TBEAM LT01#79 MES - BAM Fc' 36.0 9 12-Jul-18 02-Aug-18
05-Jul-18 2187 WHARF SLAB PS06#02 MES - BAM Fc' 36.0 9 12-Jul-18 02-Aug-18
05-Jul-18 2188 WHARF FENDER PILECAP FPC01#04 SLAB MES - BAM Fc' 36.0 9 12-Jul-18 02-Aug-18
05-Jul-18 2189 INSITU GRID 61 MES - BAM Fc' 36.0 9 12-Jul-18 02-Aug-18
05-Jul-18 2190 HEADSTOCK CB06#03 WALL MES - BAM Fc' 36.0 9 12-Jul-18 02-Aug-18
05-Jul-18 2191 CROSS BEAM CB01#7/8/9 , LBA04#09 , CB01#10 MES - BAM Fc' 36.0 9 12-Jul-18 02-Aug-18
05-Jul-18 2192 SLAB CW INTAKE PH MES Fc' 36.0 9 12-Jul-18 02-Aug-18
05-Jul-18 2193 SLAB CW INTAKE PH MES Fc' 36.0 9 12-Jul-18 02-Aug-18
05-Jul-18 2194 SLAB CW INTAKE PH MES Fc' 36.0 9 12-Jul-18 02-Aug-18
05-Jul-18 2195 SLAB CW INTAKE PH MES Fc' 36.0 9 12-Jul-18 02-Aug-18
06-Jul-18 2196 LC ESP, LC WTP DEMIN DESAL, LC GGH#5 , LC GGH#6, LC WTP CHLORINATION, LC TURBIN 5, LC CDB 16 MES Fc' 15.0 9 13-Jul-18 03-Aug-18
06-Jul-18 2197 BOILER 6 STAGE 6T MES Fc' 30.0 9 13-Jul-18 03-Aug-18
06-Jul-18 2198 BOILER 6 STAGE 6T MES Fc' 30.0 9 13-Jul-18 03-Aug-18
06-Jul-18 2199 BOILER 6 STAGE 6T MES Fc' 30.0 9 13-Jul-18 03-Aug-18
06-Jul-18 2200 BOILER 6 STAGE 6T MES Fc' 30.0 9 13-Jul-18 03-Aug-18
SLAB TURBIN 5, WALL WTP ELECTRICAL CONTROL HOUSE, COVER BOX CULVERT T3A, WTP
06-Jul-18 2201 DEHYDRATOR ROOM MES Fc' 30.0 9 13-Jul-18 03-Aug-18
06-Jul-18 2202 HEADSTOCK CB01#63 MES - BAM Fc' 36.0 9 13-Jul-18 03-Aug-18
06-Jul-18 2203 WHARF SLAB PS07S#01-02, TOWER PILECAP PC02#01, WHARF SLAB PS07S#03 MES - BAM Fc' 36.0 9 13-Jul-18 03-Aug-18
06-Jul-18 2204 WHARF SLAB PS03#06 , CROSS BEAM CB04#05 MES - BAM Fc' 36.0 9 13-Jul-18 03-Aug-18
06-Jul-18 2205 CURB , WHARF PILECAP PC01#06 MES - BAM Fc' 36.0 9 13-Jul-18 03-Aug-18
06-Jul-18 2206 WHARF PILECAP PC01#07, SLAB PS07N#01 MES - BAM Fc' 36.0 9 13-Jul-18 03-Aug-18
LC 500 KV, LC AMONIA REMOVAL, LC TURBIN 5, LC WWTP REG IRREG, LC ESP, LC AERATION BASIN, LC
07-Jul-18 2207 WTP DEMIN DESAL, LC CDB 25 MES Fc' 15.0 9 14-Jul-18 04-Aug-18
PT. PIONIRBETON INDUSTRI
CRUSHING TEST SCHEDULE

PLANT : TANJUNG JATI - JEPARA

Total

18-Jul

19-Jul

20-Jul

21-Jul

22-Jul

23-Jul

24-Jul

25-Jul

26-Jul

27-Jul

28-Jul

29-Jul

30-Jul

31-Jul
Date of Code
Location Contractor Grade Sampl Remarks
Pouring Sample
e 7 Days 28 Days

07-Jul-18 2208 WALL WTP FILTERED WATER TANK MES Fc' 30.0 9 14-Jul-18 04-Aug-18
07-Jul-18 2209 SLAB CCB ELEV 12300 MES Fc' 30.0 9 14-Jul-18 04-Aug-18
07-Jul-18 2210 DUCT BANK BOILER 6 MES Fc' 30.0 9 14-Jul-18 04-Aug-18
07-Jul-18 2211 WALL COVER BOX CULVERT T15B, COLUMN FGD UNIT 5 MCC ROOM MES Fc' 30.0 9 14-Jul-18 04-Aug-18
07-Jul-18 2212 WHARF FENDER PILECAP FPC01#04 MES - BAM Fc' 36.0 9 14-Jul-18 04-Aug-18
07-Jul-18 2213 WHARF CROSS BEAM CB04#06 MES - BAM Fc' 36.0 9 14-Jul-18 04-Aug-18
07-Jul-18 2214 INSITU GRID 49 MES - BAM Fc' 36.0 9 14-Jul-18 04-Aug-18
07-Jul-18 2215 TBEAM LT04#08 MES - BAM Fc' 36.0 9 14-Jul-18 04-Aug-18
07-Jul-18 2216 TBEAM LT03#09 MES - BAM Fc' 36.0 9 14-Jul-18 04-Aug-18
07-Jul-18 2217 WHARF PILECAP PC02B#15-16 MES - BAM Fc' 36.0 9 14-Jul-18 04-Aug-18
08-Jul-18 2218 LC AMONIA REMOVAL MES Fc' 15.0 9 15-Jul-18 05-Aug-18
08-Jul-18 2219 WHARF SLAB PS01B#01, PS01#01, PS07N#02, PS07N#04 MES - BAM Fc' 36.0 9 15-Jul-18 05-Aug-18
08-Jul-18 2220 CURB MES - BAM Fc' 36.0 9 15-Jul-18 05-Aug-18
08-Jul-18 2221 WHARF SLAB PS02#01, PS07N#03 MES - BAM Fc' 36.0 9 15-Jul-18 05-Aug-18
09-Jul-18 2222 LC GGH 5, LC 500 KV, LC WTP DEMIN DESAL, LC CHIMNEY, LC CDB, MES Fc' 15.0 9 16-Jul-18 06-Aug-18
09-Jul-18 2223 PHT FOUNDATION CHIMNEY MES Fc' 30.0 9 16-Jul-18 06-Aug-18
09-Jul-18 2224 WALL WTP COAGULATION TANK MES Fc' 30.0 9 16-Jul-18 06-Aug-18
09-Jul-18 2225 WALL TURBIN 5 MES Fc' 30.0 9 16-Jul-18 06-Aug-18
09-Jul-18 2226 SLAB TURBIN 5 MES Fc' 30.0 9 16-Jul-18 06-Aug-18
PHT WWTP AERATION BASIN, PHT WWTP REG IRREG, COLUMN FGD UNIT 5 MCC ROOM, WALL WWTP
09-Jul-18 2227 ELECTRICAL CONTROL HOUSE, PHT TURBIN 6, COLUMN WTP DEHYDRATOR, PHT AMONIA REMOVAL MES Fc' 30.0 9 16-Jul-18 06-Aug-18
09-Jul-18 2228 WWTP FOUNDATION GRAFITY FILTERED WATER TANK MES Fc' 30.0 9 16-Jul-18 06-Aug-18
09-Jul-18 2229 UPL - PS 06#03 , UPL PS07N#04 , TTW - PS 03B#01 MES - BAM Fc' 36.0 9 16-Jul-18 06-Aug-18
09-Jul-18 2230 TBEAM LT02#10 MES - BAM Fc' 36.0 9 16-Jul-18 06-Aug-18
09-Jul-18 2231 INSITU GRID 76 MES - BAM Fc' 36.0 9 16-Jul-18 06-Aug-18
09-Jul-18 2232 HEADSTOCK CB01#64 MES - BAM Fc' 36.0 9 16-Jul-18 06-Aug-18
09-Jul-18 2233 UPL PS05#05-06 , UPL - PS01#15-16 MES - BAM Fc' 36.0 9 16-Jul-18 06-Aug-18
09-Jul-18 2234 UPL - CB4#07 , TTW CB07#01 MES - BAM Fc' 36.0 9 16-Jul-18 06-Aug-18
09-Jul-18 2235 CURB MES - BAM Fc' 36.0 9 16-Jul-18 06-Aug-18
09-Jul-18 2236 UPL - LBA04#12 , UPL CB04A#20-21 MES - BAM Fc' 36.0 9 16-Jul-18 06-Aug-18
09-Jul-18 2237 UPL - CB04#08 , TTW - CB06#01 MES - BAM Fc' 36.0 9 16-Jul-18 06-Aug-18
LC CHIMNEY, LC ESP, LC WWTP REG IRREG, LC AMONIA REMOVAL, LC WTP DEMIN DESAL, LC
10-Jul-18 2238 SWITCGEAR MES Fc' 15.0 9 17-Jul-18 07-Aug-18
10-Jul-18 2239 PILECAP & TBEAM FGD UNIT 6 MCC ROOM MES Fc' 30.0 9 17-Jul-18 07-Aug-18
10-Jul-18 2240 PARAPET WTP ELECTRICAL ROOM, COLUMN PEDESTAL AERATION BLOWER 6 MES Fc' 30.0 9 17-Jul-18 07-Aug-18
10-Jul-18 2241 SLAB TURBIN 5 MES Fc' 30.0 9 17-Jul-18 07-Aug-18
10-Jul-18 2242 PILECAP & TBEAM COMMON FGD ELECTRICAL HOUSE MES Fc' 30.0 9 17-Jul-18 07-Aug-18
10-Jul-18 2243 BOILER 6 STAGE 11B MES Fc' 30.0 9 17-Jul-18 07-Aug-18
10-Jul-18 2244 BOILER 6 STAGE 11B MES Fc' 30.0 9 17-Jul-18 07-Aug-18
10-Jul-18 2245 BOILER 6 STAGE 11B MES Fc' 30.0 9 17-Jul-18 07-Aug-18
10-Jul-18 2246 BOILER 6 STAGE 11B MES Fc' 30.0 9 17-Jul-18 07-Aug-18
PT. PIONIRBETON INDUSTRI
CRUSHING TEST SCHEDULE

PLANT : TANJUNG JATI - JEPARA

Total

18-Jul

19-Jul

20-Jul

21-Jul

22-Jul

23-Jul

24-Jul

25-Jul

26-Jul

27-Jul

28-Jul

29-Jul

30-Jul

31-Jul
Date of Code
Location Contractor Grade Sampl Remarks
Pouring Sample
e 7 Days 28 Days

10-Jul-18 2247 HEADSTOCK CB01#65 MES Fc' 36.0 9 17-Jul-18 07-Aug-18


10-Jul-18 2248 TBEAM LT01#80 MES Fc' 36.0 9 17-Jul-18 07-Aug-18
10-Jul-18 2249 UPL - PC01#08 + TTW-PC02#02, UPL - PS05#07, PS06#04 , PS02#01 MES Fc' 36.0 9 17-Jul-18 07-Aug-18
10-Jul-18 2250 UPL-LB A05#02-03 , PS05#03/05/06/02 MES Fc' 36.0 9 17-Jul-18 07-Aug-18
10-Jul-18 2251 UPL - FB01A#05 MES Fc' 36.0 9 17-Jul-18 07-Aug-18
11-Jul-18 2252 LC SWITCGEAR, LC ESP, LC AERATION BASIN, LC DUCT BANK BOILER 6, LC TURBIN 5 MES Fc' 15.0 9 18-Jul-18 08-Aug-18 7D
PHT WWTP REG IRREG, COLUMN FGD UNI5 MCC ROOM, LH15 BOILER 6, COLUMN AERATION
11-Jul-18 2253 BLOWER 6, COLUMN WTP DEHYDRATOR, COVER BOX CULVERT T15, PARAPET WTP ELECTRICAL MES Fc' 30.0 9 18-Jul-18 08-Aug-18 7D
11-Jul-18 2254 PHT CHIMNEY MES Fc' 30.0 9 18-Jul-18 08-Aug-18 7D
11-Jul-18 2255 UPL-PS01N#05-06, UPL-CB04#10, UPL-PS01#17 MES- BAM Fc' 36.0 9 18-Jul-18 08-Aug-18 7D
11-Jul-18 2256 CURB MES- BAM Fc' 36.0 9 18-Jul-18 08-Aug-18 7D
11-Jul-18 2257 TBEAM LT04#09 MES- BAM Fc' 36.0 9 18-Jul-18 08-Aug-18 7D
11-Jul-18 2258 UPL-PS01#17, UPL-LB-AO5#04 , UPL-LB-A04#13, UPL-PC01#09 MES- BAM Fc' 36.0 9 18-Jul-18 08-Aug-18 7D
12-Jul-18 2259 SLAB TURBIN 5 MES Fc' 30.0 9 19-Jul-18 09-Aug-18 7D
12-Jul-18 2260 SLAB TURBIN 5 MES Fc' 30.0 9 19-Jul-18 09-Aug-18 7D
12-Jul-18 2261 SLAB TURBIN 5 MES Fc' 30.0 9 19-Jul-18 09-Aug-18 7D
12-Jul-18 2262 SLAB TURBIN 5 MES Fc' 30.0 9 19-Jul-18 09-Aug-18 7D
12-Jul-18 2263 SLAB TURBIN 5 MES Fc' 30.0 9 19-Jul-18 09-Aug-18 7D
12-Jul-18 2264 TTW-PC02#03, TTW-PC02#04 MES -BAM Fc' 36.0 9 19-Jul-18 09-Aug-18 7D
12-Jul-18 2265 TTW-PS3A#01, TTWPS04#03#01, TTW-PS04A#01, UPL-PS01N#08 MES -BAM Fc' 36.0 9 19-Jul-18 09-Aug-18 7D
12-Jul-18 2266 TBEAM LT01#81 MES -BAM Fc' 36.0 9 19-Jul-18 09-Aug-18 7D
12-Jul-18 2267 CURB MES -BAM Fc' 36.0 9 19-Jul-18 09-Aug-18 7D
LC ESP, LC BOILER 6, LC CABLE TUNNEL BOILER 5, LC DUCT BANK BOILER 6, LC FOUNDATION
13-Jul-18 2268 CHIMNEY MES Fc' 15.0 9 20-Jul-18 10-Aug-18 7D
COLUMN PEDESTAL WTP DEMIN DESAL, PILECAP+TBEAM FGD UNIT 6 MCC ROOM, SLAB WTP
13-Jul-18 2269 DEMIN DESAL, COLUMN WTP DEHYDRATOR ROOM, SLAB CDB 25, FGD UNIT 5 MCC ROOM, MES Fc' 30.0 9 20-Jul-18 10-Aug-18 7D
13-Jul-18 2270 PHT FOUNDATION CHIMNEY MES Fc' 30.0 9 20-Jul-18 10-Aug-18 7D
13-Jul-18 2271 CCB SLAB ELEV.15200 MES Fc' 30.0 9 20-Jul-18 10-Aug-18 7D
13-Jul-18 2272 SLAB CDB03 MES Fc' 30.0 9 20-Jul-18 10-Aug-18 7D
13-Jul-18 2273 HEADSTOK CB01(4/3)#66 MES-BAM Fc' 36.0 9 20-Jul-18 10-Aug-18 7D
13-Jul-18 2274 INSITU GRID 76 MES-BAM Fc' 36.0 9 20-Jul-18 10-Aug-18 7D
13-Jul-18 2275 CROSS BEAM CB04#11-12-13 MES-BAM Fc' 36.0 9 20-Jul-18 10-Aug-18 7D
13-Jul-18 2276 LONGITUDINAL BEAM LB-105#05-06, CROSS BEAM CB04#22-23 MES-BAM Fc' 36.0 9 20-Jul-18 10-Aug-18 7D
13-Jul-18 2277 CROSS BEAM CB04A#24, CROSS BEAM CB04#14, PS06#05 SLAB, PS02A#02 MES-BAM Fc' 36.0 9 20-Jul-18 10-Aug-18 7D
13-Jul-18 2278 WHARF PILECAP PS04#01, HEADSTOCK CB06#04 SLAB MES-BAM Fc' 36.0 9 20-Jul-18 10-Aug-18 7D
13-Jul-18 2279 TBEAM LT01#82 MES-BAM Fc' 36.0 9 20-Jul-18 10-Aug-18 7D
13-Jul-18 2280 LONGITUDINAL BEAM LBA#05#07 MES-BAM Fc' 36.0 9 20-Jul-18 10-Aug-18 7D
14-Jul-18 2281 LC IDF 6A, LC WTP DEMIN DESAL, LC BOILER 6, MES Fc' 15.0 9 21-Jul-18 11-Aug-18 7D
14-Jul-18 2282 WALL WTP COAGULATION TANK, WALL WWTP ELECTRICAL CONTROL HOUSE MES Fc' 30.0 9 21-Jul-18 11-Aug-18 7D
14-Jul-18 2283 WWTP NEUTRALIZATION SUMP MES Fc' 30.0 9 21-Jul-18 11-Aug-18 7D
14-Jul-18 2284 WWTP NEUTRALIZATION SUMP MES Fc' 30.0 9 21-Jul-18 11-Aug-18 7D
14-Jul-18 2285 WALL TURBIN 5, WTP FILTERED WATER TANK A MES Fc' 30.0 9 21-Jul-18 11-Aug-18 7D
PT. PIONIRBETON INDUSTRI
CRUSHING TEST SCHEDULE

PLANT : TANJUNG JATI - JEPARA

Total

18-Jul

19-Jul

20-Jul

21-Jul

22-Jul

23-Jul

24-Jul

25-Jul

26-Jul

27-Jul

28-Jul

29-Jul

30-Jul

31-Jul
Date of Code
Location Contractor Grade Sampl Remarks
Pouring Sample
e 7 Days 28 Days

14-Jul-18 2286 SLAB TURBIN 5 MES Fc' 30.0 9 21-Jul-18 11-Aug-18 7D


14-Jul-18 2287 SLAB SWITCHGEAR , CDB 21/22 MES Fc' 30.0 9 21-Jul-18 11-Aug-18 7D
14-Jul-18 2288 UPL-PC04#10, UPL-CB02B#17, UPL-LB-A05#08 MES-BAM Fc' 36.0 9 21-Jul-18 11-Aug-18 7D
14-Jul-18 2289 HEADSTOCK CB01#67 MES-BAM Fc' 36.0 9 21-Jul-18 11-Aug-18 7D
14-Jul-18 2290 TBEAM LT01#83 MES-BAM Fc' 36.0 9 21-Jul-18 11-Aug-18 7D
14-Jul-18 2291 UPL-FB-01A#06 MES-BAM Fc' 36.0 9 21-Jul-18 11-Aug-18 7D
14-Jul-18 2292 END PANEL+CURB MES-BAM Fc' 15.0 9 21-Jul-18 11-Aug-18 7D
15-Jul-18 2293 LC WTP DEMIN DESAL, AIR COMPESSOR, LC TURBIN 5 MES Fc' 15.0 9 22-Jul-18 12-Aug-18 7D
15-Jul-18 2294 SLAB TURBIN 5, COLUMN WWTP COMMON FGD ELECTRICAL HOUSE, MES Fc' 30.0 9 22-Jul-18 12-Aug-18 7D
15-Jul-18 2295 CDB#15 MES Fc' 30.0 9 22-Jul-18 12-Aug-18 7D
15-Jul-18 2296 BOILER 6 STAGE 1T-6T MES Fc' 30.0 9 22-Jul-18 12-Aug-18 7D
15-Jul-18 2297 BOILER 6 STAGE 1T-6T MES Fc' 30.0 9 22-Jul-18 12-Aug-18 7D
15-Jul-18 2298 BOILER 6 STAGE 1T-6T MES Fc' 30.0 9 22-Jul-18 12-Aug-18 7D
15-Jul-18 2299 BOILER 6 STAGE 1T-6T MES Fc' 30.0 9 22-Jul-18 12-Aug-18 7D
15-Jul-18 2300 BOILER 6 STAGE 1T-6T MES Fc' 30.0 9 22-Jul-18 12-Aug-18 7D
15-Jul-18 2301 BOILER 6 STAGE 1T-6T MES Fc' 30.0 9 22-Jul-18 12-Aug-18 7D
15-Jul-18 2302 UPL-CB04#16, UPL-FPC01#05 MES-BAM Fc' 36.0 9 22-Jul-18 12-Aug-18 7D
15-Jul-18 2303 INSITU GRID 87 MES-BAM Fc' 36.0 9 22-Jul-18 12-Aug-18 7D
16-Jul-18 2304 LC WAREHOUSE BUT-CRI Fc' 15.0 9 23-Jul-18 13-Aug-18 7D
LC DUCT BANK BOILER 6, LC FOUNDATION CHIMNEY, LC ESP#6, LC ABSORBER, LC GGH-5, LC
16-Jul-18 2305 TURBIN 5, LC WWTP REG.IRREG MES Fc' 15.0 9 23-Jul-18 13-Aug-18 7D
TOP COVER BOX CULVERT T3A, PEDESTAL COLUMN WTP CHEMICAL ROOM, WALL WWTP
16-Jul-18 2306 FOCCULATION TANK, PHT TURBIN 5, COLUMN COMMON FGD ELECTRICAL HOUSE MES Fc' 30.0 9 23-Jul-18 13-Aug-18 7D
16-Jul-18 2307 PHT CHIMNEY MES Fc' 30.0 9 23-Jul-18 13-Aug-18 7D
16-Jul-18 2308 TTW-PS04A#01, TTW-PS08#01, TTW-PS09#01/02/03 MES-BAM Fc' 36.0 9 23-Jul-18 13-Aug-18 7D
16-Jul-18 2309 TBEAM LT01#84 MES-BAM Fc' 36.0 9 23-Jul-18 13-Aug-18 7D
16-Jul-18 2310 UPL-PS01S#01/02 MES-BAM Fc' 36.0 9 23-Jul-18 13-Aug-18 7D
16-Jul-18 2311 INSITU GRID 61, INSITU GRID 73 MES-BAM Fc' 36.0 9 23-Jul-18 13-Aug-18 7D
16-Jul-18 2312 HEADSTOCK CB06(7/12)#01 WALL, END PANEL&CURB MES-BAM Fc' 36.0 9 23-Jul-18 13-Aug-18 7D
16-Jul-18 2313 UPL-CB04#17/18, UPL PC01#11, PC02A#01 MES-BAM Fc' 36.0 9 23-Jul-18 13-Aug-18 7D
17-Jul-18 2314 SLAB TURBIN 5 MES Fc' 30.0 9 24-Jul-18 14-Aug-18 7D
17-Jul-18 2315 SLAB TURBIN 5 MES Fc' 30.0 9 24-Jul-18 14-Aug-18 7D
PHT BOILER 6, WTP GRAVITY FILTERED WATER TANK, COLUMN COMMON FGD ELECTRICAL
17-Jul-18 2316 HOUSE, COLUMN FGD UNIT 5 MCC ROOM MES Fc' 30.0 9 24-Jul-18 14-Aug-18 7D
17-Jul-18 2317 SLAB AERATION BASIN MES Fc' 30.0 9 24-Jul-18 14-Aug-18 7D
17-Jul-18 2318 SLAB AERATION BASIN MES Fc' 30.0 9 24-Jul-18 14-Aug-18 7D
17-Jul-18 2319 LC WAREHOUSE BUT. CRI Fc' 15.0 9 24-Jul-18 14-Aug-18 7D
17-Jul-18 2320 LC WTP DEMIN DESAL, LC 500 KV, LC AERATION BASIN, LC AIR COMPRESSOR MES Fc' 15.0 9 24-Jul-18 14-Aug-18 7D
17-Jul-18 2321 UPL-CB04#19, UPL-PC02A#02, UPL-LBA11#01 MES-BAM Fc' 36.0 9 24-Jul-18 14-Aug-18 7D
17-Jul-18 2322 TBEAM LT01#85 MES-BAM Fc' 36.0 9 24-Jul-18 14-Aug-18 7D
PT. PIONIRBETON INDUSTRI
CRUSHING TEST SCHEDULE

PLANT : TANJUNG JATI - JEPARA

Total

18-Jul

19-Jul

20-Jul

21-Jul

22-Jul

23-Jul

24-Jul

25-Jul

26-Jul

27-Jul

28-Jul

29-Jul

30-Jul

31-Jul
Date of Code
Location Contractor Grade Sampl Remarks
Pouring Sample
e 7 Days 28 Days

17-Jul-18 2323 UPL-PS01S#03/04, UPL-PS07N#05/06, UPL-LB-A011#1 MES-BAM Fc' 36.0 9 24-Jul-18 14-Aug-18 7D
17-Jul-18 2324 HEADSTOCK CB01#68 MES-BAM Fc' 36.0 9 24-Jul-18 14-Aug-18 7D
17-Jul-18 2325 UPL-FPC01#05 WALL, CURB MES-BAM Fc' 36.0 9 24-Jul-18 14-Aug-18 7D
17-Jul-18 2326 UPL-LBA05#10 MES-BAM Fc' 36.0 9 24-Jul-18 14-Aug-18 7D

Checked by Approved by,

Andriyan Agus Marwel Simbolon


Staff Technician QC Manager