Contract ID : 17PL0271

Contract Name : Construction of Two(2) Storey - Four(4) Classroom Worksop Building (Regular Laboratory - 2), Kalinga National igh School, Tabuk City, Kalinga
Location : Tabuk City, Kalinga
Effectivity of Contract : January 14, 2018
Expiry Date : July 12, 2018

14-Jan

15-Jan

16-Jan

17-Jan

18-Jan

19-Jan

20-Jan

21-Jan

22-Jan

23-Jan

24-Jan

25-Jan

26-Jan

27-Jan

28-Jan

29-Jan

30-Jan
ITEM No. DESCRIPTION QTY. UNIT UNIT COST TOTAL PERCENTAGE % DURATION

10

11

12

13

14

15

16

17
1

9
A.1.1(8) Provision of Field Office for the Engineer (Rental 6.00 mos. 14,437.50 86,625.00 0.64% 180.00 Planned
Basis)

B.3 Building Permit and Other LGU Permits 1.00 l.s. 23,100.00 23,100.00 0.17% 5.00 Planned

B.5 Project Billboard/Signboard 1.00 set 22,869.00 22,869.00 0.17% 180.00 Planned

B.7 Occupational Safety and Health Program 6.00 mos. 4,521.83 27,130.98 0.20% 180.00 Planned

B.9 Mobilization/Demobilization 1.00 l.s. 254,100.00 254,100.00 1.87% 4.00 Planned

801(1) Clearing and Grubbing 301.15 sq.m. 1,299.38 391,308.29 2.88% 4.00 Planned

1200(4) Package Type Air Conditioning Unit(PACU) 2.0HP 8.00 set 38,981.25 311,850.00 2.30% 20.00 Planned
coiling Capacity(Floor Standing type)

505(5) Stone Masonry Class "A" 46.75 cu.m. 4,908.75 229,484.06 1.69% 24.00 Planned

803(1)a Structure Excavation (Common Soil) 206.36 cu.m. 326.98 67,475.59 0.50% 5.00 Planned

804(1)a Embankment form Structure Excavation 94.06 cu.m. 28.34 2,665.66 0.02% 1.00 Planned

804(1)b Embankment from Borrow 651.50 cu.m. 464.93 302,901.90 2.23% 4.00 Planned

804(4) Gravel Fill 46.06 cu.m. 1,278.27 58,877.12 0.43% 4.00 Planned

900(1)c1 Structural Concrete (Stair and Sun Breake) 6.97 cu.m. 6,290.77 43,846.67 0.32% 7.00 Planned

900(1)c2 Structural Concrete (Footing and Slab-on-Fill) 67.86 cu.m. 6,251.32 424,214.58 3.13% 7.00 Planned

900(1)c3 Structural Concrete (Footing Tie Beam) 23.58 cu.m. 6,264.69 147,721.39 1.09% 4.00 Planned

900(1)c4 Structural Concrete (Column) 34.27 cu.m. 6,254.34 214,336.23 1.58% 8.00 Planned

900(1)c5 Structural Concrete(Suspended Slab) 25.68 cu.m. 6,249.79 160,494.61 1.18% 5.00 Planned

900(1)c6 Structural Concrete (Beams, Girders) 39.74 cu.m. 6,253.58 248,517.27 1.83% 9.00 Planned

902(1)a1 Reinforcing Steel Bars (Deformed, G-40) 35,844.00 kgs. 82.70 2,964,298.80 21.85% 41.00 Planned

903(2) Forms and Falseworks 690.85 sq.m. 1,501.50 1,037,311.28 7.65% 165.00 Planned

1000(1) Soil Poisoning 115.60 lit. 638.09 73,763.20 0.54% 3.00 Planned

1046(2)a1 CHB Non-Load Bearing (Including RSB) 129.91 sq.m. 764.13 99,268.13 0.73% 15.00 Planned

1046(2)a2 CHB Non-Load Bearing (Including RSB) 383.18 sq.m. 848.38 325,082.25 2.40% 20.00 Planned

1010(1) Frames 16.00 set 14,017.50 224,280.00 1.65% 5.00 Planned

1010(2)b Doors (Wood Panel) 14.62 sq.m. 3,780.00 55,256.04 0.41% 7.00 Planned

1009(1)a Jalousie Window (Glass) 24.70 sq.m. 2,520.00 62,244.00 0.46% 7.00 Planned

1005(6) Steel Window 1.00 l.s. 45,360.00 45,360.00 0.33% 7.00 Planned

1005(5) Grille Window 26.80 sq.m. 1,512.00 40,521.60 0.30% 7.00 Planned

1004(2)a Finishing Hardware (Locksets) 16.00 set 693.00 11,088.00 0.08% 7.00 Planned

1004(2)g Finishing Hardware (Hinges) 12.00 set 630.00 7,560.00 0.06% 7.00 Planned

1003(9) Carpentry & Joinery Works (Chalk Board) 1.00 l.s. 56,700.00 56,700.00 0.42% 5.00 Planned

1021(1)c Cement Floor Finish (With Floor) 584.99 sq.m. 239.46 140,081.71 1.03% 4.00 Planned

1027(1) Cement Plaster Finish 2,313.80 sq.m. 200.71 464,402.80 3.42% 18.00 Planned

1051(1) Railing 74.10 m. 10,080.00 746,928.00 5.51% 30.00 Planned

1038(1) Reflective Insulation 316.61 sq.m. 403.20 127,657.15 0.94% 15.00 Planned

1018(1) Glazed Tiles & Trims 71.55 sq.m. 1,243.10 88,943.81 0.66% 18.00 Planned

1018(2) Unglazed Tiles 251.60 sq.m. 1,193.45 300,272.02 2.21% 26.00 Planned

1018(3) Granite Tiles 378.00 sq.m. 1,827.00 690,606.00 5.09% 29.00 Planned

1003(1)a1 Ceiling 325.88 sq.m. 1,260.00 410,608.80 3.03% 5.00 Planned

1032(1)a Painting Works (Masonry/Concrete) 2,553.90 sq.m. 151.20 386,149.68 2.85% 15.00 Planned

1032(1)b Painting Works (Wood) 133.27 sq.m. 270.90 36,102.84 0.27% 10.00 Planned

1032(1)c Painting Works (Steel) 62.73 sq.m. 453.60 28,454.33 0.21% 15.00 Planned

1014(1)b1 Prepainted Metal Sheets, 0.5mm, Long Span 316.61 sq.m. 850.50 269,276.81 1.99% 10.00 Planned

1047(8) Structural Steel (Roof Framing) 9,442.70 kgs. 88.20 832,846.14 6.14% 66.00 Planned

1047(1) Metal Structure, Fire Scape 1.00 157,500.00 157,500.00 1.16% 30.00 Planned

1001(8) Sewer Line Works 1.00 l.s. 151,200.00 151,200.00 1.11% 35.00 Planned

1001(9) Storm Drainage/Down Spout 1.00 l.s. 50,400.00 50,400.00 0.37% 10.00 Planned

1002(28) Cold Water Lines 1.00 l.s. 19,334.70 19,334.70 0.14% 20.00 Planned

1001(6) Catch Basin, CHB/Septik Tank 14 each 6,161.40 86,259.60 0.64% 20.00 Planned

1002(8) Plumbing Fixtures 1.00 l.s. 98,280.00 98,280.00 0.72% 20.00 Planned

1100(30) Conduit, Boxes & Fittings 1.00 l.s. 54,432.00 54,432.00 0.40% 30.00 Planned

1101(42) Wires and Wiring Devices 1.00 l.s. 106,545.60 106,545.60 0.79% 20.00 Planned

1102(27) Power Load Center, Switch Gear & Panel Board 1.00 l.s. 43,470.00 43,470.00 0.32% 10.00 Planned

1103(1) Lighting Fixtures 1.00 l.s. 107,100.00 107,100.00 0.79% 10.00 Planned

1208 Fire Alarm System 1.00 l.s. 40,320.00 40,320.00 0.30% 5.00 Planned

1003(17) Carpentry and Joinery, Furniture 1.00 l.s. 107100 107,100.00 0.79% 20 Planned

DAILY ACCOMPLISHMENT Planned 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

TOTAL 13,564,523.64 100.00% 180.00


0.00 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
14-Jan

15-Jan

16-Jan

17-Jan

18-Jan

19-Jan

20-Jan

21-Jan

22-Jan

23-Jan

28-Jan

29-Jan

30-Jan

Prepared by: Reviewed and Submitted by:

KALINGA BUILDERS ADOLFO R. CARBONELL


CONTRUCTOR PROJECT ENGINEER
DPWH-LKDEO
10-Feb

11-Feb

12-Feb

13-Feb

14-Feb

15-Feb

16-Feb

17-Feb

18-Feb

19-Feb

20-Feb

21-Feb

22-Feb

23-Feb

24-Feb

25-Feb

26-Feb

27-Feb

28-Feb
31-Jan

1-Mar

2-Mar

3-Mar
1-Feb

2-Feb

3-Feb

4-Feb

5-Feb

6-Feb

7-Feb

8-Feb

9-Feb
18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49
0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004

0.034 0.034 0.034 0.034 0.034

0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001

0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001

0.468 0.468

0.721 0.721 0.721 0.721

0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070

0.099 0.099 0.099 0.099 0.099

0.109 0.109

0.533

0.046 0.046 0.046 0.046 0.046 0.046

0.181 0.181 0.181

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.040 0.040 0.040 0.040 0.040 0.474 0.474 0.979 0.979 0.979 0.727 0.105 0.105 0.151 0.222 0.222 0.231 0.231 0.655

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.040 0.079 0.119 0.159 0.198 0.672 1.146 2.125 3.103 4.082 4.809 4.914 5.019 5.170 5.392 5.614 5.845 6.076 6.731
10-Feb

11-Feb

12-Feb

13-Feb

14-Feb

15-Feb

16-Feb

17-Feb

18-Feb

19-Feb

20-Feb

21-Feb

22-Feb

23-Feb

24-Feb

25-Feb

26-Feb

27-Feb

28-Feb
31-Jan

1-Mar

2-Mar

3-Mar
1-Feb

2-Feb

3-Feb

4-Feb

5-Feb

6-Feb

7-Feb

8-Feb

9-Feb

Recommending Approval: Approved:

RUBY A. UYAM IRENEO S. GALLATO


ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
DPWH-LKDEO DPWH-LKDEO
10-Mar

11-Mar

12-Mar

13-Mar

14-Mar

15-Mar

16-Mar

17-Mar

18-Mar

19-Mar

20-Mar

21-Mar

22-Mar

23-Mar

24-Mar

25-Mar

26-Mar

27-Mar

28-Mar

29-Mar

30-Mar

31-Mar
4-Mar

5-Mar

6-Mar

7-Mar

8-Mar

9-Mar

1-Apr

2-Apr

3-Apr

4-Apr
50

51

52

53

54

55

56

57

58

59

60

61

62

63

64

65

66

67

68

69

70

71

72

73

74

75

76

77

78

79

80

81
0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004

0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001

0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001

0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070

0.020

0.558 0.558 0.558 0.558

0.109 0.109

0.447 0.447 0.447

0.272 0.272 0.272 0.272

0.533 0.533 0.533 0.533 0.533 0.533 0.533 0.533 0.533 0.533 0.533 0.533 0.533 0.533 0.533 0.533 0.533 0.533

0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046

0.655 0.569 0.569 0.655 0.655 0.655 0.655 0.655 0.655 0.655 0.655 0.395 0.395 0.395 0.395 0.142 0.610 0.610 0.610 0.610 0.160 0.160 0.585 0.585 0.585 0.585 0.585 0.585 0.585 0.585 0.585 0.499

7.387 7.956 8.525 9.181 9.836 10.491 11.147 11.802 12.458 13.113 13.769 14.163 14.558 14.953 15.347 15.490 16.100 16.710 17.320 17.930 18.091 18.251 18.836 19.421 20.006 20.591 21.176 21.761 22.346 22.931 23.516 24.015
10-Mar

11-Mar

12-Mar

13-Mar

14-Mar

15-Mar

16-Mar

17-Mar

18-Mar

19-Mar

20-Mar

21-Mar

22-Mar

23-Mar

24-Mar

25-Mar

26-Mar

27-Mar

28-Mar

29-Mar

30-Mar

31-Mar
4-Mar

5-Mar

6-Mar

7-Mar

8-Mar

9-Mar

1-Apr

2-Apr

3-Apr

4-Apr
KALINGA BUILDERS

10-Apr

11-Apr

12-Apr

13-Apr

14-Apr

15-Apr

16-Apr

17-Apr

18-Apr

19-Apr

20-Apr

21-Apr

22-Apr

23-Apr

24-Apr

25-Apr

26-Apr

27-Apr

28-Apr

29-Apr

30-Apr

1-May

2-May

3-May

4-May

5-May

6-May
5-Apr

6-Apr

7-Apr

8-Apr

9-Apr

100

101

102

103

104

105

106

107

108

109

110

111

112

113
82

83

84

85

86

87

88

89

90

91

92

93

94

95

96

97

98

99
0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004

0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001

0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001

0.046 0.046 0.046 0.046 0.046 0.046 0.046

0.447 0.447 0.447 0.447

0.198 0.198 0.198 0.198

0.237 0.237 0.237 0.237 0.237

0.204 0.204 0.204 0.204 0.204

0.533 0.533 0.533 0.533 0.533 0.533 0.533 0.533 0.533 0.533 0.533 0.533 0.533 0.533 0.533 0.533 0.533 0.533 0.533

0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046

0.499 0.499 0.499 0.499 0.585 0.585 0.585 0.585 0.585 0.585 0.585 0.249 0.249 0.249 0.249 0.585 0.585 0.585 0.585 0.585 0.585 0.631 0.631 0.538 0.538 0.538 0.538 0.538 0.585 0.585 0.585 0.585

24.513 25.012 25.511 26.009 26.594 27.179 27.764 28.349 28.934 29.519 30.104 30.354 30.603 30.852 31.102 31.687 32.272 32.857 33.442 34.027 34.612 35.243 35.874 36.412 36.950 37.489 38.027 38.565 39.150 39.735 40.320 40.905
10-Apr

11-Apr

12-Apr

13-Apr

14-Apr

15-Apr

16-Apr

17-Apr

18-Apr

19-Apr

20-Apr

21-Apr

22-Apr

23-Apr

24-Apr

25-Apr

26-Apr

27-Apr

28-Apr

29-Apr

30-Apr

1-May

2-May

3-May

4-May

5-May

6-May
5-Apr

6-Apr

7-Apr

8-Apr

9-Apr
10-May

11-May

12-May

13-May

14-May

15-May

16-May

17-May

18-May

19-May

20-May

21-May

22-May

23-May

24-May

25-May

26-May

27-May

28-May

29-May

30-May

31-May
7-May

8-May

9-May

1-Jun

2-Jun

3-Jun

4-Jun

5-Jun

6-Jun

7-Jun
114

115

116

117

118

119

120

121

122

123

124

125

126

127

128

129

130

131

132

133

134

135

136

137

138

139

140

141

142

143

144

145
0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004

0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001

0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001

0.198 0.198 0.198 0.198

0.204 0.204 0.204 0.204

0.533 0.533 0.533

0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046

0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049

0.120 0.120 0.120 0.120 0.120 0.120

0.184 0.184 0.184 0.184 0.184 0.184 0.184 0.184 0.184 0.184 0.184 0.184 0.184 0.184 0.184 0.184 0.184 0.184 0.184

0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093

0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032

0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013

0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039

0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032

0.585 0.585 0.678 0.342 0.342 0.342 0.342 0.349 0.349 0.349 0.349 0.226 0.226 0.409 0.409 0.409 0.409 0.409 0.409 0.409 0.409 0.494 0.494 0.494 0.494 0.494 0.565 0.565 0.565 0.565 0.565 0.494

41.490 42.075 42.753 43.096 43.438 43.781 44.123 44.472 44.820 45.169 45.517 45.743 45.968 46.378 46.787 47.196 47.605 48.014 48.423 48.833 49.242 49.736 50.229 50.723 51.217 51.711 52.276 52.841 53.406 53.971 54.535 55.029
10-May

11-May

12-May

13-May

14-May

15-May

16-May

17-May

18-May

19-May

20-May

21-May

22-May

23-May

24-May

25-May

26-May

27-May

28-May

29-May

30-May

31-May
7-May

8-May

9-May

1-Jun

2-Jun

3-Jun

4-Jun

5-Jun

6-Jun

7-Jun
10-Jun

11-Jun

12-Jun

13-Jun

14-Jun

15-Jun

16-Jun

17-Jun

18-Jun

19-Jun

20-Jun

21-Jun

22-Jun

23-Jun

24-Jun

25-Jun

26-Jun

27-Jun

28-Jun

29-Jun

30-Jun
8-Jun

9-Jun

1-Jul

2-Jul

3-Jul

4-Jul

5-Jul

6-Jul

7-Jul

8-Jul

9-Jul
146

147

148

149

150

151

152

153

154

155

156

157

158

159

160

161

162

163

164

165

166

167

168

169

170

171

172

173

174

175

176

177
0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004

0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001

0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001

0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046

0.120 0.120 0.120 0.120 0.120 0.120 0.120 0.120 0.120 0.120 0.120 0.120 0.120 0.120

0.331 0.331 0.331 0.331 0.331

0.058 0.058 0.058 0.058 0.058 0.058 0.058

0.066 0.066 0.066 0.066 0.066 0.066 0.066

0.048 0.048 0.048 0.048 0.048 0.048 0.048

0.043 0.043 0.043 0.043 0.043 0.043 0.043

0.012 0.012 0.012 0.012 0.012 0.012 0.012

0.008 0.008 0.008 0.008 0.008 0.008 0.008

0.258 0.258 0.258 0.258

0.190 0.190

0.184 0.184 0.184 0.184 0.184 0.184 0.184 0.184 0.184 0.184 0.184

0.036 0.036 0.036 0.036 0.036

0.085 0.085 0.085 0.085 0.085 0.085 0.085 0.085 0.085 0.085

0.176 0.176 0.176 0.176 0.176 0.176 0.176 0.176 0.176 0.176 0.176 0.176 0.176

0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093

0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039

0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032

0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007

0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032

0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036

0.013 0.013 0.013 0.013

0.494 0.494 0.494 0.494 0.480 0.480 0.480 0.480 0.480 0.480 0.480 0.333 0.333 0.333 0.512 0.512 0.512 0.512 0.558 0.668 0.668 0.668 0.753 0.753 0.753 0.753 0.778 0.814 0.814 0.814 0.746 0.710

55.523 56.016 56.510 57.003 57.484 57.964 58.444 58.924 59.404 59.884 60.365 60.698 61.030 61.363 61.875 62.387 62.899 63.411 63.969 64.637 65.305 65.973 66.727 67.480 68.233 68.987 69.764 70.579 71.393 72.207 72.953 73.663
10-Jun

11-Jun

12-Jun

13-Jun

14-Jun

15-Jun

16-Jun

17-Jun

18-Jun

19-Jun

20-Jun

21-Jun

22-Jun

23-Jun

24-Jun

25-Jun

26-Jun

27-Jun

28-Jun

29-Jun

30-Jun
8-Jun

9-Jun

1-Jul

2-Jul

3-Jul

4-Jul

5-Jul

6-Jul

7-Jul

8-Jul

9-Jul
10-Jul

11-Jul

12-Jul

13-Jul

14-Jul

15-Jul

16-Jul

17-Jul

18-Jul

19-Jul

20-Jul

21-Jul

22-Jul

23-Jul

24-Jul

25-Jul

26-Jul

27-Jul

28-Jul

29-Jul

30-Jul

31-Jul

1-Aug

2-Aug

3-Aug

4-Aug
178

179

180

181

182

183

184

185

186

187

188

189

190

191

192

193

194

195

196

197

198

199

200

201

202

203
0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004

0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001

0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001

0.115 0.115 0.115 0.115 0.115 0.115 0.115 0.115 0.115 0.115 0.115 0.115 0.115 0.115 0.115

0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046

0.084 0.084 0.084 0.084 0.084

0.190 0.190 0.190 0.190 0.190 0.190 0.190 0.190 0.190 0.190 0.190 0.190 0.190 0.190 0.190 0.190

0.063 0.063 0.063 0.063 0.063 0.063 0.063 0.063 0.063 0.063 0.063 0.063 0.063 0.063 0.063

0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036

0.085 0.085 0.085 0.085 0.085 0.085 0.085 0.085 0.085 0.085 0.085 0.085 0.085 0.085 0.085 0.085

0.176 0.176 0.176 0.176 0.176 0.176 0.176 0.176 0.176 0.176 0.176 0.176 0.176 0.176 0.176 0.176

0.190 0.190 0.190 0.190 0.190 0.190 0.190 0.190 0.190 0.190

0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027

0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014

0.199 0.199 0.199 0.199 0.199 0.199 0.199 0.199 0.199 0.199

0.093 0.093 0.093 0.093

0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039

0.037 0.037 0.037 0.037 0.037 0.037 0.037 0.037 0.037 0.037

0.007 0.007 0.007 0.007 0.007 0.007

0.032 0.032 0.032 0.032 0.032 0.032 0.032

0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013

0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039

0.079 0.079 0.079 0.079 0.079

0.059 0.059 0.059 0.059 0.059

0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039

0.710 0.710 0.710 0.710 0.853 0.853 0.845 0.814 0.937 0.989 0.989 1.208 1.208 1.088 0.852 0.852 0.552 0.552 0.552 0.513 0.513 0.625 0.625 0.625 0.611 0.611
100.00%

74.373 75.083 75.793 76.503 77.355 78.208 79.053 79.867 80.804 81.793 82.782 83.990 85.198 86.285 87.137 87.989 88.541 89.094 89.646 90.159 90.671 91.296 91.921 92.545 93.157 93.768
1-Aug

2-Aug

3-Aug

4-Aug
10-Jul

11-Jul

12-Jul

13-Jul

14-Jul

15-Jul

16-Jul

17-Jul

18-Jul

19-Jul

20-Jul

21-Jul

22-Jul

23-Jul

24-Jul

25-Jul

26-Jul

27-Jul

28-Jul

29-Jul

30-Jul

31-Jul
10-Aug

11-Aug
5-Aug

6-Aug

7-Aug

8-Aug

9-Aug
204

205

206

207

208

209

210
0.004 0.004 0.004 0.004 0.004 0.004 0.004

0.001 0.001 0.001 0.001 0.001 0.001 0.001

0.001 0.001 0.001 0.001 0.001 0.001 0.001

0.468 0.468

0.115 0.115 0.115 0.115 0.115

0.046 0.046 0.046 0.046 0.046

0.605 0.605 0.605 0.605 0.605

0.190 0.190 0.190 0.190 0.190

0.079 0.079 0.079 0.079 0.079

0.039 0.039

1.081 1.081 1.041 1.041 1.041 0.474 0.474

94.849 95.929 96.970 98.011 99.052 99.526 100.000


10-Aug

11-Aug
5-Aug

6-Aug

7-Aug

8-Aug

9-Aug
Contract ID : 17PL0148
Contract Name : Construction of One (1) Storey - Two Classroom School Building with Attached Comfort Room, Balawag Elementary School
Location : Tabuk City, Kalinga
Effectivity of Contract : November 09, 2017
Expiry Date : February 01, 2018

NOVEMBER
7 15
ITEM No. DESCRIPTION QTY. UNIT UNIT COST TOTAL 7 22

10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
9

1
2
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
1
2
3
4
5
6
7
8
9
A.1.1(8) Provision of Field Office for the Engineer (Rental
Basis) 2.83 mos. 7,350.00 20,800.50
B.3 Building Permit and Other LGU Permits 1.00 l.s. 52,435.00 52,435.00
B.5 Project Billboard/Signboard 1.00 set 1,905.49 1,905.49
B.7 Occupational Safety and Health Program 2.83 mos. 9,168.39 25,946.54
B.9 Mobilization/Demobilization 1.00 l.s. 13,949.04 13,949.04
801(1) Clearing and Grubbing 242.00 sq.m. 117.38 28,405.96
800(1) Removal of Structures and Obstruction 1.00 l.s. 69,415.72 69,415.72
803(1)a Structure Excavation (Common Soil) 20.16 cu.m. 613.29 12,363.93
804(1)a Embankment form Structure Excavation 14.85 cu.m. 441.41 6,554.94
804(1)b Embankment from Borrow 255.35 cu.m. 1,609.32 410,939.86
804(4) Gravel Fill 19.49 cu.m. 1,726.82 33,655.72
900(1)c2 Structural Concrete (Footing and Slab-on-Fill) 25.09 cu.m. 6,456.88 162,003.12
900(1)c3 Structural Concrete (Footing Tie Beam) 6.30 cu.m. 6,825.99 43,003.74
900(1)c4 Structural Concrete (Column) 6.55 cu.m. 6,882.13 45,077.95
900(1)c6 Structural Concrete (Beams, Girders) 8.86 cu.m. 6,927.66 61,379.07
902(1)a1 Reinforcing Steel Bars (Deformed, G-40) 5,420.30 kgs. 75.10 407,064.53
903(2) Forms and Falseworks 191.82 sq.m. 694.82 133,280.37
1000(1) Soil Poisoning 15.00 lit. 1,040.10 15,601.50
1046(2)a2 CHB Non-Load Bearing (Including RSB) 267.50 sq.m. 1,088.44 291,157.70
1010(1) Frames 16.00 set 3,676.87 58,829.92
1010(2)b Doors (Wood Panel) 11.17 sq.m. 4,854.13 54,220.63
1009(1)a Jalousie Window (Glass) 24.70 sq.m. 3,011.31 74,379.36
1005(5) Grille Window 24.70 sq.m. 2,804.57 69,272.88
1004(2)a Finishing Hardware (Locksets) 6.00 set 2,175.89 13,055.34
1004(2)g Finishing Hardware (Hinges) 12.00 set 249.26 2,991.12
1003(9) Carpentry & Joinery Works (Chalk Board) 1.00 l.s. 16,524.50 16,524.50
1021(1)c Cement Floor Finish (With Floor) 155.78 sq.m. 325.21 50,661.21
1027(1) Cement Plaster Finish 332.64 sq.m. 321.28 106,870.58
1051(1) Railing 18.00 m. 570.53 10,269.54
1038(1) Reflective Insulation 242.00 sq.m. 102.64 24,838.88
1018(1) Glazed Tiles & Trims 15.00 sq.m. 1,426.15 21,392.25
1018(2) Unglazed Tiles 6.80 sq.m. 1,545.69 10,510.69
1003(1)a1 Ceiling 193.52 sq.m. 589.27 114,035.53
1032(1)a Painting Works (Masonry/Concrete) 492.42 sq.m. 258.69 127,384.13
1032(1)b Painting Works (Wood) 41.46 sq.m. 370.93 15,378.76
1032(1)c Painting Works (Steel) 29.03 sq.m. 406.58 11,803.02
1014(1)b1 Prepainted Metal Sheets, 0427mm, Long Span 242.00 sq.m. 727.37 176,023.54
1047(8) Structural Steel (Roof Framing) 4,297.80 kgs. 103.95 446,756.31
1001(8) Sewer Line Works 1.00 l.s. 18,430.23 18,430.23
1002(28) Cold Water Lines 1.00 l.s. 16,245.09 16,245.09
1002(8) Plumbing Fixtures 1.00 l.s. 50,518.28 50,518.28
1100(30) Conduit, Boxes & Fittings 1.00 l.s. 8,079.89 8,079.89
1101(42) Wires and Wiring Devices 1.00 l.s. 27,231.62 27,231.62
1102(27) Power Load Center, Switch Gear & Panel Board 1.00 l.s. 7,039.16 7,039.16
1103(1) Lighting Fixtures 1.00 l.s. 54,020.28 54,020.28
MONTHLY PLANNED ACCOMPLISHMENT 1.15% #REF!
PLANNED ACCOMPLISHMENT
CUMULATIVE PLANNED ACCOMPLISHMENT 1.15% #REF!

Prepared by: Reviewed and Submitted by: Recommending Approval:

WARREN D. LIWALIW ERNESTO O. VECALDO RUBY A. UYAM


ENGINEER II CHIEF, CONSTRUCTION SECTION ASSISTANT DISTRICT ENGINEER
GINEER
25 3
26 4
27 5
28 6
29 7

37
15
30 8

#REF!
#REF!
31 9
32 10
33 11
34 12
35 13
36 14
37 15

Approved:
38 16
39 17
DECEMBER

40 18
41 19
42 20

DISTRICT ENGINEER
IRENEO S. GALLATO
43 21
44 22
45 23
53
16

#REF!
#REF!
46 24
47 25
48 26
49 27
50 28
51 29
52 30
53 31
54 1
55 2
56 3
57 4
58 5
59 6
60 7
68
15

61 8

#REF!
#REF!
62 9
63 10
64 11
65 12
66 13
67 14
68 15
69 16
70 17
JANUARY

71 18
72 19
73 20
74 21
75 22
76 23
84
16

#REF!
#REF!
77 24
78 25
79 26
80 27
81 28
82 29
83 30
84 31
1
85

85 1
FEB

#REF!
#REF!
Contract ID :17PL0139

Contract Name :Construction of One (1) Storey - Two Classroom School Building with Attached Comfort Room, Southern Tabuk Central School School
Location :Tabuk City, Kalinga
Effectivity of Contract : November 09, 2017
Expiry Date : February 01, 2018

10-Nov

11-Nov

12-Nov

13-Nov

14-Nov

15-Nov

16-Nov

17-Nov

18-Nov
9-Nov
ITEM No. DESCRIPTION QTY. UNIT UNIT COST TOTAL PERCENTAGE % DURATION

10
1

9
0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007
A.1.1(8) Provision of Field Office for the Engineer (Rental Basis) 2.83 mos. 7,350.00 20,800.50 0.61% 85.00 Planned

0.306 0.306 0.306 0.306 0.306


B.3 Building Permit and Other LGU Permits 1.00 l.s. 52,435.00 52,435.00 1.53% 5.00 Planned
0.028 0.028
B.5 Project Billboard/Signboard 1.00 set 1,905.49 1,905.49 0.06% 2.00 Planned
0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009
B.7 Occupational Safety and Health Program 2.83 mos. 9,168.39 25,946.54 0.76% 85.00 Planned
0.102 0.102
B.9 Mobilization/Demobilization 1.00 l.s. 13,949.04 13,949.04 0.41% 4.00 Planned
0.830
801(1) Clearing and Grubbing 242.00 sq.m. 117.38 28,405.96 0.83% 1.00 Planned
1.014 1.014
800(1) Removal of Structures and Obstruction 1.00 l.s. 69,415.72 69,415.72 2.03% 2.00 Planned

803(1)a Structure Excavation (Common Soil) 20.16 cu.m. 613.29 12,363.93 0.36% 6.00 Planned

804(1)a Embankment form Structure Excavation 14.85 cu.m. 441.41 6,554.94 0.19% 2.00 Planned

804(1)b Embankment from Borrow 255.35 cu.m. 1,609.32 410,939.86 12.01% 14.00 Planned

804(4) Gravel Fill 19.49 cu.m. 1,726.82 33,655.72 0.98% 1.00 Planned

900(1)c2 Structural Concrete (Footing and Slab-on-Fill) 25.09 cu.m. 6,456.88 162,003.12 4.73% 2.00 Planned

900(1)c3 Structural Concrete (Footing Tie Beam) 6.30 cu.m. 6,825.99 43,003.74 1.26% 3.00 Planned

900(1)c4 Structural Concrete (Column) 6.55 cu.m. 6,882.13 45,077.95 1.32% 2.00 Planned

900(1)c6 Structural Concrete (Beams, Girders) 8.86 cu.m. 6,927.66 61,379.07 1.79% 2.00 Planned

902(1)a1 Reinforcing Steel Bars (Deformed, G-40) 5,420.30 kgs. 75.10 407,064.53 11.90% 29.00 Planned

903(2) Forms and Falseworks 191.82 sq.m. 694.82 133,280.37 3.90% 28.00 Planned
0.228 0.228
1000(1) Soil Poisoning 15.00 lit. 1,040.10 15,601.50 0.46% 2.00 Planned

1046(2)a2 CHB Non-Load Bearing (Including RSB) 267.50 sq.m. 1,088.44 291,157.70 8.51% 8.00 Planned

1010(1) Frames 16.00 set 3,676.87 58,829.92 1.72% 8.00 Planned

1010(2)b Doors (Wood Panel) 11.17 sq.m. 4,854.13 54,220.63 1.58% 7.00 Planned

1009(1)a Jalousie Window (Glass) 24.70 sq.m. 3,011.31 74,379.36 2.17% 3.00 Planned

1005(5) Grille Window 24.70 sq.m. 2,804.57 69,272.88 2.02% 10.00 Planned

1004(2)a Finishing Hardware (Locksets) 6.00 set 2,175.89 13,055.34 0.38% 2.00 Planned

1004(2)g Finishing Hardware (Hinges) 12.00 set 249.26 2,991.12 0.09% 3.00 Planned

1003(9) Carpentry & Joinery Works (Chalk Board) 1.00 l.s. 16,524.50 16,524.50 0.48% 5.00 Planned

1021(1)c Cement Floor Finish (With Floor) 155.78 sq.m. 325.21 50,661.21 1.48% 4.00 Planned

1027(1) Cement Plaster Finish 332.64 sq.m. 321.28 106,870.58 3.12% 7.00 Planned

1051(1) Railing 18.00 m. 570.53 10,269.54 0.30% 2.00 Planned

1038(1) Reflective Insulation 242.00 sq.m. 102.64 24,838.88 0.73% 3.00 Planned

1018(1) Glazed Tiles & Trims 15.00 sq.m. 1,426.15 21,392.25 0.63% 4.00 Planned

1018(2) Unglazed Tiles 6.80 sq.m. 1,545.69 10,510.69 0.31% 3.00 Planned

1003(1)a1 Ceiling 193.52 sq.m. 589.27 114,035.53 3.33% 12.00 Planned

1032(1)a Painting Works (Masonry/Concrete) 492.42 sq.m. 258.69 127,384.13 3.72% 5.00 Planned

1032(1)b Painting Works (Wood) 41.46 sq.m. 370.93 15,378.76 0.45% 3.00 Planned

1032(1)c Painting Works (Steel) 29.03 sq.m. 406.58 11,803.02 0.34% 3.00 Planned

1014(1)b1 Prepainted Metal Sheets, 0427mm, Long Span 242.00 sq.m. 727.37 176,023.54 5.14% 4.00 Planned

1047(8) Structural Steel (Roof Framing) 4,297.80 kgs. 103.95 446,756.31 13.06% 16.00 Planned

1001(8) Sewer Line Works 1.00 l.s. 18,430.23 18,430.23 0.54% 5.00 Planned

1002(28) Cold Water Lines 1.00 l.s. 16,245.09 16,245.09 0.47% 4.00 Planned

1002(8) Plumbing Fixtures 1.00 l.s. 50,518.28 50,518.28 1.48% 4.00 Planned

1100(30) Conduit, Boxes & Fittings 1.00 l.s. 8,079.89 8,079.89 0.24% 3.00 Planned

1101(42) Wires and Wiring Devices 1.00 l.s. 27,231.62 27,231.62 0.80% 5.00 Planned

1102(27) Power Load Center, Switch Gear & Panel Board 1.00 l.s. 7,039.16 7,039.16 0.21% 3.00 Planned
1103(1) Lighting Fixtures 1.00 l.s. 54,020.28 54,020.28 1.58% 2.00 Planned
DAILY ACCOMPLISHMENT Planned 0.323 0.323 0.323 0.323 0.323 0.118 0.118 0.874 1.286 1.258

TOTAL 3,421,703.42 100.00% 85.00

MONTHLY PLANNED ACCOMPLISHMENT 8.53


PLANNEDACCOMPLISHMENT
CUMMULATIVE PLANNED ACCOMPLISHMENT 8.53
MONTHLY PLANNED ACCOMPLISHMENT 9.26
REVISED PLANNED ACCOMPLISHMENT DUE TO TIME EXTESION NO.1
CUMMULATIVE PLANNED ACCOMPLISHMENT 9.26
0.323 0.645 0.968 1.290 1.613 1.731 1.849 2.723 4.009 5.267

Prepared by: Reviewed and Submitted by: Recommending Approval:

ADOLFO R. CARBONELL ERNESTO O. VECALDO RUBY A. UYAM


ENGINEER II CHIEF, CONSTRUCTION SECTION ASSISTANT DISTRICT ENGINEER
19-Nov

20-Nov

21-Nov

22-Nov

23-Nov

24-Nov

25-Nov

26-Nov

27-Nov

28-Nov

29-Nov

30-Nov

1-Dec

2-Dec

3-Dec

4-Dec

5-Dec

6-Dec

7-Dec
11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29
0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007

0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009

0.060 0.060 0.060 0.060 0.060 0.060

0.984

2.367 2.367

0.419

0.410 0.410 0.410 0.410 0.410 0.410 0.410

0.139 0.139

0.215 0.215

0.226 0.226

0.202 0.202

0.291 0.518 0.505 0.279 0.076 0.487 1.410 0.426 0.000 0.000 0.000 0.000 0.000 0.426 0.000 0.000 2.794 2.933 0.984

8.53
8.53
9.26
9.26
5.559 6.076 6.581 6.860 6.936 7.423 8.833 9.259 9.259 9.259 9.259 9.259 9.259 9.685 9.259 9.259 12.479 15.412 16.396

Approved:

IRENEO S. GALLATO
INEER DISTRICT ENGINEER
10-Dec

11-Dec

12-Dec

13-Dec

14-Dec

15-Dec

16-Dec

17-Dec

18-Dec

19-Dec

20-Dec

21-Dec

22-Dec

23-Dec

24-Dec

25-Dec

26-Dec

27-Dec

28-Dec

29-Dec

30-Dec

31-Dec
8-Dec

9-Dec
30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53
0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007

0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009

0.096 0.096

0.858 0.858 0.858 0.858 0.858 0.858

0.419 0.419

0.659 0.659

0.410 0.410 0.410 0.410 0.410 0.410 0.410 0.410 0.410 0.410 0.410 0.410 0.410

0.139 0.139 0.139 0.139 0.139 0.139 0.139 0.139 0.139 0.139 0.139 0.139 0.139

0.984 0.984 1.224 2.082 1.423 0.565 0.000 0.661 0.661 0.565 0.000 0.000 1.423 1.423 0.000 0.000 0.000 0.000 0.000 1.423 1.423 0.000 0.000 0.000

16.49
25.01
21.98
31.24
17.380 18.365 19.589 21.671 23.094 23.660 23.660 24.321 24.982 25.547 25.547 25.547 26.971 28.394 28.394 28.394 28.394 28.394 28.394 29.817 31.240 31.240 31.240 31.240
10-Jan

11-Jan

12-Jan

13-Jan

14-Jan

15-Jan

16-Jan

17-Jan

18-Jan
1-Jan

2-Jan

3-Jan

4-Jan

5-Jan

6-Jan

7-Jan

8-Jan

9-Jan
54

55

56

57

58

59

60

61

62

63

64

65

66

67

68

69

70

71
0.007 0.007 0.007 0.007 0.007 0.007 0.007

0.009 0.009 0.009 0.009 0.009 0.009 0.009

0.858 0.858 0.858 0.858 0.858

0.897

0.410 0.410 0.410 0.410 0.410 0.410 0.410

0.139 0.139 0.139 0.139 0.139 0.139 0.139

0.000 1.423 1.462 1.423 0.000 1.423 1.423 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 1.423 0.565 0.000

16.48
41.49
29.03
60.27
31.240 32.664 34.126 35.549 35.549 36.972 38.396 38.396 38.396 38.396 38.396 38.396 38.396 38.396 38.396 39.819 40.384 40.384
10-Feb

11-Feb
19-Jan

20-Jan

21-Jan

22-Jan

23-Jan

24-Jan

25-Jan

26-Jan

27-Jan

28-Jan

29-Jan

30-Jan

31-Jan

1-Feb

2-Feb

3-Feb

4-Feb

5-Feb

6-Feb

7-Feb

8-Feb

9-Feb
72

73

74

75

76

77

78

79

80

81

82

83

84

85

86

87

88

89

90

91

92

93

94

95
0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007

0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009

0.858 0.858 0.858

0.897

0.410 0.410

0.139 0.139 0.139 0.139 0.139 0.139

1.064 1.064 1.064 1.064 1.064 1.064 1.064 1.064

0.215 0.215 0.215 0.215

0.226 0.226 0.226 0.226 0.226

0.725 0.725 0.725

0.202 0.202 0.202 0.202 0.202 0.202 0.202 0.202

0.191 0.191

0.029 0.029 0.029

0.097 0.097 0.097 0.097 0.097

0.150 0.150

0.156 0.156 0.156 0.156

0.102 0.102 0.102

0.115 0.115 0.115

1.286

0.816 0.816 0.816 0.816 0.816 0.816 0.816 0.816 0.816 0.816 0.816 0.816 0.816 0.816 0.816 0.816

0.000 0.565 0.565 1.052 1.013 1.013 2.893 2.046 2.046 2.098 2.098 2.201 2.297 2.297 1.287 1.514 2.238 1.939 1.783 1.088 1.191 1.191 0.537 1.708

0.58
42.08

40.384 40.950 41.515 42.567 43.580 44.593 47.486 49.532 51.578 53.676 55.774 57.975 60.272 62.569 63.856 65.370 67.609 69.548 71.331 72.419 73.610 74.801 75.338 77.046
12-Feb

13-Feb

14-Feb

15-Feb

16-Feb

17-Feb

18-Feb

19-Feb

20-Feb

21-Feb

22-Feb

23-Feb

24-Feb

25-Feb

26-Feb

27-Feb

28-Feb

1-Mar

2-Mar

3-Mar
100

101

102

103

104

105

106

107

108

109

110

111

112

113

114

115
96

97

98

99

0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007

0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009

0.102 0.102

0.215 0.215

0.370 0.370 0.370 0.370

0.446 0.446 0.446 0.446 0.446 0.446 0.446

0.242 0.242 0.242

0.278 0.278 0.278 0.278 0.278 0.278 0.278 0.278 0.278 0.278 0.278 0.278

0.745 0.745 0.745 0.745 0.745

0.150 0.150 0.150

1.286 1.286 1.286

0.108 0.108 0.108 0.108 0.108

0.119 0.119 0.119 0.119

0.369 0.369 0.369 0.369

0.079 0.079 0.079

0.159 0.159 0.159 0.159 0.159

0.069 0.069 0.069

0.789 0.789

1.795 1.795 2.026 0.982 0.982 1.459 1.217 1.195 1.246 1.545 1.424 1.674 1.357 0.829 0.455 1.176 1.176 0.386 0.118 0.118

39.11 0.62
99.38 100.00
78.840 80.635 82.661 83.643 84.625 86.084 87.301 88.496 89.742 91.287 92.711 94.385 95.743 96.572 97.027 98.202 99.378 99.764 99.882 100.000
Contract ID : 17PL0271
Contract Name : Construction of Two(2) Storey - Four(4) Classroom Worksop Building (Regular Laboratory - 2), Kalinga National igh School, Tabuk City, Kalinga
Location : Tabuk City, Kalinga
Effectivity of Contract : January 14, 2018
Expiry Date : July 12, 2018

14-Jan

15-Jan

16-Jan

17-Jan

18-Jan

19-Jan

20-Jan

21-Jan

22-Jan

23-Jan

24-Jan

25-Jan

26-Jan

27-Jan

28-Jan
ITEM No. DESCRIPTION QTY. UNIT UNIT COST TOTAL PERCENTAGE % DURATION

10

11

12

13

14

15
1

9
Provision of Field Office for the Engineer (Rental 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
A.1.1(8) 6.00 mos. 14,437.50 86,625.00 0.64% 180.00 Planned
Basis)
0.034 0.034 0.034 0.034 0.034
B.3 Building Permit and Other LGU Permits 1.00 l.s. 23,100.00 23,100.00 0.17% 5.00 Planned
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
B.5 Project Billboard/Signboard 1.00 set 22,869.00 22,869.00 0.17% 180.00 Planned
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
B.7 Occupational Safety and Health Program 6.00 mos. 4,521.83 27,130.98 0.20% 180.00 Planned
0.468 0.468
B.9 Mobilization/Demobilization 1.00 l.s. 254,100.00 254,100.00 1.87% 4.00 Planned
0.721 0.721 0.721 0.721
801(1) Clearing and Grubbing 301.15 sq.m. 1,299.38 391,308.29 2.88% 4.00 Planned

1200(4) Package Type Air Conditioning Unit(PACU) 2.0HP 8.00 set 38,981.25 311,850.00 2.30% 20.00 Planned
coiling Capacity(Floor Standing type)

0.070 0.070 0.070 0.070


505(5) Stone Masonry Class "A" 46.75 cu.m. 4,908.75 229,484.06 1.69% 24.00 Planned

0.099 0.099 0.099 0.099


803(1)a Structure Excavation (Common Soil) 206.36 cu.m. 326.98 67,475.59 0.50% 5.00 Planned

804(1)a Embankment form Structure Excavation 94.06 cu.m. 28.34 2,665.66 0.02% 1.00 Planned

804(1)b Embankment from Borrow 651.50 cu.m. 464.93 302,901.90 2.23% 4.00 Planned

804(4) Gravel Fill 46.06 cu.m. 1,278.27 58,877.12 0.43% 4.00 Planned

900(1)c1 Structural Concrete (Stair and Sun Breake) 6.97 cu.m. 6,290.77 43,846.67 0.32% 7.00 Planned

900(1)c2 Structural Concrete (Footing and Slab-on-Fill) 67.86 cu.m. 6,251.32 424,214.58 3.13% 7.00 Planned

900(1)c3 Structural Concrete (Footing Tie Beam) 23.58 cu.m. 6,264.69 147,721.39 1.09% 4.00 Planned

900(1)c4 Structural Concrete (Column) 34.27 cu.m. 6,254.34 214,336.23 1.58% 8.00 Planned

900(1)c5 Structural Concrete(Suspended Slab) 25.68 cu.m. 6,249.79 160,494.61 1.18% 5.00 Planned

900(1)c6 Structural Concrete (Beams, Girders) 39.74 cu.m. 6,253.58 248,517.27 1.83% 9.00 Planned

902(1)a1 Reinforcing Steel Bars (Deformed, G-40) 35,844.00 kgs. 82.70 2,964,298.80 21.85% 41.00 Planned
0.046 0.046
903(2) Forms and Falseworks 690.85 sq.m. 1,501.50 1,037,311.28 7.65% 165.00 Planned
0.181 0.181 0.181
1000(1) Soil Poisoning 115.60 lit. 638.09 73,763.20 0.54% 3.00 Planned

1046(2)a1 CHB Non-Load Bearing (Including RSB) 129.91 sq.m. 764.13 99,268.13 0.73% 15.00 Planned

1046(2)a2 CHB Non-Load Bearing (Including RSB) 383.18 sq.m. 848.38 325,082.25 2.40% 20.00 Planned

1010(1) Frames 16.00 set 14,017.50 224,280.00 1.65% 5.00 Planned

1010(2)b Doors (Wood Panel) 14.62 sq.m. 3,780.00 55,256.04 0.41% 7.00 Planned

1009(1)a Jalousie Window (Glass) 24.70 sq.m. 2,520.00 62,244.00 0.46% 7.00 Planned

1005(6) Steel Window 1.00 l.s. 45,360.00 45,360.00 0.33% 7.00 Planned

1005(5) Grille Window 26.80 sq.m. 1,512.00 40,521.60 0.30% 7.00 Planned

1004(2)a Finishing Hardware (Locksets) 16.00 set 693.00 11,088.00 0.08% 7.00 Planned

1004(2)g Finishing Hardware (Hinges) 12.00 set 630.00 7,560.00 0.06% 7.00 Planned

1003(9) Carpentry & Joinery Works (Chalk Board) 1.00 l.s. 56,700.00 56,700.00 0.42% 5.00 Planned

1021(1)c Cement Floor Finish (With Floor) 584.99 sq.m. 239.46 140,081.71 1.03% 4.00 Planned

1027(1) Cement Plaster Finish 2,313.80 sq.m. 200.71 464,402.80 3.42% 18.00 Planned

1051(1) Railing 74.10 m. 10,080.00 746,928.00 5.51% 30.00 Planned

1038(1) Reflective Insulation 316.61 sq.m. 403.20 127,657.15 0.94% 15.00 Planned

1018(1) Glazed Tiles & Trims 71.55 sq.m. 1,243.10 88,943.81 0.66% 18.00 Planned

1018(2) Unglazed Tiles 251.60 sq.m. 1,193.45 300,272.02 2.21% 26.00 Planned

1018(3) Granite Tiles 378.00 sq.m. 1,827.00 690,606.00 5.09% 29.00 Planned

1003(1)a1 Ceiling 325.88 sq.m. 1,260.00 410,608.80 3.03% 5.00 Planned

1032(1)a Painting Works (Masonry/Concrete) 2,553.90 sq.m. 151.20 386,149.68 2.85% 15.00 Planned

1032(1)b Painting Works (Wood) 133.27 sq.m. 270.90 36,102.84 0.27% 10.00 Planned

1032(1)c Painting Works (Steel) 62.73 sq.m. 453.60 28,454.33 0.21% 15.00 Planned

1014(1)b1 Prepainted Metal Sheets, 0.5mm, Long Span 316.61 sq.m. 850.50 269,276.81 1.99% 10.00 Planned

1047(8) Structural Steel (Roof Framing) 9,442.70 kgs. 88.20 832,846.14 6.14% 66.00 Planned

1047(1) Metal Structure, Fire Scape 1.00 157,500.00 157,500.00 1.16% 30.00 Planned

1001(8) Sewer Line Works 1.00 l.s. 151,200.00 151,200.00 1.11% 35.00 Planned

1001(9) Storm Drainage/Down Spout 1.00 l.s. 50,400.00 50,400.00 0.37% 10.00 Planned

1002(28) Cold Water Lines 1.00 l.s. 19,334.70 19,334.70 0.14% 20.00 Planned

1001(6) Catch Basin, CHB/Septik Tank 14 each 6,161.40 86,259.60 0.64% 20.00 Planned

1002(8) Plumbing Fixtures 1.00 l.s. 98,280.00 98,280.00 0.72% 20.00 Planned

1100(30) Conduit, Boxes & Fittings 1.00 l.s. 54,432.00 54,432.00 0.40% 30.00 Planned

1101(42) Wires and Wiring Devices 1.00 l.s. 106,545.60 106,545.60 0.79% 20.00 Planned

1102(27) Power Load Center, Switch Gear & Panel Board 1.00 l.s. 43,470.00 43,470.00 0.32% 10.00 Planned

1103(1) Lighting Fixtures 1.00 l.s. 107,100.00 107,100.00 0.79% 10.00 Planned

1208 Fire Alarm System 1.00 l.s. 40,320.00 40,320.00 0.30% 5.00 Planned

1003(17) Carpentry and Joinery, Furniture 1.00 l.s. 107100 107,100.00 0.79% 20 Planned

DAILY ACCOMPLISHMENT Planned 0.040 0.040 0.040 0.040 0.040 0.474 0.474 0.979 0.979 0.979 0.727 0.105 0.105 0.151 0.222

TOTAL 13,564,523.64 100.00% 180.00


0.00 0.040 0.079 0.119 0.159 0.198 0.672 1.146 2.125 3.103 4.082 4.809 4.914 5.019 5.170 5.392
14-Jan

15-Jan

16-Jan

17-Jan

18-Jan

19-Jan

20-Jan

21-Jan

22-Jan

23-Jan

28-Jan
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
LOWER KALINGA
DISTRICT ENGINEERING OFFICE
CORDILLERA ADMINISTRATIVE REGION
Bulanao, Tabuk City, Kalinga

10-Feb

11-Feb

12-Feb

13-Feb

14-Feb

15-Feb

16-Feb

17-Feb

18-Feb

19-Feb

20-Feb

21-Feb

22-Feb

23-Feb

24-Feb

25-Feb

26-Feb

27-Feb
29-Jan

30-Jan

31-Jan

1-Feb

2-Feb

3-Feb

4-Feb

5-Feb

6-Feb

7-Feb

8-Feb

9-Feb
16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45
0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004

0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001

0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001

0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070

0.099

0.020

0.558 0.558 0.558 0.558

0.109 0.109 0.109 0.109

0.447 0.447

0.272 0.272 0.272 0.272

0.533 0.533 0.533 0.533 0.533 0.533 0.533 0.533 0.533 0.533 0.533 0.533 0.533 0.533

0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046

0.222 0.231 0.231 0.655 0.655 0.569 0.569 0.655 0.655 0.655 0.655 0.655 0.655 0.655 0.655 0.395 0.395 0.395 0.395 0.142 0.610 0.610 0.610 0.610 0.160 0.160 0.585 0.585 0.585 0.585

5.614 5.845 6.076 6.731 7.387 7.956 8.525 9.181 9.836 10.491 11.147 11.802 12.458 13.113 13.769 14.163 14.558 14.953 15.347 15.490 16.100 16.710 17.320 17.930 18.091 18.251 18.836 19.421 20.006 20.591
10-Feb

11-Feb

12-Feb

13-Feb

14-Feb

15-Feb

16-Feb

17-Feb

18-Feb

19-Feb

20-Feb

21-Feb

22-Feb

23-Feb

24-Feb

25-Feb

26-Feb

27-Feb
29-Jan

30-Jan

31-Jan

1-Feb

2-Feb

3-Feb

4-Feb

5-Feb

6-Feb

7-Feb

8-Feb

9-Feb
10-Mar

11-Mar

12-Mar

13-Mar

14-Mar

15-Mar

16-Mar

17-Mar

18-Mar

19-Mar

20-Mar

21-Mar

22-Mar

23-Mar

24-Mar

25-Mar

26-Mar

27-Mar

28-Mar

29-Mar
28-Feb

1-Mar

2-Mar

3-Mar

4-Mar

5-Mar

6-Mar

7-Mar

8-Mar

9-Mar
46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

61

62

63

64

65

66

67

68

69

70

71

72

73

74

75
0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004

0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001

0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001

0.046 0.046 0.046

0.447 0.447 0.447 0.447 0.447

0.198 0.198 0.198 0.198

0.237

0.204

0.533 0.533 0.533 0.533 0.533 0.533 0.533 0.533 0.533 0.533 0.533 0.533 0.533 0.533 0.533 0.533 0.533 0.533 0.533 0.533

0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046

0.585 0.585 0.585 0.585 0.585 0.499 0.499 0.499 0.499 0.499 0.585 0.585 0.585 0.585 0.585 0.585 0.585 0.249 0.249 0.249 0.249 0.585 0.585 0.585 0.585 0.585 0.585 0.631 0.631 0.538

21.176 21.761 22.346 22.931 23.516 24.015 24.513 25.012 25.511 26.009 26.594 27.179 27.764 28.349 28.934 29.519 30.104 30.354 30.603 30.852 31.102 31.687 32.272 32.857 33.442 34.027 34.612 35.243 35.874 36.412
10-Mar

11-Mar

12-Mar

13-Mar

14-Mar

15-Mar

16-Mar

17-Mar

18-Mar

19-Mar

20-Mar

21-Mar

22-Mar

23-Mar

24-Mar

25-Mar

26-Mar

27-Mar

28-Mar

29-Mar
28-Feb

1-Mar

2-Mar

3-Mar

4-Mar

5-Mar

6-Mar

7-Mar

8-Mar

9-Mar
30-Mar

31-Mar

10-Apr

11-Apr

12-Apr

13-Apr

14-Apr

15-Apr

16-Apr

17-Apr

18-Apr

19-Apr

20-Apr

21-Apr

22-Apr

23-Apr

24-Apr

25-Apr

26-Apr

27-Apr

28-Apr
1-Apr

2-Apr

3-Apr

4-Apr

5-Apr

6-Apr

7-Apr

8-Apr

9-Apr

100

101

102

103

104

105
76

77

78

79

80

81

82

83

84

85

86

87

88

89

90

91

92

93

94

95

96

97

98

99
0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004

0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001

0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001

0.046 0.046 0.046 0.046

0.198 0.198 0.198 0.198

0.237 0.237 0.237 0.237

0.204 0.204 0.204 0.204 0.204 0.204 0.204 0.204

0.533 0.533 0.533 0.533 0.533 0.533 0.533

0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046

0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049

0.184 0.184 0.184 0.184 0.184 0.184 0.184 0.184 0.184

0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093

0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032

0.013

0.039

0.032

0.538 0.538 0.538 0.538 0.585 0.585 0.585 0.585 0.585 0.585 0.678 0.342 0.342 0.342 0.342 0.349 0.349 0.349 0.349 0.226 0.226 0.409 0.409 0.409 0.409 0.409 0.409 0.409 0.409 0.494

36.950 37.489 38.027 38.565 39.150 39.735 40.320 40.905 41.490 42.075 42.753 43.096 43.438 43.781 44.123 44.472 44.820 45.169 45.517 45.743 45.968 46.378 46.787 47.196 47.605 48.014 48.423 48.833 49.242 49.736
30-Mar

31-Mar

10-Apr

11-Apr

12-Apr

13-Apr

14-Apr

15-Apr

16-Apr

17-Apr

18-Apr

19-Apr

20-Apr

21-Apr

22-Apr

23-Apr

24-Apr

25-Apr

26-Apr

27-Apr

28-Apr
1-Apr

2-Apr

3-Apr

4-Apr

5-Apr

6-Apr

7-Apr

8-Apr

9-Apr
10-May

11-May

12-May

13-May

14-May

15-May

16-May

17-May

18-May

19-May

20-May

21-May

22-May

23-May

24-May

25-May

26-May

27-May

28-May
29-Apr

30-Apr

1-May

2-May

3-May

4-May

5-May

6-May

7-May

8-May

9-May
106

107

108

109

110

111

112

113

114

115

116

117

118

119

120

121

122

123

124

125

126

127

128

129

130

131

132

133

134

135
0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004

0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001

0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001

0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046

0.049 0.049 0.049 0.049

0.120 0.120 0.120 0.120 0.120 0.120 0.120 0.120 0.120 0.120 0.120 0.120 0.120 0.120 0.120 0.120 0.120 0.120 0.120 0.120

0.331 0.331 0.331 0.331 0.331

0.058

0.066

0.048

0.043

0.012

0.008

0.184 0.184 0.184 0.184 0.184 0.184 0.184 0.184 0.184 0.184 0.184 0.184 0.184 0.184 0.184 0.184 0.184 0.184 0.184 0.184 0.184

0.176

0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093

0.039 0.039

0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032

0.007 0.007

0.032

0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036

0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013

0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039

0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032

0.494 0.494 0.494 0.494 0.565 0.565 0.565 0.565 0.565 0.494 0.494 0.494 0.494 0.494 0.480 0.480 0.480 0.480 0.480 0.480 0.480 0.333 0.333 0.333 0.512 0.512 0.512 0.512 0.558 0.668

50.229 50.723 51.217 51.711 52.276 52.841 53.406 53.971 54.535 55.029 55.523 56.016 56.510 57.003 57.484 57.964 58.444 58.924 59.404 59.884 60.365 60.698 61.030 61.363 61.875 62.387 62.899 63.411 63.969 64.637
10-May

11-May

12-May

13-May

14-May

15-May

16-May

17-May

18-May

19-May

20-May

21-May

22-May

23-May

24-May

25-May

26-May

27-May

28-May
29-Apr

30-Apr

1-May

2-May

3-May

4-May

5-May

6-May

7-May

8-May

9-May
29-May

30-May

31-May

10-Jun

11-Jun

12-Jun

13-Jun

14-Jun

15-Jun

16-Jun

17-Jun

18-Jun

19-Jun

20-Jun

21-Jun

22-Jun

23-Jun

24-Jun

25-Jun

26-Jun

27-Jun
1-Jun

2-Jun

3-Jun

4-Jun

5-Jun

6-Jun

7-Jun

8-Jun

9-Jun
136

137

138

139

140

141

142

143

144

145

146

147

148

149

150

151

152

153

154

155

156

157

158

159

160

161

162

163

164

165
0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004

0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001

0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001

0.115 0.115 0.115 0.115 0.115 0.115 0.115

0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046

0.058 0.058 0.058 0.058 0.058 0.058

0.066 0.066 0.066 0.066 0.066 0.066

0.048 0.048 0.048 0.048 0.048 0.048

0.043 0.043 0.043 0.043 0.043 0.043

0.012 0.012 0.012 0.012 0.012 0.012

0.008 0.008 0.008 0.008 0.008 0.008

0.084 0.084 0.084 0.084 0.084

0.258 0.258 0.258 0.258

0.190 0.190 0.190 0.190 0.190 0.190 0.190 0.190 0.190 0.190 0.190 0.190 0.190 0.190 0.190 0.190 0.190 0.190

0.063 0.063 0.063 0.063 0.063 0.063 0.063

0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036

0.085 0.085 0.085 0.085 0.085 0.085 0.085 0.085 0.085 0.085 0.085 0.085 0.085 0.085 0.085 0.085 0.085 0.085 0.085 0.085 0.085 0.085 0.085 0.085 0.085 0.085

0.176 0.176 0.176 0.176 0.176 0.176 0.176 0.176 0.176 0.176 0.176 0.176 0.176 0.176 0.176 0.176 0.176 0.176 0.176 0.176 0.176 0.176 0.176 0.176 0.176 0.176 0.176 0.176

0.190 0.190

0.027 0.027 0.027 0.027 0.027 0.027 0.027

0.014 0.014 0.014 0.014 0.014 0.014 0.014

0.199 0.199 0.199 0.199 0.199 0.199 0.199 0.199 0.199 0.199

0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093 0.093

0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039

0.037 0.037 0.037 0.037 0.037 0.037 0.037 0.037 0.037 0.037

0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007

0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032

0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036

0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013

0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039

0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039

0.668 0.668 0.753 0.753 0.753 0.753 0.778 0.814 0.814 0.814 0.746 0.710 0.710 0.710 0.710 0.710 0.853 0.853 0.845 0.814 0.937 0.989 0.989 1.208 1.208 1.088 0.852 0.852 0.552 0.552

65.305 65.973 66.727 67.480 68.233 68.987 69.764 70.579 71.393 72.207 72.953 73.663 74.373 75.083 75.793 76.503 77.355 78.208 79.053 79.867 80.804 81.793 82.782 83.990 85.198 86.285 87.137 87.989 88.541 89.094
29-May

30-May

31-May

10-Jun

11-Jun

12-Jun

13-Jun

14-Jun

15-Jun

16-Jun

17-Jun

18-Jun

19-Jun

20-Jun

21-Jun

22-Jun

23-Jun

24-Jun

25-Jun

26-Jun

27-Jun
1-Jun

2-Jun

3-Jun

4-Jun

5-Jun

6-Jun

7-Jun

8-Jun

9-Jun
28-Jun

29-Jun

30-Jun

10-Jul

11-Jul

12-Jul
1-Jul

2-Jul

3-Jul

4-Jul

5-Jul

6-Jul

7-Jul

8-Jul

9-Jul
166

167

168

169

170

171

172

173

174

175

176

177

178

179

180
0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004

0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001

0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001

0.468 0.468

0.115 0.115 0.115 0.115 0.115 0.115 0.115 0.115 0.115 0.115 0.115 0.115 0.115

0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046

0.063 0.063 0.063 0.063 0.063 0.063 0.063 0.063

0.605 0.605 0.605 0.605 0.605

0.190 0.190 0.190 0.190 0.190 0.190 0.190 0.190 0.190 0.190 0.190 0.190 0.190

0.027 0.027 0.027

0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014

0.013 0.013 0.013 0.013 0.013 0.013

0.039

0.079 0.079 0.079 0.079 0.079 0.079 0.079 0.079 0.079 0.079

0.059 0.059 0.059 0.059 0.059

0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039

0.552 0.513 0.513 0.625 0.625 0.625 0.611 0.611 1.081 1.081 1.041 1.041 1.041 0.474 0.474

89.646 90.159 90.671 91.296 91.921 92.545 93.157 93.768 94.849 95.929 96.970 98.011 99.052 99.526 100.000
28-Jun

29-Jun

30-Jun

10-Jul

11-Jul

12-Jul
1-Jul

2-Jul

3-Jul

4-Jul

5-Jul

6-Jul

7-Jul

8-Jul

9-Jul
PMD CONSTRUCTION AND SUPPLIES
134 Centro, Appas, Tabuk City, Kalinga

Contract ID :17PL0271
Contract Name :Construction of Two(2) Storey - Four(4) Classroom Worksop Building (Regular Laboratory - 2), Kalinga National igh School, Tabuk City, Kalinga
Location :Tabuk City, Kalinga
Effectivity of Contract :November 09, 2017
Expiry Date :February 01, 2018

10-Nov

11-Nov

12-Nov

13-Nov

14-Nov

15-Nov

16-Nov

17-Nov

18-Nov

19-Nov

20-Nov

21-Nov

22-Nov

23-Nov

24-Nov

25-Nov

26-Nov

27-Nov

28-Nov

29-Nov

30-Nov

10-Dec

11-Dec

12-Dec

13-Dec

14-Dec

15-Dec

16-Dec

17-Dec

18-Dec

19-Dec

20-Dec

21-Dec

22-Dec

23-Dec

24-Dec

25-Dec

26-Dec

27-Dec
9-Nov

1-Dec

2-Dec

3-Dec

4-Dec

5-Dec

6-Dec

7-Dec

8-Dec

9-Dec
ITEM No. DESCRIPTION QTY. UNIT UNIT COST TOTAL PERCENTAGE % DURATION

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49
1

9
0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009
A.1.1(8) Provision of Field Office for the Engineer (Rental Basis) 6.00 mos. 14,437.50 86,625.00 0.73% 85.00 Planned

0.039 0.039 0.039 0.039 0.039


B.3 Building Permit and Other LGU Permits 1.00 l.s. 23,100.00 23,100.00 0.19% 5.00 Planned
0.096 0.096
B.5 Project Billboard/Signboard 1.00 set 22,869.00 22,869.00 0.19% 2.00 Planned
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
B.7 Occupational Safety and Health Program 6.00 mos. 4,521.83 27,130.98 0.23% 85.00 Planned
0.536 0.536
B.9 Mobilization/Demobilization 1.00 l.s. 254,100.00 254,100.00 2.14% 4.00 Planned
3.301
801(1) Clearing and Grubbing 301.15 sq.m. 1,299.38 391,308.29 3.30% 1.00 Planned
1.315 1.315
800(1) Removal of Structures and Obstruction 8.00 set 38,981.25 311,850.00 2.63% 2.00 Planned

0.095 0.095 0.095 0.095 0.095 0.095


803(1)a Structure Excavation (Common Soil) 206.36 cu.m. 326.98 67,475.59 0.57% 6.00 Planned
0.011 0.011
804(1)a Embankment form Structure Excavation 94.06 cu.m. 28.34 2,665.66 0.02% 2.00 Planned
0.183 0.183 0.183 0.183 0.183
804(1)b Embankment from Borrow 651.50 cu.m. 464.93 302,901.90 2.56% 14.00 Planned
0.497
804(4) Gravel Fill 46.06 cu.m. 1,278.27 58,877.12 0.50% 1.00 Planned
1.789 1.789
900(1)c2 Structural Concrete (Footing and Slab-on-Fill) 67.86 cu.m. 6,251.32 424,214.58 3.58% 2.00 Planned

0.415 0.415 0.415


900(1)c3 Structural Concrete (Footing Tie Beam) 23.58 cu.m. 6,264.69 147,721.39 1.25% 3.00 Planned
0.904 0.904
900(1)c4 Structural Concrete (Column) 34.27 cu.m. 6,254.34 214,336.23 1.81% 2.00 Planned

900(1)c6 Structural Concrete (Beams, Girders) 39.74 cu.m. 6,253.58 248,517.27 2.10% 2.00 Planned
0.862 0.862 0.862 0.862 0.862 0.862 0.862 0.862 0.862 0.862 0.862 0.862 0.862 0.862 0.862 0.862 0.862 0.862 0.862
902(1)a1 Reinforcing Steel Bars (Deformed, G-40) 35,844.00 kgs. 82.70 2,964,298.80 25.01% 29.00 Planned
0.313 0.313 0.313 0.313 0.313 0.313 0.313 0.313 0.313 0.313 0.313 0.313 0.313 0.313
903(2) Forms and Falseworks 690.85 sq.m. 1,501.50 1,037,311.28 8.75% 28.00 Planned
0.311 0.311
1000(1) Soil Poisoning 115.60 lit. 638.09 73,763.20 0.62% 2.00 Planned

1046(2)a2 CHB Non-Load Bearing (Including RSB) 383.18 sq.m. 848.38 325,082.25 2.74% 8.00 Planned
0.237 0.237
1010(1) Frames 16.00 set 14,017.50 224,280.00 1.89% 8.00 Planned
0.067 0.067
1010(2)b Doors (Wood Panel) 14.62 sq.m. 3,780.00 55,256.04 0.47% 7.00 Planned

1009(1)a Jalousie Window (Glass) 24.70 sq.m. 2,520.00 62,244.00 0.53% 3.00 Planned

0.034 0.034
1005(5) Grille Window 26.80 sq.m. 1,512.00 40,521.60 0.34% 10.00 Planned

1004(2)a Finishing Hardware (Locksets) 16.00 set 693.00 11,088.00 0.09% 2.00 Planned

1004(2)g Finishing Hardware (Hinges) 12.00 set 630.00 7,560.00 0.06% 3.00 Planned

1003(9) Carpentry & Joinery Works (Chalk Board) 1.00 l.s. 56,700.00 56,700.00 0.48% 5.00 Planned

1021(1)c Cement Floor Finish (With Floor) 584.99 sq.m. 239.46 140,081.71 1.18% 4.00 Planned

1027(1) Cement Plaster Finish 2,313.80 sq.m. 200.71 464,402.80 3.92% 7.00 Planned
PLANNED S- CURVE
1051(1) Railing 74.10 m. 10,080.00 746,928.00 6.30% 2.00 Planned
ACCOMPLISHMENT
1038(1) Reflective Insulation 316.61 sq.m. 403.20 127,657.15 1.08% 3.00 Planned

1018(1) Glazed Tiles & Trims 71.55 sq.m. 1,243.10 88,943.81 0.75% 4.00 Planned

1018(2) Unglazed Tiles 251.60 sq.m. 1,193.45 300,272.02 2.53% 3.00 Planned

1003(1)a1 Ceiling 325.88 sq.m. 1,260.00 410,608.80 3.46% 12.00 Planned

1032(1)a Painting Works (Masonry/Concrete) 2,553.90 sq.m. 151.20 386,149.68 3.26% 5.00 Planned

1032(1)b Painting Works (Wood) 133.27 sq.m. 270.90 36,102.84 0.30% 3.00 Planned

1032(1)c Painting Works (Steel) 62.73 sq.m. 453.60 28,454.33 0.24% 3.00 Planned REVISED S- CURVE
1014(1)b1 Prepainted Metal Sheets, 0427mm, Long Span 316.61 sq.m. 850.50 269,276.81 2.27% 4.00 Planned
ACCOMPLISHMENT
DUE TO T.E. NO. 1
1047(8) Structural Steel (Roof Framing) 9,442.70 kgs. 88.20 832,846.14 7.03% 16.00 Planned

1001(8) Sewer Line Works 1.00 l.s. 151,200.00 151,200.00 1.28% 5.00 Planned

1002(28) Cold Water Lines 1.00 l.s. 19,334.70 19,334.70 0.16% 4.00 Planned

1002(8) Plumbing Fixtures 1.00 l.s. 98,280.00 98,280.00 0.83% 4.00 Planned

1100(30) Conduit, Boxes & Fittings 1.00 l.s. 54,432.00 54,432.00 0.46% 3.00 Planned

1101(42) Wires and Wiring Devices 1.00 l.s. 106,545.60 106,545.60 0.90% 5.00 Planned

1102(27) Power Load Center, Switch Gear & Panel Board 1.00 l.s. 43,470.00 43,470.00 0.37% 3.00 Planned

1103(1) Lighting Fixtures 1.00 l.s. 107,100.00 107,100.00 0.90% 2.00 Planned
DAILY ACCOMPLISHMENT Planned 0.050 0.050 0.050 0.050 0.050 0.547 0.547 3.409 1.734 1.638 0.343 0.409 0.207 0.140 0.106 0.968 1.370 0.874 0.874 2.663 2.975 1.602 1.602 0.000 0.000 0.000 0.000 1.602 2.090 2.273 1.369 1.186 1.197 1.197 1.186 1.369 1.369 1.369 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

TOTAL 11,853,884.57 100.00% 85.00

MONTHLY PLANNED ACCOMPLISHMENT 8.53 16.49


PLANNEDACCOMPLISHMENT
CUMMULATIVE PLANNED ACCOMPLISHMENT 8.53 25.01

MONTHLY PLANNED ACCOMPLISHMENT 20.66 17.81


REVISED PLANNED ACCOMPLISHMENT DUE TO TIME EXTESION NO.1
CUMMULATIVE PLANNED ACCOMPLISHMENT 20.66 38.47

0.00 0.050 0.101 0.151 0.201 0.251 0.799 1.346 4.755 6.489 8.127 8.469 8.879 9.086 9.226 9.332 10.300 11.671 12.544 13.418 16.081 19.056 20.658 22.259 22.259 22.259 22.259 22.259 23.861 25.951 28.224 29.593 30.779 31.976 33.173 34.360 35.728 37.097 38.466 38.466 38.466 38.466 38.466 38.466 38.466 38.466 38.466 38.466 38.466 38.466

Prepared by: Reviewed by: Submitted by: Recommending Approval: Approved:

DAMAY T. DAO-AS ADOLFO R. CARBONELL ERNESTO O. VECALDO RUBY A. UYAM IRENEO S. GALLATO
Authorized Managing Officer Project Engineer Chief, Construction Section ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
PMD CONSTRUCTION AND SUPPLIES DPWH-LKDEO DPWH-LKDEO DPWH-LKDEO DPWH-LKDEO
ON AND SUPPLIES
abuk City, Kalinga
28-Dec

29-Dec

30-Dec

31-Dec

10-Feb

11-Feb

12-Feb

13-Feb

14-Feb

15-Feb

16-Feb

17-Feb

18-Feb

19-Feb

20-Feb

21-Feb

22-Feb

23-Feb

24-Feb

25-Feb

26-Feb

27-Feb

28-Feb
10-Jan

11-Jan

12-Jan

13-Jan

14-Jan

15-Jan

16-Jan

17-Jan

18-Jan

19-Jan

20-Jan

21-Jan

22-Jan

23-Jan

24-Jan

25-Jan

26-Jan

27-Jan

28-Jan

29-Jan

30-Jan

31-Jan

1-Mar

2-Mar

3-Mar
1-Feb

2-Feb

3-Feb

4-Feb

5-Feb

6-Feb

7-Feb

8-Feb

9-Feb
1-Jan

2-Jan

3-Jan

4-Jan

5-Jan

6-Jan

7-Jan

8-Jan

9-Jan

100

101

102

103

104

105

106

107

108

109

110

111

112

113

114

115
50

51

52

53

54

55

56

57

58

59

60

61

62

63

64

65

66

67

68

69

70

71

72

73

74

75

76

77

78

79

80

81

82

83

84

85

86

87

88

89

90

91

92

93

94

95

96

97

98

99
0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009

0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003

0.536 0.536

0.183 0.183 0.183 0.183 0.183 0.183 0.183 0.183 0.183

1.048 1.048

0.862 0.862 0.862 0.862 0.862 0.862 0.862 0.862 0.862 0.862

0.313 0.313 0.313 0.313 0.313 0.313 0.313 0.313 0.313 0.313 0.313 0.313 0.313 0.313

0.343 0.343 0.343 0.343 0.343 0.343 0.343 0.343

0.237 0.237 0.237 0.237 0.237 0.237

0.067 0.067 0.067 0.067 0.067

0.175 0.175 0.175

0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034

0.047 0.047

0.021 0.021 0.021

0.096 0.096 0.096 0.096 0.096

0.295 0.295 0.295 0.295

0.560 0.560 0.560 0.560 0.560 0.560 0.560

3.151 3.151

0.359 0.359 0.359

0.188 0.188 0.188 0.188

0.844 0.844 0.844

0.289 0.289 0.289 0.289 0.289 0.289 0.289 0.289 0.289 0.289 0.289 0.289

0.652 0.652 0.652 0.652 0.652

0.102 0.102 0.102

0.080 0.080 0.080

0.568 0.568 0.568 0.568

0.439 0.439 0.439 0.439 0.439 0.439 0.439 0.439 0.439 0.439 0.439 0.439 0.439 0.439 0.439 0.439

0.255 0.255 0.255 0.255 0.255

0.041 0.041 0.041 0.041

0.207 0.207 0.207 0.207

0.153 0.153 0.153

0.180 0.180 0.180 0.180 0.180

0.122 0.122 0.122

0.452 0.452

0.000 0.000 0.000 0.000 0.000 1.369 1.369 0.000 0.000 2.234 1.369 0.000 0.000 0.000 0.000 0.000 1.369 1.369 1.369 0.000 0.000 1.186 1.186 1.186 1.372 0.506 0.506 1.288 3.944 3.944 0.827 0.827 1.672 1.767 1.767 0.768 0.834 1.009 0.880 0.692 0.538 0.788 0.788 0.375 0.862 1.104 1.104 1.428 1.219 1.219 1.681 1.322 1.410 1.335 1.427 1.427 1.594 1.172 0.785 0.429 0.758 0.758 0.307 0.547 0.547

16.48 0.58

41.49 42

30.66 29.47 1.40

69.12 98.60 100.00

38.466 38.466 38.466 38.466 38.466 38.466 39.834 41.203 41.203 41.203 43.437 44.806 44.806 44.806 44.806 44.806 44.806 46.174 47.543 48.912 48.912 48.912 50.098 51.284 52.470 53.842 54.349 54.855 56.143 60.087 64.031 64.858 65.686 67.357 69.125 70.892 71.660 72.494 73.504 74.384 75.076 75.614 76.402 77.190 77.565 78.427 79.532 80.636 82.064 83.282 84.501 86.182 87.504 88.914 90.249 91.675 93.102 94.696 95.868 96.653 97.082 97.840 98.599 98.906 99.453 100.000