Professional Documents
Culture Documents
1.60
0.50
1.60
12" X 12" B D
HOMOGENIOUS FD LAV
FLOOR TILES
2.10
2.10
2.10
2.10
PLAN F
0.90
CEILING LINE CEILING LINE
3.75
12" X 12" 12" X 12"
0.60
2.20
2.20
HOMOGENIOUS HOMOGENIOUS
WALL TILES WALL TILES
1.40
CR FINISH FLR. LINE CR FINISH FLR. LINE
2.30
0.55 0.55 0.55 0.55 0.55
ELEVATION A ELEVATION C
0.50
0.50
3.45
FIBER CEMENT BOARD FIBER CEMENT BOARD
PAINTED FINISH ON PAINTED FINISH ON
METAL FURRING METAL FURRING
1.60 1.60
1.60
1.60
TOP OF BEAM TOP OF BEAM
FIN. FLOOR LINE
0.90
0.90
WHITE ALUMINUM FRAMED WHITE ALUMINUM FRAMED STEEL FRAMED FIX GLASS
AWNING WINDOW AWNING WINDOW WINDOW
12" X 12" 12" X 12"
2.20
2.20
DETAILS OF CR
1:100 MTS
PROJECT TITLE : DESIGNED BY: REVIEWED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.:
A3
PLT RHEA MINDA N TAYABAN
CONSTRUCTION OF LAUNDRY FACILITY
DRAFTED BY: DATE: JAMES A ESPORAS LAWRENCE B RELOJ RUBEN P MENDOZA RICARDO G LAYUG, JR ABELARDO C MATILLANO
CONTROL NUMBER: POLICE MAJOR POLICE COLONEL POLICE COLONEL POLICE COLONEL POLICE BRIGADIER GENERAL
ES-ID1-CPLAUNDRYFCLTY-C-02-08/20/21 LOCATION: CAMP PANOPIO, P.TUAZON BLVD., COR. PLANAS ST., CHIEF, PLANS AND DESIGN SECTION CHIEF, INFRASTRUCTURE DIVISION CHIEF OF STAFF, ENGINEERING SERVICE DEPUTY DIRECTOR, ENGINEERING SERVICE DIRECTOR, ENGINEERING SERVICE
PLT RN TAYABAN 08/20/2021 DT-19
BARANGAY KAUNLARAN, CUBAO Q.C.