You are on page 1of 1

C

1.60

0.45 0.50 0.50


2.20
WC 0.90 0.80 0.70 0.70

0.50
1.60
12" X 12" B D
HOMOGENIOUS FD LAV
FLOOR TILES

2.10

2.10

2.10

2.10
PLAN F

CEILING FINISH: C CEILING FINISH: C FIN. FLOOR LINE


FIBER CEMENT BOARD FIBER CEMENT BOARD
PAINTED FINISH ON PAINTED FINISH ON D-1 D-2 D-3 D-4
METAL FURRING METAL FURRING
1.60 1.60
WHITE ALUMINUM FRAMED STEEL DOOR PVC DOOR HOLLOW CORE
GLASS DOOR DOOR
QTY : 1 SET QTY : 1 SET
TOP OF BEAM TOP OF BEAM QTY : 1 SET LOC : EXIT/SERVICE DOOR LOC : CR QTY : 1 SET
LOC : FRONT DOOR LOC : CLEAN ROOM
0.90

0.90
CEILING LINE CEILING LINE

3.75
12" X 12" 12" X 12"
0.60
2.20

2.20
HOMOGENIOUS HOMOGENIOUS
WALL TILES WALL TILES

1.40
CR FINISH FLR. LINE CR FINISH FLR. LINE
2.30
0.55 0.55 0.55 0.55 0.55
ELEVATION A ELEVATION C

CEILING FINISH: 1 CEILING FINISH: 1

0.50

0.50

3.45
FIBER CEMENT BOARD FIBER CEMENT BOARD
PAINTED FINISH ON PAINTED FINISH ON
METAL FURRING METAL FURRING
1.60 1.60

1.60

1.60
TOP OF BEAM TOP OF BEAM
FIN. FLOOR LINE
0.90

0.90

CEILING LINE CEILING LINE W-1 W-2 W-3

WHITE ALUMINUM FRAMED WHITE ALUMINUM FRAMED STEEL FRAMED FIX GLASS
AWNING WINDOW AWNING WINDOW WINDOW
12" X 12" 12" X 12"
2.20

2.20

HOMOGENIOUS HOMOGENIOUS QTY : 1 SET QTY : 1 SET QTY : 1 SET


WALL TILES WALL TILES LOC : SEE PLAN LOC : CR, CLEAN ROOM LOC : SEE PLAN

CR FINISH FLR. LINE CR FINISH FLR. LINE

ELEVATION B ELEVATION D SCHEDULE OF


DOORS AND WINDOWS
1:100 MTS

SCALE 1:50 MTS

DETAILS OF CR
1:100 MTS

SCALE 1:100 MTS

PROJECT TITLE : DESIGNED BY: REVIEWED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.:

A3
PLT RHEA MINDA N TAYABAN
CONSTRUCTION OF LAUNDRY FACILITY
DRAFTED BY: DATE: JAMES A ESPORAS LAWRENCE B RELOJ RUBEN P MENDOZA RICARDO G LAYUG, JR ABELARDO C MATILLANO
CONTROL NUMBER: POLICE MAJOR POLICE COLONEL POLICE COLONEL POLICE COLONEL POLICE BRIGADIER GENERAL
ES-ID1-CPLAUNDRYFCLTY-C-02-08/20/21 LOCATION: CAMP PANOPIO, P.TUAZON BLVD., COR. PLANAS ST., CHIEF, PLANS AND DESIGN SECTION CHIEF, INFRASTRUCTURE DIVISION CHIEF OF STAFF, ENGINEERING SERVICE DEPUTY DIRECTOR, ENGINEERING SERVICE DIRECTOR, ENGINEERING SERVICE
PLT RN TAYABAN 08/20/2021 DT-19
BARANGAY KAUNLARAN, CUBAO Q.C.

You might also like