Gener al Section complete

Update Time Summary

Job
Job type Primary Copy To Library Copy From Library
Contractor SCHLUMBERGER
N2 used Ground temp. °F
Cement Engineer VICTOR CUECA
Zone isolated Air temp °F
Arrival date/time 06/05/2013 14:36
CO2 Seabed temp. °F
Cement job start date/time 05/20/2006 14:50
Geothermal gradient 1.20 °F/100ft BHCT 80.00 °F
Job end date/time 06/05/2013 15:55
WOC time 9.00 hr BHST 80.00 °F
Activity phase
Job Description
CEMENTACION
Casing details
Assembly SURFACE CASING Hole size 12.250 in Tubing/Casing size 9.625 in
MD landed 453.0 ft Assembly set date 06/05/2013 Rathole length ft
Float Shoe Depth 453.0 ft
Depths
Float Shoe TVD 453.0 ft Packer TVD ft

Pipe Movement
Pipe movement Initial rotating TQ ft-lbf Reciprocating drag up kip
Rotating start date/time Average rotating TQ ft-lbf Reciprocating drag down kip
Pipe rotating end date/time Max. rotating TQ ft-lbf Reciprocating SPM spm
Rotating RPM rpm Reciprocating pipe start date/time Reciprocating stroke length ft
Reciprocating pipe end date/time

F lu i d s Section complete
Cementing Fluids

Fluid name Fluid type Class Density (ppg) Description


1 TAIL SLURRY CLASS G 15.60

Fluid Details

Slurry Additives Tests Dial


Slurry
Slurry top TVD 0.0 ft Excess measurement type GAUGE HOLE Cement used volume bbl
Slurry base TVD 453.0 ft Excess slurry percent % Other amount used bbl
Purpose CASING SUPPORT Excess slurry volume bbl Total slurry volume 0.0 bbl
Type TAIL Mix water ratio gal/sk94 Total slurry in well bbl
Class CLASS G Mix method ON THE FLY Total water volume used 0.0 bbl

Density 15.60 ppg Yield ft³/sk Calc. sacks used 100.00 94lb sacks

Description Source water location Sacks used 100.00 94lb sacks


Source water temp. °F Sack size 95.00 lbm

Rheology
Fluid density 9.50 ppg RPM rpm Funnel viscosity 80.00 s/qt
Fluid name TAIL Density temp °F PV 16.00 cp
Fluid type SLURRY Rheology temp. °F YP 14.000 lbf/100ft²
Density at press. ppg API WL cc/30min Gels 10 sec. 5.000 lbf/100ft²
Density measure method Mud type Gels 10 min. 8.000 lbf/100ft²
Deflection ° Gels 30 min. 10.000 lbf/100ft²

St a g e s Section complete
Cementing Stages

Stage no. Type Cemented wellbore name


1 PRIMARY 1 CASABE 1452

Stage Details
Stage Information
MD top 18.5 ft CT used Circulate prior hr
TVD top 18.5 ft MD CTU ft Circulate flow rate gpm
MD base 453.0 ft TVD CTU ft Circulate press. psi
TVD base 453.0 ft Initial CTU press. psi Tool contractor
Hole size 12.250 in Final CTU press. psi Tool description
MD tool top ft Top plug used Returns
TVD cement tool ft Bottom plug Vol. returns 20.0 bbl
MD plug circ. ft Bumped plug Volume lost bbl
TVD plug circ. ft Plug catcher used WOC time hr
Tool desc. Annular flow Press. held psi
MD stage tool ft Ann press held Pressure remaining psi
TVD stage tool ft Float held Pressure held duration min
Initial casing press. psi Pill spotted below plug Bump press. psi
Final casing press. psi Plug bumped Press. prior bump psi
Init TBG press. psi Float held Hesitation
Final TBG press. psi
Hesitation reason

Pumping Schedule
Fluid pumped Rate Volume Pumping start date/time Pumping end date/time Operation

Schedule Details Foam Details


Placement method Foam job
Slurry top MD Disp rate max. Foam gas type
Slurry base MD Disp rate final Foam gas vol. used
Shut down time Disp rate avg. Length
Top of fluid Disp pressure final Density
Top of fluid TVD Surface mix temp. Quality
Strokes Bh static temp. Gas rate no.
Stroke rate BH circ. temp. Constant Gas Ratio Method
Bulk cement Flowline temp. GL ratio
Date start mixing Vol. back wash Avg. foam density
Mixing rate Overflush vol. Constant Density Ratio Method
Date start slurry Preflush vol. Foam density
Date start displace Initial ratio
Date end pumping Final ratio

T est s Section complete


Casing Test Liner Top Test
Test pressure 1,200.00 psi Comments Test MD top ft
Duration 15 min Test section TVD top ft
Test date 06/05/2013 17:04 Test MD btm. ft
Packer depth ft Test section TVD base ft
Fluid density ppg Liner overlap ft
Float Shoe Depth 453.0 ft Time before test hr
Cement found Negative test tool
Negative test EMW ppg
Positive test tool
Log/Survey Evaluation Positive test EMW ppg
CET run CET quality Cmt. found on tool
CBL run CBL quality Shoetrack Cement
CBL press. psi BHT log run Shoetrack top MD ft
Time prior to log hr Shoetrack top TVD ft
Shoe Test Shoetrack drill date/time
Shoe test press. ppg Tool Shoetrack drill MD ft
Open hole length ft Time before shoe test hr Shoetrack drill TVD ft
Interpretation Survey
MD TOC ft Interpreter
TOC TVD ft Interpretation
TOC sufficient
Remedial cement required
No. squeezes
TOC locate method
Job rating
Detection indicator

In t e r m e d i a t e C i r c u l a t i o n s Section complete

Circulation type Md (ft) Flow rate (bbl/min) Objective Pressure (psi) Time of circulation
1 453.0 4.00 100.00 06/05/2013 16:42

P u mp E q u i p me n t s Section complete

Manufacturer Equipment type Equipment name Measured


efficiency (%)
1 SCHLUMBERGER PUMP UNIT CEMSTREAK 95.00

Is o l a t e d In t er v a ls Section complete

MD top (ft) MD base (ft) Caliper (in) Successful Evaluation date


1 0.0 453.0 12.250 06/05/2013 16:44

Wo r k St r in g s Section complete
Work String Summary

Create New From Copy Copy Work String To Library Create New Work String From Library
ST no. BHA no. Assembly name

Summary Components
General
BHA no. Assembly name RIH time
MD in Date/Time in POOH time
MD out Date/Time out Pilot hole size
Min. ID Hole size Left in well
Purpose Create Obstruction
Predicted Performance Actual Performance

BHA Run Comments

J o b Ac t i v i t y Section complete

Date/Time from Date/Time to Duration Activity class Activity code Activity subcode MD from (ft) MD to (ft) Operation Operation success Service compa
(hr)
1 06/05/2013 14:44 06/05/2013 16:44 2.01 CEMENTING 2500 2512 453.0 0.0 SCHLUMBERGER

Total hours 2.01 hr

R e ma r k s Section complete

REALIZO CEMENTACION DE CASING DE 9 5/8 ASI: PROBO LINEA CON 2500PSI DURANTE 5MIN,OK. BOMBEO 10BBL DE AGUA FRESCA DE 8.3PPG A 3BPM. MEZCLO Y BOMBEO 79 BBL DE LECHADA PRINCIPAL CONVENCIONAL DE 15PPG A 4 BPM. LAVO LINEAS Y DES´LAZO
CON 33.6BBL DE AGUA A 3BPM. ULTIMA PRESION DE CIRCULACION 168PSI. RETORNARON 20 BBL DE LECHADA DE 15PPG, BACK FLOW 0.2BBL. 300 SACOS USADOS