You are on page 1of 1

DOC.

# : SNGPL – GPR003-F-001
Sui Northern Gas Pipelines Limited Issue # 02 Issue Date

Training Needs Matrix Page 1 of 1 30-01-2014

TNM for HSE courses / Departmental SOP’s (Metering) for the Year: 2018-19

Employees Source of Duration


Course Frequency
Requiring Training Training (Hours)
SOP for Adjustment of
Safety Relief Valve “Set Internal 30 Mint.
10
Pressure”
SOP for Maintenance of
Internal 30 Mint.
Pressure Control Valve 10
SOP for Calibration of
12 Internal 30 Mint.
flow Computer As per annual
SOP for Filter Element training schedule
Internal 30 Mint.
Replacement 10 for the FY 2018-
SOP for Roots Model 5 19
10 Internal 30 Mint.
Prover
SOP for operation of Gas
11 Internal 30 Mint.
Chromatograph
SOP for Natural gas
condensate collection, 10 Internal 30 Mint.
handling and disposal

Recommendation Form: ______________________ Date: 05.07.2018


(HSE Focal Point) / MR

You might also like