Direncanakan :
= 0,039 m3/dtk
= 3434 m3/hr
Perhitungan :
Perhitungan lumpur
Qr/Q = 0,5
Qr = 0,5 x Q
= 0,5 x 3434 m3/hr
= 1717 m3/hr
sludge Wasting
Qw = Px – (TSSeff x Qbak)/Xr
= (2292,30 – (0,99 x 3,434)/3,390
= 675,21 m3/hr
= 0,14/hr
= 314,59 gr/m3.hr
Perhitungan kebutuhan oksigen
Kebutuhan oksigen teoritis
O2 kg/hr = [(Q x (So-S)) / (BOD5/BODL)] – 1,42 x Px
= [(3434m3/hr x (2800-18,62)) x (10-3kg)/(0,68)]- 1,42 x
2292,30kg.VSS/hr
= 10791 kg/hr
Karena kebutuhan oksigen teoritis rencana (10791 kg/hr) < (20850 kg/hr)
standard oxgent requirement (SOR), maka kebutuhan oksigen teoritis yang
direncanakan mencukupi. (OKE)
Diasumsikan :
Efisiensi aerator udara = 10%
Maka udara yang dibutuhkan = 80170 m3/hr udara / 0,1
= 801,70 m3/hr
Untuk tiap ft panjang rotor / jam = (10425 kg/hr x 2,2046 lb/kg) / (16,4 ft x
24 jam/hr)
= 58,39 lb O2/ft rotor jam
Perbandingan dimensi OD
panjang ditch = 2L
= 2 X 10 = 20 m
4 𝑥 15
Diameter belokan =√ = 4,3 𝑚
3,14