You are on page 1of 8

Perhitungan Oxidation Ditch

Faktor Desain Satuan Nilai Kriteria Sumber


Desain
Terpilih
Kemiringan ditch Derajat (o) 45-90 90 L., K, Wang
and N. C.
Pereira, 1986
Konsentrasi TSS mg/l 1500- 4500 Metcalf &
MLSS 5000 Eddy, 1991

Rasio Resirkulasi 0,5-2,0 0,5 C. P. L.


Grady,. Jr., G.
T. Daigger,
1999
Aerator loading Kg/m3.hr 0,1-0,5 0,5 US EPA, 2000
Nilai Yield kgVSS/kgBOD5 0,4-0,8 0,8 G.L Karia and
R.A Christian,
2006
Nilai Kd Hari 0,04- 0,075 G.L Karia and
0,075 R.A Christian,
2006
Kedalaman Ditch M 1,0-5,0 3,0 Japan Sewage
Works
Association,
2013
Efisiensi proses % 85-95 95 Metcalf&Eddy,
1991
Waktu retensi Jam 18-36 36 L., K, Wang
hydraulic/Periode and N. C.
aerasi Pereira, 1986
Kebutuhan rasio kgBOD/kgMLVSShr 0,025- 0,15 L., K, Wang
(F/M) 0,15 and N. C.
Pereira, 1986
Waktu retensi Hari 20-30 30 WEF and
solids/umur ASCE, 1992
lumpur
Kecepatan m/s 0,25- 0,40 Metcalf &
aerator 0,40 Eddy, 1991
Volumetric kgBOD/m3hr 0,08- 0,45 L., K, Wang
loading 0,48 and N. C.
Pereira, 1986
Sedangkan konsentrasi BOD dan TSS sebagai berikut :

BOD5 : 2800 mg/l = 2800 g/m3

TSS : 990 mg/l = 990 g/m3

Direncanakan :

- Jumlah oxidation ditch = 4 bak


(pemilihan jumlah bak disesuaikan dengan debit air limbah yang akan
diolah , karena debit mempengaruhi dimensi dari unit pengolahan. Dengan
perencanaan 2 bak diharapkan mampu mengolah air limbah dengan debit
yang ada).
- Debit rencana (Qave) = 0,159 m3/dtk = 13737,6 m3/hr
- Debit masing-masing bak = debit rencana/jumlah bak
𝑚3
0,159
𝑑𝑡𝑘
=
4

= 0,039 m3/dtk

= 3434 m3/hr

- Umur lumpur (𝜃𝑐) = 30hari


- Rasio F/M = 0,15 kgBOD/kg MLVSS.hr
- Aerator loading = 0m5 kg/m3.hr
- MLSS direncanakan = 4500 mg/l
- Periode aerasi (td) = 36 jam
- Rasio Resirkulasi (Qr/Q) = 0,5
- Volumetrik loading = 0,45 kg.BOD/m3.hr
- Efisiensi proses = 95%
- Kedalaman bak = 3,0 m
- Freeboard = 0,5 m
- BOD in = 2800 mg/l
- Konsentrasi TSS = 990 mg/l
- BOD eff direncanakan = 50 mg/l
- Rasio MLVSS/MLSS = 0,8
- Y = 0,8 KgVSS/kgBOD5

Perhitungan :
 Perhitungan lumpur

Konsentrasi BOD5 Terlarut dalam Effluen


Biological solid = 65% biodegradable
1 gr biodegradable = 1,42 gr BODu
BOD5 = 0,68 BODu
BOD5 solid = 65% x BODeff x konversi ke BOD5
= 65% x 50 mg/l x 1,42 x 0,68
= 31,38 mg/l
BOD terlarut = (50 mg/l – 31,38 mg/l)
= 18,62 mg/l
 efisiensi proses

removal BOD5 terlarut = [(BOD5in-BOD5terlarut)/BOD5in]x100%


= [(2800-18,62)/2800]x100%
= 99%

Overall efisiensi = [(BOD5in-BOD5eff)/BOD5in)x100%


= [(2800-50)/2800)x100%
= 98%

Nilai tipikal koefisien kinetik untuk proses oxidation ditch

Y = 0,6 kg VSS/kg BOD5


Kd = 0,05 /hr
Rasio MLVSS/MLSS = 0,5
MLSS = 4500 mg/l

MLVSS = 0,5 x MLSS


= 0,5 x 4500
= 2250

Yobs = Y/(1+(Kd x 𝜃𝑐)


= 0,6/(1+ (0,05/hr x 30hr)
= 0,24

Peningkatan Massa MLVSS


Px = Yobs x Qbak x (So-S)
= 0,24 x 3434 m3/hr x (2800 – 18,62)mg/l
= 2292302 mg VSS/hr
= 2292,30 kg VSS/hr

Peningkatan MLSS = Px : 0,5


= 2292,30 : 0,5
= 4584,6 kg.VSS/hr
Volume reaktor (V) = (Qbak x 𝜃𝑐 x Y x (So-S)) / (MLVSS(1+Kd. 𝜃𝑐))
= (3434 x 30hr x 0,6 x (2800-18,62)) /
(2250(1+(0,05/hr x 30hr)
= 30564 m3
 perhitungan Mass Balance
Qinfluen = 3434 m3/hr
Xinfluen = Y x BODinf
= 0,6 kg VSS/kg BOD x 2800 mg/l
=1680 mg/l

Qr/Q = 0,5
Qr = 0,5 x Q
= 0,5 x 3434 m3/hr
= 1717 m3/hr

Xr = [(Qbak + Qr) x MLVSS – (Qbak x Xinf)]/Qr


= [(3434 + 1717) x 2250 – (3434 x 1680)]/1717
= 3390 mg/l

 sludge Wasting
Qw = Px – (TSSeff x Qbak)/Xr
= (2292,30 – (0,99 x 3,434)/3,390
= 675,21 m3/hr

Maka konsentrasi MLSS sludge = 3390/0,5


= 6780 mg/l
 Cek periode aerasi = volume/Q
= (30564 m3x24 jam/hr) / 3434 m3/hr
= 213,6 jam
 Cek F/M ratio = Q x (So-S) / (V x MLVSS)

= 3434m3/hr x (2800-18,62) / (30564m3/hr x 2250)

= 0,14/hr

 Organic loading = (So x Q) / V

= (2800g/m3 x 3434m3/hr) / 30564m3

= 314,59 gr/m3.hr
 Perhitungan kebutuhan oksigen
Kebutuhan oksigen teoritis
O2 kg/hr = [(Q x (So-S)) / (BOD5/BODL)] – 1,42 x Px
= [(3434m3/hr x (2800-18,62)) x (10-3kg)/(0,68)]- 1,42 x
2292,30kg.VSS/hr
= 10791 kg/hr

 Standar oxygent requirement (SOR)


Dari data diketahui :
N = kebutuhan oksigen teoritis yang ditransfer ke limbah 10791 kg/hr
C’sw = konsentrasi O2 pada suhu dan tekanan standar
= 8,24 (25 oC, 760 mmHg)
Csw = konsentrasi O2 yang digunakan
= 9,08 (20 oC, 760 mmHg)
C = Level DO saat Operasi
= 2,0 mg/l
b = Rasio Saturasi Limbah Terhadap Saturasi Air
= 0,9
a = Rasio Transfer O2
= 0,9
Fa = faktor koreksi kelarutan O2
= 1 - (ketinggian (m)/ 9450)
= 1 – (10/9450)
= 1,0

Temperatur diasumsikan (T) = 30oC


SOR = N / [(C’sw.b.Fa-C)/Csw](1,024)T-20 a
= 10791 / [(8,24x0,9x1) – 2) / 9,08] (1,024)30-200,9
= 20850 kg/hr

Volume udara yang dibutuhkan


Berat Udara = 1,121 kg/m3
O2 dalam udara = 23,2%
Kebutuhan udara teoritis = 20850 kg/hr / (1,121 kg/m3 x 0,232 g O2/g udara)
= 80170 m3/hr udara

Karena kebutuhan oksigen teoritis rencana (10791 kg/hr) < (20850 kg/hr)
standard oxgent requirement (SOR), maka kebutuhan oksigen teoritis yang
direncanakan mencukupi. (OKE)
Diasumsikan :
Efisiensi aerator udara = 10%
Maka udara yang dibutuhkan = 80170 m3/hr udara / 0,1
= 801,70 m3/hr

Udara yang disediakan = 130% dari kebutuhan udara teoritis


= 130% x 80170
= 104221 m3/hr
= 72,37 m3/menit

Volume udara/BOD5 removal = 104221 m3/hr / 3434 m3/hr x (2800-


18,62)
= 0,01 m3/hr

Volume udara/air limbah terolah = 104221 m3/hr / 3434 m3/hr


= 30,34 m3/m3

Volume udara/m3 volume OD = 104221 m3/hr / 30564m3


= 3,41 m3/hr

 Perhitungan Desain Aerator


Direncanakan aerator yang digunakan adalah Mammoth Rotor
Volume tiap ditch = 30564 m3
= 8074154 gallon

Digunakan rotor dengan diameter = 42 inch


= 1,067 m

Kedalaman rotor terendam = 0,36 m

Panjang tiap rotor = 5,0 m


= 16,4 ft

Kemampuan rotor = 16000 gal/ft (volume OD > 60000 gallon)

Maka rotor mampu mengaerasi = 16000 gal/ft x 16,4 ft


= 262464 gallon

Kebutuhan rotor tiap ditch diasumsikan sebanyak = 2 rotor

Kapasitas transfer O2 tiap rotor = SOR / jumlah rotor


= 20850 kg/hr / 2 unit
= 10425 kg/hr

Untuk tiap ft panjang rotor / jam = (10425 kg/hr x 2,2046 lb/kg) / (16,4 ft x
24 jam/hr)
= 58,39 lb O2/ft rotor jam

Untuk rotor dengan dimensi 42 inchi karakteristiknya sbg berikut:


Kecepatan rotor = 60 rpm
Kebutuhan power = 0,25 kW x ft.rotor
= 0,25 kW x 16,4 ft kW/rotor
= 4,10 kW/rotor

Kebutuhan power total = jum.ditch x jum.rotor/ditch x kebutuhan


power/rotor
= 4 x 2 x 4,10
= 32,8 kW

Perbandingan dimensi OD

Volume ditch = 30564 m3


Perbandingan lebar ditch dengan panjang rotor = 2
Lebar OD = 2 x panjang rotor
= 2 x 5,0 m
= 10 m

Kedalaman ditch = 3,0 m

Luas penampang (Across)= ½ x lebar Od x tinggi


= ½ x 10 x 3
= 15 m2

panjang ditch = 2L
= 2 X 10 = 20 m

4 𝑥 15
Diameter belokan =√ = 4,3 𝑚
3,14

Jari-jari belokan = ½ x 4,3 = 2,15 m


Luas lahan = jum ditch x panjang total x lebar OD
= 4 x 20 x 10
= 800 m2

You might also like