Perhitungan Dimensi
1. Sumur Pengumpul
Direncanakan sumur pengumpul
1) Jumlah = 1 bak
2) Debit (Qpeak) = 689,53 L/det = 0,69 m3/detik
3) Waktu detensi (td) = 5 menit = 300 detik
4) Volume sumur = Qpeak x td
= 0,69 m3/detik x 300 detik
= 206,859 m3
5) Kedalaman (h) = 3 meter
6) A surface = volume sumur / h
= 206,859 m3 / 3 m
= 68,95 m3
7) Asumsi P : L =2:1
𝐴 𝑠𝑢𝑟𝑓𝑎𝑐𝑒
8) Lebar Sumur =√ 2
68,95
=√ 2
= 5,8 m =6m
9) Panjang sumur = 2 x lebar
=2x6m
= 12 m
10) Check td = (P x L x h) / Qpeak
= (12 x 6 x 3) / 0,69 m3/detik
= 4,9 menit = 5 menit
11) Luas lahan =PxL
= 12 m x 6 m
= 72 m2
2. Bar Screen
1) Jumlah bak = 2 unit
2) Kecepatan aliran = 0,4 m/det
3) Debit (Qpeak) = 344,765 L/det = 0,344 m3/det
4) Across = Qpeak/kecepatan
= 0,344 / 0,4
= 0,86 m2
0,86
=√ 2
= 0,65 m
7) Tinggi saluran = 2 x lebar
= 2 x 0,65
= 1,3 m
8) Check V = Qave / (lebar x tinggi)
= 0,44 / (0,65 x 1,3)
= 0,4 m/det
9) Rencana Panjang =2m
10) Luas lahan = panjang x lebar
= 2 x 0,65
= 1,3 m2
3. Grit Chamber
1) Jumlah = 2 bak
2) Debit (Qpeak) = 344,765 L/det = 0,344 m3/det
3) Partikel kecil yang terendapkan = 65 mesh
4) Waktu detensi = 60 detik = 1 menit
5) Kecepatan pengendapan (Vs) = 1,3 m/menit = 0,02 m/det
6) Kedalaman pengendapan (h) = Vs xtd
= 1,3 m/menit x 1 menit
= 1,3 m
7) Kecepatan horizontal (Vh) = 0,4 m/det
8) Across bak = Q / Vh
= 0,344 / 0,4
= 0,86 m2
9) Lebar bak = Across / kedalaman
= 0,86 / 1,3
= 0,67 m =1m
10) Check Vh = Q / (h x lebar)
= 0,344 / (1,3 x 1)
= 0,4 m
11) Asurface = Q / Vs
= 0,344 / 0,02
= 16 m2
12) Panjang bak = Asurface/lebar
= 16 / 1
= 16 m
13) Check Vs = Q tiap bak / (panjang x lebar)
= 0,344 / (16 x 1)
= 1,3 m/menit
14) Luas lahan = panjang x lebar x jumlah bak
= 16 x 1 x 2 = 32 m2
4. Bak Pengendap I
1) Jumlah bak = 2 bak
2) Debit (Qpeak) = 689,53 L/det = 0,689 m3/det
3) Debit tiap bak = 344 L/det = 0,344 m3/det
4) Waktu detensi = 1,5 jam = 5400 detik
5) Volume tiap bak = Q x td
= 0,344 m3/det x 5400 detik
= 1861,73 m3
6) Kedalaman =4m
7) Luas Permukaan = Volume / h
= 1861,73 / 4
= 465,43 m2
8) Rasio P : L = 1,5 : 1
𝐴 𝑠𝑢𝑟𝑓𝑎𝑐𝑒
Lebar PS = √(𝑟𝑎𝑠𝑖𝑜 𝑝𝑎𝑛𝑗𝑎𝑛𝑔∶𝑙𝑒𝑏𝑎𝑟)
= 12,75 m
Panjang PS = 2 x lebar = 2 x 12,75 m = 25,5 m
𝑣𝑜𝑙𝑢𝑚𝑒
Cek td =
𝑄𝑡𝑖𝑎𝑝 𝑏𝑎𝑘
103 𝑚𝑔 103 𝑚𝑙
( )( )
𝑔 𝑙
= 𝑚𝑙
150
𝑔
= 6666 g/m3
𝑔
𝑉𝑠 𝑋 (3500 3 )
𝑚
14) Fraksi pengendapan = 𝑉𝑡 = 𝑋𝑠= = 0.525
6666 𝑔/𝑚3
15) Penambahan sludge blangket agar padatan tidak hilang saat fase decant = 20%
liquid
𝑉𝑠
16) = 1.2 (0.525) = 0.63
𝑉𝑡
𝑉𝑓 𝑉𝑠
17) Besarnya fraksi pengisian = + 𝑉𝑡 =1
𝑉𝑡
𝑉𝑓
= 1 – 0.63 = 0.37
𝑉𝑡
1. Qlumpur BP I
= 27,94
m³/hari
2. Qlumpur OD
= 16,76
m³/hari
3. Q lumpur SDB
= 44,7
m³/hari
4. Kadar air pada sludge cake (awal)
= 96 %
f. Panjang bed
= Luas permukaan/lebar bed = 7,45 m