You are on page 1of 72

ASSAM ELECTRICITY GRID CORPORATION LIMITED 

PRE‐COMMISSIONING OF TRANSFORMER 

 COMMISSIONING FORMATS 

DOC NO:              SUBSTATION:   

Transformer BAY NO:            EQUIPMENT IDENTIFICATION NO: 
DATE OF TESTING:   

Transformer Type:    2 Winding    ICT              

Voltage level, kV    132/33  220/132  220/132/11  400/220/33     

Current (HV side):     Current (LV side):    Current (Tertiary):   

MVA RTING:                     

A.  CHECK LIST OF ELECTRICAL TESTS CARRIED OUT FOR TRANSFORMER 

Performed  Test Results 
Sl.No  Name of Tests  (Yes/No)  OK/Not OK 
1  Insulation resistance measurement      
2  Vector group test & polarity check      
3  Short circuit impedance test       
4  Magnetic balance test       
5  Floating neutral voltage measurement       
6  Magnetisation current test       
7  Voltage ratio test      
8  Insulation resistance measurements of bushing CT      
9  Continuity Test of Bushing CTs      
10  Secondary winding resistance of bushing CT      
11  Polarity Test of Bushing CTs       
12  Current Ratio test      
13  Magnetising curves performance        
14  Contact Resistance measurement        
15  TAN DELTA & CAPACITANCE Measurement of Bushings      
16  TAN DELTA & CAPACITANCE Measurement of   
WINDINGS    
17  Protection and alarm tests       
18  Stability test of Differential and REF protection      
19  Frequency Response Analysis       
20  Measurement of Winding Resistance       
 

Page 1 of 72 
 
Signature:    Signature:      Signature:    Signature 
Name:      Name:        Name:      Name: 
Designation:    Designation:      Designation:    Designation: 
(Supplier Rep)    Erection Agency:    Site I/C, AEGCL    T & C, AEGCL 
 

B. CHECKS AFTER RECEIPT OF TRANSFORMER AT SITE:

a. N2 PRESSURE & DEW POINT RECORD

Description  N2 Pressure  Dew Point  Ambient Temp  Remarks 


During Dispatch         
at factory 
After receipt at         
site 
DURING STORAGE        
AT SITE BEFORE
COMM. 
 

NOTE:  N2  pressure  and  dew  point  should  be  within  permissible  range  as  per  graph  provided  by 
manufacturer.  During  storage  at  site,  dew  point  has  to  be  measured  whenever  any  drop  in  N2 
pressure is observed. During storage at site before commissioning, N2 pressure has to be measured 
daily and record to be maintained in a separate sheet. 

b. IMPACT RECORER ANALYSIS 

RECEIVED IN  STATUS  BRIEF ANALYSIS 


HEALTHY  Yes  No   
CONDITION AT SITE 
Analysis report   Yes  No   
Received from 
Manufacturer 
Before  starting  of 
erection 
 

Note:  Impact  Recorder  should  be  detached  from  the  Transformer/  Reactor  preferably  when  the 
main unit has been placed on its foundation. 

c. CORE INSULATION CHECK 

  INSULATION VALUE 
Between CC‐G   
Between CL‐G   
Between CC‐CL   
(Recommended value > 10 M Ohms)' 

Note: Shorting link between CC, CL & G to be removed and IR value to be taken between CC‐G, CL‐G 
& CC‐CL. 

Page 2 of 72 
 
C. CHECKS/ PRECAUTIONS DURING ERECTION 

i)   Active part of transformer should minimum exposed to atmosphere 

ii)  During exposure of active part of transformer to atmosphere: 

DRY  AIR  GENERATOR/  Yes  No  Remarks 


DRY  AIR  CYLINDERS       
USED : 
 

iii) WHILE ENTERING IN TRANSFORMER TANK, CHECK AVAILABILITY OF PROPER OXYGEN 

TRANSFORMER  KEPT  Yes  No  Remarks 


SEALED  WITH  N2  IN       
BETWEEN  DIFFERENT 
ERECTION 
ACTIVITIES 
 

D. PRE‐COMMISSIONING CHECKS:  

Sl  DESCRIPTION  STATUS  REMARKS 


No  Yes  No  RECORD DEFICIENCIES, IF ANY 
1.   Transformer  and  its  auxiliaries  are  free       
from  visible  defects  on  physical 
inspection 
2.   All  fittings  as  per  out  line  general       
arrangement drawing. 
3.   Check main tank has been provided with       
double earthing 
4.   Check  neutral  is  grounded  through       
separate  connections.  Ensure  metallic 
requirements  as  per  specification  in 
earthing strips used 
5.   Check that Marshalling box, OLTC driving       
gear,  Diverter,  Radiator  bank,  Pump  & 
Fan motor etc has been earthed 
6.   All nuts and bolts are tightened correctly       
as  per  specified  torque  (as  per 
manufacturers recommendation) 
7.   Check tightness of terminal connectors       
8.   Check  levelling  of  transformer  and  its       
accessories 
9.   Erection completion certificate along with       
list of outstanding activities reviewed 
10.   Any  paint  removed  /  scratched  in  transit       
has been touched up 
11.   Bushings are clean and free from physical       
damages 
12.   Oil level is correct on all bushings       

Page 3 of 72 
 
13.   Check  hermetically  sealing  is  intact  in  all       
bushings 
14.   Check  oil  leakage  through  any  joints  /       
valves etc. 
15.   Check oil drain valves are properly closed       
and locked. 
16.   Check  oil  level  in  Main  /  OLTC       
conservator tank 
17.   Check  oil  level  at  conservator  matches       
with oil temperature of transformer 
18.   Check gear box oil level in OLTC       
19.   Check OTI and WTI pockets and replenish       
the oil , if required 
20.   check  all  valves  for  their  opening  &       
closing sequence 
21.   Check  the  colour  of  breather  silica  gel  (       
blue when dry ) 
22.   Check  availability  of  oil  in  the  breather       
cup 
23.   Check  all  rollers  are  locked  and  tack       
welded with rails ( where ever applicable 

24.   Check bushing test tap is grounded       
25.   Check  no  debris  ,  loose  T  &  P  and  oil       
strains on and around the transformer 
26.   Check  door  seals  of  marshalling  box  is       
intact  and  all  cable  gland  plates  unused 
holes are sealed 
27.   Check  that  pressure  relief  valve  is       
correctly mounted 
28.   Ensure  unused  secondary  cores  of       
bushing CT's, if any, has been shorted 
29.   Check  star  point  has  been  formed       
properly and grounded at one end only as 
per scheme 
30.   Check  that  permanent  and  adequate       
lightning arrangements are ready 
31.   Check  that  labelling  and  identification  is       
permanent and satisfactory 
32.   Check  that  buchholz  relay  is  correctly       
mounted  with  arrow  pointing  towards 
conservator 
33.   Check  cables  are  properly  fixed  and       
ensure cable entry at the bottom 
34.   Ensure  all  power  and  control  cable       
terminals are tightened 
35.   Check all cables and ferrules are provided       
with number as per cable schedule (cross 
feruling to be Checked) 
36.   Check  that  all  cables  are  correctly       
glanded 

Page 4 of 72 
 
37.   Check external cabling from junction box       
to relay / control panel completed 
38.   Check that air has been released from the       
radiators  and  their  headers  /  OLTC 
buchholz  relay  /Main  tank  /  tank/ 
bushing turrets etc. 
39.   Check fire protection system & is       
adequate & ready 
40.   Check that CC‐CL& G are shorted       
41.   Check that all radiator bank valves on top       
and bottom headers are open 
42.   Change over operation of ac supply from       
Source‐i to Source‐ii checked 
43.   Check the flanges of bushing &        
OLTC for any crack after fixing 
44.   Check  various  interlocks  provided  with       
fire fighting as per the schematic ref. Drg 
no :__________ 
 

DESCRIPTION OF INTERLOCKS  CHECKED 
   
   
 

E. MEASUREMENT OF EARTH RESISTANCE OF ELECTRODE

LOCATION  1  2  3  4 
VALUE (Before connection to grid)         
VALUE (After connection to grid)         
 

NOTE: Value of Earth Resistance< 1.0 OHM 

F. CALIBRATION OF OTI & WTI PERFORMED AS PER PROCEDURE:   Yes    No 

G. DETAILS OF RELAYS/ CONTACTORS USED: SCHEMATIC DRAWING NO.: __________________ 

Circuit  Make  Serial No.  Type  Number  of  NO  &  Number  of  AI,  BI  & 
Reference  NC contacts  BO 
        NO  NC  AI  BI+BO 
               
               
               
 

H. EVACUATING AND OIL FILLING: 

  a)  Before  filling  oil,  each  drum  has  been  physically  checked  for  free  moisture  and 
appearance:   Yes    No 

  b) OIL FILTER MACHINE: 

Page 5 of 72 
 
i). Capacity        : 
ii). Make          : 
iii). Lubricating oil of vacuum pump changed or not : 
iv). Filter Packs cleaned or not    : 
v). Whole filter machine flushed with fresh oil or not  : 
vi). Vacuum obtained without load (milli bar)    : 

c) VACUUM PUMP FOR EVACUATION OF TRANSFORMER: 

i). Lubricating Oil changed or not        : 
ii). Vacuum obtained without load (milli bar)    : 
iii). Diameter of vacuum hose (50 mm)      : 
iv). Dry ice chamber employed or not      : 

d) OIL STORAGE TANK: 

i). Inside painted or not          : 
ii). Silica gel breather provided or not      : 
iii). Any opening left uncovered        : 
iv). Capacity of Storage tank  (KL)        : 
v). Cleanliness of inside of pipes/ hoses to the storage tank : 

e) EXPOSURE DURING ERECTION: 

i). Exposure hours during First day, Number of Hours:    : 
a. N2 filled pressure (PSI or Bar)      : 
b. Number of Hours under N2      : 
c. Ambient temperature        : 
d. Relative Humidity        : 
e. Weather (sunny/cloudy/stormy/rainy)    : 
ii). Exposure hours during Second day, Number of Hours:    : 
a. N2 filled pressure (PSI or Bar)      : 
b. Number of Hours under N2      : 
c. Ambient temperature        : 
d. Relative Humidity        : 
e. Weather (sunny/cloudy/stormy/rainy)    : 
 
iii). Exposure hours during Third day, Number of Hours:    : 
a. N2 filled pressure (PSI or Bar)      : 
b. Number of Hours under N2      : 
c. Ambient temperature        : 
d. Relative Humidity        : 
e. Weather (sunny/cloudy/stormy/rainy)    : 

f) N2 SEALING IN CASE OF DELAY IN OIL FILLING: 

a. No. of Cylinders used for displacing the air inside the tank: 
b. N2 admitted from bottom valve 

Page 6 of 72 
 
a. Valve at diametrically opposite end at top kept open: 
b. No. of Cylinders used for building up 2 PSI (0.14 kg/cm2) 

Inspection Item  Date  Time  Checked  Remarks 


1. Tightness test         
a. Start evacuating on complete unit         
b. Stop evacuating at 3 mbar         
c.  Pressure  P1  in  ‐‐‐‐kPa,  1  hour  after  stop         
evacuating 
d.  Pressure  P2  in  ‐‐‐‐‐‐‐kPa,  0.5  hrs  after         
reading P1 
e.  Leakage  =  (P2‐P1)X  V=  If  >3.6,  continue         
evacuating, ‘V’ is the volume of oil as per 
name plate. 
2. VACUUM         
a. Pressure 0.13 kPa (1.3 mbar) reached         
b. Vacuum kept for         
Upto 145 kV, 12 Hour         
145 kV & upto 220 kV, 24 Hours         
3. OIL FILLING         
a. Oil filling is made         
b. Oil Conservator with Air Cell         
c. OLTC         
4. STANDING TIME         
Upto 145 kV, 12 Hours         
145 kV & upto 220 kV, 48 Hours         
 

G) RECORD OF DRYING OUT PROCESS: 

Drying out started on:    Date:      Time:      Ambient Temp: 

(Hourly reading to be taken) 

Date  Time  Vacuum  Vacuum reading  OTI OF  Condensate  Remarks & sign 


reading in  In transformer  TANK  Collected  total  of supervising 
Filtration  Tank  /Rate  Engineer 
machine 
             
             
             
Record  of  filtration  and  Dry  out  shall  be  kept  in  a  register  and  shall  be  made  a  part  of  the  Pre‐
commissioning document. 

H) INSULATION RESISTANCE MEASUREMENT: (USING 500 V MEGGER): 

Megger details: 

Validity of Calibration: 

Page 7 of 72 
 
Ambient temperature:  

Sl No  Description  Status  Remarks, if any 


Yes  No 
A  Control Wiring       
B  Tap Cganger       
Motor       
Control wiring       
C  Cooling System       
  Fan Motor       
  Pump Motor       
  Control Wiring       
NOTE: IR values should be > 50 MΩ for cables 

I) INSULATION RESISTANCE MEASUREMENT: (USING 5000 V MEGGER): 

Megger details: 

Validity of Calibration: 

Ambient temperature:          Temperature of OIL: 

Main Winding  IR Value (MΩ)  AI=60ss/15 s  PI=600s/60 s  Temp. 


15 Sec  60 Sec  600 sec 
Auto Transformer 
HV+IV to LV              
HV+IV to E              
LV to E              
2 Winding Transformer 
HV to E              
LV to E             
HV to LV             
 

J) VECTOR GROUP TEST & POLARITY CKECKING 

CONNECT  NEUTRAL  POINT  WITH  EARTH,  JOIN  1RI  AND  3  RI  TERMINALS,  ‐APPLY  415V,  3‐PHASE 
SUPPLY TO HV TERMINALS 

Terminal  Voltage Measured  Remarks 


1R1 – 1Y1     
1Y1 – 1B1     
1B1 – 1R1     
3B1 – 1B1     
3B1 – 1Y1     
3R1 ‐ N     
3Y1 – N     
1R1 ‐ N     
2R1 ‐ N     
2 Y1 ‐ N     
2 B1 ‐ N     

Page 8 of 72 
 
 

ENSURE 2R1 ‐N = 2Y1 ‐N = 2B1 ‐ N = CONSTANT 

AS 3R1 ‐N > 3B1 ‐ N > 3Y1 ‐ N, AND 3Y1 ‐ 1B1 > 3B1 – 1B1 

VECTOR GROUP Ynaod1 IS CONFIRMED AND POLARITY VERIFIED 

K) MEASUREMENT OF WINDING RESISTANCE (IN OHM) 

Winding Resistance meter detail: 

Validity of calibration: 

Ambient Temperature:      OTI reading:      WTI reading: 

i). HV Side Measurement 

Tap  Wdg. Resistance, HV‐N  Resistance at 750C  Factory  Value  at  Remarks 


positi 750C 
on  1R1‐2R1  1Y1‐2Y1  1B1‐2B1  R  Y  B  R  Y  B 
1                     
2                     
3                     
4                     
5                     
6                     
7                     
8                     
9b                     
10                     
11                     
12                     
13                     
14                     
15                     
16                     
17                     
 

Factory Test Report Ref. NO: 

ii). INTERMEDIATE VOLTAGE SIDE: 

Between Winding  Resistance  Resistance at 750C  Remarks 


At Site  Site  Factory 
2R1 ‐ N         
2Y1 – N         
2B1 ‐ N         
 

iii). LOW VOLTAGE SIDE: 

Page 9 of 72 
 
Between Winding  Resistance  Resistance at 750C  Remarks 
At Site  Site  Factory 
3R1 – N3B1         
3Y1 – 3R1         
3B1 – 3Y1         
 

NOTE:  LV  WINDING  RESISTANCE  AT  FACTORY  MEASURED  WITHOUT  FORMATION  OF  DELTA. 
HOWEVER  MEASUREMENTS  CARRIED  OUT  AT  SITE  ARE  AFTER  FORMATION  OF  DELTA.  HENCE  A 
CORRECTION FACTOR OF 1.5 TIMES TO BE APPLIED IN SITE RESULTS. 

L) MAGNETIC BALANCE TEST: 

Apply single phase 230 V across one phase of HV winding terminal and neutral then measure voltage 
in other two HV terminals across neutral. Repeat the test for each of the three phases. 

Apply  1‐ph,  230V  AC  Voltage measured in Volts  Remarks 


across (1)  Between (2)  Between (3) 
2R1 ‐ N  2Y1 – N  2B1 ‐ N   
2Y1 ‐ N  2R1 – N  2B1 ‐ N   
2B1 ‐ N  2Y1 – N  2R1 ‐ N   
 

M) FLOATING NEUTRAL VOLTAGE MEASUREMENT   

Disconnect the transformer neutral from the ground 

Apply 3 phase 415 volts to the high voltage winding and make the measurement in the IV winding 
with respect to neutral and neutral point to ground. 

Tap Position  HV Winding  Voltage  IV Winding  Voltage  Remarks,  if 


Applied  Measured   any 
Normal (    )  1R ‐ N    2R ‐ N     
Normal (    )  1Y ‐ N    2Y ‐ N     
Normal (    )  1B ‐ N    2B ‐ N     
      N ‐ Earth     
 

Apply  3  phase  415  volts  to  the  intermediate  voltage  winding  and  make  the  measurement  in  the 
tertiary winding with respect to neutral and neutral point to ground. 

IV Winding  Voltage Applied  LV Winding  Voltage  Remarks, if any 


Measured  
2R ‐ N    3R ‐ N     
2Y – N    3Y – N     
2B – N    3B ‐ N     
    N ‐ Earth     
 

Check: After the test, neutral reconnected to Ground:     Yes / No 

N) MAGNETISATION CURRENT TEST: 

Page 10 of 72 
 
Testing Instrument detail: 

Testing Instrument Calibration valid or not: 

Ambient temperature at the time of test: 

Temperature of OIL: 

i). APPLY 1‐PHASE AC SUPPLY ON HV TERMINALS AND KEEP IV & LV OPEN 
Tap Position  Voltage  Current  Factory  test  Remarks 
Applied (V)  Measured (mA)  value 
Lowest (     )  R ‐ N  R ph     
Y ‐ N  Y ph     
B ‐ N  B ph     
Normal (     )  R ‐ N  R ph     
Y ‐ N  Y ph     
B ‐ N  B ph     
Highest (      )  R ‐ N  R ph     
Y ‐ N  Y ph     
B ‐ N  B ph     
 
ii). APPLY 1‐PHASE AC SUPPLY ON IV TERMINALS AND KEEP HV & LV OPEN 
Tap Position  Voltage  applied  Current measured  Remarks 
(Volts)  in LV side (mAmps) 
Normal (     )  2R ‐ N     
2Y ‐ N     
2B ‐ N     
 

P) VOLTAGE RATIO TEST: 

Testing Instrument (TRM) detail: 
Testing Instrument Calibration valid or not: 
Ambient temperature at the time of test: 
Temperature of OIL: 
i). Ratio HV / IV 

Tap   Voltage applied  Voltage measured  Ratio  Factory Ratio 


Pos  1R‐N  1Y‐N  1B‐N  2R‐N  2Y‐N  2B‐N  R  Y  B  R  Y  B 
1                         
2                         
3                         
4                         
5                         
6                         
7                         
8                         
9                         
10                         
11                         
12                         

Page 11 of 72 
 
13                         
14                         
15                         
16                         
17                         
 
ii). RATIO : HV / LV 
 

Tap   Voltage applied  Voltage measured  Ratio  Factory Ratio 


Position  1R‐N  1Y‐N  1B‐N  3R‐N  3Y‐N  3B‐N  R  Y  B  R  Y  B 
Lowest                         
Normal                         
Highest                         
 
iii). RATIO : IV / LV 

Tap   Voltage applied  Voltage measured  Ratio  Factory Ratio 


Position  2R‐N  2Y‐N  2B‐N  3R‐N  3Y‐N  3B‐N  R  Y  B  R  Y  B 
Lowest                         
 

Q) OIL CHARACTERISTICS: 

Date:      Time:        Ambient Temp: 

OTI reading:            WTI reading: 

Sample to be collected before Charging & following value to be achieved: 

BDV: Min 70 kV 

Moisture in PPM: Min 10 

Tan delta (900C): Max 0.1 

Resistivity: Min 6 x 1012 Ohm‐cm 

Interfacial Tension at 270C: Min 0.035 N/m 

OIL Sample  BDV (kV)  Moisture  Tan delta  Resistivity  Inter  facial  Remarks 


(PPM)  (Ohm‐cm)  tension 
(N/m) 
Main Tank             
Top             
Bottom             
OLTC             
 

R) DISSOLVE GAS ANALYSIS 

DISOLVE  OIL SAMPLE SCHEDULE 

Page 12 of 72 
 
GASES  Before  24 Hrs  7 Days  15 Days  01 Month  03 Month 
Charging  After  After  After  After  After 
Charging  Charging  Charging  Charging  Charging 
Total Gas%             
H2             
CH4             
C2H4             
C2H6             
C2H2             
CO             
CO2             
O2             
N2             
 

S) Test on OLTC: 

Sl  Description  Status  Remarks 


No  OK  Not OK 
1  Visual inspection of equipment       
2  Manual operation on all taps ( local ) with confirmation       
of the no. of revolutions and Locking at extreme taps 
3  Over load device of driving motor       
4  Local operation (Electrical)       
5  Remote operation (Electrical)       
6  Tap position indicator       
7  Check operation with Master Follower scheme ( parallel       
operation ) 
8  Out of step relay       
9  Step by Step Contactor       
10  Limit Switch       
11  Winding resistance at all taps       
12  Continuity test of winding during one Complete cycle of       
operation 
 

T) OPERATIONAL TEST OF OTHER EQUIPMENTS 

i). CHECKING OF COOLING EQUIPMENTS 
a) Rotation Direction of Pumps:  OK  Not Ok 
b) Rotation Direction of Fans:    OK  Not Ok 
ii). PROTECTION CHECKS 
Eqpt.  Setting Value  Pickup Value  Single Phasing 
Fan No  Prevention check 
1       
2       
3       
4       
5       
6       

Page 13 of 72 
 
7       
8       
9       
10       
11       
12       
Pump No 
1       
2       
3       
4       
 

U) INSULATION RESISTANCE MEASUREMENT OF BUSHING CT’s: (USING 500V MEGGER) 

Between  HV  IV  Neutral LV 


R‐ph  Y‐ph  B‐ph  R‐ph  Y‐ph  B‐ph  R‐ph  Y‐ph  B‐ph 
Earth – Core I                     
Earth – Core II                     
Earth – Core III                     
Earth‐ Core IV                     
Core I – Core II                     
Core I – Core III                     
Core I – Core IV                     
Core II – Core III                     
Core II – Core IV                     
Core III – Core IV                     
 

V) CONTINUITY TEST OF BUSHING CT's 

Core  Between  HV  IV  Neutral  LV 


Terminal  R‐ph  Y‐ph  B‐ph  R‐ph  Y‐ph  B‐ph  R‐ph  Y‐ph  B‐ph 
Core I  1S1‐1S2                     
Core II  2S1‐2S2                     
Core III  3S1‐3S2                     
Core IV  4S1‐4S2                     
 

W) SECONDARY WINDING RESISTANCE OF BUSHING CT's (IN OHM) 

i). HV SIDE 

Core  Between  R‐Phase (Ω)  Y‐Phase(Ω)  B‐Phase(Ω) 


  Terminal  Factory  Site  Factory  Site  Factory  Site 
CORE‐I  1S1‐1S2             
CORE‐II  2S1‐2S2             
CORE‐III  3S1‐3S2             
CORE‐IV  4S1‐4S2             
 

Page 14 of 72 
 
ii). IV SIDE 

Core  Between  R‐Phase (Ω)  Y‐Phase(Ω)  B‐Phase(Ω) 


  Terminal  Factory  Site  Factory  Site  Factory  Site 
CORE‐I  1S1‐1S2             
CORE‐II  2S1‐2S2             
CORE‐III  3S1‐3S2             
CORE‐IV  4S1‐4S2             
 
iii). LV SIDE 

Core  Between  R‐Phase (Ω)  Y‐Phase(Ω)  B‐Phase(Ω) 


  Terminal  Factory  Site  Factory  Site  Factory  Site 
CORE‐I  1S1‐1S2             
CORE‐II  2S1‐2S2             
CORE‐III  3S1‐3S2             
CORE‐IV  4S1‐4S2             
 

iv). NEUTRAL SIDE 

Core  Between  NEUTRAL (Ω) 


  Terminal  Factory  Site 
CORE‐I  1S1‐1S2     
 

X) POLARITY TEST OF BUSHING CT's : (With 1.5 V DC Supply) 

i). POLARITY OF HV & IV BCT 

CORE  Between  HV  IV 


R‐PH  Y‐PH  B‐PH  R‐PH  Y‐PH  B‐PH 
CORE‐I  1S1(+ve)  1S2(‐ve)             
CORE‐II  2S1(+ve)  2S2(‐ve)             
CORE‐III  3S1(+ve)  3S2(‐ve)             
CORE‐IV  4S1(+ve)  4S2(‐ve)             
 
ii). POLARITY OF LV & Neutral BCT 

CORE  Between  LV  Neutral 


R‐PH  Y‐PH  B‐PH 
CORE‐I  1S1(+ve)  1S2(‐ve)         
CORE‐II  2S1(+ve)  2S2(‐ve)       
CORE‐III  3S1(+ve)  3S2(‐ve)       
CORE‐IV  4S1(+ve)  4S2(‐ve)       
 

Y) CURRENT RATIO TEST: Measure current on secondary terminals 

i). R – PHASE: HV SIDE 

Page 15 of 72 
 
CORE  Primary  Current  Secondary  Theoretical  Actual  % 
S1 – S2  %  Actual  Current  Ratio  Ratio  Error 
CORE‐I  20%           
(1S1‐1S2)  40%           
80%           
CORE‐II  20%           
(2S1‐2S2)  40%           
80%           
CORE‐III  20%           
(3S1‐3S2)  40%           
80%           
CORE‐IV  20%           
(4S1‐4S2)  40%           
80%           
 

ii). Y – PHASE: HV SIDE 

CORE  Primary  Current  Secondary  Theoretical  Actual  % 


S1 – S2  %  Actual  Current  Ratio  Ratio  Error 
CORE‐I  20%           
(1S1‐1S2)  40%           
80%           
CORE‐II  20%           
(2S1‐2S2)  40%           
80%           
CORE‐III  20%           
(3S1‐3S2)  40%           
80%           
CORE‐IV  20%           
(4S1‐4S2)  40%           
80%           
 

iii). B – PHASE: HV SIDE 

CORE  Primary  Current  Secondary  Theoretical  Actual  % 


S1 – S2  %  Actual  Current  Ratio  Ratio  Error 
CORE‐I  20%           
(1S1‐1S2)  40%           
80%           
CORE‐II  20%           
(2S1‐2S2)  40%           
80%           
CORE‐III  20%           
(3S1‐3S2)  40%           
80%           
CORE‐IV  20%           
(4S1‐4S2)  40%           
80%           

Page 16 of 72 
 
 

iv). R – PHASE: IV SIDE 

CORE  Primary  Current  Secondary  Theoretical  Actual  % 


S1 – S2  %  Actual  Current  Ratio  Ratio  Error 
CORE‐I  20%           
(1S1‐1S2)  40%           
80%           
CORE‐II  20%           
(2S1‐2S2)  40%           
80%           
CORE‐III  20%           
(3S1‐3S2)  40%           
80%           
CORE‐IV  20%           
(4S1‐4S2)  40%           
80%           
   

v). Y – PHASE: IV SIDE 

CORE  Primary  Current  Secondary  Theoretical  Actual  % 


S1 – S2  %  Actual  Current  Ratio  Ratio  Error 
CORE‐I  20%           
(1S1‐1S2)  40%           
80%           
CORE‐II  20%           
(2S1‐2S2)  40%           
80%           
CORE‐III  20%           
(3S1‐3S2)  40%           
80%           
CORE‐IV  20%           
(4S1‐4S2)  40%           
80%           
 

vi). B – PHASE: IV SIDE 

CORE  Primary  Current  Secondary  Theoretical  Actual  % 


S1 – S2  %  Actual  Current  Ratio  Ratio  Error 
CORE‐I  20%           
(1S1‐1S2)  40%           
80%           
CORE‐II  20%           
(2S1‐2S2)  40%           
80%           
CORE‐III  20%           
(3S1‐3S2)  40%           
80%           

Page 17 of 72 
 
CORE‐IV  20%           
(4S1‐4S2)  40%           
80%           
Z) MAGNETISING CURVES PERFORMANCE: 

(NOT TO BE DONE FOR METERING CORE) 

KNEE POINT VOLTAGE (KVP) = 

i). R– PHASE: HV SIDE 
VOLTAGE  CURRENT MEASUREMENT (mA) 
To be applied  Actual  CORE‐I  CORE‐II  CORE‐III  CORE‐IV 
Value  1S1‐1S2  2S1‐2S2  3S1‐3S2  4S1‐4S2 
0.25 x KVP           
0.50 x KVP           
0.75 x KVP           
1.00 x KVP           
1.10 x KVP           
 
ii). Y– PHASE: HV SIDE 
VOLTAGE  CURRENT MEASUREMENT (mA) 
To be applied  Actual  CORE‐I  CORE‐II  CORE‐III  CORE‐IV 
Value  1S1‐1S2  2S1‐2S2  3S1‐3S2  4S1‐4S2 
0.25 x KVP           
0.50 x KVP           
0.75 x KVP           
1.00 x KVP           
1.10 x KVP           
 

iii). B– PHASE: HV SIDE 
VOLTAGE  CURRENT MEASUREMENT (mA) 
To be applied  Actual  CORE‐I  CORE‐II  CORE‐III  CORE‐IV 
Value  1S1‐1S2  2S1‐2S2  3S1‐3S2  4S1‐4S2 
0.25 x KVP           
0.50 x KVP           
0.75 x KVP           
1.00 x KVP           
1.10 x KVP           
 

iv). R– PHASE: IV SIDE 
VOLTAGE  CURRENT MEASUREMENT (mA) 
To be applied  Actual  CORE‐I  CORE‐II  CORE‐III  CORE‐IV 
Value  1S1‐1S2  2S1‐2S2  3S1‐3S2  4S1‐4S2 
0.25 x KVP           
0.50 x KVP           
0.75 x KVP           
1.00 x KVP           
1.10 x KVP           

Page 18 of 72 
 
 

v). Y– PHASE: IV SIDE 
VOLTAGE  CURRENT MEASUREMENT (mA) 
To be applied  Actual  CORE‐I  CORE‐II  CORE‐III  CORE‐IV 
Value  1S1‐1S2  2S1‐2S2  3S1‐3S2  4S1‐4S2 
0.25 x KVP           
0.50 x KVP           
0.75 x KVP           
1.00 x KVP           
1.10 x KVP           
 

vi). B– PHASE: IV SIDE 
VOLTAGE  CURRENT MEASUREMENT (mA) 
To be applied  Actual  CORE‐I  CORE‐II  CORE‐III  CORE‐IV 
Value  1S1‐1S2  2S1‐2S2  3S1‐3S2  4S1‐4S2 
0.25 x KVP           
0.50 x KVP           
0.75 x KVP           
1.00 x KVP           
1.10 x KVP           
 

AA) CONTACT RESISTANCE MEASUREMENT: At 100 AMPS 

NOTE: THE VALUE OF CONTACT RESISTANCE SHOULD NOT BE MORE THAN 10 μΩ PER JOINT / 
CONNECTOR 

CONTACT RESISTANCE  R‐PH (μΩ)  Y‐PH (μΩ)  B‐PH (μΩ) 


Across HV Bushing Terminal Bushing       
Across IV Bushing Terminal Bushing       
Across LV Bushing Terminal Bushing       
Across Neutral Bushing Terminal Bushing       
Across Surge Arrestor Connection       
 

AB) BUSHING DETAILS : 

Drawing No. __________________________________ 

Details  HV Side  IV Side  LV Side  Neutral


Rph  Yph  Bph  Rph  Yph  Bph  Rph  Yph  Bph 
Make                     
Type                     
Sl. No                     
 

AC) TAN DELTA AND CAPACITANCE MEASUREMENT OF BUSHING 

Testing Instrument detail: 

Page 19 of 72 
 
Testing Instrument Calibration valid or not: 
Ambient temperature at the time of test: 
Temperature of OIL: 
i). HV SIDE 
VOLTAGE  CAPACITANCE (Measured Value)  Remarks 
R‐PHASE  Y‐PHASE    B‐PHASE 
SITE  FACTORY  SITE  FACTORY  SITE  FACTORY 
1 kV               
2 kV               
10 kV               
 
VOLTAGE  TAN DELTA (Measured Value)  Remarks 
R‐PHASE  Y‐PHASE    B‐PHASE 
SITE  FACTORY  SITE  FACTORY  SITE  FACTORY 
1 kV               
2 kV               
10 kV               
 

ii). IV SIDE 
VOLTAGE  CAPACITANCE (Measured Value)  Remarks 
R‐PHASE  Y‐PHASE    B‐PHASE 
SITE  FACTORY  SITE  FACTORY  SITE  FACTORY 
1 kV               
2 kV               
10 kV               
 

VOLTAGE  TAN DELTA (Measured Value)  Remarks 


R‐PHASE  Y‐PHASE    B‐PHASE 
SITE  FACTORY  SITE  FACTORY  SITE  FACTORY 
1 kV               
2 kV               
10 kV               
 

AD) TAN DELTA AND CAPACITANCE MEASUREMENT OF WINDINGS 

Testing Instrument detail:____________________________________________________ 
Testing Instrument Calibration valid or not: ___________________ 
Ambient temperature at the time of test: _______________ 
Temperature of OIL: __________________ 

Voltage  Winding  Test  CAPACITANCE  TAN DELTA  Remarks 


Combination  Mode  Site  Factory  Site  Factory 
2 kV  HV‐IV/LV  UST           
10 kV           

Page 20 of 72 
 
2 kV  HV‐IV/LV+G  GST           
10 kV           
2 kV  HV‐IV/LV  GSTg           
10 kV  with Guard           
2 kV  LV/HV‐IV+G  GST           
10 kV           
2 kV  LV/HV‐IV  GSTG           
10 kV  with Guard           
 

AD) SHORT CIRCUIT IMPEDANCE TEST 

Testing Instrument detail:____________________________________________________ 
Testing Instrument Calibration valid or not: ___________________ 
Ambient temperature at the time of test: _______________ 
Temperature of OIL: __________________ 
i). HV TO IV 
  1U1 (R)  1V1 (Y)  1W1 (B) 
  (IV  OF  R‐φ  AND  N  (IV  OF  Y‐φ  AND  N  (IV  OF  B‐φ  AND  N 
Tap No.  SHORTED, LV OPEN)  SHORTED, LV OPEN)  SHORTED, LV OPEN) 
Voltage (V)  Current (A) Voltage (V)  Current (A)  Voltage(V)  Current(A) 
LOWEST             
NORMAL             
HIGHEST             
 
ii). IV TO LV (NORMAL TAP) 
SUPPLY  SHORT  ALL  3  LV  SHORT  ALL  3  LV  SHORT  ALL  3  LV 
BUSHINGS, HV OPEN  BUSHINGS, HV OPEN  BUSHINGS, HV OPEN 
2U1‐N  ____________A     
2V1‐N    _____________A   
2W1‐N      ____________A 
 
iii). HV TO LV (NORMAL TAP) 
SUPPLY  SHORT  ALL  3  LV  SHORT  ALL  3  LV  SHORT  ALL  3  LV 
BUSHINGS, HV OPEN  BUSHINGS, HV OPEN  BUSHINGS, HV OPEN 
1U1‐N  ____________A     
1V1‐N    _____________A   
1W1‐N      ____________A 
 
AT LOWEST TAP 
SUPPLY  SHORT  ALL  3  LV  SHORT  ALL  3  LV  SHORT  ALL  3  LV 
BUSHINGS, HV OPEN  BUSHINGS, HV OPEN  BUSHINGS, HV OPEN 
1U1‐N  ____________A     
1V1‐N    _____________A   
1W1‐N      ____________A 
 
AT HIGHEST TAP 

Page 21 of 72 
 
SUPPLY  SHORT  ALL  3  LV  SHORT  ALL  3  LV  SHORT  ALL  3  LV 
BUSHINGS, HV OPEN  BUSHINGS, HV OPEN  BUSHINGS, HV OPEN 
1U1‐N  ____________A     
1V1‐N    _____________A   
1W1‐N      ____________A 
 
AE) PROTECTION AND ALARMS 
SL  Device  SET FOR  PROVED 
No  ALARM  TRIP  ALARM  TRIP 
1.   Excessive Winding Temperature         
2.   Excessive Oil Temperature         
3.   Oil Flow Failure    NA    NA 
4.   Pressure Relief Valve  NA    NA   
5.   Main Tank Buchholz relay         
6.   OLTC Buchholz relay  NA    NA   
7.   Fan Failure    NA    NA 
8.   Low Oil Level Gauge (MOLG)    NA    NA 
9.   Differential relay  NA    NA   
10.   Overload Relay    NA    NA 
11.   REF  NA    NA   
12.   Over Current  NA    NA   
13.   Inter trip, if any  NA    NA   
14.   Trip Free Check  NA    NA   
15.   Backup Over Current  NA    NA   
16.   Over Flux         
 
AF) DETALS OF PROTECTION SETTINGS:  
i). DIFFERENTIAL PROTECTION: 
a. DIFFERENTIAL CHARACTERISTICS SETTINGS 
b. Function        Enabled  
c. Pickup           Enabled/Disabled       
d. Slope 1                                         Enabled/Disabled 
e. Break 1         Enabled/Disabled 
f. Break 2         Enabled/Disabled 
g. Slope 2                                        Enabled/Disabled 
h. Inrush Inhibit Mode      Enabled/Disabled 
i. Inrush Inhibit Level      Enabled/Disabled 
j. Over excitation Inhibit Function   Enabled/Disabled 
k. Over excitation Inhibit Level    Enabled/Disabled 
ii). REF PROTECTION 
REF SETTINGS: 
a. Function    Enabled 

Page 22 of 72 
 
b. Source       
c. Pickup       
d. Slope       
e. Pickup Delay     
f. Reset Delay 
iii). OVER FLUXING PROTECTION: 
OVER FLUXING SETTINGS: 
a. Function    Enabled 
b.    Source       
c.    Pickup       
d.    Curves        
e.    TD Multiplier     
f.    T Reset   
iv). BACK UP PROTECTION: 
LV Side: 
a. Over current Settings: 
                                  PS    TMS      HS 
           __________    ______          _________ 
b. Earth Fault Settings: 
                            PS    TMS      HS 
           __________    ______          _________ 
 
HV SIDE: 
c. Over current Settings: 
                                  PS    TMS      HS 
           __________    ______          _________ 
d. Earth Fault Settings: 
                            PS    TMS      HS 
           __________    ______          _________ 
 
AG) STABILITY TEST OF DIFFERENTIAL & REF PROTECTION:  OK/ Not OK 
 
NOTE  :  Prove  the  tripping  of  associated  breakers  by  actual  operation  of  the  various  devices  and 
relays as per the schemes. 
   
AH) FREQUENCY RESPONSE ANALYSIS (FRA) 

Page 23 of 72 
 
i). Carried out after completion of all commissioning activities:   Yes / No 
ii). Interpretation of test results carried out:      Yes / No 
iii). Test results matching with the factory results:      Yes / No 
iv). Factory & site fra test report available at site:      Yes / No 
 
AI) all electrical test results compared with Factory test results and found to be in order: Yes / No 
 
CHECKS AFTER CHARGING OF TRANSFORMER 
AK) RECORD THE FOLLOWING AFTER CHARGING: 
i). Any abnormal sound emanating from the transformer:  Yes / No / Remarks 
 
ii). No load current at relay terminal:  
R – Phase: ______________A 
Y – Phase: __________________A 
B – Phase: ___________________A 
CTR: ______________________ 
 
iii). Temperature at the time of Charging: 
OTI   :_____________0C 
WTI  :_____________0C 
Ambient temperature: ______________0C 
 
iv). MAXIMUM TEMPERATURE AFTER 24 HOURS: ___________0C 
 
v). OLTC  electrical  operation  checked  in  idle  charged  condition  from  min  position  to  max 
position and back to normal position:   YES / NO 
vi). Thermovision scanning done at least after 24 hours of loading and repeated after one week: 
YES/ NO. 

AL) FINAL DOCUMENTATION REVIEW 

i). FACTORY TEST RESULTS ARE AVAILABLE :      YES / NO 

ii). FINAL DOCUMENT OF PRE‐COMMISSIONING CHECKS  
REVIEWED AND APPROVED:           YES / NO 
           

Page 24 of 72 
 
iii). DOCUMENTS REGARDING SPARES, EQUIPMENT, O & M  
MANNUALS ETC AVAILABLE AT SITE FOR O & M PURPOSE:  YES / NO 
 
iv). AFTER MODIFICATION, IF ANY, "AS BUILT DRAWINGS"  
ARE AVAILABLE AT SITE:          YES / NO 
 

Signature:    Signature:      Signature:    Signature 


Name:      Name:        Name:      Name: 
Designation:    Designation:      Designation:    Designation: 
(Supplier Rep)    Erection Agency:    Site I/C, AEGCL    T & C, AEGCL 
 

Page 25 of 72 
 
ASSAM ELECTRICITY GRID CORPORATION LIMITED 

PRE‐COMMISSIONING OF ISOLATOR AND GROUND SWITCH 

COMMISSIONING FORMATS 

DOC NO:              SUBSTATION:   

BAY NO:              DATE OF TESTING:   

EQUIPMENT SERIAL NO : R‐Phase___________ Y‐PHASE____________B‐PHASE______________ 

Type:            MAKE:           

Voltage level, kV    33    132    220    400     

Current Carrying Capacity: ___________A  

Type of Operating Mechanism: 

Control Voltage:______________Volt DC         

1) DETAILS: 
SL  DESCRIPTION  STATUS  REMARKS,  IF 
No  ANY 
YES  NO   
1.   Equipment  is  free  from  dirt/dust  Foreign  materials       
etc. 
2.   Equipment is free from all visible defects on physical       
inspection 
3.   Support  structures,  marshalling  box  Has  been       
provided with two earthing Pads / points 
4.   All  nuts  and  bolts  are  tightened  correctly  as  per       
specified torque 
5.   Equipment erection is complete in all respect as per       
instruction  manual  (attach  remaining  activities,  if 
any) 
6.   Permanent  isolator  levelling  and  identification  is       
done 
7.   Levelling and alignment of structure and base frame       
is checked 

Page 26 of 72 
 
8.   Control  box  /  marshalling  kiosk  is  free  from  any       
physical defects 
9.   Tightness  of  nuts  bolts  of  terminal  connectors  are       
checked 
10.   Auxiliary contacts and relays have been cleaned and       
free from rust / damage 
11.   Corona rings are provided and properly fixed       
12.   Cable termination and tightness checked and unused       
holes sealed 
13.   External cabling is completed in all respect       
14.   All  the  cable  identification  tags  provided  and  all       
cores  are  provided  with  identification  ferrules  at 
M.B. 
15.   All moving parts are lubricated       
16.   Alignment of isolator already made and locking bolt       
provided, if any 
17.   Freeness of manual operation is OK       
18.   Greasing  has  been  made  on  the  main  contacts       
according to the manufacturers instruction 
19.   Functional  checking  of  auxiliary  Contacts  for       
indications and interlocks 
20.   Erection  completion  certificate  along  with  list  of       
outstanding activities reviewed 
21.   All  spare  wires  to  be  kept  with  ferrules  but  not       
terminated at the terminal blocks 
22.   Earth  switch  connected  to  earth  through  braided       
wires 
23.   Interlocks checked as per approved scheme with all       
combinations 
24.   Check that earth switch blade alignment In condition       
is at sufficient distant from Isolator 
25.   Check  that  operation  and  positioning  of  the  limit       
switch & the auxiliary contacts assembly are ok 
26.   Check  that  all  three  phase  isolators  are  Closing  &       

Page 27 of 72 
 
Opening at a time 
27.   Check all 3 earth switches close at the same time       
28.   Provision  of  bimetallic  strips  ensured  wherever       
applicable 
 
2) MOTOR DETAILS: 
a) Make: 
b) Sl. No: 
c) Type: 
d) HP/KW: 
e) Volt: 
f) Ampere: 
g) Year of Manufacture: 
h) Overload Settings: 
i) Insulation  Resistance  of  Motor  Winding  (Winding  to  Earth):  (By  500  V 
Megger):_____________MΩ. 
3) ISOLATOR OPERATIONAL CHECK: 
a) Operate the Isolator and record the motor current: 
a. Open: _________________A 
b. Close: _________________A 
b) OPERATION OF ISOLATOR FROM LOCAL / REMOTE:  OK / NOT OK 
Isolator Operation  CONTROL PANEL 
LOCAL  REMOTE 
Open     
Close     
 
c) MEASUREMENT OF OPERATING TIME 
OPERATION  PHASE 
R‐Phase  Y‐Phase  B‐Phase 
CLOSING (Sec)       
OPENING (Sec)       
 
d) AUXILLARY CONTACTS CHECKING 
 

Page 28 of 72 
 
ISOLATOR  AUXILIARY  OPERATION TIME 
OPERATION  RELAY  R‐PHASE  Y‐PHASE  B‐PHASE 
TYPE  NO  NC  NO  NC  NO  NC 
CLOSE               
             
             
             
OPEN               
             
             
             
 
4) INSULATION RESISTANCE TEST ( USING 5000 VOLT MEGGER ): 
ISOLATOR OPEN CONDITION 
BETWEEN  PHASE 
R‐Phase  Y‐Phase  B‐Phase 
Male side to Ground       
Female side to Ground       
Male side to Female side       
 
5) CONTACT RESISTANCE MEASUREMENT: 
(TO BE MEASURED AFTER 50 OPERATIONS) 
a) ISOLATOR CLOSE CONDITION 
(CONTACT RESISTANCE SHOULD BE LESS THAN 10 μΩ/ CONNECTOR) 
ACROSS  PHASE 
R‐Phase (μΩ)  Y‐Phase(μΩ)  B‐Phase(μΩ)
CONNECTOR (MALE SIDE)       
CONNECTOR (FEMALE SIDE)       
MAIN CONTACT (MALE & FEMALE)       
 
b) ISOLATOR OPEN CONDITION & GROUND SWITCH CLOSE 
(CONTACT RESISTANCE SHOULD BE LESS THAN 150 μΩ / BREAK) 
 
 

Page 29 of 72 
 
ACROSS  PHASE 
R‐Phase (μΩ)  Y‐Phase(μΩ)  B‐Phase(μΩ)
MAIN CONTACT (MALE & FEMALE)       
(GROUND SWITCH) 
 
c) Resistance of Operating Coil ____________________ 
d) Resistance of Interlocking Coil ____________________ 
6) FINAL DOCUMENTATION REVIEW: 
a) FINAL DOCUMENT OF PRE‐COMMISSIONING CHECKS  
REVIEWED AND APPROVED:          YES / NO 
b) DOCUMENTS REGARDING SPARES, EQUIPMENT, O & M 
MANNUALS ETC AVAILABLE AT SITE FOR O & M PURPOSE:    YES / NO 
c) AFTER MODIFICATION, IF ANY, "AS BUILT DRAWINGS" 
ARE AVAILABLE AT SITE:            YES / NO 
 
 
 
 
Signature:    Signature:      Signature:    Signature 
Name:      Name:        Name:      Name: 
Designation:    Designation:      Designation:    Designation: 
(Supplier Rep)    Erection Agency:    Site I/C, AEGCL    T & C, AEGCL 
 

Page 30 of 72 
 
ASSAM ELECTRICITY GRID CORPORATION LIMITED 

PRE‐COMMISSIONING OF WAVE TRAP 
COMMISSIONING FORMATS 
 
DOC NO:              SUBSTATION:   

BAY NO:              DATE OF TESTING:   

EQUIPMENT SERIAL NO: R‐Phase___________ Y‐PHASE____________B‐PHASE______________ 

Type:            MAKE:       

Voltage level, kV        132    220    400     

Current rating: ___________A  

mH Rating:          BAND WIDTH: 

1. DETAILS : CHECKLIST / TESTING 
SL  DESCRIPTION  STATUS  REMARKS,  IF 
No  ANY 
YES  NO   
1.   Equipment  is  free  from  dirt/dust  Foreign  materials       
etc. 
2.   Equipment is free from all visible defects on physical       
inspection 
3.   Support  structures,  has  been  provided  with  two       
earthing Pads / points 
4.   All  nuts  and  bolts  are  tightened  correctly  as  per       
specified torque 
5.   Permanent  isolator  levelling  and  identification  is       
done 
6.   Levelling and alignment of structure and base frame       
is checked 
7.   All insulators & line matching unit are free from any       
physical defects 
8.   Tightness of  nuts /  bolts  of terminal connectors are       
checked 

Page 31 of 72 
 
9.   Erection  completion  certificate  along  with  list  of       
outstanding activities reviewed 
10.   Check that the tuning unit and Arrestor are properly       
tightened And free from any damage 
 

2. INSULATION RESISTANCE MEASUREMENT: 
SL  BETWEEN  MEGGER  PHASE  Permissive 
NO  R‐PHASE  Y‐PHASE  B‐PHASE  Value 
  Upper  Terminal  5000 V        1000 MΩ 
& Earth 
  LA  of  the  Wave  500 V        1 MΩ 
Trap 
 

3. CONTACT RESISTANCE MEASUREMENT: 
THE VALUE SHOULD NOT MORE THAN 5 μΩ PER CONNECTOR / JOINT 
SL    PHASE 
No  ACROSS  R‐Phase (μΩ)  Y‐Phase (μΩ)  B‐Phase (μΩ) 
1  Upper Terminal       
2  Bottom Terminal       
 
4. FINAL DOCUMENTATION REVIEW : 
a) Final document of pre‐commissioning checks  
Reviewed and Approved:            YES / NO 
           
b) Documents regarding spares, equipment, O& M 
Manuals etc. available at site for o & m purpose:      YES / NO 
 
c) After modification, if any, "as built drawings" 
are available at site:            YES / NO 
 
 
 
Signature:    Signature:      Signature:    Signature 
Name:      Name:        Name:      Name: 
Designation:    Designation:      Designation:    Designation: 
(Supplier Rep)    Erection Agency:    Site I/C, AEGCL    T & C, AEGCL 

Page 32 of 72 
 
ASSAM ELECTRICITY GRID CORPORATION LIMITED 
PRE‐COMMISSIONING OF SF6 CIRCUIT BREAKER 

COMMISSIONING FORMATS 
 
DOC NO:              SUBSTATION:   

BAY NAME /  NO:                 

DATE OF ERECTION:           DATE OF ENERZIZATION: 

EQUIPMENT SERIAL NO: R‐Phase___________ Y‐PHASE____________B‐PHASE______________ 

SERIAL NO (FOR GO TYPE): 

Type:            MAKE:       

Voltage level, kV    33    132    220    400     

Current rating: ___________A         RATED BREAKING CAPACITY: 

CONTROL VOLTAGE: 

DETAILS : CHECKLIST / TESTING 

SL No  DESCRIPTION  STATUS  REMARKS,RECORD 


DEFICIENCIES, IF ANY 
YES  NO   
1.   Equipment  is  free  from  dirt/dust  Foreign       
materials etc. 
2.   Equipment  is  free  from  all  visible  defects  on       
physical inspection 
3.   Support structures, has been provided with two       
earthing Pads / points 
4.   All nuts and bolts are tightened correctly as per       
specified torque 
5.   Equipment erection is complete in all respect &       
erection completion Certificate along with list of
Outstanding activities reviewed. 
(ATTACH REMAINING ACTIVITIES,IF ANY) 
6.   Permanent  pole  levelling  and  Identification  is       
done 
7.   Levelling  and  alignment  of  structure  and  base       
frame is checked 
8.   Control box / marshalling kiosk is free from any       

Page 33 of 72 
 
physical defects 
9.   Tightness  of  nuts  bolts  of  terminal  connectors       
are checked 
10.   i)  Auxiliary  contacts  and  relays  have  been       
cleaned and free from rust /damage 
ii)  All  spare  wires  to  be  kept  with  ferrules  but       
not terminated at the terminal blocks 
iii)  Check  all  the  valves  in  the  SF6  pipe  line  are       
tightened, dilo coupling are tightened.   
11.   Slow  and  power  closing  operation  and  opening       
done. (wherever applicable) 
12.   Operating System       
a) Closing       
i). Hydraulic       
ii). Spring 
iii). Pneumatic 
b) Opening       
i). Hydraulic       
ii). Spring 
iii). Pneumatic 
12.1.   HYDRAULIC SYSTEM       
12.1.1.   ACCUMULATOR       
a) Make       
b) Serial No:        
R‐ph: 
Y‐Ph 
B‐Ph 
c) Type       
d) Year of Manufacture       
12.1.2.   PUMP DETAILS       
  a) Make       
b) Type 
c) Sl. No 
d) Volt 
e) Ampere 
f) HP/KW 
g) Year of Manufacture 
 

12.1.3. DETAILS OF RELAYS/CONTACTORS USED: SCHEMATIC DRAWING NO :____________ 
CIRCUIT REFERENCE  MAKE  Serial No.  TYPE  NO + NC 
Oil Pressure monitor         
Closing lockout         

Page 34 of 72 
 
Auto reclosing lockout         
General lockout         
Anti‐Pumping contactor         
Pole discrepancy timer         
Auxiliary         
Power contactor         
Others         
 
12.1.4. OPERATION CHECK: 
Date of filling hydraulic oil:      ____________________ 
Type of hydraulic oil:        _____________________ 
Venting of Hydraulic System is done: 
a) Pump          ___________________ 
b) Pilot Valve          ___________________ 
c) Accumulator        ___________________ 
d) Hydraulic Mechanism      ___________________ 
 
PRE‐FILLING PRESSURE OF N2      FACTORY TEST      SITE TEST 
0
IN ACCUMULATOR ( BAR at Deg.C)    _______at  C      ______at 0C 
 
Pump running time for charging 
Hydraulic system from initial pressure    _________  MIN    ________ 
to working pressure 
CHECKING SAFETY VALVE (OPEN/CLOSE)   _________  BAR    ________ 
 
HYDRAULIC PRESSURE DROP FOR 1 HR 
BREAKER ON POSITION        _________  BAR    _______ 
 
BREAKER OFF POSITION       _________  BAR    _______ 
 
OIL PRESSURE MONITOR 
PUMP ON / OFF BAR         _________  BAR    _______ 
PUMP RUNNING TIME        _________  SEC    _______ 
 
AUTO RECLOSING LOCKOUT (OIL) 

Page 35 of 72 
 
FACTORY TEST      SITE TEST 
PRESSURE CONTACT __________MAKE/BREAK _________  BAR    _______ 
 
CLOSING LOCKOUT (OIL) 
PRESSURE CONTACT __________MAKE/BREAK _________  BAR    _______ 
 
GENERAL LOCKOUT (OIL) 
PRESSURE CONTACT __________MAKE/BREAK _________  BAR    _______ 
 
CHECKING ANTI PUMPING CONTACTOR 
PRESSURE CONTACT __________MAKE/BREAK      OK / NOT OK 
 
CHECKING LOSS OF NITROGEN 
PRESSURE CONTACT __________MAKE/BREAK      OK / NOT OK 
 
12.1.5. OIL PRESSURE DROP DURING OPERATIONS AND PUMP RUNNING TIME IN SECONDS 
Sl  Description  Factory Test  Site Test 
No  Value  Value 
1  Pressure before operation, BAR     
Pressure after Closing operation, BAR     
Pump running time, Sec     
2  Pressure before operation, BAR     
Pressure after Opening operation, BAR     
Pump running time, Sec     
3  Pressure before operation, BAR     
Pressure after Close/Open operation, BAR     
Pump running time, Sec     
4  Pressure before operation, BAR     
Pressure after Open –Close‐Open operation, BAR     
Pump running time, Sec     
 
12.2. SPRING OPERATING SYSTEM 
12.2.1. MOTOR DETAILS: 
Make:        Type:        Serial No: 

Volt:        Ampere:      HP/KW: 

Page 36 of 72 
 
Thermal Overload Setting: 

DC current taken by Motor for charging the Spring _______________Amp 

12.2.2. DETAILS OF RELAYS/CONTACTORS USED: SCHEMATIC DRAWING NO :____________ 
CIRCUIT REFERENCE  MAKE  Serial No.  TYPE  NO + NC 
Oil Pressure monitor         
Closing lockout         
Auto reclosing lockout         
General lockout         
Anti‐Pumping contactor         
Pole discrepancy timer         
Auxiliary         
Power contactor         
Others         
 
12.2.3. SPRING OPERATING TIME: 
TIME TAKEN BY THE SPRING TO CHARGE FULLY AFTER CLOSING OF BREAKER 
DETAILS  R – PHASE  Y‐PHASE  B‐PHASE 
Factory Site  Factory  Site  Factory  Site 
Charging time             
 
13. SF6 DENSITY MONITOR DETAILS 
    Quantity of SF6 Gas Filled 
Make    ACTUAL  AS PER SPEC  Remark 
Model    R‐Ph  Y‐Ph  B‐Ph  R‐Ph  Y‐Ph  B‐Ph   
Serial No  R‐ph:               
Y‐ph: 
B‐Ph: 
 
13.1. SF6 DENSITY MONITOR SETTINGS 
PHASE  DETAILS  BLOCKING  DE‐BLOCKING  SF6 GAS FILLED AT 
Factory  Site  Factory  Site  __________BAR 
R‐PH  Refill Alarm          AT _________0C ON 
Operation Block          ____/_____/_____ 

Page 37 of 72 
 
Y‐PH  Refill Alarm           
Operation Block         
B‐PH  Refill Alarm         
Operation Block         
 
13.2. MEASUREMENT OF DEW POINT OF SF6 GAS : 
SL NO  Description  Measured Value 
  Minimum  value  of  Dew  Point  as   
  per SF6 Gas supplier/Manufacturer   
  of CB   
 

NOTE: Dew point measurement of SF6 gas needs to be done pole wise in close loop method 
without any wastage of sf6 gas. 

13.3. LEAKAGE CHECK: 
Sl No  Description  PHASE 
R‐Phase  Y‐Phase  B‐Phase 
A  Initial filling of SF6 Gas at _____0C       
(AS per Temp. correction chart) 
_____BAR  _____BAR  _____BAR
B  Drop in SF6 Gas Pressure in 24 Hrs  _____BAR  _____BAR  _____BAR
C  Filling pressure at ________0C  _____BAR  _____BAR  _____BAR
(After all testing) 
D  Additional leakage test by covering  Yes / No  Yes / No  Yes / No 
Individual joint with Polythene 
 
14. COIL RESISTANCE MEASUREMENT: 
SL NO  PHASE  COIL  MEASURED  SERIES  TOTAL 
VALUE (Ω)  RESISTOR (Ω)  (Ω) 
A  R‐Phase  TRIP COIL ‐ I       
TRIP COIL ‐ II       
CLOSE COIL       
B  Y ‐ Phase  TRIP COIL ‐ I       
TRIP COIL ‐ II       
CLOSE COIL       
C  B‐Phase  TRIP COIL ‐ I       
TRIP COIL ‐ II       
CLOSE COIL       
 
15. CIRCUITARY / OPEARTIONAL CHECKS: 

Page 38 of 72 
 
SL NO  CIRCUIT REFERENCE  CIRCUITRY CHECK  OPERATIONAL CHECK 
LOCAL  REMOTE  LOCAL  REMOTE 
A  Tripping through TC‐I         
B  Tripping through TC‐II         
C  Closing circuit         
D  ANTI PUMPING OPERATION         
(Close Open operation) 
E  POLE Discrepancy feature          
F  Breaker Position Indication         
G  Heater in Switch Cubicle         
H  Heater in Control Cubicle         
I  Illumination in Switch Cubicle         
J  Illumination in Control Cubicle         
 
NOTE : In case wiring for remote operation is not ready, please indicate terminal number along 
with  wire  ferrule  number  in  switch  cubicle  where  remote  cables  shall  be  terminated.  Remote 
operation can be checked from these terminals. 
 
16. OPERATING TIME ( IN MILLI‐SECONDS ): 
PHASE  BREAK  CLOSE  OPEN  CLOSE OPEN USING 
TRIP‐I  TRIP‐II  TRIP‐I  TRIP‐II 
R‐PH Main Contact             
R‐PH PIR  BREAK‐I           
AUXILIARY Contact           
R‐PH Main Contact             
R‐PH PIR  BREAK‐II           
AUXILIARY Contact           
Y‐PH Main Contact             
Y‐PH PIR  BREAK‐I           
AUXILIARY Contact           
Y‐PH Main Contact             
Y‐PH PIR  BREAK‐II           
AUXILIARY Contact           
B‐PH Main Contact             
B‐PH PIR  BREAK‐I           
AUXILIARY Contact           
B‐PH Main Contact             
B‐PH PIR  BREAK‐II           
AUXILIARY Contact           
 
17. IR VALUE OF CONTROL CIRCUIT: (Use 500 V Megger) 
Before Meggering isolate DC for Trip Coil ‐ I & II and Closing Coil 
COIL DETAIL  MEASURED VALUE (MΩ) 
R‐Phase Trip Coil ‐ I   
R‐Phase Trip Coil ‐ II   
R‐Phase Closing Coil ‐ II   

Page 39 of 72 
 
Y‐Phase Trip Coil ‐ I   
Y‐Phase Trip Coil ‐ II   
Y‐Phase Closing Coil ‐ II   
B‐Phase Trip Coil ‐ I   
B‐Phase Trip Coil ‐ II   
B‐Phase Closing Coil ‐ II   
 
18. IR VALUE WITH BREAKER OPEN: (Using 5000 V Megger) 
ACROSS OPEN CONTACT  MEASUREMENT VALUE (MΩ) 
R‐Phase Break ‐ I   
R‐Phase Break ‐ II   
Y‐Phase Break ‐ I   
Y‐Phase Break ‐ II   
B‐Phase Break ‐ I   
B‐Phase Break ‐ II   
 
19. IR  VALUE  WITH  RESPECT  TO  EARTH  WITH  BREAKER  CLOSED,  EARTH  SWITCH  AND  ISOLATOR 
OPEN : (USING 5000 VOLT MEGGER) 
BETWEEN  MEASUREMENT VALUE (MΩ) 
R‐PHASE and EARTH   
Y‐PHASE and EARTH   
B‐PHASE and EARTH   
 
20. MINIMUM PICKUP VOLTAGE OF COILS: 
COIL DETAILS  MEASUREMENT VALUE (V) 
R‐Phase Trip Coil ‐ I   
R‐Phase Trip Coil ‐ II   
R‐Phase Closing Coil    
Y‐Phase Trip Coil ‐ I   
Y‐Phase Trip Coil ‐ II   
Y‐Phase Closing Coil    
B‐Phase Trip Coil ‐ I   
B‐Phase Trip Coil ‐ II   
B‐Phase Closing Coil    
 
21. GRADING CAPACITOR: 
21.1. DETAILS 
 

Page 40 of 72 
 
DETAILS  INTERRUPTER ‐ 1  INTERRUPTER ‐ 2 
R  Y  B  R  Y  B 
MAKE             
Serial No.             
Capacitance value             
Year of Manufacture             
 
21.2. CAPACITANCE AND TAN DELTA MEASUREMENT: (To be done on UST mode) 
DESCRIPTION  INTERRUPTER ‐ 1  INTERRUPTER ‐ 2 
R  Y  B  R  Y  B 
CAPACITANCE: 
SITE             
FACTORY             
TAN DELTA: 
FACTORY             
SITE             
 
22. CONTACT RESISTANCE MEASUREMENT: 
SL  PHASE  ACROSS EACH POLE  INTERRUPTER ‐ 1  INTERRUPTER ‐ 2 
NO  FACTORY  SITE  FACTORY  SITE  FACTORY  SITE 
1  R‐Phase             
2  Y‐Phase             
3  B‐Phase             
 
23. BREAKER OPERATION COUNTER READING: 
Sl  PHASE  COUNTER  READING DATE 
No  TYPE 
ELECTRICAL  MECHANICAL
1  R‐Phase         
2  Y‐Phase         
3  B‐Phase         
 
24. CHECK FOR ANNUNCIATION IN CONTROL ROOM: 
(As per the following formats and record the reading) 
 
 

Page 41 of 72 
 
Sl  DESCRIPTION  OF  SOURCE OF  WINDOW/HMI   RESULT  REMARKS 
NO  TEST  INITIATION  DESCRIPTION  OK  NOT 
OK 
1  Switch  off  the  DC  Control  Source  I/II  DC       
source  in  control  cubicle  DC  Fail, AC Fail 
cubicle  Switch 
ON/OFF 
2  Switch  off  the  AC  Control  Source  I/II  DC       
source  in  control  cubicle  AC  Fail, AC Fail 
cubicle  Switch 
ON/OFF 
3  Short the ALARM contacts of SF6 GAS Density Monitor 
  R ‐ Phase  DENSITY  SF6  GAS  DENSITY       
MONITOR  LOW 
Y‐Phase  DENSITY  SF6  GAS  DENSITY       
MONITOR  LOW 
B‐Phase  DENSITY  SF6  GAS  DENSITY       
MONITOR  LOW 
4  Remove the cable connected to Density Monitor 
R‐Phase  DENSITY  OPERATION/CLOS      
MONITOR  ING LOCKOUT 
Y‐Phase  DENSITY  OPERATION/CLOS      
MONITOR  ING LOCKOUT 
B‐Phase  DENSITY  OPERATION/CLOS      
MONITOR  ING LOCKOUT 
5  Give  Tripping  PD  Relay  at  Breaker  Pole       
command  to  R‐Ph  CB Cubicle  Discrepancy 
only and check the 
operation  of  Pole 
Discrepancy Relay 
6  Give  Tripping  PD  Relay  at  Breaker  Pole       
command  to  Y‐Ph  CB Cubicle  Discrepancy 
only and check the 
operation  of  Pole 
Discrepancy Relay 
7  Give  Tripping  PD  Relay  at  Breaker  Pole       
command  to  Y‐Ph  CB Cubicle  Discrepancy 
only and check the 
operation  of  Pole 
Discrepancy Relay 
8  Close  the  breaker  Protection  Breaker Auto‐Trip       
and  Trip  through  relay  as  per 
Protection  which  scheme 
are applicable 
 
NOTE: The tripping details are to be checked as per the Scheme approved by design. 
25. Operation time measurement of pole discrepancy relay: 
26. Mechanical close interlock checked (wherever applicable):   Yes / No 
 

Page 42 of 72 
 
27. FINAL DOCUMENTATION REVIEW : 
a) Factory Test results are available          YES / NO 
b) Final document of pre‐commissioning checks  
Reviewed and Approved:            YES / NO 
           
c) Documents regarding spares, equipment, O& M 
Manuals etc. available at site for o & m purpose:      YES / NO 
 
d) After modification, if any, "as built drawings" 
are available at site:            YES / NO 
 
 
 
Signature:    Signature:      Signature:    Signature 
Name:      Name:        Name:      Name: 
Designation:    Designation:      Designation:    Designation: 
(Supplier Rep)    Erection Agency:    Site I/C, AEGCL    T & C, AEGCL 
 

Page 43 of 72 
 
ASSAM ELECTRICITY GRID CORPORATION LIMITED 
PRE‐COMMISSIONING OF CURRENT TRANSFORMER 

COMMISSIONING FORMATS 
 
DOC NO:              SUBSTATION:   

BAY NAME /  NO:                 

DATE OF ERECTION:           DATE OF ENERZIZATION: 

EQUIPMENT SERIAL NO: R‐Phase___________ Y‐PHASE____________B‐PHASE______________ 

Type:            MAKE:       

DEAD TANK:          LIVE TANK: 

RATIO SELECTION:  PRIMARY / SECONDARY 

Voltage level, kV    33    132    220    400   

YEAR OF MANUFACTURE: 

PURCHASE ORDER NO:   

RATED DATA & CLASS OF ACCURACY: 
CORE  RATIO  BURDEN  ACCURACY  KNEE  POINT 
CLASS  VOLTAGE (KVP) 
WINDING ‐ I         
WINDING ‐ II         
WINDING ‐ III         
WINDING ‐ IV         
WINDING ‐ V         
 
1.0 DETAIL: 
SL   DESCRIPTION  STATUS  REMARKS 
No  YES  NO  RECORD  DEFICENCIES, 
IF ANY 
i). Equipment is cleaned and free from       
Dust / Dirt foreign materials etc. 
ii). Equipment is free from all visible       
defects on physical inspection 
iii). Check ct tank has been provided       
With double earthing (dead tank CT’s) 
iv). Check that CT junction box is earthed       
v). All nuts and bolts are tightened       
correctly as per specified torque 
vi). Check tightness of terminal connector       

Page 44 of 72 
 
vii). All fittings as per Out line       
General Arrangement drawing. 
viii). Levelling and alignment of structure       
and base frame is checked 
ix). Erection completion certificate along       
with list of outstanding activities 
Reviewed 
x). Any paint removed / scratched in       
transit has been touched up 
xi). Check primary polarity of CT,s       
erected as per relevant drawing. 
xii). Check hermetically sealing is intact       

xiii). Check the oil level and leakage       
through any joints / Sec. Terminals 
xiv). Check oil drain valve is properly       
Closed and locked. 
xv). Oil Level & Oil sampling       

xvi). N2 pressure checked (wherever applicable)       

xvii). Oil level on top chamber gauge glass       

xviii). BDV of oil sample taken from tank       
bottom drain valve ( only if Nitrogen 
Pressure is measured zero ) 
xix). All the cable identification tags       
provided and all cores are provided 
with identification ferrules at M.B. 
xx). Check secondary cable end box is       
properly fixed and ensure cable entry 
at the bottom and unused holes sealed 
xxi). Ensure interpole cabling is completed       
And check the continuity. 
xxii). Check the IR value of secondary cable       

xxiii). Check  external  cabling  from  junction  box  to       


relay / control panel completed 
xxiv). Ensure unused secondary cores,       
if any, has been shorted 
xxv). Check star point has been formed       
properly and grounded at one end only 
xxvi). Check spark gap setting in P1 terminal       
(wherever provided/ possible) 
Permanent pole levelling and 
identification markings made 
xxvii). Check TAN DELTA test tap is properly       
earthed 
xxviii). Check that lugs used in secondary circuit are       
of ring type 
xxix). Check  direction  of  PRIMARY  (P1/  P2)  w.r.t.       

Page 45 of 72 
 
BUS/LINE on erection 
xxx). Provision of bimetallic strips (Cu +AL)       
ensured wherever applicable 
 
2.0 INSULATION RESISTANCE MEASUREMENT: ( USING 5KV MEGGER) 
Sl No. of Megger: 
Make: 
Calibration valid up to: _____/______/______ 
Ambient temperature:_______0C 
Relative Humidity: 
NOTE:   A) Remove the connected earthing to system involving CT under test 
B) Disconnect the connected terminals of CT M.Box 
C) Permissible values is 1000 MΩ. 
   
SL  CORE  PHASE 
No  R‐Phase (MΩ)  Y‐Phase (MΩ)  B‐Phase (MΩ) 
1  PRIMARY – CORE I       
2  PRIMARY – CORE II       
3  PRIMARY – CORE III       
4  PRIMARY – CORE IV       
5  PRIMARY – CORE V       
6  PRIMARY – EARTH       
 
3.0 INSULATION RESISTANCE MEASUREMENT: (Using 500 V Megger) 
Sl No. of Megger: 
Make: 
Calibration valid up to: _____/______/______ 
Ambient temperature:_______0C 
a)  
SL  CORE  PHASE 
No  R‐Phase (MΩ)  Y‐Phase (MΩ)  B‐Phase (MΩ) 
1  CORE I ‐ Earth       
2  CORE II ‐ Earth       
3  CORE III ‐ Earth       
4  CORE IV ‐ Earth       
5  CORE V ‐ Earth       
6  EARTH ‐ Earth       
 
b)    
SL  CORE  PHASE 
No  R‐Phase (MΩ)  Y‐Phase (MΩ)  B‐Phase (MΩ) 

Page 46 of 72 
 
1  CORE I – CORE II       
2  CORE I – CORE III       
3  CORE I ‐  CORE IV       
4  CORE I – CORE V       
5  CORE II – CORE III       
6  CORE II – CORE IV       
7  CORE II – CORE V       
8  CORE III – CORE IV       
9  CORE III – CORE V       
10  CORE IV – CORE V       
 
4.0 CHECK IR VALUE BETWEEN TAN DELTA POINT AND EARTH ( AT 1 KV IN SECONDARY BOX) 
 
R‐Phase ________ MΩ,     Y‐Phase_________ MΩ    B‐Phase_________ MΩ   
 
5.0 SECONDARY WINDING RESISTANCE (IN OHM) 
Details of Testing equipment: 
Make:            Date of testing: ______/_____/_____ 
Calibration valid up to: _____/______/______ 
Ambient temperature:_______0C 
 
CORE  TERMINAL  R ‐ PHASE  Y ‐ PHASE  B ‐ PHASE 
Factory  Site  Factory Site  Factory  Site 
CORE‐I  1S1 – 1S2             
1S1 – 1S3             
1S1 – 1S4             
CORE‐II  2S1 – 2S2             
2S1 – 2S3             
2S1 – 2S4             
CORE‐III  3S1 – 3S2             
3S1 – 3S3             
3S1 – 3S4             
CORE‐IV  4S1 – 4S2             
4S1 – 4S3             
4S1 – 4S4             
CORE‐V  5S1‐5S2             
5S1‐5S3             

Page 47 of 72 
 
5S1‐5S4             
 
6.0 POLARITY TEST : 
(With 1.5 V DC Supply) 
Connect +VE at P1 & ‐Ve at P2 
CORE  BETWEEN  PHASE 
R‐Phase  Y‐Phase  B‐Phase 
CORE ‐ I  1S1 (+Ve)  1S2 (‐Ve)       
1S1 (+Ve)  1S3 (‐Ve)       
1S1 (+Ve)  1S4 (‐Ve)       
CORE‐II  2S1 (+Ve)  2S2 (‐Ve)       
2S1 (+Ve)  2S3 (‐Ve)       
2S1 (+Ve)  2S4 (‐Ve)       
CORE ‐ III  3S1 (+Ve)  3S2 (‐Ve)       
3S1 (+Ve)  3S3 (‐Ve)       
3S1 (+Ve)  3S4 (‐Ve)       
CORE ‐ IV  4S1 (+Ve)  4S2 (‐Ve)       
4S1 (+Ve)  4S3 (‐Ve)       
4S1 (+Ve)  4S4 (‐Ve)       
CORE ‐ V  5S1 (+Ve)  5S2 (‐Ve)       
5S1 (+Ve)  5S3 (‐Ve)       
5S1 (+Ve)  5S4 (‐Ve)       
 
7.0 TAN DELTA AND CAPACITANCE MEASUREMENT 
Sl No. of Test Kit: 
Make: 
Calibration valid up to: _____/______/______     
Date of Testing:  ______/______/______ 
Ambient temperature:_______0C 
a) CAPACITANCE MEASRUEMENT 
VOLTAGE  CAPACITANCE (MEASURED VALUE)  REMARKS 
R‐Phase  Y‐Phase  B‐Phase 
FACTORY  SITE  FACTORY SITE  FACTORY SITE 
2 kV               

Page 48 of 72 
 
10 kV               
 
b) TAN DELTA MEASUREMENT 
VOLTAGE  TAN DELTA (MEASURED VALUE)  REMARKS 
R‐Phase  Y‐Phase  B‐Phase 
FACTORY  SITE  FACTORY SITE  FACTORY SITE 
2 kV               
10 kV               
 
8.0 CURRENT RATIO TEST 
Sl No. of Test Kit: 
Make: 
Primary Current Range:         VA Burden: 
Calibration valid up to: _____/______/______     
Date of Testing:  ______/______/______ 
Ambient temperature:_______0C 
a) R – PHASE 
CORE  PRIMARY CURRENT  SECONDARY THERITICAL ACTUAL  %  OF 
%  ACTUAL  CURRENT  RATIO  RATIO  ERROR
CORE‐I  20%           
(1S1‐1S2)  40%           
80%           
CORE‐II  20%           
(2S1– 2S2) 40%           
80%           
CORE‐III  20%           
(3S1‐3S2)  40%           
80%           
CORE‐IV  20%           
(4S1‐4S2)  40%           
80%           
CORE‐V  20%           
(5S1‐5S2)  40%           
80%           
CORE‐I  20%           
(1S1‐1S3)  40%           
80%           
CORE‐II  20%           
(2S1– 2S3) 40%           
80%           
CORE‐III  20%           
(3S1‐3S3)  40%           

Page 49 of 72 
 
80%           
CORE‐IV  20%           
(4S1‐4S3)  40%           
80%           
CORE‐V  20%           
(5S1‐5S3)  40%           
80%           
CORE‐I  20%           
(1S1‐1S4)  40%           
80%           
CORE‐II  20%           
(2S1– 2S4) 40%           
80%           
CORE‐III  20%           
(3S1‐3S4)  40%           
80%           
CORE‐IV  20%           
(4S1‐4S4)  40%           
80%           
CORE‐V  20%           
(5S1‐5S4)  40%           
80%           
 
b) Y – PHASE 
CORE  PRIMARY CURRENT  SECONDARY THERITICAL ACTUAL  %  OF 
%  ACTUAL  CURRENT  RATIO  RATIO  ERROR
CORE‐I  20%           
(1S1‐1S2)  40%           
80%           
CORE‐II  20%           
(2S1– 2S2) 40%           
80%           
CORE‐III  20%           
(3S1‐3S2)  40%           
80%           
CORE‐IV  20%           
(4S1‐4S2)  40%           
80%           
CORE‐V  20%           
(5S1‐5S2)  40%           
80%           
CORE‐I  20%           
(1S1‐1S3)  40%           
80%           
CORE‐II  20%           
(2S1– 2S3) 40%           
80%           
CORE‐III  20%           
(3S1‐3S3)  40%           

Page 50 of 72 
 
80%           
CORE‐IV  20%           
(4S1‐4S3)  40%           
80%           
CORE‐V  20%           
(5S1‐5S3)  40%           
80%           
CORE‐I  20%           
(1S1‐1S4)  40%           
80%           
CORE‐II  20%           
(2S1– 2S4) 40%           
80%           
CORE‐III  20%           
(3S1‐3S4)  40%           
80%           
CORE‐IV  20%           
(4S1‐4S4)  40%           
80%           
CORE‐V  20%           
(5S1‐5S4)  40%           
80%           
 
c) B‐PHASE 
CORE  PRIMARY CURRENT  SECONDARY THERITICAL ACTUAL  %  OF 
%  ACTUAL  CURRENT  RATIO  RATIO  ERROR
CORE‐I  20%           
(1S1‐1S2)  40%           
80%           
CORE‐II  20%           
(2S1– 2S2) 40%           
80%           
CORE‐III  20%           
(3S1‐3S2)  40%           
80%           
CORE‐IV  20%           
(4S1‐4S2)  40%           
80%           
CORE‐V  20%           
(5S1‐5S2)  40%           
80%           
CORE‐I  20%           
(1S1‐1S3)  40%           
80%           
CORE‐II  20%           
(2S1– 2S3) 40%           
80%           
CORE‐III  20%           
(3S1‐3S3)  40%           

Page 51 of 72 
 
80%           
CORE‐IV  20%           
(4S1‐4S3)  40%           
80%           
CORE‐V  20%           
(5S1‐5S3)  40%           
80%           
CORE‐I  20%           
(1S1‐1S4)  40%           
80%           
CORE‐II  20%           
(2S1– 2S4) 40%           
80%           
CORE‐III  20%           
(3S1‐3S4)  40%           
80%           
CORE‐IV  20%           
(4S1‐4S4)  40%           
80%           
CORE‐V  20%           
(5S1‐5S4)  40%           
80%           
 
9.0 MAGNETISING CURVES PERFORMANCE 
KNEE POINT VOLTAGE ( KVp ) _______________ VOLT 
Sl No. of Test Kit: 
Make: 
Calibration valid up to: _____/______/______     
Date of Testing:  ______/______/______ 
Ambient temperature:_______0C 
a) R – PHASE 
VOLTAGE  CURRENT MEASUREMENT (mA) 
To  be  Actual   CORE‐I  CORE‐II  CORE‐III  CORE‐IV  CORE‐V 
applied  Value  1S1‐1S2  2S1 – 2S2  3S1‐3S2  4S1‐4S2  5S1‐5S2 
0.25xKVP    Not  to         
0.5xKVP    apply  for         
0.75xKVP    Metering         
1.00xKVP    Core         
1.10xKVP           
 
b) Y – PHASE 
VOLTAGE  CURRENT MEASUREMENT (mA) 
To  be  Actual   CORE‐I  CORE‐II  CORE‐III  CORE‐IV  CORE‐V 
applied  Value  1S1‐1S2  2S1 – 2S2  3S1‐3S2  4S1‐4S2  5S1‐5S2 
0.25xKVP    Not  to         

Page 52 of 72 
 
0.5xKVP    apply  for         
0.75xKVP    Metering         
1.00xKVP    Core         
1.10xKVP           
 
c) B – PHASE 
VOLTAGE  CURRENT MEASUREMENT (mA) 
To  be  Actual   CORE‐I  CORE‐II  CORE‐III  CORE‐IV  CORE‐V 
applied  Value  1S1‐1S2  2S1 – 2S2  3S1‐3S2  4S1‐4S2  5S1‐5S2 
0.25xKVP    Not  to         
0.5xKVP    apply  for         
0.75xKVP    Metering         
1.00xKVP    Core         
1.10xKVP           
 
NOTE :  
 1.0 CT should not saturate at 110 % of knee point voltage ( KVp ) 
2.0  If  knee  point  voltage  is  not  mentioned  then  knee  point  current  may  be  taken  into 
consideration 
10.0 CONTACT RESISTANCE MEASUREMENT 
Details of Test Kit: 
CONTACT RESISTANCE  R‐Phase (μΩ)  Y‐Phase(μΩ)  B‐Phase(μΩ) 
Across terminal P1       
Across terminal P2       
 
NOTE  :  The  value  of  contact  resistance  should  not  be  more  than  10  μΩ  PER  JOINT  / 
CONNECTOR. 
11.0 DGA TEST OF CT OIL (AFTER ONE MONTH OF COMMISSIONING) 
(Sample to be taken at 250 ml bottle) 
DISOLVE GAS  R‐PHASE  Y‐PHASE  B‐PHASE  REMARKS 
Total Gas%         
H2         
CH4         
C2H4         
C2H6         
C2H2         
CO         
CO2         
O2         
N2         
 

Page 53 of 72 
 
12.0 FINAL DOCUMENTATION REVIEW : 
a) Final document of pre‐commissioning checks  
Reviewed and Approved:            YES / NO 
           
b) Documents regarding spares, equipment, O& M 
Manuals etc. available at site for o & m purpose:      YES / NO 
 
c) After modification, if any, "as built drawings" 
are available at site:            YES / NO 
 
 
 
Signature:    Signature:      Signature:    Signature 
Name:      Name:        Name:      Name: 
Designation:    Designation:      Designation:    Designation: 
(Supplier Rep)    Erection Agency:    Site I/C, AEGCL    T & C, AEGCL 
 
 

Page 54 of 72 
 
ASSAM ELECTRICITY GRID CORPORATION LIMITED 
PRE‐COMMISSIONING OF CAPACITOR VOLTAGE TRANSFORMER 

COMMISSIONING FORMATS 
 
DOC NO:              SUBSTATION:   

BAY NAME /  NO:                 

DATE OF ERECTION:           DATE OF ENERZIZATION: 

Voltage level, kV        132    220    400 

DETAILS OF EQUIPMENT: 

DESCRIPTION  R‐PHASE  Y‐PHASE  B‐PHASE 


PURCHASE ORDER NO       
MAKE       
TYPE       
SERIAL NO       
CAPACITANCE (pF)       
 

SECONDARY DETAILS: 

DESCRIPTION  WINDING‐I  WINDING‐II  WINDING‐III 


VOLTAGE (V)       
VA BURDEN (VA)       
CLASS       
PURPOSE       
 

1.0 DETAILS OF CHECK LIST: 
 
SL   DESCRIPTION  STATUS  REMARKS 
No  YES  NO  RECORD  DEFICENCIES, 
IF ANY 
i). Equipment is cleaned and free from       
Dust / Dirt foreign materials etc. 
ii). Equipment is free from all visible       
defects on physical inspection 
iii). Check CVT tank has been provided       
With double earthing  
iv). Check that CVT Marshalling Box is earthed       
v). All nuts and bolts are tightened       
correctly as per specified torque 
vi). Check tightness of terminal connector       
vii). All fittings as per Out line       
General Arrangement drawing. 

Page 55 of 72 
 
viii). Levelling  and  Identification  marking    is       
carried out. 
ix). Levelling and alignment of structure       
and base frame is checked 
x). Erection completion certificate along       
with list of outstanding activities 
Reviewed 
xi). Any paint removed / scratched in       
transit has been touched up 
xii). Sl. No of HV CAPACITOR identical to the       
Sl.no mentioned on RATING & DIG. PLATE 
xiii). Ensure  brass  vent  plug  between  stacks  of       
CVT's is removed 
xiv). Check the oil level and leakage       
through any joints / Sec. Terminals 
xv). Check oil drain valve is properly       
Closed and locked. 
xvi). Oil Level on tank Gauge Glass       
xvii). BDV of oil sample taken from tank       
bottom drain valve  
xviii). Check secondary cable end box is       
properly fixed and ensure cable entry 
at the bottom and unused holes sealed 
xix). Ensure H.F terminal of unused phases       
has been earthed and no load on 
H.F terminal bushing 
xx). Check RATING / HEALTHINESS of Fuses       
at CVT M.B and CVT terminal box. 
xxi). Check that the neutral point is earthed       
xxii). Ensure interpole cabling is completed       
and check the continuity 
xxiii). Check the IR value of secondary cable       
xxiv). Check  external  cabling  from  junction  box  to       
relay / control panel completed 
xxv). All the cable identification tags provided and       
all  cores  are  provided  with  identification 
ferrules at M.B. 
 
2.0 CONTINUITY OF WINDING: 
(After removing Earth Link 1, 2 & 3) 
 
Sl No  BETWEEN TERMINAL  OK  NOT OK 
A  1a – 1n     
B  2a – 2n     
C  3a – 3n     
 
3.0 INSULATION RESISTANCE MEASUREMENT: (Using 5 kV Megger) 

Details of Megger: 

Page 56 of 72 
 
SL No:      Type:          Make: 

Ambient Temperature: __________0C 
Sl No  BETWEEN  MEASURED VALUE (MΩ) 
R ‐ Phase  Y ‐ Phase  B ‐ Phase 
i)  Primary – Secondary CORE 1       
ii)  Primary – Secondary CORE 2       
iii)  Primary – Secondary CORE 3       
iv)  Primary ‐ Earth       
 
4.0 INSULATION RESISTANCE MEASUREMENT: (Using 500 V Megger) 

Details of Megger: 
Sl No  BETWEEN  MEASURED VALUE (MΩ) 
R ‐ Phase  Y ‐ Phase  B ‐ Phase 
i)  Secondary CORE 1 ‐ Earth       
ii)  Secondary CORE 2 ‐ Earth       
iii)  Secondary CORE 3 ‐Earth       
iv)  CORE 1 – CORE 2       
v)  CORE 1 – CORE 3       
vi)  CORE 2 – CORE 3       
 
5.0 VOLTAGE RATIO TEST: 

Details of Testing Instruments: 

PHASE  PRIMARY  SECONDARY VOLTAGE  THEORITICAL ACTUAL RATIO  % 


Between  Value  RATIO  FACTORY  SITE  ERROR 
    1a – 1n           
R    2a – 2n           
  3a – 3n           
    1a – 1n           
Y    2a – 2n           
  3a – 3n           
    1a – 1n           
B    2a – 2n           
  3a – 3n           
 

NOTE : 
1. Apply voltage of the order of 500 V or more across line capacitor ( top flange ) to earth link 
2. Ensure all earth links connected 
 
6.0 TAN DELTA AND CAPACITANCE MEASUREMENT 

Sl No. of Test Kit: 
Make: 

Page 57 of 72 
 
Serial No: 
Calibration valid up to: _____/______/______     
Date of Testing:  ______/______/______ 
Ambient temperature:_______0C 
a) CAPACITANCE MEASRUEMENT 
VOLTAGE  CAPACITANCE (MEASURED VALUE)  REMARKS 
R‐Phase  Y‐Phase  B‐Phase 
FACTORY  SITE  FACTORY SITE  FACTORY SITE 
2 kV               
10 kV               
 
a) TAN DELTA MEASUREMENT 
VOLTAGE  TAN DELTA (MEASURED VALUE)  REMARKS 
R‐Phase  Y‐Phase  B‐Phase 
FACTORY  SITE  FACTORY SITE  FACTORY SITE 
2 kV               
10 kV               
 
7.0 FINAL DOCUMENTATION REVIEW : 

d) Final document of pre‐commissioning checks  
Reviewed and Approved:            YES / NO 
           
e) Documents regarding spares, equipment, O& M 
Manuals etc. available at site for o & m purpose:      YES / NO 
 
f) After modification, if any, "as built drawings" 
are available at site:            YES / NO 
 
 
Signature:    Signature:      Signature:    Signature 
Name:      Name:        Name:      Name: 
Designation:    Designation:      Designation:    Designation: 
(Supplier Rep)    Erection Agency:    Site I/C, AEGCL    T & C, AEGCL 
 

Page 58 of 72 
 
ASSAM ELECTRICITY GRID CORPORATION LIMITED 
PRE‐COMMISSIONING OF SURGE ARRESTER 

COMMISSIONING FORMATS 
 
DOC NO:              SUBSTATION:   

BAY NAME /  NO:                 

DATE OF ERECTION:           DATE OF ENERZIZATION: 

Voltage level, kV    33    132    220    400 

DETAILS OF EQUIPMENT: 

DESCRIPTION  R‐PHASE  Y‐PHASE  B‐PHASE 


PURCHASE ORDER NO       
MAKE       
TYPE       
SERIAL NO       
RATING       
 

1.0 DETAILS: CHECK LIST / TESTING 

SL   DESCRIPTION  STATUS  REMARKS 


No  YES  NO  RECORD  DEFICENCIES, 
IF ANY 
i). Equipment is cleaned and free from       
Dust / Dirt foreign materials etc. 
ii). Equipment is free from all visible       
defects on physical inspection 
iii). Support structures have been provided with       
double earth 
iv). All nuts and bolts are tightened       
correctly as per specified torque 
v). Equipment  erection  is  complete  in  all       
respect 
(ATTACH REMAINING ACTIVITIES,IF ANY) 
vi). Levelling  and  Identification  marking  is       
carried out. 
vii). Levelling and alignment of structure       
and base frame is checked 
viii). All insulators & Surge counter are free from       
any physical defects 
ix). Check  tightness  of  all  nuts  &  bolts  and       
terminal connector 
x). Erection  completion  certificate  along  with       
list of outstanding activities 

Page 59 of 72 
 
reviewed 
xi). Check one end of surge counter is connected       
to  the  bottom  of  la  stack  and  one  end  of 
surge counter has been earth 
xii). The direction of the exhaust vent ports away       
from  the  protected  equipment  and  other 
arrester poles 
xiii). Clearance  from  the  arrester  to  earthed       
objects  and  from  the  arrester  pole  to 
another  arrester  pole  maintained  as  per 
Outline  drawing  and  all  erection  has  been 
done as per approved drawing. 
xiv). Check  the  serial  no.  and  sequence  of  LA        
parts for erection in multi stack LA 
xv). Check the alignment of Corona Ring       
xvi). Check  on  charging,  the  Surge  Counter       
pointer is in green zone 
 

2.0 INSULATION RESISTANCE MEASUREMENT: (Using 5 kV Megger) 

Sl No. of Test Kit: 
Make: 
Calibration valid up to: _____/______/______     
Date of Testing:  ______/______/______ 
Ambient temperature:_______0C 
 

Sl No  BETWEEN  PHASE 


R‐Phase (MΩ)  Y‐Phase (MΩ)  B‐Phase (MΩ) 
st
a  1  Stack ‐ Earth       
b  2nd  Stack ‐ Earth       
c  3rd Stack ‐ Earth       
d  4th Stack ‐ Earth       
e  5th Stack ‐ Earth       
f  6th Stack ‐ Earth       
 

3.0 SURGE COUNTER READING: 

Sl No  READING  PHASE 


R‐Phase   Y‐Phase   B‐Phase  
a  Counter Serial No.       
b  Counter Make       
c  Counter Reading       
 

4.0 CAPACITANCE & TAN DELTA MEASUREMENT: 

Page 60 of 72 
 
Sl No. of Test Kit: 
Make: 
Calibration valid up to: _____/______/______     
Date of Testing:  ______/______/______ 
Ambient temperature:_______0C 
VOLTAGE  STACK  CAPACITANCE  TAN DELTA  REMARKS 
2 kV  TOP       
MIDDLE 1       
MIDDLE 2       
BOTTOM       
10 kV  TOP       
MIDDLE 1       
MIDDLE 2       
BOTTOM       
 

5.0 CHECKING OF HEALTHINESS OF SURGE MONITOR :   OK / NOT OK 

6.0 FINAL DOCUMENTATION REVIEW : 

g) Final document of pre‐commissioning checks  
Reviewed and Approved:            YES / NO 
           
h) Documents regarding spares, equipment, O& M 
Manuals etc. available at site for o & m purpose:      YES / NO 
 
i) After modification, if any, "as built drawings" 
are available at site:            YES / NO 
 
 
 
 
Signature:    Signature:      Signature:    Signature 
Name:      Name:        Name:      Name: 
Designation:    Designation:      Designation:    Designation: 
(Supplier Rep)    Erection Agency:    Site I/C, AEGCL    T & C, AEGCL 
 

Page 61 of 72 
 
ASSAM ELECTRICITY GRID CORPORATION LIMITED 
PRE‐COMMISSIONING OF 220 kV LINE RELAY & CONTROL PANEL 

COMMISSIONING FORMATS 
 
DOC NO:              SUBSTATION:   

BAY NAME /  NO:                 

DATE OF ERECTION:           DATE OF ENERZIZATION: 

Voltage level, kV    33    132    220    400 

DETAILS OF EQUIPMENT: 

Make:              Year of Manufacture: 

Purchase Order No: 

Type of Panel: Swing Simplex/Simplex/Duplex      DC Auxiliary Voltage: 

Panel Overall Dimensions: 

Relay Specifications Details: 

Sl  Relay Type  Make  Relay  Relay  Type & Nos. of  No. of  Nos. of 


No  Ordering  Compatibility  Communication  Analogue  BI & BO 
Code  Ports  Channel 
IEC  Modbus RJ 45  Serial  BI  BO 
61850
1  Main ‐1                   
2  Main – 2                   
3  Line                   
Differential 
 

1.0 DETAILS: CHECK LIST / TESTING 

a. Wiring 

Sl As per norms Yes No Remarks


No
1 Wiring done using PVC insulated 650 grade single-
core multi strands annealed copper conductor flexible
wire.
2 2.5 Sqmm Red, Yellow, Blue & Black for CT Circuit
3 2.5 Sqmm Red, Yellow, Blue & Black for PT Circuit
4 2.5 Sqmm for 240V AC circuits
5 1.5 Sqmm Grey for DC circuits

Page 62 of 72 
 
6 1.5 Sqmm Black for AC circuits
7 2.5 Sqmm Green for Earthing Circuit
 

b. EARTHING:

Sl As per norms Yes No Remarks


No
1 1 no. Copper Bar of size 25 x 6 mm will be run
throughout the board
2 Earthing between equipments will be looped &
finally terminated in Earth bar
3 Earth bar coupling link of copper will be provided
between adjacent panels

c. AC DISTRIBUTION:

Sl As per norms Yes No Remarks


No
1 Checking of AC Supervision Relay
2

d. DC DISTRIBUTION

Sl As per norms Yes No Remarks


No
1 Checking of DC Supervision Relay
2 Source-1
3 Source-2
4 Changeover between Sources
a) Electro Mechanical switch
b) Through changeover relays

e. VOLTAGE SELECTION RELAYS

Sl As per norms Yes No Remarks


No
1 75 A
2 75 B
3 Check VTSS (BPT-LPT)

Page 63 of 72 
 
f. METERING CIRCUIT

Sl As per norms Yes No Remarks


No
1 W Meter
2 VAR Meter
3 V Meter
4 A Meter
5 TVM Meter

g. SYNCHRONISING CIRCUIT

Sl As per norms Yes No Remarks


No
1 Bus PT Supply Circuit
2 Line CVT Supply Circuit

h. CT CIRCUIT

Sl As per norms Yes No Remarks


No
1 Metering Circuit
Star Point
Continuity
Earthing should be either at CT JB or at Panel end
2 Main Protection Circuit
Star Point
Continuity
Earthing should be either at CT JB or at Panel end
3 B/U Protection Circuit
Star Point
Continuity
Earthing should be either at CT JB or at Panel end
4 BBP Protection Circuit
Star Point
Continuity
Earthing should be either at CT JB or at Panel end

i. Input Circuit

Page 64 of 72 
 
Sl As per norms Yes No Remarks
No
1 Main/TBC CB R phase Open
2 Main/TBC CB Y phase Open
3 Main/TBC CB B phase Open
4 Main/TBC CB Ready for A/R
5 Carrier Out of Service

Sl As per norms Yes No Remarks


No
6 External LBB/ A/R Initiation
R phase
Y phase
B phase
7 A/R Switch ON
8 Carrier Channel I Healthy
Carrier Channel II Healthy
9 Carrier Channel I Received
10 SOTF Initiation
11 A/R Block
12 Main CB Open Status
R phase
Y phase
B phase
13 TBC CB Open Status
R phase
Y phase
B phase
14 Main CB Ready for A/R
15 TBC CB Ready for A/R

j. Carrier circuit

Sl As per norms Yes No Remarks


No
1 Carrier Channel I Received
2 Carrier Channel I Healthy
3 Carrier Channel I Send
Carrier Channel II Send
4 Carrier Channel II Received
5 Carrier Channel II Healthy
6 Carrier Channel I Send
Carrier Channel II Send
7 Direct Trip Received
Channel I

Page 65 of 72 
 
Channel II
8 Direct Trip Send
Channel I
Channel II
9
10

k. Single Phase/ Three Phase Initiation Circuit

Sl As per norms Yes No Remarks


No
1 1φ Trip R-φ : 86 R1
1φ Trip Y-φ : 86 Y1
1φ Trip B-φ : 86 B1
2 1φ Trip R-φ : 86 R2
1φ Trip Y-φ : 86 Y2
1φ Trip B-φ : 86 B2
3 Master Trip Relay : 86 A Optd
Distance Prot Optd.
B/U Protection Optd.
DT Received Ch-I
DT Received Ch-II

Master Trip Relay : 86 B Optd


Distance Prot Optd.
B/U Protection Optd.
DT Received Ch-I
DT Received Ch-II
4 Auxiliary Trip Relay: 86 X (RL-1) Optd.
Auxiliary Trip Relay: 86 X (RL-2) Optd.

l. LBB Trip Relay Circuit

Sl As per norms Yes No Remarks


No
1 LBB -96 Realy Optd.
2 Check all the Trip Extensions as per scheme
i)
ii)
iii)
iv)
v)
vi)

Page 66 of 72 
 
vii)

m. CB Closing & Manual Trip Circuit

Sl As per norms Yes No Remarks


No
1 DC Supply-1 to CB
DC Supply-2 to CB

2 Auto Reclose/ Remote Close


3 Manual Trip-1 (TC-1)/ (TC-2)

n. CB TC-1 / TC 2 Circuit (Protection Trip/Post Close Supn) & Pre Close


Supervision

Sl As per norms Yes No Remarks


No
1 1-φ Optd. From Main Prot. Relay

2 Group A Trip Optd.

Group B Trip Optd.

3 LBB/ BB Optd.

4 195 R

195 Y

195 B

o. TTX Contact Multiplication Circuit (Related to TTS)

Page 67 of 72 
 
Sl As per norms Yes No Remarks
No
1 TTX 1

TTX 2

TTX3

p. TBC TRIPPING CIRCUIT


Sl As per norms Yes No Remarks
No
1 86 A Extension

86 B extension

1-φ Trip Optd. From Main Protection Relay


R

2 To LBB Initiation TBC

86 R1

86 Y1

86 B1

86 R2

86 Y2

86 B2

q. ISOLATOR CONTROL CIRCUIT

Sl As per norms Yes No Remarks


No
1 89 A Close

Page 68 of 72 
 
89 A Open

89 B Close

89 B Open

89 C Close

89 C Open

89 D Close

89 D Open

r. INDICATION CIRCUIT
Sl As per norms Yes No Remarks
No
1 CB Open
CB Close
CB Auto Trip
CB Spring Charged
89 A Open
89 B Close
89 B Open
89 BE Close
89 BE Open
89 C Close
89 C Open
89 D Close
89 D Open
89 DE1 Close
89 DE1 Open
89 DE2 Close
89 DE2 Open

2 Line Hot R-φ Healthy


Line Hot Y-φ Healthy
Line Hot B-φ Healthy

s. ANNUNCIATION CIRCUIT
Sl As per norms Yes No Remarks
No
1 DC Fail
2 AC Fail
3 Main Dist Prot. Optd.
4 O/C & E/F Optd.
5 DEF/ SOTF Optd.

Page 69 of 72 
 
6 Carrier CH-I & II Fail
7 A/R Optd.
8 Power Swing Detected
9 Panel AC Supply Fail
10 LBB/BB Optd.
11 Numerical Relay Faulty
12 DT Received Ch-I & II
13 CB TC-1 faulty
14 CB TC-2 faulty
15 SF6 Low Alarm
16 SF6 Lock Out

t. Main Distance Protection Relay

Sl As per norms Yes No Remarks


No
1 Check CT Circuit (If any Mismatch)

2 Check PT Circuit (If any Mismatch)

3 Zone Reach Test

4 LBB

5 SOTF Optd.

6 Carrier Send

7 A/R
i) AR Optd

Page 70 of 72 
 
ii) AR Lock Out

iii) AR Blocked

8 Power Swing Detected


9 Carrier Inter-tripping

10 VT Fuse fail

11 Broken Conductor

u. Main Distance Protection Relay & Directional B/U Relay

Sl As per norms Yes No Remarks


No
12 Under Frequency Optd.

13 Over Voltage Optd.

14 Directional B/U Relay


15 Check CT Circuit (If any Mismatch)

16 Check PT Circuit (If any Mismatch)

17 Directionality Test
i) Operating Zone

ii) Non Operating Zone

18 Pick Up Test
19 Operating Timing Check

Page 71 of 72 
 
20 High Set

v. ISOLATOR INTERLOCK CIRCUIT

Sl As per norms Yes No Remarks


No
1 89 A Interlock

2 89 B Interlock

3 89 BE Interlock

4 89 DE1 Interlock

5 89 DE2 Interlock

6 89 D Interlock

7 89 C Interlock

Page 72 of 72 
 