You are on page 1of 2

Assignment

Name: Farhana Rahman

ID: 1530095030

Course: Mgt351

Section: 12

Date: 5th September,2018

Problem-1

a) Piece rate:
 40 piece / day
1 day = 8 hr
 8 hr = 40 pieces
1 hr = 40/8 pieces
= 5 pieces
 5 piece = $ 8.50
1 piece = $8.50/ 5
= $ 1.70

Total Earnings:= $ 1.70 x 40


= $ 68

b) 1 hr = $ 8.50
8 hr = 8 x $ 8.50
= $ 68 per day
Production exceeded by ( 80-40) = 40 pieces
Total earnings will be = $ 68+$ 68
= $138

c) Piece rate:
Standard Unit: 40 pieces / 8 hours = 5 pieces per hour

Std. rate per Unit is; $8.50 (hourly rate) / 5 (pieces per hour) = $1.70 per piece
Premium rate per unit is 1.70 X 1.2 = $2.04

Earnings: So, if Karim produces 80 unit then his earnings will be


Wages from producing Standard unit: $1.70x 40 = $68.

Wages from producing premium unit: $2.04 x (80-40=40) = $81.6

Total: $68 + $81.6 (Standard + Premium) = $149.6

Problem-2:

Subhat’s Subhat’s Employer’s Employer’s


Years Basic Contribution Contribution Contribution Contribution
Salary 5% Total 5% Total

1st 40000 2000 2000 x 12 2000 2000 x 12


= 24000 = 24000

2nd 44000 2200 2200 x 12 2200 2200 x 12


=26400 =26400
(10%
increased)

Total =50400 Total = 50400

So, PF = Tk 50,400 + (20% of Tk 50,400)


= Tk 50,400 + Tk 10,080
= Tk 60,480

Problem – 3: Fouzia’s Gratuity = 50,000 x 5 x 8

= 20,00,000 tk

You might also like