Professional Documents
Culture Documents
ID: 1530095030
Course: Mgt351
Section: 12
Problem-1
a) Piece rate:
40 piece / day
1 day = 8 hr
8 hr = 40 pieces
1 hr = 40/8 pieces
= 5 pieces
5 piece = $ 8.50
1 piece = $8.50/ 5
= $ 1.70
b) 1 hr = $ 8.50
8 hr = 8 x $ 8.50
= $ 68 per day
Production exceeded by ( 80-40) = 40 pieces
Total earnings will be = $ 68+$ 68
= $138
c) Piece rate:
Standard Unit: 40 pieces / 8 hours = 5 pieces per hour
Std. rate per Unit is; $8.50 (hourly rate) / 5 (pieces per hour) = $1.70 per piece
Premium rate per unit is 1.70 X 1.2 = $2.04
Problem-2:
= 20,00,000 tk