Construction of the Multi- Lane Road Tunnel under the River Karnaphuli
“BG HEL Yl ks A a SBE
Fo 5a Be Hk Be th ze
Contractor: CCCC Employer: BBA DATE: 2018-2-25 _No.0098
NO. BOQ | Description of Works Location Completion quantity | Total number Remarks
fe | ttem LAr Hi cm Fe ait pant
3-2-6, 2-27-29, 2-52~59, Al-I~
1 Jet grouting pile 2351
1 0176-005 +t grouting pile (@850) ADL. 101-2 21
Cement-Mixed
7 No wor
2 0176-008 Pilec850) 0 1250 lo work,
3 0176-00 upw WWID-108-5 1 269.1 meters
1 49 pieces
° a Cast-in-situ bored pile LZZ-03 I 31
CHECKED BY: He a
e DATE: 4/6.2.26Construction of the Multi- Lane Road Tunnel under the River Karnaphuli
Sh Pe BL Yi ge A HE RL St Be
FM oe TB Hie BE tb Ze
Contractor: CCCC Employer: BBA - DATE: 2018-2-26 No.0099
No. | 80Q | Description of Works Location Completion quantity | Total number Remarks
Fea | Item Coffe dts te FES ait EE
1 | 0176.005 | Jet grouting pite ssa). | 71264651 ALS A ATI-2, 21 272
A22. M25
Cement-Mixed
176-008 125 No work
on ik Pile(@850) o : ie
3 | 07600 upw wwp.tiss 273.1 meters
1 50 pieces
" mee KBZ8-C7 1 32
CHECKED BY: Moa,
“ DATE: 30/8 2.27Construction of the Multi- Lane Road Tunnel under the River Karnaphuli
BF Ley GS AE He Pa
FW 56 TL Beit Bi it Be
Contractor: CCCC
Employer: BBA
DATE: 2018-2-27
: No.0100
No. | 60Q_ | Description of Works Location ‘Completion quantity | Total number Remarks
RS Item TAH ALL FEB Ait Atk
, 21OIB, 2.3945, AL-D-AL, ADS.
1 | 0176-005 | Jet grouting pte (9850) a 25 2397
Cement-Mixed
0176. o 1250 No work
a os Pile(@850)
3 | 017600 upw WWID-1IN4 1 270-1 meters
\ 51 pieces
217609 TF Castin-situ bored pile L7z-02 1 33
CHECKED BY:
DATE:
218. 2.8Construction of the Multi- Lane Road Tunnel under the River Karnaphuli
fe ph SL YT Je Ae A HE SB
Fe 76 LB Be aR
Contractor: CCCC Employer: BBA DATE: 2018-2-28 No.0101
NO. | B80Q _ | Description of Works Location ‘Completion quantity | Total number Remarks
FRG | Item Pe aS we Fe eit VE
21-9, 230-38. C121. AD6.
0176-005 | Jet 30 2 420
1 16 Jet grouting pile (9850) Renan 2
Cement-Mixed
176-008 ° 1250 No work
Bees fo Pile(@850) °
176.
a ore uUDW WWID-118-4 1 2 ee
1 52 pieces
0176.
P08 | casvinsita bored pile L27-04 1 34
CHECKED BY: = aA, DATE: o/f.3./
018 3.Construction of the Multi- Lane Road Tunnel under the River Karnaphuli
“RP HLT ke A He HE
Fi 56 L Be it Be th
Contractor: CCCC Employer: BBA DATE: 2018-3-1 No.0102
NO. | B80Q | Description of Works Location Completion quantity | Total number Remarks
RS Item Tea A FEHR Be Be ait tk
1 | 0176-005 | Jet grouting pile gsso) | CTOs Ch22-24. ALIS. 9 2429
- Jet grouting pile (9! ones
Cement-Mixed
2 | 0176-008 een 0 1250 No work
0176-00 291
3 upw WWID-I1S-2 1 ‘meters
1 53 pieces
219509 | catiosi td pe tz 1s
CHECKEDBY: pag ¢
Hah. DATE: olf. 3,2Construction of the Multi- Lane Road Tunnel under the River Karnaphuli
“Boy 1 LD Be Ae He eB
FW 56 LB Hak Be th Ze
____ Contractor: CCCC Employer: BBA DATE: 2018-3-2 No.0103
NO. | B0Q | Description of Works Location Completion quantity | Total number Remarks
FES | Item testis LE Tea ait TE
C112, C26, 5-62-65. C2112,
ing pile (985 2 2441
1 0176-005 | Jet grouting pile (p850) AL-IT. ALT-8. A24
Cement-Mixed
01764 0 1250 No work
2 are Pile(@850)
o17 297.1 meters
3 00 UDW WWJD-10N-3 1 . “
1 54 pieces
0176-00
2 Cast-in-situ bored pile 122-05 36
CHECKED BY: yh ag
DATE: 20/%3.3,Construction of the Multi- Lane Road Tunnel under the River Karnaphuli
“By HELD] ke 4H Het
FL 56 Be BE vb Be
Contraetor: CCCC Employer: BBA DATE: 2018-3-3 No.0104
NO. | BOQ | Description of Works Location Completion quantity | Total number Remarks
fem | tem TEA Ai Seat ait atk
13-78, C25, 5-66-73, Al-S~6.
0176-005 | Jet grouting pile (9850) 1s 2456
! Se A23. AL-I6
Cement-Mixed
764 2
2 | 0176-008 pommany 0 1250 No work
176. meters
3 | 70 ww.052 sn
1 55 pices
0176-00 ,
4 Cast-in-situ bored pile KBZ8-D7, LZz9-B2 2 38
CHECKED BY: Bag, Z
DATE: 20/824