Construction of the Multi- Lane Road Tunnel under the River Karnaphuli “BG HEL Yl ks A a SBE Fo 5a Be Hk Be th ze Contractor: CCCC Employer: BBA DATE: 2018-2-25 _No.0098 NO. BOQ | Description of Works Location Completion quantity | Total number Remarks fe | ttem LAr Hi cm Fe ait pant 3-2-6, 2-27-29, 2-52~59, Al-I~ 1 Jet grouting pile 2351 1 0176-005 +t grouting pile (@850) ADL. 101-2 21 Cement-Mixed 7 No wor 2 0176-008 Pilec850) 0 1250 lo work, 3 0176-00 upw WWID-108-5 1 269.1 meters 1 49 pieces ° a Cast-in-situ bored pile LZZ-03 I 31 CHECKED BY: He a e DATE: 4/6.2.26 Construction of the Multi- Lane Road Tunnel under the River Karnaphuli Sh Pe BL Yi ge A HE RL St Be FM oe TB Hie BE tb Ze Contractor: CCCC Employer: BBA - DATE: 2018-2-26 No.0099 No. | 80Q | Description of Works Location Completion quantity | Total number Remarks Fea | Item Coffe dts te FES ait EE 1 | 0176.005 | Jet grouting pite ssa). | 71264651 ALS A ATI-2, 21 272 A22. M25 Cement-Mixed 176-008 125 No work on ik Pile(@850) o : ie 3 | 07600 upw wwp.tiss 273.1 meters 1 50 pieces " mee KBZ8-C7 1 32 CHECKED BY: Moa, “ DATE: 30/8 2.27 Construction of the Multi- Lane Road Tunnel under the River Karnaphuli BF Ley GS AE He Pa FW 56 TL Beit Bi it Be Contractor: CCCC Employer: BBA DATE: 2018-2-27 : No.0100 No. | 60Q_ | Description of Works Location ‘Completion quantity | Total number Remarks RS Item TAH ALL FEB Ait Atk , 21OIB, 2.3945, AL-D-AL, ADS. 1 | 0176-005 | Jet grouting pte (9850) a 25 2397 Cement-Mixed 0176. o 1250 No work a os Pile(@850) 3 | 017600 upw WWID-1IN4 1 270-1 meters \ 51 pieces 217609 TF Castin-situ bored pile L7z-02 1 33 CHECKED BY: DATE: 218. 2.8 Construction of the Multi- Lane Road Tunnel under the River Karnaphuli fe ph SL YT Je Ae A HE SB Fe 76 LB Be aR Contractor: CCCC Employer: BBA DATE: 2018-2-28 No.0101 NO. | B80Q _ | Description of Works Location ‘Completion quantity | Total number Remarks FRG | Item Pe aS we Fe eit VE 21-9, 230-38. C121. AD6. 0176-005 | Jet 30 2 420 1 16 Jet grouting pile (9850) Renan 2 Cement-Mixed 176-008 ° 1250 No work Bees fo Pile(@850) ° 176. a ore uUDW WWID-118-4 1 2 ee 1 52 pieces 0176. P08 | casvinsita bored pile L27-04 1 34 CHECKED BY: = aA, DATE: o/f.3./ 018 3. Construction of the Multi- Lane Road Tunnel under the River Karnaphuli “RP HLT ke A He HE Fi 56 L Be it Be th Contractor: CCCC Employer: BBA DATE: 2018-3-1 No.0102 NO. | B80Q | Description of Works Location Completion quantity | Total number Remarks RS Item Tea A FEHR Be Be ait tk 1 | 0176-005 | Jet grouting pile gsso) | CTOs Ch22-24. ALIS. 9 2429 - Jet grouting pile (9! ones Cement-Mixed 2 | 0176-008 een 0 1250 No work 0176-00 291 3 upw WWID-I1S-2 1 ‘meters 1 53 pieces 219509 | catiosi td pe tz 1s CHECKEDBY: pag ¢ Hah. DATE: olf. 3,2 Construction of the Multi- Lane Road Tunnel under the River Karnaphuli “Boy 1 LD Be Ae He eB FW 56 LB Hak Be th Ze ____ Contractor: CCCC Employer: BBA DATE: 2018-3-2 No.0103 NO. | B0Q | Description of Works Location Completion quantity | Total number Remarks FES | Item testis LE Tea ait TE C112, C26, 5-62-65. C2112, ing pile (985 2 2441 1 0176-005 | Jet grouting pile (p850) AL-IT. ALT-8. A24 Cement-Mixed 01764 0 1250 No work 2 are Pile(@850) o17 297.1 meters 3 00 UDW WWJD-10N-3 1 . “ 1 54 pieces 0176-00 2 Cast-in-situ bored pile 122-05 36 CHECKED BY: yh ag DATE: 20/%3.3, Construction of the Multi- Lane Road Tunnel under the River Karnaphuli “By HELD] ke 4H Het FL 56 Be BE vb Be Contraetor: CCCC Employer: BBA DATE: 2018-3-3 No.0104 NO. | BOQ | Description of Works Location Completion quantity | Total number Remarks fem | tem TEA Ai Seat ait atk 13-78, C25, 5-66-73, Al-S~6. 0176-005 | Jet grouting pile (9850) 1s 2456 ! Se A23. AL-I6 Cement-Mixed 764 2 2 | 0176-008 pommany 0 1250 No work 176. meters 3 | 70 ww.052 sn 1 55 pices 0176-00 , 4 Cast-in-situ bored pile KBZ8-D7, LZz9-B2 2 38 CHECKED BY: Bag, Z DATE: 20/824

You might also like