Construction Methods for Cross Passage in Soft

Ground Tunnels in China

Xiangdong Hu Wang Guo


Department of Geotechnical Engineering, Department of Geotechnical Engineering,
Tongji University. Tongji University.
Key Laboratory of Geotechnical and Underground Key Laboratory of Geotechnical and Underground
Engineering of Ministry of Education, Tongji University Engineering of Ministry of Education, Tongji University.
Shanghai, P.R. China Shanghai, P.R. China
anton.geotech@tongji.edu.cn guowangnk@sina.com

Abstract—In recent years, lots of soft ground tunnels, including artificial ground freezing method is introduced, and its risk
metro tunnels and road tunnels, have been constructed in many prevention and safety protection measures are also described in
cities in the east of China. Nearly all tunnels have cross passages detail.
between two tubes. In soft ground area, cross passages could be
built in many kinds of methods, such as, cut-and-cover, mining
methods, and combined method. Mining methods with help of II. COSTRUCTION METHODS OF CROSS PASSAGE IN METRO
ground improvement include grouting method, deep-mixing, TUNNEL
high pressure jet grouting and ground freezing method. This The construction of cross passage is the most important
thesis summarizes cross passage construction methods for soft part in the metro construction. If one process encounters
ground conditions in China, in which the most successful and improper operation, the whole construction safety of cross
popular one, mining method with ground improved by artificial passage will be impacted, resulting in the risk of the main
ground freezing and its risk prevention and safety protection body of the tunnel. There are three primary construction
measures, are introduced in detail. methods in cross passage in soft ground tunnel: cut-and-cover
method, mining methods and the combination of the two
Keywords-metro; soft ground tunnel; cross passage;
construction method; artificial groud freezing
methods.

A. Cut-and-Cover Method
I. INTRODUCTION
Cut-and-cover method in cross passage has three steps.
In metro construction in many cities in East China, the Firstly, excavation is in advance, and it is supported to the
subway interval tunnel distance between two metro stations is designed elevation; Secondly, the prophase works include
about 1km in general with a cross passage set to connect the lashing reinforcement cage, standing module and concreting,
twin tubes of metro tunnel. The cross passage of metro tunnel then the major structure of the cross passage would be formed;
is usually laid in the middle of subway interval tunnel buried Last, the covering soil is backfilled.
under the metro lines. The construction of cross passage and
the drainage sump are always combined, playing important Many advantages are contained in cut-and-cover method.
parts in catchment, drainage and connection of twin tubes[1,2]. First is the wide adaptability. This method is suitable for all
classes of soil. Second is lower cost. The cost mainly depends
The section span of cross passage is 2.0~3.0m commonly, on the charge of the supporting systems. The third advantage
and the wall height is about 2.5~3.5m. Rectangular, circular the influence to the main body of the tunnel is much smaller
and straight-wall-top-arch are three primary shapes of the when some accidents broken out in the course of the cross
section. The distance of cross passage is usually 6~15m. passage construction. Moreover, the requirement of
Although the work load is less in the cross passage, the risk is construction technique is more inferior, and the construction
very high. There are many engineering accidents not only in pace is faster. When the cover depth of cross passage is lighter
cross passage, but in the main body of metro tunnel, such as and the surrounding area allowed, this method is considerable.
quicksand and piping which might create very severe damage.
For example, in July 1st, 2003, there was a great quicksand, B. Mining Method
pouring into the cross passage of Shanghai metro Line 4. The The Mining method in cross passage construction can be
metro tunnel was damaged. Land subsidence in the periphery divided into three categories by different ground
region, severe incline of 3 buildings, crack and settlement in reinforcement methods (see TABLE I).
flood prevention wall, were all caused by this accident. This
paper fully considers the risk existing in construction of cross
passage. The paper summarizes the applicability of various
construction methods. The most popular method currently,

978-1-4577-0290-7/11/$26.00 ©2011 IEEE


193
TABLE I. DIFFERENT GROUND REINFORCEMENT METHODS This method brings many advantages. Firstly, the frozen
soil cylinder has higher strength. Secondly, the frozen soil
Physical stabilization method: artificial cylinder has good impermeability, and this could be easily
ground freezing method tested by the hydrological hole which is setting in the frozen
Foundation reinforcement soil cylinder. Thirdly, by using this method, the disturbance of
method Chemical stabilization method:
grouting method; the ground would be smaller, and the land subsidence could be
deep-mixing method; well controlled. Lastly, the ground area wouldn’t be occupied
high pressure jet grouting method by this method. However, some disadvantages also exist, such
Previous timbering mining pipe shed method; as the construction cycle is relatively longer, the cost is higher,
method flashboard method and frost heave and thaw settlement would lead to land
subsidence.
Mechanized construction
pipe jacking method
method
B. Deep-mixing Method, High Pressure Jet Grouting
The foundation reinforcement method is used to enhance Method
the strength, impermeability and self-supporting of the weak These two methods are suitable for the soft clay region,
and crashing soil by physical chemistry method in order to and their craft has been mature because there are many
excavating through manual work or mechanical process. The construction instances in city metro.
previous timbering method is used to support the soil and
prevent the collapse of soil through flashboard or pipe shed. If the reinforced soil has a good quality, the cross passage
Then soil excavation and lining support should be well construction would be much safer and faster. On the contrary,
proceeded. The mechanized method uses pipe jacking machine when the cross passage is in the sandy soil with a greater
to push and to keep the stabilization of the tunnel surface. The depth, the reinforcement quality would be difficult to
precast section of direct jacking could be used for permanent guarantee. However, if the reinforced soil has a poor quality,
structure. This method has higher mechanization. the tunnel surface will be more likely to collapse in the
excavation process, and the water leakage will be brought on.
C. Combined Method (Combining Cut-and-cover Method Besides, these methods would occupy plenty of ground area,
and Mining Method) which may cause noise pollution, mud pollution and land
subsidence.
Combined method also has three steps. At first, adopting
manual hole digging pile or other supporting methods to
C. Grouting Reinforcement Mining Method
construct one shaft to the designed elevation of cross passage
at the top of the reinforced soil in the middle of main body of Grouting method could consolidate the ground and plug off
two tunnels. Then, from the shaft to the main body of two the growth of the crack in order to shut off the water. Then, the
tunnels respectively, using mining method to excavate, thus purpose of ground reinforcement would be achieved. This
the cross passage would be formed. As the structure of cross method has a good effect on the weak rock and soil stratum
passage finished, the sealed steel segment should be opened. with crack. Meanwhile, it also has a bad effect on the
In the end, after the end of the cross passage construction, the homogeneous and dense ground. Therefore, the homogeneity
shaft would be backfilled or reformed as a discharging-air or a of the reinforcement effect is relatively poor, and the reliable
drainage passage. detection measures for reinforcement quality are lack off. In
sum, grouting method has been used less commonly in the
cross passage construction of the shield tunnel.
III. APPLICABILITY ANALYSIS OF THE COMMON MINING
METHOD
D. Pipe Shed Method, Flashboard Method
The different kinds of risk in mining method are undertaken These two methods are suitable for the weak surrounding
by the main body of the tunnel and cross passage together. rock, especially for the rigorous land subsidence. They have a
However, by using cut-and-cover method or the combined good pre-reinforcement effect on surrounding rock, bringing
method, the risk is mainly assumed to the main body of the with remarkable economy and social benefit. They are also
tunnel. Therefore, in the specific cross passage engineering, the among the comprehensive subsidiary methods in underground
selection of the proper construction methods should be based engineering. Pipe shed method was originally applied in
on the engineering geologic condition and the surrounding Beijing metro, and plenty of engineering experience had been
environment in order to consolidate the security and economic accumulated. Furthermore, this method is used more often in
interest of the construction. poor geologic condition of tunnel construction. In cross
passage construction, especially with the drainage sump, this
A. Artificial Ground Freezing Method method is seldom used.
This method has been widely used in many engineering
fields such as cross passage, shield launching and accessing E. Pipe Jacking Method
tunnel and other tunnel engineering. The method is suitable Pipe jacking method is a streamlined construction method
for all kinds of soil, especially for the soft ground with high in underground pipelines. It is a non-excavation method in
water content. At first, horizontal freezing technology is used paving underground pipelines. This method has a greatest
to reinforce the soil on the excavation surface. Then, mining difference with other soil reinforcement methods. The pipeline
construction is followed.

194
section not only acts as the permanent structure of the cross In order to balance the water and soil pressure, the pressure
passage, but also supports the excavation surface. This is also will be supplied by the by-pass vavle of blow-out preventer. At
the superiority of this method. the same time, the volume of sand removal should be
monitored strictly. When the strata loss is over size,
This method is suitable for the soil with low water content compensatory grouting must be carried through the freezing
and good self-supporting ability, and the cost is not high. pipes. Furthermore, the junction between blow-out preventer
However, when the jacking force is exerting on the segment, it and tunnel structure should be fastness, so that the paroxysmal
might affect the stability of the main body of the tunnel and sandblasting would be held back when the blow-out preventer
the segment. If the jacking force is not well controlled, the is departed from the tunnel structure. It is very important to the
displacement of the main body of the tunnel will be occurred. freezing pipes under the structure.
Therefore, we should stabilize the main body of the tunnel and
install rational fixed device. Because of these reasons, pipe
jacking method has more complicated technology and higher B. Protection of Segment
requirement for the construction workers. During the excavation of cross passage, a part of the
segment lining of the main tunnel has to be removed,
At present, deep-mixing method, high pressure jet grouting rendering the ring structure of lining in a disintegrated state,
method and artificial ground freezing method are the most thus, the considerable stress concentration at the opening,
common mining methods in the cross passage construction. which may cause excessive deformation or even
Shanghai metro Line 1 mostly adopted the deep-mixing destabilization of lining structure. Steel reinforcement is fixed
method and jet grouting method. Since the application in around the opening as a protection device to prevent lining
Shanghai metro Line 2, the artificial ground freezing method from excessive deformation (see Fig. 2).
in cross passage construction has been more and more popular
used, such as in Nanjing metro, Guangzhou metro, the
extension of Line 1 and Line 4 in Shanghai, etc.

IV. ARTIFICIAL GROUND FREEZING METHOD


Artificial ground freezing method has personal
particularity such as the necessity of drilling operation,
variability of the property in frozen soil and the behavior in
frozen soil cylinder, the nature of the frost heave and thaw
settlement[3-5]. With these characteristic, many accidents may
happen during the freeze holes drilling, frozen, excavation and
thawing process of frozen soil. In this way, artificial ground
freezing method is a kind of construction method with a high Figure 2. Protection device for segment
risk. Catastrophe will be bred without enough attention.
Concerning with these hidden dangers, some key techniques
adopted are introduced as below[6,7]. C. Protective Door
Many factors may cause the failure of frozen soil cylinder,
A. Drilling of Freeze Holes such as geometric imperfection and physical defect of the
During the process of drilling freeze holes from the main cylinder, error judgment of the characteristics of the frozen
tunnel to the outside, water spewing and sandblasting are soil cylinder In case of uncontrollable water inrush due to the
likely to occur, which may lead to excessive ground loss failure of the frozen soil cylinder, pre-installed protective door
followed with destabilization of lining structure. In order to can block the path of intruding water to the inside. Thus, it
guarantee drilling safety, reliable blow-out preventer should protects the main tunnel and minimizes the loss.
be applied to reduce the risk of water spewing and
sandblasting. Fig. 1 illustrates the structure of a blow-out
preventer.
Ground Segment Flaned casing-stub
Gate valve (spherical)
Freeze-tube

Figure 3. Waterproofing door for tunnel collapse prevention


Bleed valve
In convenience of emergency shut-down, the protective
door adopts the up-down rotating shutting system. In normal
Figure 1. Blow-out preventer state, the protective door is open upward and fixed (see Fig. 2
and Fig. 3).

195
D. Thermal Insulation F. Thaw Settlement
Ventilation in the main tunnel may take away the coldness Thaw settlement usually occurs after the completion of the
of the frozen soil near segment lining with the existence of frozen engineering. This phenomenon may cause the
concrete thermo-conductivity and reduce refrigeration effect, differential settlement of substructure. As a result, the
which may lead to a problem that the frozen soil does not substructure will be deformed or destroyed. Besides, the
adfreeze to the outer surface of the segment. In order to surface structures, other underground structures and some
achieve a sound adfrozen state between segment and frozen pipelines might also be destroyed.
soil, surface freezing tubes are set lying along the inner side of
the segment to reduce the segment temperature, thus weaken Thaw settlement is also the order of nature. At present, the
the influence of heat exchange caused by ventilation. Surface main method used to control thaw settlement is grouting.
freezing tubes are located around the opening and appressed Owing to the restriction of various conditions in construction,
on the inner surface of the segment, covering the area larger the grouting tubes are always difficult to dispose to the
than designed range of the frozen soil curtain. Fig. 4 presents optimum position. Therefore, the whole freezing area should
the general layout of the surface thermal insulation. be guaranteed to grout fully as far as possible.

V. CONCLUSION
This thesis analyzes the cross passage construction methods
for soft ground conditions in China. Then, it generalizes the
applicability of different kinds of methods in common use, as
well as the relating advantages and disadvantages. At last, the
paper summarizes plenty of ordinary risk and the relevant
countermeasures in construction of artificial ground freezing
method, some of which have been commonly applied into
actual engineering fields. No matter what methods applied, the
security in projects is premier. Before the final decision, it is
Figure 4. General layout of the surface thermal insulation for segment
necessary to consider cautiously based on the characteristic of
different construction methods.
E. Frost Heave
The hazard of frost heave is mainly consisted in the over REFERENCES
size of the frozen soil volume, taking much longer time of [1] X.D. Hu, R. Chen. 2006. “Construction technology of freezing method
freezing and bad control measures of frost heave. applied to cross-passage of double-deck cross-river road tunnel,” Low
Temperature architecture Technology, 2006(5): 64-66.
There are several measures applying to controlling the [2] X.D. Hu, F. Zhao. 2009. “Influence of heat dissipation of main tunnel
hazard of frost heave. First, the sensibility of the frost heave structure on freezing effect in cross passage construction.,” China
should be ascertained by the frost heave test. Second, much Journal of Rock Mechanics and Engineering, Vol.28 Supp.1, 3109-3115.
longer time in freezing should be avoided. Third, during the (in Chinese)
excavation, the cooling energy consumption should not be [3] Hans Mortier, Léon L.T.C. Tuunter. 2004. “Cross Connections at
provided too sufficient, and the control measures of the frost Pannerdensch Canal Tunnel – Freezing Soil Mass Design and Execution
Comparison,” Robert Hack, Rafig Azzam, and Robert Charlier (Eds.):
heave should be carried out. For instance, prestressed steel LNES 104, pp. 455–465.
ring could be set up in the tunnel to limit the segment
[4] Z.H. Huang, X.D. Hu, J.Y. Wang, H.B. Lin and R.Z. Yu. 2008. “Key
deformation caused by the frost heave (see Fig. 5). techniques in cross passage construction of Shanghai Yangtze River
Tunnel by artificial ground freezing method,” The Shanghai Yangtze
River Tunnel – Theory, Design and Construction, Complimentary
Special Issue to The Sixth International Symposium on Geotechnical
Aspects of Underground Construction in Soft Ground, Shanghai, pp.
205-210.
[5] F. Qiu and X.D. Hu. 2006. “3D Visualization Analysis of the Frozen
Soil Curtain for the Cross-Passage Construction in Tunnels,” Proc. 2nd
National Symposium on Geotechnical Engineering, Science Press,
Beijing, 79-83. (in Chinese)
[6] Z.H. Zhang, H.H. Zhu and R. Zhuang. 2006. Metro and Light Rail.
Beijing: China Communications Press. (in Chinese)
[7] X.D. Hu, F.Huang and N. Bai. 2008. “Models of artificial frozen
Figure 5. Prestressed steel ring for tunnel structure protection temperature field considering soil freezing point,” Journal of China
University of Mining & Technology, 37, 550-555. (in Chinese)