Abstract—In recent years, lots of soft ground tunnels, including artificial ground freezing method is introduced, and its risk
metro tunnels and road tunnels, have been constructed in many prevention and safety protection measures are also described in
cities in the east of China. Nearly all tunnels have cross passages detail.
between two tubes. In soft ground area, cross passages could be
built in many kinds of methods, such as, cut-and-cover, mining
methods, and combined method. Mining methods with help of II. COSTRUCTION METHODS OF CROSS PASSAGE IN METRO
ground improvement include grouting method, deep-mixing, TUNNEL
high pressure jet grouting and ground freezing method. This The construction of cross passage is the most important
thesis summarizes cross passage construction methods for soft part in the metro construction. If one process encounters
ground conditions in China, in which the most successful and improper operation, the whole construction safety of cross
popular one, mining method with ground improved by artificial passage will be impacted, resulting in the risk of the main
ground freezing and its risk prevention and safety protection body of the tunnel. There are three primary construction
measures, are introduced in detail. methods in cross passage in soft ground tunnel: cut-and-cover
method, mining methods and the combination of the two
Keywords-metro; soft ground tunnel; cross passage;
construction method; artificial groud freezing
methods.
A. Cut-and-Cover Method
I. INTRODUCTION
Cut-and-cover method in cross passage has three steps.
In metro construction in many cities in East China, the Firstly, excavation is in advance, and it is supported to the
subway interval tunnel distance between two metro stations is designed elevation; Secondly, the prophase works include
about 1km in general with a cross passage set to connect the lashing reinforcement cage, standing module and concreting,
twin tubes of metro tunnel. The cross passage of metro tunnel then the major structure of the cross passage would be formed;
is usually laid in the middle of subway interval tunnel buried Last, the covering soil is backfilled.
under the metro lines. The construction of cross passage and
the drainage sump are always combined, playing important Many advantages are contained in cut-and-cover method.
parts in catchment, drainage and connection of twin tubes[1,2]. First is the wide adaptability. This method is suitable for all
classes of soil. Second is lower cost. The cost mainly depends
The section span of cross passage is 2.0~3.0m commonly, on the charge of the supporting systems. The third advantage
and the wall height is about 2.5~3.5m. Rectangular, circular the influence to the main body of the tunnel is much smaller
and straight-wall-top-arch are three primary shapes of the when some accidents broken out in the course of the cross
section. The distance of cross passage is usually 6~15m. passage construction. Moreover, the requirement of
Although the work load is less in the cross passage, the risk is construction technique is more inferior, and the construction
very high. There are many engineering accidents not only in pace is faster. When the cover depth of cross passage is lighter
cross passage, but in the main body of metro tunnel, such as and the surrounding area allowed, this method is considerable.
quicksand and piping which might create very severe damage.
For example, in July 1st, 2003, there was a great quicksand, B. Mining Method
pouring into the cross passage of Shanghai metro Line 4. The The Mining method in cross passage construction can be
metro tunnel was damaged. Land subsidence in the periphery divided into three categories by different ground
region, severe incline of 3 buildings, crack and settlement in reinforcement methods (see TABLE I).
flood prevention wall, were all caused by this accident. This
paper fully considers the risk existing in construction of cross
passage. The paper summarizes the applicability of various
construction methods. The most popular method currently,
194
section not only acts as the permanent structure of the cross In order to balance the water and soil pressure, the pressure
passage, but also supports the excavation surface. This is also will be supplied by the by-pass vavle of blow-out preventer. At
the superiority of this method. the same time, the volume of sand removal should be
monitored strictly. When the strata loss is over size,
This method is suitable for the soil with low water content compensatory grouting must be carried through the freezing
and good self-supporting ability, and the cost is not high. pipes. Furthermore, the junction between blow-out preventer
However, when the jacking force is exerting on the segment, it and tunnel structure should be fastness, so that the paroxysmal
might affect the stability of the main body of the tunnel and sandblasting would be held back when the blow-out preventer
the segment. If the jacking force is not well controlled, the is departed from the tunnel structure. It is very important to the
displacement of the main body of the tunnel will be occurred. freezing pipes under the structure.
Therefore, we should stabilize the main body of the tunnel and
install rational fixed device. Because of these reasons, pipe
jacking method has more complicated technology and higher B. Protection of Segment
requirement for the construction workers. During the excavation of cross passage, a part of the
segment lining of the main tunnel has to be removed,
At present, deep-mixing method, high pressure jet grouting rendering the ring structure of lining in a disintegrated state,
method and artificial ground freezing method are the most thus, the considerable stress concentration at the opening,
common mining methods in the cross passage construction. which may cause excessive deformation or even
Shanghai metro Line 1 mostly adopted the deep-mixing destabilization of lining structure. Steel reinforcement is fixed
method and jet grouting method. Since the application in around the opening as a protection device to prevent lining
Shanghai metro Line 2, the artificial ground freezing method from excessive deformation (see Fig. 2).
in cross passage construction has been more and more popular
used, such as in Nanjing metro, Guangzhou metro, the
extension of Line 1 and Line 4 in Shanghai, etc.
195
D. Thermal Insulation F. Thaw Settlement
Ventilation in the main tunnel may take away the coldness Thaw settlement usually occurs after the completion of the
of the frozen soil near segment lining with the existence of frozen engineering. This phenomenon may cause the
concrete thermo-conductivity and reduce refrigeration effect, differential settlement of substructure. As a result, the
which may lead to a problem that the frozen soil does not substructure will be deformed or destroyed. Besides, the
adfreeze to the outer surface of the segment. In order to surface structures, other underground structures and some
achieve a sound adfrozen state between segment and frozen pipelines might also be destroyed.
soil, surface freezing tubes are set lying along the inner side of
the segment to reduce the segment temperature, thus weaken Thaw settlement is also the order of nature. At present, the
the influence of heat exchange caused by ventilation. Surface main method used to control thaw settlement is grouting.
freezing tubes are located around the opening and appressed Owing to the restriction of various conditions in construction,
on the inner surface of the segment, covering the area larger the grouting tubes are always difficult to dispose to the
than designed range of the frozen soil curtain. Fig. 4 presents optimum position. Therefore, the whole freezing area should
the general layout of the surface thermal insulation. be guaranteed to grout fully as far as possible.
V. CONCLUSION
This thesis analyzes the cross passage construction methods
for soft ground conditions in China. Then, it generalizes the
applicability of different kinds of methods in common use, as
well as the relating advantages and disadvantages. At last, the
paper summarizes plenty of ordinary risk and the relevant
countermeasures in construction of artificial ground freezing
method, some of which have been commonly applied into
actual engineering fields. No matter what methods applied, the
security in projects is premier. Before the final decision, it is
Figure 4. General layout of the surface thermal insulation for segment
necessary to consider cautiously based on the characteristic of
different construction methods.
E. Frost Heave
The hazard of frost heave is mainly consisted in the over REFERENCES
size of the frozen soil volume, taking much longer time of [1] X.D. Hu, R. Chen. 2006. “Construction technology of freezing method
freezing and bad control measures of frost heave. applied to cross-passage of double-deck cross-river road tunnel,” Low
Temperature architecture Technology, 2006(5): 64-66.
There are several measures applying to controlling the [2] X.D. Hu, F. Zhao. 2009. “Influence of heat dissipation of main tunnel
hazard of frost heave. First, the sensibility of the frost heave structure on freezing effect in cross passage construction.,” China
should be ascertained by the frost heave test. Second, much Journal of Rock Mechanics and Engineering, Vol.28 Supp.1, 3109-3115.
longer time in freezing should be avoided. Third, during the (in Chinese)
excavation, the cooling energy consumption should not be [3] Hans Mortier, Léon L.T.C. Tuunter. 2004. “Cross Connections at
provided too sufficient, and the control measures of the frost Pannerdensch Canal Tunnel – Freezing Soil Mass Design and Execution
Comparison,” Robert Hack, Rafig Azzam, and Robert Charlier (Eds.):
heave should be carried out. For instance, prestressed steel LNES 104, pp. 455–465.
ring could be set up in the tunnel to limit the segment
[4] Z.H. Huang, X.D. Hu, J.Y. Wang, H.B. Lin and R.Z. Yu. 2008. “Key
deformation caused by the frost heave (see Fig. 5). techniques in cross passage construction of Shanghai Yangtze River
Tunnel by artificial ground freezing method,” The Shanghai Yangtze
River Tunnel – Theory, Design and Construction, Complimentary
Special Issue to The Sixth International Symposium on Geotechnical
Aspects of Underground Construction in Soft Ground, Shanghai, pp.
205-210.
[5] F. Qiu and X.D. Hu. 2006. “3D Visualization Analysis of the Frozen
Soil Curtain for the Cross-Passage Construction in Tunnels,” Proc. 2nd
National Symposium on Geotechnical Engineering, Science Press,
Beijing, 79-83. (in Chinese)
[6] Z.H. Zhang, H.H. Zhu and R. Zhuang. 2006. Metro and Light Rail.
Beijing: China Communications Press. (in Chinese)
[7] X.D. Hu, F.Huang and N. Bai. 2008. “Models of artificial frozen
Figure 5. Prestressed steel ring for tunnel structure protection temperature field considering soil freezing point,” Journal of China
University of Mining & Technology, 37, 550-555. (in Chinese)
196