Location Monitoring Items Monitoring points Actual Level 1 Level 2 Maximum allowable value Remarks
Provided/Comments
Value
WJ1-1 frequency of monitoring once per 3 months
Ground surface settlement[mm] -12 43 28% 51 24% 51 24% 12/10/2018
(North side of WW) '"+" stands for falling, "-" stands for rising
WS6 frequency of monitoring once per 3 months
UDW top settlement[mm] -17 -17 99% -20 84% -20 84% 12/10/2018
(West side of WW) '"+" stands for falling, "-" stands for rising
WLC-2 frequency of monitoring once per 3 months
Working Column settlement[mm] -20 -21 97% -25 82% -25 82% 07/09/2018
(Southern tunnel side) '"+" stands for falling, "-" stands for rising
Well
WU2 frequency of monitoring once per 3 months
(Launching Support settlement[mm] -23 -26 87% -30 76% -30 76% 12/10/2018
(East side of WW) '"+" stands for falling, "-" stands for rising
Shaft)
WS3 frequency of monitoring once per 3 months
UDW top horizontal displacement[mm] 15 26 56% 30 49% 30 49% 24/08/2018
(East side of WW) '"+" stands for falling, "-" stands for rising
frequency of monitoring once per 3 months
WX3
UDW lateral displacement[mm] 26 43 62% 50 53% 50 53% 12/10/2018 '"+" stands for change to inside pit, "-" stands for change
(East side of WW)
to outside pit
J11-1 frequency of monitoring WJD7-8 1/day, WJD9-11 1/ 3 months
Ground surface settlement[mm] 7 26 28% 30 24% 30 24%
(North side of WWJD-5) '"+" stands for falling, "-" stands for rising
Maximum drop
HW6 0.02 -0.7 -3% -0.9 -2% -1 -2% frequency of monitoring once per day
08/12/2018
Ground water table[m]
Maximum raise
HW5 0.73 -0.7 104% -0.9 81% -1 73% frequency of monitoring once per day
08/12/2018
Total change
Lake water level [m] HH1 1.75 1.77 / / / / / frequency of monitoring once per day
08/12/2018
S1
17+Δ+(-4)
(North side of swimming / / / / / / frequency of monitoring once per month
= 13 +/-
pool)
S7
20+Δ+(-4)
External (North side of swimming / / / / / / frequency of monitoring once per month
Swimming pool = 16 +/-
pool)
structure 17/12/2018
S14
settlement[mm] 8+Δ+(-5)
(South side of swimming / / / / / / frequency of monitoring once per month
= 15 +/-
pool)
S30 19+Δ+7
Internal / / / / / / frequency of monitoring once per month
(East side of swimming pool) = 26 +/-
Navy Area S48 Monitoring started
Signal tower 12 / / / / / /
(North-East corner) 16/11/2018
S7-S14
11+Δ+ (1)
Distance 51 m (East part of NAVY sw. pool 0.0014L= 71 16.9% 0.0018L= 92 13.18% 0.002L= 102 11.86% "+" stands for settlement, "-" stands for rise
=12 +/-
building)
Differential settlement S48-S49
Distance 3.9m 11 0.0014L= 5 198% 0.0018L= 7 154% 0.002L=8 138% tower is inclined towards foundation pit
monitoring points[mm] (East side of tower)
Monitoring started
16/11/2018
S50-S47
Distance 3.2m 8 0.0014L= 4 188% 0.0018L= 6 146% 0.002L= 6 108% tower is inclined towards foundation pit
(West side of tower)
20+Δ+39
Ground surface settlement[mm] S40 (East side) / / / / / / 06/08/2018 frequency of monitoring once per month
= 59 +/-
SS3
Initial Inclination
Electric pole (North side of swimming -0.112 / / / / 0.5 22% frequency of monitoring once per month
89.285
Inclination monitoring pool) 'levels I and II not provided by CCCC
(degree) SS2 'The pit direction is "+", Naval Academy is "-" (monitoring is
Initial Inclination - situated near the pool)
Column (North side of swimming -0.09 / / / / 0.5 19%
89.82
pool)
12/11/2018
19/11/2018
26/11/2018
10/12/2018
17/12/2018
24/12/2018
31/12/2018
5/11/2018
3/12/2018
14/1/2019
7/1/2019
-5
(*1) The issues were address via Letters such as for example KTP-00872-CCCC, KTP-00913-CCCC, KTP-00976-CCCC, KTP-01298-CCCC and KTP-01577-CCCC, various ad hoc meetings and regular Site Progress Meetings.
Date Action Date Action Date
early 2018 CCCC did not agree to monitor tower (no limits set up) (*1) Nov, Dec 2018 CCCC failed to assess/report on differential settlement (*1)
31/10/2018 WJD-06 excavation started 23/11/2018 Two (2) additional steel struts installed at WJD-05
4/11/2018 WJD-05 excavation started 19/12/2018 Base slab concrete pouring at WJD-05
5/11/2018 Monitoring of tower started - zero reading (taken late) 23/12/2018 Two (2) additional steel struts dismantled at WJD-05
9/11/2018 Fresh crack observed in the staircase
14/11/2018 Cracks in the NAVY swimming pool building noticed