Karnaphuli Road Tunnel Project

Summary of Daily Monitoring Report Date: 25/12/2018

Maximum
Last Data
Location Monitoring Items Monitoring points Actual Level 1 Level 2 Maximum allowable value Remarks
Provided/Comments
Value
WJ1-1 frequency of monitoring once per 3 months
Ground surface settlement[mm] -12 43 28% 51 24% 51 24% 12/10/2018
(North side of WW) '"+" stands for falling, "-" stands for rising
WS6 frequency of monitoring once per 3 months
UDW top settlement[mm] -17 -17 99% -20 84% -20 84% 12/10/2018
(West side of WW) '"+" stands for falling, "-" stands for rising
WLC-2 frequency of monitoring once per 3 months
Working Column settlement[mm] -20 -21 97% -25 82% -25 82% 07/09/2018
(Southern tunnel side) '"+" stands for falling, "-" stands for rising
Well
WU2 frequency of monitoring once per 3 months
(Launching Support settlement[mm] -23 -26 87% -30 76% -30 76% 12/10/2018
(East side of WW) '"+" stands for falling, "-" stands for rising
Shaft)
WS3 frequency of monitoring once per 3 months
UDW top horizontal displacement[mm] 15 26 56% 30 49% 30 49% 24/08/2018
(East side of WW) '"+" stands for falling, "-" stands for rising
frequency of monitoring once per 3 months
WX3
UDW lateral displacement[mm] 26 43 62% 50 53% 50 53% 12/10/2018 '"+" stands for change to inside pit, "-" stands for change
(East side of WW)
to outside pit
J11-1 frequency of monitoring WJD7-8 1/day, WJD9-11 1/ 3 months
Ground surface settlement[mm] 7 26 28% 30 24% 30 24%
(North side of WWJD-5) '"+" stands for falling, "-" stands for rising

LC7-2 frequency of monitoring WJD7-8 1/day, WJD9-11 1/3 months


Column settlement[mm] -22 -30 73% -35 63% -35 63%
(WWJD-6) "+" stands for falling, "-" stands for rising

frequency of monitoring WJD7-8 1/day, WJD9-11 1/3 months


S13 Limit seems high
-26 63 42% 67 39% 70 38% '"+" stands for change to inside pit, "-" stands for change to
(North side of WWJD-6) 16/12/2018
outside pit
Horizontal displacement[mm]
frequency of monitoring WJD7-8 1/day, WJD9-11 1/3 months
S36
-28 63 44% 67 41% 70 40% Limit seems high '"+" stands for change to inside pit, "-" stands for change to
(South side of WWJD-6)
outside pit

frequency of monitoring WJD7-8 1/day, WJD9-11 1/3 months


X15
20 26 78% 30 68% 30 68% '"+" stands for change to inside pit, "-" stands for change to
(South side of WWJD-7)
outside pit

frequency of monitoring WJD7-8 1/day,


X14
25 26 96% 30 83% 30 83% '"+" stands for change to inside pit, "-" stands for change to
(South side of WWJD-8)
UDW area 21/12/2018 outside pit
frequency of monitoring WJD7-8 1/day,
X6
25 26 96% 30 84% 30 84% '"+" stands for change to inside pit, "-" stands for change to
(North side of WWJD-7)
outside pit
frequency of monitoring WJD7-8 1/day,
X7
Cut & Cover 24 26 90% 30 78% 30 78% '"+" stands for change to inside pit, "-" stands for change to
(North side of WWJD-8)
and Open Lateral displacement outside pit
Cut frequency of monitoring WJD7-8 1/day,
X5
4 63 6% 67 6% 70 6% At elevation 2.2 '"+" stands for change to inside pit, "-" stands for change to
(North side of WWJD-6)
outside pit
frequency of monitoring WJD7-8 1/day,
X19
26 63 41% 67 38% 70 37% '"+" stands for change to inside pit, "-" stands for change to
(South side of WWJD-2)
outside pit
Sheet pile area
frequency of monitoring 1/day,
X2 Allowable
5 63 8% 67 7% 70 7% '"+" stands for change to inside pit, "-" stands for change to
(North side of WWJD-2) Limit seems High
outside pit
frequency of monitoring 1/day,
X4
-25 63 40% 67 38% 70 36% '"+" stands for change to inside pit, "-" stands for change to
(North side of WWJD-5)
outside pit

frequency of monitoring WJD7-8 1/day, WJD9-11 1/3 months


Z1-10
1st 2375 4851 49% 5891 40% 6930 34% 12/12/2018 '"+" stands for change to inside pit, "-" stands for change to
(WWJD-8)
outside pit

frequency of monitoring WJD7-8 1/day, WJD9-11 1/3 months


Z2-9
2nd 725 1029 70% 1210 60% 1210 60% 02/12/2018 '"+" stands for change to inside pit, "-" stands for change to
Axial support force[KN] (WWJD-7)
outside pit

Z1-8 frequency of monitoring WJD7-8 1/day, WJD9-11 1/3 months


204 606 34% 713 29% 713 29%
(WWJD-6) '"+" stands for increase, "-" stands for decrease
Sheet pile area
Z2-5 frequency of monitoring WJD7-8 1/day, WJD9-11 1/3 months
429 838 51% 986 44% 986 44% 12/12/2018
(WWJD-5) '"+" stands for increase, "-" stands for decrease

Maximum drop
HW6 0.02 -0.7 -3% -0.9 -2% -1 -2% frequency of monitoring once per day
08/12/2018
Ground water table[m]
Maximum raise
HW5 0.73 -0.7 104% -0.9 81% -1 73% frequency of monitoring once per day
08/12/2018
Total change
Lake water level [m] HH1 1.75 1.77 / / / / / frequency of monitoring once per day
08/12/2018
S1
17+Δ+(-4)
(North side of swimming / / / / / / frequency of monitoring once per month
= 13 +/-
pool)
S7
20+Δ+(-4)
External (North side of swimming / / / / / / frequency of monitoring once per month
Swimming pool = 16 +/-
pool)
structure 17/12/2018
S14
settlement[mm] 8+Δ+(-5)
(South side of swimming / / / / / / frequency of monitoring once per month
= 15 +/-
pool)
S30 19+Δ+7
Internal / / / / / / frequency of monitoring once per month
(East side of swimming pool) = 26 +/-
Navy Area S48 Monitoring started
Signal tower 12 / / / / / /
(North-East corner) 16/11/2018
S7-S14
11+Δ+ (1)
Distance 51 m (East part of NAVY sw. pool 0.0014L= 71 16.9% 0.0018L= 92 13.18% 0.002L= 102 11.86% "+" stands for settlement, "-" stands for rise
=12 +/-
building)
Differential settlement S48-S49
Distance 3.9m 11 0.0014L= 5 198% 0.0018L= 7 154% 0.002L=8 138% tower is inclined towards foundation pit
monitoring points[mm] (East side of tower)
Monitoring started
16/11/2018
S50-S47
Distance 3.2m 8 0.0014L= 4 188% 0.0018L= 6 146% 0.002L= 6 108% tower is inclined towards foundation pit
(West side of tower)
20+Δ+39
Ground surface settlement[mm] S40 (East side) / / / / / / 06/08/2018 frequency of monitoring once per month
= 59 +/-
SS3
Initial Inclination
Electric pole (North side of swimming -0.112 / / / / 0.5 22% frequency of monitoring once per month
89.285
Inclination monitoring pool) 'levels I and II not provided by CCCC
(degree) SS2 'The pit direction is "+", Naval Academy is "-" (monitoring is
Initial Inclination - situated near the pool)
Column (North side of swimming -0.09 / / / / 0.5 19%
89.82
pool)

* ≥ 80% highlighted in bold


* Values provided by CCCC monitoring team
Karnaphuli Tunnel Project

12/11/2018

19/11/2018

26/11/2018

10/12/2018

17/12/2018

24/12/2018

31/12/2018
5/11/2018

3/12/2018

14/1/2019
7/1/2019
-5

Zero readings were taken late, 6


days after excavation of WJD-6
Diff. Settlement S48-S49: 10+ mm
Total Settlement (mm)

5 started. The actual settlement and


differential settlement can be (Zero readings were taken late, 6 days after excavation of
therefore higher. (*1) WJD-6 started. The actual settlement and differential
settlement can be therefore higher.) (*1)
Distance:approx. 3.9 m (not provided by the Contractor)
Actual differential settlement over distance: 0.0027+ !
10 Limits: not specified by the Contractor

Layout provided by CCCC is


wrong - the location of WJD walls
15
are shown incorrectly in the
scheme. (*1)

S47 S48 S49 S50


20
Navy Signal Tower - Settlement (measured and reported by the Contractor)

(*1) The issues were address via Letters such as for example KTP-00872-CCCC, KTP-00913-CCCC, KTP-00976-CCCC, KTP-01298-CCCC and KTP-01577-CCCC, various ad hoc meetings and regular Site Progress Meetings.
Date Action Date Action Date
early 2018 CCCC did not agree to monitor tower (no limits set up) (*1) Nov, Dec 2018 CCCC failed to assess/report on differential settlement (*1)
31/10/2018 WJD-06 excavation started 23/11/2018 Two (2) additional steel struts installed at WJD-05
4/11/2018 WJD-05 excavation started 19/12/2018 Base slab concrete pouring at WJD-05
5/11/2018 Monitoring of tower started - zero reading (taken late) 23/12/2018 Two (2) additional steel struts dismantled at WJD-05
9/11/2018 Fresh crack observed in the staircase
14/11/2018 Cracks in the NAVY swimming pool building noticed