Professional Documents
Culture Documents
Bulletin Boxer Fly Primark
Bulletin Boxer Fly Primark
(LINGERIE)
OPERATION BULLETIN
Buyer: Primark Total SMV: 5.20 Total Manpower: 25 Pitch Time 0.26
Item Description: Boxer Machine SMV: 4.35 Total Machine: 20 Cycle Time 0.21
Order No: Manual SMV: 0.85 Target @100% 288 Prepared on: 9-Jun-18
STYLE No: Total Operator: 20 Target @80% 231 Prepared By: Md. Aminur Rahman
Fabrication: Total Helper: 5 Target @70% 202 Factory FFL(Lingerie)
Required Required Target Target Total Shortage /
OP NO. Machine Operation Description Work-Aid SMV Reff. SMV
Machine Man @100% @80% Target Excess
1 HP Fly Ironing Data Bank 0.25 1 240 192 192 -39
2 OL Fly servicing upper & lower Data Bank 0.30 1 1 200 160 160 -71
3 SN Lower fly single tack Data Bank 0.30 1 1 200 160 160 -71
4 SN Lower fly front tack Data Bank 0.20 1 1 300 240 240 9
5 OL Join Front rise Data Bank 0.25 1 1 240 192 192 -39
6 SN Upper Fly Topsitch Data Bank 0.35 2 2 171 137 274 44
7 HP Mark fly Data Bank 0.15 1 400 320 320 89
Making Triangle Box and topstitch upper
8 SN Data Bank 0.35 2 2 171 137 274 44
top fly.
9 BH Button Hole Data Bank 0.15 1 1 400 320 320 89
10 OL Back rise join Data Bank 0.20 1 1 300 240 240 9
11 OL Side seam join Data Bank 0.35 1 1 171 137 137 -94
12 OL Inseam join Data Bank 0.22 1 1 273 218 218 -13
13 OL Waist Elastic attach Data Bank 0.36 2 2 167 133 267 36
14 SN Tack Elastic Data Bank 0.20 1 1 300 240 240 9
15 HP Mark waist centre Data Bank 0.15 1 400 320 320 89
16 SN Label attach Data Bank 0.22 1 1 273 218 218 -13
17 FL Tostitch to waist Data Bank 0.35 2 2 171 137 274 44
18 BA button Attach Data Bank 0.15 1 1 400 320 320 89
19 FL Hemming to leg (L&R) Data Bank 0.40 2 2 150 120 240 9
20 HP Trimming Data Bank 0.30 2 200 160 320 89
Machine Summary 5.20 21.00 26.00 12 9 240 9
SMV 1.6 1.7 0.8 0.0 0.0 0 0.0 0.0 0.15 0.15 4.35 0.85
QTY 8.0 7.0 4.0 0.0 0.0 0 0.0 0.0 1.0 1.0 21.0 0.0
SN ZZ OL FL BT FD FOA BA BH PMD US
8 0 8 4 0 0 0 1 1 0 0
TTL M/C 22 LINE NO. 10,11,13,19,22,23 DATE: September 18, 2018
END TABLE
Operation SMV Target M/C M/C Target SMV Operation
INPUT TABLE
Work-Study MPD Production