LAMA BARU TR.3 W E Tiang Beton 13m- 350daN Bh 15 Tiang Beton 11- 36,6 M A 200daN Bh S A Tibet 9m-200daN TR.3 & 9m-200 daN+E Bh 7 TR.1 40,8 M SUTR Lama dengan Ferlenk Bh 1 TM. 2 Horizontal GW TM 24 M 32 M + TR Set TR.2 29 M SUTM seiring SUTR Kms TM. 1 SUTM A3CS 31 M 3x150mm2 Ms TR.6 28 M SUTR 36 M Ms 3x70+1x50mm2 TM. 4 Trekschoor TM Set 3 TR.3 MVTIC 22 M Trekschoor TR Set 3 TM. 4 Drukschoor TM Set 1 34,7 M 37 M Druckschoor TR Set 39 M TM. 1 B TR.7 GTT Double Pole Set 1 TM. 12 30,4 M 28 M GTT Single Pole Set TM. 1 37 M TM. 1 B TR.3A Ground/Arde TM = 3 TR.3A 28 M TM. 1 DalamLuar Set TR = 5 TR.6 37 M NFA2XSEY-T TR.1 61,8 M 3x150+1X95mm Kms 46,7 M NA2XSEYBY 3X150 46,7 M TM. 1C mm Kms TM. 1 46 M TR.3 A PT. ANINDO BERTAHANNUTS PERKASA 22,7 M TM. 1 KONSTRUKSI TM : A KONSTRUKSI TR : Pekerjaan: 53 M TM. 1 = 7 SET TM. 1C TR. 1 = 2 SET PEMASANGAN , GTT 2 TIANG DAN SUTR U/ MENUNJANG PASANG BARU TM. 1C = 2 SET TR. 2 = 1 SET PASANG BARU 15 PLG @ DAYA 1300 VA A/N PR. DE RAGIL 20,8 M TM. 1C = 1 SET ( VERLENK ) TM. 1C TR. 3 = 5 SET JL. RAYA KI AGENG GRIBIK RAYON BLIMBING TM. 2 = 1 SET 27 M TR. 3A = 2 SET ,Diketahui Diketahui Diketahui Direktur Pengawas Rayon Pengawas Area TM. 4 = 2 SET TM. 4X TR. 6 = 1 SET TM. 4X = 1 SET TR. 7 = 1 SET TM. 10 = 1 SET TM. 12 = 1 SET ( DUDUKAN TRAFO 2 TIANG ) Ir. H.Yunar Mulya Hk.,MM