N SIMBOL

KETERANGAN SAT VOL


LAMA BARU
TR.3 W E Tiang Beton 13m-
350daN Bh 15
Tiang Beton 11-
36,6 M A 200daN Bh
S
A Tibet 9m-200daN
TR.3
& 9m-200 daN+E Bh 7
TR.1
40,8 M SUTR Lama
dengan Ferlenk Bh 1
TM. 2 Horizontal GW TM
24 M
32 M + TR Set
TR.2 29 M
SUTM seiring
SUTR Kms
TM. 1
SUTM A3CS
31 M
3x150mm2 Ms
TR.6 28 M SUTR
36 M Ms
3x70+1x50mm2
TM. 4
Trekschoor TM Set 3
TR.3 MVTIC 22 M Trekschoor TR Set 3
TM. 4
Drukschoor TM Set 1
34,7 M
37 M Druckschoor TR Set
39 M TM. 1
B
TR.7
GTT Double Pole Set 1
TM. 12 30,4 M
28 M
GTT Single Pole Set
TM. 1
37 M TM. 1
B TR.3A Ground/Arde TM = 3
TR.3A 28 M TM. 1
DalamLuar Set TR = 5
TR.6
37 M NFA2XSEY-T
TR.1
61,8 M
3x150+1X95mm Kms
46,7 M
NA2XSEYBY 3X150
46,7 M
TM. 1C
mm Kms
TM. 1
46 M
TR.3 A PT. ANINDO BERTAHANNUTS PERKASA
22,7 M TM. 1
KONSTRUKSI TM : A KONSTRUKSI TR : Pekerjaan:
53 M
TM. 1 = 7 SET TM. 1C TR. 1 = 2 SET PEMASANGAN , GTT 2 TIANG DAN SUTR U/ MENUNJANG PASANG BARU
TM. 1C = 2 SET TR. 2 = 1 SET PASANG BARU 15 PLG @ DAYA 1300 VA A/N PR. DE RAGIL
20,8 M
TM. 1C = 1 SET ( VERLENK ) TM. 1C TR. 3 = 5 SET JL. RAYA KI AGENG GRIBIK RAYON BLIMBING
TM. 2 = 1 SET 27 M TR. 3A = 2 SET ,Diketahui Diketahui Diketahui
Direktur Pengawas Rayon Pengawas Area
TM. 4 = 2 SET TM. 4X
TR. 6 = 1 SET
TM. 4X = 1 SET TR. 7 = 1 SET
TM. 10 = 1 SET TM. 12 = 1 SET ( DUDUKAN TRAFO 2 TIANG )
Ir. H.Yunar Mulya Hk.,MM