You are on page 1of 6
139 /New ose 20170 6.2017 UTTAR HARYANA BIJLI VITRAN NIGAM Sales Circular No. U- 27/2017 From Chief Engineer/Commercial, UHBVN, Panchkula To All CEs (OP), SEs (OP), XENs (OP), SDOs (OP), JEs-| In-charge Sub-office in UHBVN Memo No.Ch- _04/TR-72(90)/Tariff/ FY 2017-18/CE/C-1 Dated: 20.07.2017 Subject: Schedule of tariff for supply of energy. HERC in its Order dated 11" July, 2017 has approved the Distribution and Retail Supply Tariff to be charged by UHBVN and DHBVN from their consumers during the FY 2017-18 as under. The revised rates shall be applicable with effect from 01.07.2017. Sr. Tariff for 2016-17 Tariff for 2017-48 No. Category of | Energy | Fixed MMC (Rs. por | Category of | Energy | Fixed MMC (Rs. consumers | Charges | Charge KW per month | consumers | Charges | Charge (Rs. | per kW per (Paisa/ | perkWper | of the (Paisa/ | per kW per | month of kWh or! | month of the | connected kWh orf | month of | the kVAh) | connected —_| load or part kVAh) | the connected load/per | thereof) connected | load or KVA of load/ per | part sanctioned kVA of thereof) contract sanctioned demand (in contract ‘supply demand (in ison HT) or case supply as indicated is on HT) or as indicated 7 | Domestic Supply Domestic Supply Category I: (Total consumption up to 100 units per Category |: (Total consumption up to 100 units per month) month) (0-50 units | 270KWh | Ni Rs. 115 upto | 0- 50 units | 270KWh Nil Rs. 115 up er month, 2 Wand Rs. | per month to2 kW 51-100 “a50KWh | Nit 70 above 2 KW [51-100 S0KWR Ni and Rs. 70 above 2 kW Category Ti (Total consumption more than 100 Category Ii: (Total consumption more than 100 units/month and up to 800 units/month)) uunits/month and up to 800 units/month)) 0-150 450KWh | Nil Rs. 120 upto 0-150 “450/KWh Nil Rs 125 2kWand upto 2 KW. Rs,70 above 2 and Rs.75 151-260 SOORWh_| Nil kW 151-250 ‘S2eKWh Ni above 2 251-500 | 605/kWh_| Nil 251-500 630/kWh Nil kw ‘501-600 | 675/kWh_| Nil 501-800 TiOiKWh Nil ‘Category Ii: (Total consumption more than 500 ‘Category ill: (consumption abov tunits/month and upto 800 Units) 801 Unit and | 675/KWh | Nil Rs. 120 upto 601 Unit and |_770kWh Ni Rs. 125 up above (at rate 2kWand Rs_ | above (fat rate to2 kW no 70 above 2 KW no and Rs.75 telescopic telescopic above 2 benefits) benefits) kw 2 [ Non Domestic Non Domestic Upto SW] GOSIKWh Ni Rs. 250/KW up | Upto SkW | G35/KWh Nil Rs. 235kW ay toSkWand. | (LT) ‘Above 5 KW | 675IKWh Ni Rs. 225/KW [Above SKW | TOSIKWh Nir ‘and Up to 20 above § KW & | and Up to 20 kW(LT) upto 20 Kw | KW ‘Above 20 BISKVA | 170KW Ni ‘Above 20 | 660/KVAN | 1607 KW Ni KW upto 50 KW and upto kW (LT) 50 KW (LT) Existing @50KVAR | T70KW Nil Existing ‘OSIKVAN | 1607 KW Nil ‘consumers ‘consumers above 50 KW above 50 KW upto 70 kW Upto 70 KW (ut) (lt) Consumers | 630/KVAh | 170KW Ni ‘Consumers | 676/KVAn | 160 7KW ‘above 50 KW above 50 KW (HT) (HT) New ‘S| HT industry (above 50 KW) HT industry (above 50 KW) ‘Suppiy at 17] 615/KVAh | 170KVA Nil ‘Supply at 17] 665/KVAh | — 170KVA Nil kv. kV. (See Note- ‘Supply at 33. | GOS/KVAh | 170KVA Ni ‘Supply at 33 | 655KVAN | xiv below) Ni KV. wd ‘Supply at66_| SOS/KVAR | 17OIKVA Ni ‘Supply at 68 | 645/KVAR Ni kV or 132 kV KV or higher Supply at | S85/KVAh | 170KVA Nil ‘Supply at | 635/KVAR NIL 220 kv 220 kV ‘Supply at__| S7S/RVAN | _ 170/KVA Ni ‘Supply at] 625/kVAR NIL 400 kV 400 kV ‘Arc furmaces/ | 645 Paisa | T90/KVA Ni ‘Arc furnaces! | 695 Paisa | _ 180/KVA Ni Steel Rolling | per kVAh Steel Rolling | per kVAh Mills if supply Mills also | ifsupply is at 11 applicable to | is at 14 kv (See Open kv (See note 3 ‘Access note ii below) below) 4 | CT industry - upto 50 KW. LT Industry - upto 50 kW Upto 10 KW. | S85/kVAh Ni Rs. TE5RW [Upto 10 KW | 636/RVAN Nil Rs. 185KW ‘Above 10__| 625/KVAR Ni Rs. T8S/KW | Above 10 | 6S5/KVAR Ni Rs. 1851KW KW and upto KW & upto 20 KW. 20 kW ‘Above 20 | GOOIKVAR | Rs.160 KW to | Ni ‘Above 20 | 640/kVAn | Rs 160 on Nir KW and upto be levied on KWand upto 80% of CL 50 KW 80% of the 50 KW Existing 25) | connected Existing GB5IKVAN | Rs 160 on Nil consumers | kVAh | load ‘consumers 80% of CL above 50 KW above 50 KW upto 70 KW upto 70 KW (ty, (ut) 5 | Agriculture Tube-well Supply _ ‘Agriculture Tube-well Supply Metered: OIKWh Nil Rs. 2007 BHP | Metered: 7OKWh Ni Rs. 2007 (with per year @ with BHP per motor upto motor upto year 15 BHP 45 BHP (i) with ‘oRWh Ni i) with ‘eKWR Nil motor above motor above 15 BHP. 45 BHP Un-metered | Ni__| Rs. 157 Per Ni Un-metered | Ni__| Rs. 157 Per Ni (Rs. Per BHP / Month (Rs./ Per BHP / Month BHP? BHP Month): Month): () with with motor upto Motor upto 415 BHP 45 BHP i) with Ni | Rs. 127 Per Ni (i) with Ni__| Rs. 12/Per Ni ‘motor above BHP / Month motor above BHP / Month 45 BHP 15 BHP 6 | Public ‘eonkwh | T8OKW Nil Public 735IKWh | T80KW or Nil Water Water BHP Works: Works / Lift 7 Litt e80nKWn | T80/BHP Nil Irrigtaion 1 Irrigation MITC | MiTc ‘ea0rKWh | 180/BHP Ni 9 | Street 680/KWh Nil Rs. 1807KW | Street T3SiKWh Ni Rs. T807KW Lighting Light yew folder 2017/05.62057 70 | Railway Traction —[ Railway Traction & DMRC Supply att | 6TORVAR | —160KVA Ni Supply at 1 55IKVAh | _ 160/KVA Nir KV. ‘Supply at 33 | 6OOKVAh | 160/KVA Ni Supply at 33 G4STKVAR kv ‘Supply at 66 | SOOKVAn | T60KVA Ni ‘Supply at 66 | 63S/KVAR or 132 KV of 132 KV ‘Supply at | SBOIKVAh | 160/KVA Nil ‘Supply at | 628/KVAR 220KV. 220 kV 71 | DMRC. DMRC ‘Supply al 66 | S8OKVAh | _ 160KVA Ni ‘Supply at68 | 635/KVAR | _T60/KVA Ni kv. kV or 132 KV ‘Supply at | S80/KVAR | T60KVA Nil 432 kV 72 | Bulk Supply Bulk Supply ‘Supply at LT_| 610/KVAn | _T60/KW or Ni ‘Supply at LT_| 6501KVAN | T60/KW or Ni ‘Supply at 11 | 60OKVAh | Rs. 160/kVA Nil ‘Supply at 17 | 640/kVAN | Rs. 160/KVA kv. as applicable kv as applicable ‘Supply at 35 | SSOIKVAN | (see note 4) Ni ‘Supply at33_| G30/KVAN | (see note iv) kv. kv. Supply at 66 | SBOKVAR Nil ‘Supply at 66 | 620/KVAR or 132 KV. or 132 kV ‘Supply at | S75/KVAR Ni ‘Supply at | 61S/KVAR 220 kV. 220 KV 73 | Bulk Supply Domestic Bulk Supply Domestic For total 470 TWh | RS. 100 KW Ni For total 525 /KWh | Rs. 100 7KW Ni ‘consumption of the ‘consumption of the ina month recorded ina month recorded riot demand not demand exceeding exceeding +500 units! 500 units! flavawelling fat/dwelling unit (DU), unit (OU) For total 585 KW For total G20 TKWh | RS. 100 KW Nil ‘consumption ‘consumption of the ina month ina month recorded exceeding exceeding demand 500 500 units/fat! units/iat Du. Du. 74 | Independent | 630KWh | T60/KW Ni Independent | 854/KWh | 10/KW Ni Hoarding / Hoarding! Decorative Decorative Lightning. Lightning 75 | Temporary _| Energy charges 7.6 times the energy “Temporary | Energy charges 7.5 times the energy Metered —_| charges of relevant category for which Metered | charges of relevant category for which supply temporary supply has been sought plus | supply temporary supply has been sought plus fixed charges! MMC at normal rates of fixed charges/ MMC at normal rates of relevant consumer category relevant consumer category. Notes: Energy charges in case of Domestic consumers are telescopic in nature up to the consumption of 800 Units / month. In case of consumption more than 800 units/month, no slab benefit shall be admissible and tariff applicable will be 710 paisa/kWh for total consumption. In case of Arc furnaces/ Steel Rolling Mills for supply at 33 KV and above, the HT Industrial tariff at the corresponding voltage level shall be applicable. Fixed charges for HT Industrial supply and Bulk Supply category are in Rs.J/KVA of Contract Demand. For Railways and DMRC, the fixed charges are in Rs./kVA of the billable demand. In case of Bulk Supply Consumers (other than Bulk Supply ~ DS), the fixed charges are in Rs./KW of the connected load where contract demand is not sanctioned and in Rs/kVA of contract demand where contract demand is sanctioned. vi. vii. viii, xi xii, xiii, xiv. xvi. 80% of the connected load shall be taken into account for levying fixed charges where leviable in case of LT industrial Supply. Fixed charges for unmetered AP consumers, MITC and Lift Irrigation category are in Rs. / BHP / month. Fixed charges for Bulk Supply Domestic are in Rs. / kW of the recorded demand. Under Bulk Supply (Domestic) category no benefit of lower slab shall be admissible in the higher consumption slabs. Total consumption shall be charged at a single tariff depending upon the average consumption’ flat/ residential unit for that month. In case of single point supply as per HERC (Single Point Supply to Employers’ Colonies, Group Housing Societies and Residential or Commercial cum Residential Complexes of Developers) Regulations, 2013, Bulk Supply (Domestic Supply) tariff shall be applicable. A rebate of 4% in case of supply at 11 kV and 5% in case of supply at higher voltage in the energy consumption as recorded at Single Point Supply meter shall be admissible. NDS load, if any, beyond the prescribed limit as per schedule of tarif, the NDS tariff shall be applicable on monthly consumption Corresponding to the NDS load as detailed in the said Regulation. The Bulk Supply (Domestic) Tariff shall apply only to the consumer categories covered by the Single Point Supply Regulations notified by the Commission 'n addition to the tariff as above, the Discoms shall levy FSA as per HERC (Terms and Conditions for Determination of Tariff for Generation, Transmission, Wheeling and Distribution & Retail Supply under Multi Year Tariff Framework) Regulations, 2012. The above tariff does not include Electricity Duty, Municipal Tax and FSA, 'n case of Health and Educational Institutions having a total load exceeding 20 KW, these shall be treated as non-domestic category where the entire load is NDS. However if there is mixed load or there is some other category's load (other than Industrial) in the total load and if such other load exceeds 10 % of the total load then Bulk Supply tariff shall be applicable. The surcharge of 30 paise/ per unit on Arc Furnace/ Steel Rolling Mills at 11 KV shall also be applicable on energy drawn through Open Access. The fixed charge for HT industrial consumers with contract demand of 4 MVA and above shall be Rs. 180/ kVA/month. ‘The incentive on installation of solar system shall be Rs. 1/- per unit only for all DS consumers up to 31.03.2018. Incentive on installation of Solar Rooftop System shall not be admissible to any other categories of consumer wef, 01.07.2017. The Electricity Duty, Municipal Tax and FSA shall be charged at kWh. The consumers who will deposit advance payment online through RTGS/NEFT in the banks authorized by the Discoms equivalent to 120% of ro yew ler 2037705.62017 energy charges paid in the previous year, within one month of this Order, shall be given a discount of equivalent to Savings Bank rate till the time entire advance is adjusted. 2. The Wheeling Charges, Cross-Subsidy Surcharge and Additional Surcharge to be recovered from Short Term Open Access Consumers has been approved by HERC for FY 2017-18 to be applicable w.e.f. 01.07.2017, as under:- The Wheeling Charges: +—_—84 paise/kWh (except for the Solar and Wind energy procured from the State of Haryana which shall be exempted) li, Cross Subsidy Surcharge :- Sr. Categories Cross Subsidy No. Surcharge (Rs./kWh) 7_| HT industry 163 2_| Bulk Supply (other than DS) 0.49 3_[ Railways (Traction) 0.58 4_[LT industry 0.66 5_[ NDS (HT) 1.73 iii, Additional Surcharg The Commission in the ARR/ Tariff Order dated 11.07.2017 based on data/ details furnished by the Discoms for the period April, 2016 to September, 2016 has also determined Additional Surcharge at Rs. 0.99/kWh to be applicable on energy drawl through open access from any source other than the Distribution Licensee by various consumers of Uttar Haryana Biljli Vitran Nigam (UHBVN) and Dakshin Haryana Bijli Vitran Nigam (DHBVN) in terms of Haryana Electricity Regulatory Commission (Terms and Conditions for Grant of Connectivity and Open Access for Intra-State Transmission and Distribution System) Regulations, 2012. The additional surcharge at this rate will be applicable on the energy drawn through Open Access w.e. 01.07.2017. 3, Transmission Charges : 36 Paise / kWh to be applicable wef. 08.06.2017. (As approved by the HERC in its Order dated 30.05.2017 for approval of ARR for Transmission Business & SLDC and determination of Transmission Tariff and SLDC charges for the FY 2017-18). Sales Circular No. U-39/2016 clause 2 (ix) is amended to the above extent. The above instructions may be brought to the notice of all concerned for strict and meticulous compliance. Superintending\Engineer/Comm| for Chief Engineer/Comm. UHBVN, Panchkula. UHBVN web site address: www.uhbvn.org.in E-mail address:camcommercialuhbvn@amail.com Endst. No Ch- 04/TR-72(90)/Tariff/ FY 2017-18/CE/C- Dated: 20.07.2017 Copy of the above is forwarded to the following:- 1. SPS to Principal Secretary (Power), HPUs, Panchkula, 2. PS to CMD in UHBVN & DHBVN. 3. SPS to MD, HVPNL, Panchkula. 4, SPS to MD, HPGCL. Panchkula, 5. Dir/Vigilance, YPN, Panchkula 8. SPS to Director (T-1)/Director (T-Il) in UHBVN & DHBVN, & —_Sestetary, Haryana Elecy. Regulatory Commission, SCO 33 to 36, Sec-4, Panchkula 8 CE/Comml., DHBVN, Hisar. 8. CE/PD&C UHBVN, Panchkula, 10. CE/MM, UHBVN, Panchkula, 11. CE/HPPG, Panchkula. 12. CFO, UHBVN, Panchkula 1g Ghlef Electricity Inspector, Govt. of Haryana Sector-17, Chandigarh 14. SE/Commercial, DHBVN, Hisar. 15. SE/Admn., UHBVN, Panchkula, 16. SE/SO, UHBVN, Panchkula 17. S-E Iworkshop and store UHBVN Dhulkote (Ambala) 18. SE/RA, UHBVN, Panchkula, 38. SE/Gonst. Circle, Room no. 105, Vidyut Sadan C-16 Sector-6 Panchkula. 20. SE (M&P), UHBVN, Panchkula. 21. SE/R-APDRP, UHBVN, Panchkula, 22. Legal Remembrance, HVPN, Panchkula, 23. F.A(HQR), UHBVN, Panchkula, 24, Chief Auditor, UHBVN, Panchkula, 28. Chief Account Officer, UHBVN, Panchkula, 26. Chairman, CGRF, Kurukshetra, 27. Company Secretary, UHBVN, Panchkula. 28. XEN/IT, UHBVN, Panchkula. 29. Deputy Secy. (Technical), UHBVN, Panchkula, 30. Deputy Secy. (Project), UHBVN, Panchkula 31. Deputy Secy. (OP), HVPN, Panchkula, 32. AIL XEN's (M&P) in UHBVN, $3. RAO, Office of A G., Haryana, SCO.No.33, Ill floor, Chandigarh 34. CPRO, UHBVN, Panchkula. 38. _ PHD Chamber of Commerce & Ind. PHD Khel Gaon Road, New Delhi-16, 38. Haryana Chamber of Commerce and Industries O/0 VPS Agro Oil ind(P) Ltd., Dhanwanti Bhawan Railway Road, Kurukshetra, 37. The Haryana Chamber of Commerce and Industry (Distt Unit Panchkula), 239, Industrial ‘Area, Phase-I, Panchkula-134113, 38 Chief Coordinator IAG & Director of Industries of Haryana, 30 Bays Building, Sector-17, Chandigarh, 38. Y:Nagar- Jagadhni Chamber of Commerce and Indl. C/O the Oriental Engg. Works (P) Li, Indl, Area, Y.Nagar, Haryana- 136001 40. General Secretary, Panchkula Residents Weltare Federation, H.No. 984, Sector-16, Panchkula. 4h: _ President Haryana Rice Millers & Dealers Association, Ladwa (Kurukshetra.) 43 Haryana Chamber of Commerce Ind. C/O Mis Liberty Enterprises Raiway Road, Karnal, 43. Confederation of Indian Industries, Sector-31, Chandigarh 44, President Manufacturing Association, Sonepat, 45, Director, Industries Association, Yamunanagar 48. Citizen Welfare Association (UE) Regd. Kothi No.508, Sector-16, Panchkula, 47, Haryana Solvent Extractor’s Association 0/0 Pee-Pee Agro Industry, Pvt Ltd, Dhurkhera Hisar Road, Ambala, 48 President, Faridabad Industrial Association Bata Chowk Industral Area, Faridabad. 121004 48 Secretary, Ambala Electrical Dealers & Manufacturers Associate, 872, URBAN ESTATE, Sector-7, Ambala City. 50. The Engineers Club (Regd.), Haryana Zone, 260, Subhash Nagar, Rohtak-124001 51. President Karnal Agricultural Implements Manufacturers Association, Glo Karnal Agriculture Industries Ltd. Sham Nagar, GT Road, Karnal-132 001. 52, All Billing Agencies NEILIT centre, Hariron, HCL (T) and TCS. Executi 5 Somerton for SE/Commil, UHBVN, Panchkula.

You might also like