Professional Documents
Culture Documents
Geometrica
Top of Ridge Elevation = 16'-11"
Structure web
3'-6"
CC
5"
CC
Clearance = 12'-2" Note: Downspout from column top Downspout - galvanized and
to floor and drainage by others painted sheet tube.
3'-1"
Notes:
CL= Cladding
CC = Center of connector
TC = Top of column
1/4"
Top of Column
CC Elevation = 9'-0"
5 1/2" 1 7/8"
TC
3
3 3
1/4" 1 Pyramid
2 3 Scale : 1 1/2" = 1' Base plate 1 1/4" x 22"
x 1'-10" with eight 3/4"
A307 anchor bolts (by others)
1'-6"
Concrete footing
1/4" (by others)
2 Column Base
2 3 Scale : 2" = 1'