Professional Documents
Culture Documents
TR Report
TR Report
Acknowledgement
In the beginning I would like to thank Almighty Allah because it is
due to His grace only the completion of this report was possible. I
would like to thank Allah for giving me the strength and courage to
complete this report in the allotted time.
I would like to thank the staff of all the departments I had been
through. All the staff members were very cooperative and humble. It is
with their support and guidance that I was able to understand the
operations being carried out. It is without doubt that until I submit my
thanks to them, the report would remain incomplete.
Sincerely,
Asim Mehboob Shani
Executive Summary
In the duration of six weeks of our internship at Siemens, our main goal
was to get an exposure to the professional life and to have an idea of
how work flows in all the departments of Business Unit-Transformers.
In this duration, we observed that the working environment at Siemens
is thoroughly professional. In all the departments, there is a well
defined procedure which has to be followed to make work systematic.
There is a QMS procedure for each department which defines its scope
and shows how the work flows with the help of activity diagrams. It is
made sure that each department is running in accordance with the
procedure. There is an intranet for internal communication which
facilitates work between departments.
TOPIC
PAGE
Title Page……………………………………………………………………...............I
Acknowledgement………………………………………………..............................II
Executive Summary…………………………………………………………............III
Company Background………….……………………………………………...........1
Introduction …………..………..……………………………………………......1
Vision and Mission…..………………………………………………….............2
Divisions………..…………………….…………………………………………..3
Departmental Structure………..
………………………………………..............4
BU Transformers………………..………..……………………………………….......5
Introduction…………………..…………………………………………………..5
Internship Overview…………………………..…………………………..….....6
Sales and Marketing……………………………………………………………..7
Purchases………………………………………………………………………...11
Costing and Accounting………………………………………………………..15
Recommendations………..………………………………………………….............17
Conclusion………..…………………………………………………………..............18
Company Background
Introduction
Siemens Pakistan Engineering Company Limited is based in
Karachi, Sindh, Pakistan. It is subsidiary of Siemens. Siemens Pakistan
Engineering Company Ltd. was founded in 1953 as a private limited
company. In 1963 the company was converted into a public limited
and in 1978 it was listed in the Stock Exchange. Siemens
Aktiengesellschaft (Siemens AG) Germany holds 64% of the total
shareholding.
Vision
To remain market leader and technology pace setter in the
engineering and electronics industry by utilizing the high-tech
engineering expertise of the Siemens Group worldwide. To maintain
our strong and prominent local presence.
Mission
Divisions
Divisions
Power
Industrial Solution Finance and
Transmission Automation and
and Power MOTAC Business
and Drives
Generation Administration
Distribution
Business Units
Central Dept Corporate Dept
Corporate
HV Sub- Power Generating
Medical Solution Financial Human Resources
Stations Generation Sets
Solution
OnCall,
Logistics Standard Transportation Shared Corporate
Switchboards
and Products System Services Communication
Maintenance
Corporate
Information Siemens Home Corporate Quality
PTD Services Information
Technology Appliances Management System
Office
Export Control
Process
and
Energy Industries Carrier Telephone Regional Compliance
Customs/Procu
Automation and Water Industries Office
rement
Technologies
Governance
Strategic Business
Central Audit
Development/top
Departmental Structure
Business Unit-Transformers
Introduction
Siemens Pakistan Engineering Co. Ltd. was established in 1953 in
Karachi. In 1963 a transformer manufacturing facility was established
to cater the local market with distribution transformers. The
manufacturing facilities were later expanded and the production of
power transformers (up to 60 MVA) was launched in 1986. The
business unit of transformers comes under the Power transmission and
distribution division. Each year the BU plays a major contribution in the
total turnover of Siemens Pak. Siemens not only caters to the local
industry with the state of the art technology but also to the foreign
market in the middle-east, Bangladesh, Brunei, Kuwait and Saudi-
Arabia.
Overview:
The Sales and marketing department deals with corresponding
with the customer from the stage where the customer gives his
requirements till the stage; the customer’s requirements are fulfilled.
Sales officers make sure that any changes in the requirements in later
stages are adjusted accordingly and all customer needs are fulfilled.
Siemens Pak has four main types of customers for its transformers
which are:
• Private
• Export
• Internal (Other BUs)
• Utilities (WAPDA and KESC)
Documentation:
TR-order cycle
Inquiry Stage:
C&A Planning
Description:
The process kicks off with the customer either issuing a tender or
enquiring the Sales department about its requirements. The technical
staff gathers the information needed and enters it in the offer
checklist. This checklist is send to the E & D department, which
examines the requirements and prepares drawings and design so that
a physical appearance can be given to the required transformer and to
know which material is required and of what quantity. Thus a BOQ is
prepared which is sent to the cost and accounts department. The
Costing and accounting department have the list of current prices for
all materials and determine the cost of material required. The Planning
department determines the number of man hours required and the
lead time which is send to the Costing and accounting department to
determine the labor cost. Costing and accounting then adds overheads
and finally prepares a total cost of goods manufactured which is given
to the Sales Department via E & D. The Sales Department then applies
a divisor to the amount to keep its margin and then finally offers the
customer, the cost of the required order. After negotiations and
discussions on the offer with the management, the customers finally
decide whether to accept the offer and issue purchase order. This
completes the inquiry stage.
Order Execution:
Purchase
Planning
Productio
n
Description:
Purchase
Overview:
Vendor Selection
Material
Standard
Non-Standard
(coded)
Direct Indirect
Material Material
Material
GK Items
Raw
Work flow
Material Requisition
Inquiry to Purchase
Offer (to 3
suppliers min)
Order Placement
Follow up Reject
RI
Delivery Stores
Pass
Stock
Description:
The work flow of purchase department starts with the type of material
required. If the material required is standard then the amount required
is entered in MRP software by Planning and received by the purchase
department. MRP is generated on weekly basis, usually on Wednesday
of every week. If the material is non-standard then planning sends a
requisition separately and the inquiry is placed. After this, offer is
made to the suppliers who in return provide quotations including the
price and delivery time. The purchase officer then, prepares a
comparative statement, makes a decision of which supplier to chose
(stating the reason) and places the purchase order. The purchase order
is prepared using the Spridion system. The system has made work
easy for the purchase officers as they just have to enter the code of
the desired material and rest of the details are generated by the
software.
Import Administration
Payment Terms
Overview:
1. Costing
The overall costing is divided in two phases, cost against the offer &
the actual cost during production. First of all the customer sends the
inquiry to sales with the relevant requirement, the sales officer
prepares the offer checklist to note down all the details this checklist is
sent to E&D. E&D prepares the drawings, quantity and design
parameters. It calculates the required quantity of each material to
estimate the appropriate Bill of Quantity (BOQ). This Bill of Quantity is
sent to C& A to generate direct material cost. To generate this cost the
prices of materials are taken from the purchase department.
The amount of man-hours required in the production is calculated
by planning and forwarded to C&A. using this information and per hour
labor cost C&A generates total labor cost. Apart from these costs,
overheads are calculated on predetermined rates. Finally the overall
cost is forwarded to sales department to give the offer pertaining to
the inquiry
Operations:
• Preparing incoming stickers
• Attaching required attachments with bills
• Preparing list of due payments
• Checking sales tax invoices and forward to ECCGPL
• Making deductions for rework and material issued to
suppliers
• Processing services related bills and post required
deductions
Conclusion