Chapter 1
Safety, health and Welfare of persons working in mines is a central subject and is governed by
the Mines Act. The Mines Act is an Act of the Parliament. The basic objective of the Act is to
provide for safety, health and welfare of persons employed in mines. It is “An Act to
amend and consolidate the law relating to the regulation of labour and safety in mines”.
In countries with parliamentary system of government, there is a clear distinction
between an Act and Regulations, Rules, etc. An Act is the Principal statute on the subject and
is passed by the legislature.
Rules and Regulations are piece of legislation subordinate to the Act and are made by the
executives.
How Act is amended? Whenever it is felt by the Government that the provisions of the Act
need amendment due do changed circumstances, a draft proposal is made (usually by DGMS
duly vetted by legal experts in the ministry). The draft is given wide circulation amongst those
likely to be affected, viz.
All the State Governments,
The Committee constituted under Section 12 of the Act’
All recognised organisations of mine employers and employees, and
All other parties connected with the working of the mines.
The comments/ opinion of the above parties is sought within a specified period. The proposal
along with comments are considered by a standing committee of members of parliament,
which submits its recommendations to the Government. These recommendations are
considered by the Government and a Bill is placed before the Lok Sabha where it is
considered clause by clause. After the Bill is passed by Lok Sabha, it is placed before Rajya
Sabha. On its approval, the Bill goes to the President for his assent. After assent by the
President, it becomes law.
How Rules and Regulations are framed: The Mines Act, under Sections 57 and 58
empowers the Central Government to make Regulations and Rules. First step in the process of
making these Regulations and Rules is to frame a draft. Normally this draft is prepared by
DGMS. The draft regulations and rules are referred to the Committee constituted under Section
12 before publication. After the same are considered by the Committee, the draft regulations or
rules are published in the official gazette. Three months time is given for receipt of any
objections. After lapse of 3 months period, all objections are considered and the draft is
3
modified if considered necessary. The regulations and rules are then published in the Gazette.
On such publication, the regulations or rules have the effect as if enacted under the Act.
Exception: For prevention of apprehended danger, or for speedy remedy of the conditions
likely to cause danger, the above procedure may be dispensed with in case of regulations. The
Regulations so framed shall be sent to Committee for information and shall not remain in force
for more than one year from the date of their announcement.
4
- Any objections received will be considered by the Government and the Byelaws in final
form will be approved.
- The mine management shall have copies of such approved Byelaws in English and in
prescribed languages posted at conspicuous places where the same can easily be seen by
mine employees.
- The Central Government may be an order in writing, annual a Byelaw as a whole or part.
Inadequacies in legislation
The Mines Act, 1952
1. Duties and responsibilities of Owner:
(a) CEO of a mining company should also be treated as owner.
(b) The owner shall formulate well-defined policy for safety and health. Owner and
agent shall ensure that every mine is properly planned, designed,
commissioned, maintained and decommissioned with safety.
2. Manager shall be given financial powers.
3. Duties and responsibilities of the manufacturers of equipment, appliance,
machinery and material etc. shall be laid down.
5
4. Duties and responsibilities of Mining Consultants should be laid down in the Mines
Act.
5. Provisions should be made in the Act for safety audit of the mines by accredited
auditors.
6. There should be provisions in the Act empowering the Government to formulate
regulations on “noise” and “vibrations”.
7. There should be provisions in the Act regarding “occupational health services” in the
mines.
(Seventh Safety
Conference)
8. Kumarmangalam Committee on “Role and Function of DGMS” (19822) recommended
establishment of special mining tribunals for speedy trial of Mines Act cases. The
Committee also recommended that a suitable system for levying fines by DGMS on
individuals and management for violations of statutory provisions should be introduced
early.
Inadequacies in the Coal Mines Regulations, 1957
1. There should be separate regulations for opencast workings since the present
regulations are inadequate for opencast. (Third Safety Conference 1973)
2. Terms “abandoned workings”, “disused/ unused workings” and “discontinued
workings” shall be defined.
3. Standard conditions for permissions of routine nature like those relating to conveyors-
Regulation 92, Locomotive- Regulation 95, Solid blasting etc. may be incorporated in
the Regulations. No permission from DGMS may be required for these operations.
4. There should be provision for advance planning. Regulation 60 may be amended
requiring management to submit a programme plan regarding workings during next two
years.
5. Regulation 58: Standards of accuracy of mine plans may be laid down in the
Regulations.
6. In addition too the plans required under Regulation 59, “subsidence plan”, “water
danger plan”, and “joint survey plan” may be required to be maintained.
7. Higher supervision level
a) Strata Control officer may be required in deep mines.
b) Engineers too should hold certificates of competency.
c) Face supervision by overman.
d) Basic qualification of surveyor should be at least B.Sc.
e) Upper age limit of persons employed in mines may be fixed as 60 years.
8. Man-riding facilities should be provided when long and arduous travel is involved (Fifth
Safety Conference 1980)
9. Factor of safety for winding ropes may be specified in Regulation 80 (2) (d):
Depth in metres F.S
Up to 300 10
300.500 09
500.700 08
700.1000 07
1000 06
9. Following may be added to Regulation 126 – danger of inundation from surface
water:
6
a) Mine openings shall be at least 3 m above HFL instead of 1.5 m.
b) Danger level shall be fixed 1.2 m below HFL.
c) Depth of hard cover above workings shall not be less than 15 m.
d) Quick communication arrangements shall be provided at the mine from
riverside to the mine; from surface to workings below ground etc.
e) Arrangements for communication with dam or barrage authorities shall be
provided.
10. Regulation 145: Continuous environmental monitoring device shall be installed in
gassy mines of degree three. (Fifth Safety Conference 1980)
11. Following may be added to Regulation 131(2):
a) Electric supply to mechanical ventilator shall be through separate circuit than the
main distribution point.
b) In degree II/ III gassy mines, there should be two separate sources of drive for
the main mechanical ventilator (Jeetpur Court of Inquiry)
12. Following changes may be made to other Regulations:
a) Regulation 159 (2): Liquid Oxygen Explosive shall not be used in mines.
b) Regulation 161: Omit – explosive shall be used in cartridge form.
c) Regulation 168(5): Omit “explosive used in a hole shall be of the same type”
d) After Regulation 181, following Regulation may be added:
Regulation 181A: Owner, agent or manager while acquiring any approved type of
machine, equipment, appliance or material shall ensure that they conform to the
approved specification and shall be responsible for maintenance of approved
specification.
13. Regulations regarding noise levels and ground vibrations shall be included.
7
4. Additional duties and responsibilities of welfare officer
a) Weekly review of the performance of welfare activities in the mine.
b) Control of absenteeism and ex-gratia payment should be looked after by the welfare
officer.
c) Welfare officer should give charge report at the time of transfer or discharge.
Mines vocational training Rules, 1966 were framed long back to impart vocational
training to mine workers, which include:
Initial/basic training to new entrants followed by further training at the place of
work under close supervision of experienced workmen.
Refresher training for persons already employed and also for persons who return
to work after absence of 1 year.
Additional initial training for U/G workers.
Special training of support gang, shot-firer etc.
Subsequently, MVTR 1966 were revised with a view to make these need-based and
job-oriented for improvement of knowledge, skill and correct job procedures.
However, there have been considerable changes in mining technology in U/G, Surface
and O/C in the form of fast and rapid mechanization and outsourcing activities. The
existing statutory provisions contained in MVTR 1966 are not adequate to fulfill the
present day need.
In the present day context of heavy mechanization in U/G, Surface and O/C and
increase in outsourcing activities particularly in open cast, the following are the
flaws/inadequacies in the existing MVTR:
8
1. Duration of training: The present duration of trainings of 12 days for
surface/opencast/UG works are not adequate workers.
2. Course content: The course content designed for the purpose is very old and
inadequate and also does cover all aspects of mining technology.
3. Type of training: In the present rule, there is provision only for theory and
practical training. Training modules are too general in nature and oriented towards
departmental employees.
4. Applicability: MVTR is applicable only for limited categories workers debarring
officials, supervisors and officers, office staffs and rescue persons.
5. Training for contractor’s workers: No provision exists in this regard.
6. Appointment of training officer: Provision in respect of qualification, experience,
and nos. of training officers at training centre is not adequate.
7. Staffing: Provisions in respect of qualified training staff, instructors and their
qualifications are not prescribed adequately in the statute.
8. Training of trainers: There are no provisions for training of trainers.
9. Training aids & course material – Existing provisions lack modern amenities like
films, documentary, video, literature, models etc. at VTC.
10. No provision of training on occupational health safety.
11. No provision for special orientation training for female workers.
12. No provision for training to workmen and supervisors in respect of environmental
protection.
13. Training allowance – Allowances paid to trainers and trainees are not adequate.
MVTR 1966 has become out of date and irrelevant and needs to be repeated and
replaced by a new set of rules incorporating the revised modules for basic training,
modules for refreshing training, provision for different types of VT centers, building
accommodations, furniture, training aids etc.
In view of many changes sweeping the mining industry in the form of new
technologies, changed mining conditions etc., an acute need has been felt to recast the
existing statutory provisions contained in MVTR 1966.
9
Sr Categories of workers Duration of training (days)
No
Initial training Refresher training
1 Surface workers 17 06
2 Open cast workers 18 06
3 Underground workers 48 12
4 Additional training for specific
Categories open cast
workers/supervisors
a. Drillers, blasting crew 36 12
b. Operators dumper, shovel, 54 12
dozer 72 12
c. Dragline operators, fitters
mechanics 96 12
d. Electricians 72 12
e. Auto electricians 18 9
5. f. Electrical supervisors
Additional training for specific
Categories U/G workers /
supervisors
a. Tramm. WE drivers, banks men 18 09
on setter, fan attendants
b. Track layers, ventilation gang, 24 12
shot firing gang 30 12
c. Support gang 48 12
d. Machine drivers/long wall crew 54 12
e. fitters, electricians, mechanics 18 09
f. Electrical supervisors
Refresher training period has been kept 50% of the initial training period but not
exceeding 12 days. In the initial and refresher training, the last 1-2 days have been kept
for feedback/test.
10
persons besides instructors. The qualifications of the training officer, and the no.
and qualification of instructor’s should be prescribed.
Till the existing MVT Rules are thoroughly revised and amended incorporating the
above mentioned suggestions, the following additional steps should be taken –
a) Each mining company should draw up model training schedules for different
categories of work persons. Such schedule should be got vetted by the tripartite
review committee.
b) All front line supervisory officials like sirdars, over men, surveyors, foremen,
electrical/mechanical supervisors as well as persons supervising other surface
operation should be imparted structured training in safety management for at
least 2 weeks once in a very 5 years covering about 20% strength every year.
c) Specialized training: Courses should be arranged for the development of skilled
operators required for HEMM. L/W faces equipment etc. including contractor’s
workers.
11
d) All persons engaged at any work within the mine premises through the
contractors should be imparted relevant training and other job oriented briefings
and the drivers of vehicles belonging to contractors entering the mine premises
should be explained the salient provisions of traffic rules framed by manager of
mine. Each mining company should draw up appropriate training schedules and
modalities in this regard and implement the same.
Exercise
Q.1: Discuss the system of “Occupational Health Surveillance” in coal mines of
your company. State shortcomings and suggest improvements (First Class, 1999)
Q.2: Discuss how Safety Committee constituted under the Mines Rules can play an
effective role in improving safety standards in mines. (Second class, 1999)
Q.3: Discuss present role and functions of Workmen’s Inspector. How can he be
made pore effective? (Second class, 2001)
Q.4: Suggest measures for improving effectiveness of safety committee and
Workmen’s Inspectors. (Second Class, 2002)
Q.5: Write duties of Manager in Emergency. (First Class, 1998, 2000 and 2002;
Second Class, April, 1999 and June, 2001)
Q.6: Under the present scenario comment on adequacy of safety statute along with
suggested improvements on:
a. Duties and responsibilities of owner.
b. Statutory record and registers.
c. Duties and responsibilities of manager.
d. Workmen’s Inspectors.
(First Class, 2003)
Q.7: What are the improvements required in respect of the provisions of CMR
regarding Opencast mines. (First Class 2001)
12
Chapter 2
Safety Standards
It is often stated that safety status of a particular mine is not up to the mark. What
exactly it means? Till recently we have been comparing safety status of mines
using accident rates per thousand persons employed or accident rates per million
tonnes of output. It is also called frequency rate.
The safety standard of a mine can also be evaluated using severity rates. The
severity of accidents is evaluated by time lost due to resulting injury. To calculate
the severity rate, it is necessary to calculate actual man-days lost in case of
reportable and minor injuries and add the specific time charges taken from the
standard tables in respect of fatal and serious bodily injuries given in Workmen’s
Compensation Act. This requires compilation of all reportable and minor injuries
and time loss due such injuries. Unfortunately these figures are not readily
available and hence DGMS has given an empirical formula for calculating severity
index of a mine. This is as follows:
S.I = (50F + S) x 105/ Man-shifts worked
Where S.I = Severity index
F = No. of fatal accidents in a year
S = No. of serious injuries in a year
The above criterion is used for identifying accident-prone mines.
Accident statistics for Indian coal mines are given at Appendices. It will be
observed that
- about 100 to 150 persons are killed in mine accidents every year;
- about 600 persons are seriously injured every year;
- Death rate per thousand persons employed is nearly 0.3;
- Serious injury rate is nearly 1.5 per thousand persons employed;
- Roof and side falls and track-less transport machines are the major
contributors to fatal accidents.
13
overlying strata. The mining industry was advised by the Director general of Mines
Safety to implement the recommendations. It was a beginning of scientific approach
towards supporting the roof, particularly in development workings. The system needs
to be followed in all the mines sincerely. Having gained some experience in roof
bolting, it is advisable that another expert group may be constituted to review the work
and recommend norms of support for depillaring workings and longwall faces.
Till now, roof bolting is being done using cement capsules for grouting the roof bolts in
the boreholes. Experience reveals that the cement takes fairly long time to set and
thus the roof bolt cannot take load immediately. Resin capsules, on the other hand set
almost immediately. It is suggested that time has come to switch over to resin
capsules.
Attempts were made in some of the mines to facilitate caving by blasting in the goaf
behind last line of supports. At Balrampur 10 & 12 Inclines of M/S SECL, blasting was
done by drilling holes from the surface over longwall panels worked by powered
supports, charging them in deck pattern and doing delay firing. In one panel, charge
per hole was 50 Kg whereas charge weight per delay was 150 Kg. Total charge per
round of blast was 650 Kg. In another panel 1200 Kg of explosive was used in a blast.
Yet another blast comprised 2192 Kg of explosives. It was reported that as a result of
induced caving by deep hole blasting from surface, load on the powered supports had
reduced by about 170 to 200 tonnes and loading density by 43 tonnes/m 2.
Despite elaborate precautions like supporting the roof and doing induced blasting,
possibility of occurrences like major falls or air-blasts cannot be ruled out completely.
Experience shows that there are normally indications and warnings before any major
fall. Many disasters have been averted by withdrawal of persons from the mine on
appearance of such indications or warning signals. Experienced supervisors like
overmen and sirdars have been of great help. There is a need for intensive training
and education not only for the supervisors but also of the workers in underground
mines to examine, dress and support the roof and also examination of vulnerable
areas like goaf, areas under extraction. These efforts should be supplemented by use
of strata pressure monitoring devices and devices to check weaknesses in the roof
and sides.
Concluding remarks
Accidents and disasters due to ground movement pose a challenge to the mining industry,
research organizations and regulatory authority. The problems relating to ground control
are likely to get aggravated as mining activities are extended to deeper horizons and more
difficult geo-mining locales in future. Therefore concerted efforts are needed to evolve a
practical solution to the problem. A beginning has already been made with geo-mechanical
classification of strata and use of roof bolts and cable bolts and induced blasting of
overlying strata. Further efforts are needed to getter a better insight into the mechanism of
strata failure. These efforts must be supplemented with sincere implementations of the
laws to prevent such accidents. Training of supervisors, workers and support crew should
receive more attention because they are not only the persons who are exposed most to
the hazardous environment but they are the key personnel in an accident prevention drive.
14
MEASURES TO IMPROVE SAFETY STANDARDS IN MINES
For every accident there are many contributory factors. These factors combine in random
fashion causing accidents. Further, it must be clearly understood that the accidents are not the
problems but are only the symptoms of certain problems existing at the mine/ mines. To
eradicate accidents these problems need to be identified and then corrective action should be
taken.
In general terms we may say that to improve safety standards, two fold action as follows should
be taken:
Legislative measures
Statutory provisions are the minimum to be achieved. The mine management should
aim at higher standards than those required by the statute. In order to comply with
statutory provisions, it must be ensured that-
- Adequate and competent supervision is provided by qualified and experienced
officials and persons. This requires appointment of sufficient number of statutory
persons including those to take care of absence and leave etc.
- Adequate number of competent persons is appointed for the operation of machinery,
equipment and appliances.
- Adequate and proper machinery, equipment, appliances and material are provided and
maintained for carrying out various operations. Proper records of maintenance need to be
maintained. Enough spares should be provided.
- The manager should carefully examine the records, reports, registers and plans to ensure
compliance with various statutory provisions.
- Mines/mine should be audited for safety at regular intervals. The safety audit reports
should be examined by the management and discussed in the meetings of safety
committees.
PROMOTIONAL MEASURES
Incentive should be given to the mines/individuals for higher safety performance.
Message of safety should be propagated through safety campaigns like safety weeks,
safety fortnights etc.
Thorough training should be given whenever any new method of work, technique or
machinery is introduced in mines/mine.
Management should practice self-regulation.
Workers’ participation in safety management should be made more effective.
OTHER MEASURES
New concepts and practices like risk assessment and risk management, accident
analysis and problem identification etc should be introduced. Guidelines given in
DGMS circular 13 of 2002 and circular 2 of 2011 may be referred to.
Use of latest management tools like use of computers, information technology may be
made.
Safety Conferences at National level should be convened at shorter and regular
intervals.
Rope haulages should be phased out.
Quality roof bolts including resin grouted bolts should be used as supports wherever
applicable.
Recommendations of various safety conferences should be implemented.
Exercise
Q.1: The rate of fatalities per thousand persons employed in coal mines has remained
almost steady during last decade. How can it be brought down further? (First Class 2001)
Q.2: Discuss the purpose, scope and impact of Mines Vocational Training. Are you satisfied
with the new modules? (Second Class 2001)
Q.3: How can you harness human resources to make mining safe and efficient?
15
(First Class 2002)
Q.4: Write short note on accident-prone mines. (First Class 2002)
Q.5: Suggest measures for improving effectiveness of Safety Committee.
(Second Class 2002)
Q.6: Roof fall continues to be single largest cause of fatal accidents in our coalmines. How
would you reduce such accidents? (First Class 2003)
Q.7: Write short notes on: (a) Risk management (b) Effectiveness of Safety Committee
(First Class 2003)
Q.8: What are the objectives of convening the National Safety Conferences? Briefly state
major recommendations made by it till date and their impact on safety in mining industry.
(First Class 2005)
APPENDICES
16
Table 3 Trend in serious accidents and death rates and serious injury rates in coal mines
Year Number of accidents Accident Number of persons Rate per 1000 Death
Frequency persons employed rate per
Fatal Serious Total rate/lac Killed Seriously Death Serious million
manshifts injured rate injury tones
worked rate output
1996 131 677 808 0.51 146 723 0.29 1.43 0.48
1997 143 677 820 0.52 165 725 0.33 1.44 0.52
1998 128 523 651 0.43 146 560 0.30 1.14 0.46
1999 127 595 722 0.48 138 650 0.29 1.37 0.44
2000 117 661 778 0.54 144 707 0.31 1.54 0.43
2001 105 667 772 0.57 141 720 0.32 1.64 0.41
2002 81 629 710 0.54 97 665 0.23 1.57 0.27
Table 4 Trend in fatal and serious accidents and rates in coal mines – Place-wise
Year Number of fatal Number of serious Death rate per 1000 Serious injury rate per 1000
accidents accidents persons persons
B/G O.C A.G Over B.G O.C A.G Over B.G O.C A.G Over B.G O.C A.G Over
all all all all
1996 75 27 29 131 478 71 128 677 0.31 0.42 0.19 0.29 1.83 1.10 0.86 1.43
1997 94 27 22 143 440 79 158 677 0.41 0.42 0.14 0.33 1.71 1.24 1.05 1.44
1998 80 24 24 128 346 172 105 523 0.36 0.35 0.16 9.30 1.41 1.06 0.70 1.14
1999 74 30 23 127 408 77 110 595 0.33 0.43 0.16 0.29 1.73 1.19 0.81 1.37
2000 62 38 17 117 444 108 109 661 0.30 0.74 0.13 0.31 1.92 1.67 0.82 1.54
2001 67 26 12 105 464 73 130 667 0.43 0.38 0.10 0.32 2.100 1.12 1.07 1.64
2002 48 22 11 81 434 92 103 629 0.27 0.32 0.11 0.23 2.07 1.43 0.80 1.57
2003 46 23 14 83 380 82 101 563 0.33 0.35 0.13 0.27 1.85 1.30 0.77 1.42
2004 49 33 07 89 757 82 123 962 0.26 0.49 0.05 0.24 3.61 1.26 0.95 2.38
2005 54 28 21 103 682 93 132 907 0.35 0.41 0.16 0.30 3.24 1.39 1.03 2.23
Note: Data for the years 2004 and 2005 are provisional
17
TABLE 5 Cause-wise fatal accidents in coal mines
Cause Yr BCCL CCL ECL MCL NCL NECL SECL WCL CIL SCCL Other Total
Fall 03 1 1 3 0 0 0 5 1 11 6 0 17
Of 04 3 2 5 2 0 0 3 4 19 6 1 26
roof 05 8 1 2 3 0 0 4 1 19 1 0 20
Fall 03 1 1 2 0 0 0 0 0 4 0 1 5
Of 04 2 0 2 0 0 1 0 1 6 1 0 7
sides 05 0 0 3 0 0 0 0 2 5 1 1 7
Rope 03 1 0 2 0 0 0 1 2 6 3 1 10
haul- 04 1 1 1 0 0 0 0 1 4 0 1 5
age 05 1 1 3 0 0 0 1 2 8 3 0 11
Dum- 03 5 3 3 1 1 0 1 3 17 1 0 18
per 04 1 0 2 1 1 1 1 2 9 1 1 13
05 0 1 5 3 0 0 4 3 16 1 1 18
Truck 03 0 0 0 2 0 0 0 0 2 0 1 3
tanker 04 1 1 1 0 1 0 2 1 7 0 1 8
etc 05 0 0 0 0 0 0 0 0 0 0 0 0
Other 03 0 1 1 3 0 0 2 2 9 5 0 14
mach- 04 1 2 0 0 0 0 1 3 7 0 2 9
inery 05 3 1 4 5 1 0 3 1 18 3 1 22
Expl- 03 0 0 0 0 0 0 2 0 2 1 0 3
osives 04 0 0 1 1 0 0 0 0 2 3 0 5
05 0 0 0 0 0 0 2 0 2 0 0 2
Fall 03 2 0 2 0 1 0 0 1 6 0 0 6
of per 04 0 1 3 0 0 0 0 1 5 0 0 5
sons 05 1 1 2 0 1 1 0 0 6 1 1 8
Fall of 03 0 0 0 0 0 0 0 0 0 0 1 1
ob- 04 0 1 0 0 0 0 0 0 1 0 0 1
jects 05 2 0 0 0 0 0 0 0 2 0 2 4
Other 03 2 0 0 1 0 0 0 0 3 3 0 6
cause 04 2 2 2 0 1 0 1 0 8 0 2 10
05 3 2 1 0 0 0 0 0 6 3 2 11
Total 03 12 6 13 7 2 0 11 9 60 19 4 83
04 11 10 17 4 3 2 8 13 68 11 10 89
05 18 7 20 11 2 1 14 9 82 13 8 103
Note: Figures for 2004 and 2005 are provisional. Data for 2005 are as on 31.12.05
18
CHAPTER 3
Disaster Management in Mines
19
2. Control measures – technical and organizational
(a) Selection of appropriate equipment, material and technique
(b) Introduction of safety devices and safety systems
(c) Maintenance and monitoring schedules
(d) Location and delineation of waterlogged workings
(e) Education and training
Preparedness
To mitigate the hardship caused by disasters, preparedness calls for action with a view to
organize and facilitate timely rescue, relief and rehabilitation operations. The measures are:
(a) Setting up of training and rescue services.
(b) Provision of alarm system.
(c) Preparation of emergency plan setting out an information dissemination system, the
personnel and procedure for tackling the emergency, the provision of an emergency control
with alarm and communication routes, escape route and evacuation procedure.
(d) Liaison with local and other authorities and emergency services so as to coordinate action
particularly with relation to off-site emergency plan.
There is a need for consultation, close coordination and cooperation between bodies
such as rescue services, fire brigade, police, hospitals and public utilities.
Emergency response
In the development of emergency plans for mining disasters, systematic work started in the
early sixties and in some mines emergency plans were framed based on the model standing
orders circulated by DGMS. Later Sudamdih court of Inquiry (1976) also recommended that
there should be definite emergency plan for every mine and rehearsals should be undertaken
periodically for evacuation and rescue etc. The Coal Mines Regulations and the Metalliferous
Regulations were amended in the year 1985 to provide for emergency plan for general action
for use in emergency to be prepared by the mine management for every belowground mine.
The regulation in respect of coal mines reads as follows:
Regulation 199A. Emergency Plan
1) The manager of every mine having workings belowground shall prepare a general plan of
action for use in time of emergency. The plan shall outline the duties and responsibilities of
each mine official and key-men including the telephone operators, so that each person
shall know what is expected of him in case fire, explosion or other emergency occurs. All
officials and key-men shall be thoroughly instructed in their duties so as to avoid
contradictory orders and confusion at the time when prompt and efficient action is required.
The emergency plan shall also provide for mock rehearsals at regular intervals.
2) The manager shall submit a copy of the aforesaid emergency plan prepared by him to the
Regional Inspector, within 60 days of coming into force of the Coal Mines (Amendment)
Regulations, 1985, or in the case of a mine which is opened or reopened thereafter, within
20
thirty days of such opening or reopening. The Regional Inspector may, by an order in
writing, approve of such action plan, either in the form submitted too him or with such
additions or alterations as he may think fit and action plan so approved shall be enforced in
the mine.
3) On receiving information of any emergency, the manager and in his absence the
principal official present on the surface, shall immediately put the emergency plan in
operation.
The basic functions of emergency plan are:
(1) Sending information to different parts of the mine.
(2) Safe and orderly withdrawal of persons from unaffected part of the mine.
(3) Rescue of trapped persons. Speed of rescue operations is important. This requires:
Early location of trapped persons;
Precise location of trapped persons;
Training of rescue workers in use of rescue capsules;
Special clothing for rescue persons near fire.
(4) Recovery of dead bodies and their identification.
(5) Prevention of further danger in mine.
(6) Keeping press and public informed about the correct situation to avoid rumours.
The emergency plan to deal with disaster should come into action almost instantaneously at the
very onset of a disaster.
A model emergency plan is given in the appendix 2.
Besides the normal elements, an emergency plan may also contain the following:
Seismic sensing system for locating trapped persons.
Provision of underground shelters.
Remote sensing of in-mine conditions.
High penetration drill rigs.
Radio facilities.
Mobile van with borehole probing facilities.
Mobile winders.
Inundation in mines
Sources of inundation
From surface water
From underground sources
21
From Surface water
a) Accumulation of water over low-lying area; Example – Burradhemo disaster (1956) 28
persons killed.
b) Rivers/ nullahs in spate; Breach of embankment; Example – Gaslitan disaster (1996) 64
persons killed.
c) Water inrush through subsidence cracks;
d) Water flowing back due to flood on the main river or due to discharge of water from dam;
Example – disaster in Central Saunda (1976); 10 persons killed.
e) Through bore holes.
f) Collapse of river/ nullah bed.
From Underground source
a) Accidental connection with old waterlogged workings; Example: Chasnalla (1975); 375
persons killed.
b) Inrush of water along a fault plane; Example: Damua (1960); 16 persons killed.
c) Waterlogged workings of other seam coming in line or close to the active workings;
Example: Newton Chikli (1954); 63 persons killed.
d) Connection with water bearing strata.
e) Failure of water dams.
The most common cause is accidental connection with old waterlogged workings generally due
to incorrect plans or incorrect survey.
Prevention
Surface source: In addition to the provisions of Regulation 126, the following points should be
borne in mind:
a) Entry point to be at least 3 m above H.F.L instead of 1.5 m;
b) Goaves, subsidence, boreholes should be treated as entry points;
c) Danger on account of H.F.L of watercourse rising as a result of back flow of water from the
main river in flood should be taken into account.
d) Where there are dams on river, sudden discharge of water from such dams may cause
sudden rise of water. Therefore, management of mines on downstream side should
maintain liaison with the dam authorities.
e) Liaison with meteorological department for getting advance warning of heavy rain fall
f) Barriers between mines in different seams should be vertically coincident so that danger
from one mine is not transferred to other mine.
(See appendix 3 for precautions recommended by ninth safety conference)
22
Standing orders for withdrawal of persons in case of apprehended danger should be framed
and enforced.
23
Appendix 1
Disasters in coal mines 1899 to 2005 in India
Serial No. Causes Disasters Killed
Numbers % of Numbers % of total
total
1 Ignition and explosion 22 40 1171 53.3
2 Inundation 17 30.9 749 34
3 Fall of roof/ Premature collapse 8 14.5 106 4.8
4 Fire 3 5.5 100 4.6
5 Explosives 1 1.8 13 0.6
6 In shafts 1 1.8 14 0.7
7 Miscellaneous on surface 2 3.7 20 0.9
8 Miscellaneous belowground 1 1.8 24 1.1
9 Total 55 100 2197 100
Appendix 2
Model Standing Orders for Immediate Action on Occurrence of Disaster Underground
1. Duty of any person:
Any person realizing that anything serious has happened anywhere belowground shall
immediately inform the nearest mining official, Mining Sirdar, Overman or assistant manager. If
near the pit bottom, he shall inform the onsetter.
2. Duty of underground official:
Mining Sirdar/ Overman or other mine official and onsetter on being informed about the disaster
shall send information by telephone/ special messenger to-
(a) Other parts of the mine so that persons may be withdrawn therefrom.
(b) To the surface, in particular to the manager.
(c) To any senior official who may be present belowground at that time.
The Mining Sirdar/ Oveman/ Mine Official shall verify the veracity of the information and try to
withdraw all persons safely through previously fixed “escape route” with the help of self-
rescuers, if necessary.
If unsuccessful, he shall withdraw all persons to the ‘safe base’, seal off all openings, if
arrangement is provided, and await help.
3. Duty of Onsetter
Onsetter on getting information of disaster shall inform the banksman on surface by telephone/
signalling by giving 10 raps and confirm the same by special messenger.
4. Duty of Banksman
24
The banksman on getting information about disaster from underground shall arrange to give
warning to the following persons in the order given below without leaving his place of duty:
(a) Manager or in his absence principal official present at the surface.
(b) Attendance clerk.
(c) Safety officer.
(d) Engineer.
5. Duty of Attendance clerk:
On receiving information of a disaster underground, he shall immediately-
(a) Send information by messenger to all members of the consultative committee available at
the mine and all key personnel at the mine;
(b) Prepare a statement showing number and names of persons in different parts of the mine
and send a list to the operations control room. He shall keep the list updated and keep the
operations control room informed;
(c) Not allow anybody to proceed belowground without authorisation of ‘control room’ and
await further instructions.
6. Duty of lamp room in charge:
On hearing of emergency, he shall-
(a) stop issue of lamps without authorization from operations control room;
(b) Prepare a statement showing names of persons who were issued lamps, with cap lamp
number and send a copy to the operations control room. He shall keep the list updated and
keep the control room informed;
(c) Keep all lamps brought out from belowground separately till further orders.
7. Duty of Store keeper:
On hearing of emergency, he shall immediately-
(a) Proceed to stores;
(b) Check the materials according to emergency list;
(c) Send a list to the operations control room;
(d) Arrange for procuring additional material from central stores/ other mines in consultation
with the control room; and
(e) Arrange for transport of material underground in consultation with the control room.
8. Duty of members of consultative committee:
On hearing of the disaster, all members shall immediately rush to the operations control room,
authorize a line of action and authorize different officials for –
(a) Surface control;
(b) underground control;
(c) Officer in charge for control room and send information to the managers of adjoining mines,
likely to be endangered.
25
9. Duty of officer in-charge of Surface control:
He shall -
(a) Ensure that all key personnel are on duty according to pre-arranged plan on surface ;
(b) Organize an authorization system in consultation with control room;
(c) Check materials available in store and arrange for their transport belowground;
(d) Organize a system of relief;
(e) Arrange for rescue teams in consultation with rescue station superintendent.
10. Duty of Engineer:
The Engineer shall
(a) Report to control room;
(b) Contact the store keeper;
(c) Send messengers to call all such workmen and mechanics as are required;
(d) Check the winding and ventilation plants; if message from underground states that up-cast
shaft is not to be used, take necessary steps to prevent access to the shaft or fan drift;
(e) Establish transport system from store and stock-yards to the downcast shaft;
(f) Get loaded quickly available emergency stores, like sand bags, brattice cloth, timber,
girders, auxiliary fans, air ducts, water pipes, pumps, etc. as may be required;
(g) Issue authorization cards to surface emergency workmen.
11. Duty of Surveyor
He shall
(a) Arrange for extra rescue plans;
(b) Arrange for staff to go underground as soon as possible and put numbering labels on
bodies before removal;
(c) Record the date on plans regarding position of bodies and other evidence.
12. Duty of Doctor
He shall
(a) Report to control room;
(b) Proceed to the mine forthwith, taking such instruments and drugs (particularly morphine) as
are likely to be useful;
(c) If required proceed underground guided by a responsible person.
13. Duty of welfare officer
He will report to the control room and assist in preparation of the following accommodation:
i. Stretcher casualty station
ii. Walking casualty station
iii. Mortuary accommodation
In addition, he shall
(a) Supervise the preparation of the following accommodation;
26
Room for rescue teams to assemble in and receive instructions;
Sleeping accommodation, if rescue operations are going to be prolonged.
(b)Get a copy of the list of men in the pit from the attendance clerk and check from time
to time with bankman’s list and make a note of the men who have come out of the pit;
(c) Cooperate with police for identification of the bodies;
(d) Deal with inquiries from the relatives;
(e) coordinate with the canteen in-charge regarding food supplies;
(f) Prepare list of volunteer workers.
14. Duty of Canteen in-charge
He shall report to the control room and take necessary steps to obtain additional supplies of
food if necessary.
15. Duty of security staff
(a) They shall keep the roads clear for ambulance and other vehicles.
(b) They shall arrange for identification of bodies.
(c) They shall supervise mortuary arrangements.
Appendix 3
27
1.4.4 Development of a portable instrument for detecting the hidden slips in the roof
of coal mines should be taken up on priority by R&D organizations.
1.5 All front-line supervisory officials like Sirdars/Mates, Overmen/Foremen, Surveyors,
Electrical/Mechanical supervisors/Chargemen/Foremen as well as persons supervising
other surface operations should be imparted structured training in safety management,
for at least two weeks, once in every five years, covering about 20% strength every
year.
1.6 The recommendations of DGMS (Tech) Circular No.18 of 1975 shall be
implemented forthwith.
1.7 Audiometry should be introduced, as a part of mandatory medical examination, for
persons seeking employment in mines and for persons engaged in operations/areas
where noise level exceeds 90 dB (A).
1.8.1 The portion of surface haul road in mine premises where there is heavy traffic of
men and machines should have a separate lane properly fenced off from the haul road
for pedestrians and two wheelers.
1.8.2 Trucks and other heavy vehicles, not belonging to management should not be
allowed in the mine premises without a valid pass issued by the competent authority of
the mine.
Before the pass is issued the mine engineer should check the road-worthiness of such
vehicles.
In order to check entry of unauthorized vehicles in mine premises, each mine should
establish properly manned check gate(s) at the entrance(s) where record of entry and
exit of each such vehicle should be maintained.
At the check gate the license of the drivers should also be checked for eliminating the
possibility of unlicensed persons driving the vehicles.
1.9 Persons engaged in surface operations and, in particular, the contractors' workers,
who incidentally are often inexperienced and least informed about job-safety matters,
need closer and more competent supervision. To minimise accidents due to surface
operations it would be ensured that:
All persons engaged at any work within the mine premises through the contractors
have received relevant training and other job-related briefings and that the drivers of
vehicles belonging to contractors entering the mine premises have additionally been
explained the salient provisions of "traffic rules".
Each mining company should draw up appropriate training schedules and modalities in
this regard and implement the same.
In case of smaller mines, such arrangement may be made by association of mine
operators.
2.0 Preventing Mine Disasters from Inundation
2.1 Each mine shall be critically examined for its proneness to inundation and
assessment regarding danger of inundation and precaution to be taken should be
reviewed and updated yearly preferably before the onset of the monsoon. The
recommendations may be deliberated in the (Pit) Safety Committee of the mine and
information disseminated as widely as possible.
2.2 Suitable infrastructure at area level may be provided for drilling advance bore holes
to detect presence of waterlogged workings in advance.
2.3 Embankments provided against river and jore to guard against inundation should
be designed properly keeping in view the engineering parameters. The details of such
construction should be properly shown in the underground plan and water danger plan.
2.4 Surface excavation or disturbance in or near major sources of water, which are
connected or are likely to be connected to below ground workings should be filled up
completely.
2.5 Detailed precautions against inundation may be laid down while working beneath or
in the vicinity of river and major water bodies. This may include framing and
implementing standing order for safe withdrawal of persons, including system of
information both manual and automatic, effective communication system and system of
safe and timely withdrawal of persons to safety.
28
2.6 Mechanism may be developed for warning mines about impending heavy rains
similar to warning of impending cyclone issued in coastal areas for taking necessary
action. Also coordination with concerned agencies/departments about opening of dams
in the rivers on the upstream side should be examined.
2.7 Winding system serving as sole means of ingress and egress may be made
constantly available even in adverse weather conditions, failure of steam or electricity
or any other reasons.
2.8 Effective communication may be established within the mine and between mines
for safe withdrawal of persons. Necessary standing orders in this regard need to be
framed and enforced.
2.9 Recommendations of 6th Conference on Safety in Mines to evolve suitable cadre
structure for mine surveyors and up gradation of their skill by availing facilities at
various institutions, appointment of qualified surveyors and providing infrastructure
including computerized facility at area level to oversee survey work of the mine etc.
may be implemented.
2.10 R&D efforts should be continued to develop a system for construction of water-
tight chamber as last refuge below ground in case of inundation.
3.0 Preventing Mine Disasters from Fire, and Effective Emergency Response
3.1 Considering the risk of fire, all coal mine companies shall rank its coalmines on a
uniform scale according to its risk from fire on scientific basis. Guidelines may be
framed by DGMS and circulated to all mining companies.
3.2 Recognizing the urgent need for making the emergency plan responsive, speedy
and effective, each mine shall review the existing emergency plan, at a higher level
keeping in view the risk from fire.
3.3 A tripartite committee may be formed to study the feasibility of establishing rescue
rooms in coal mines having high risk of fire and employing more than 350 persons
ordinarily employed in a shift below ground may be considered.
3.4 A tripartite committee may be formed to study the feasibility of storing oxygen type
self rescuer at strategic places below ground in coal mines with risk of fire in such scale
so as to cater to the needs of persons who can be affected in an emergency may be
explored.
3.5 Each mining company shall formulate and implement structured training
programme for development of awareness and increasing effectiveness of emergency
response in case of fire amongst work persons, officials and management.
3.6 Through sustained and meaningful R&D activities, mining companies and research
institution shall help in creating a better understanding of the complex geo-mining
situations leading to the occurrence of fire, which in turn will help in formulating
guidelines to combat the problem of fire in effective manner. Early detection of heating
effect of reversal of fan and control of fire, other associated aspects may be studied.
4.0 Risk Management as a Tool for Development of Appropriate Health and Safety
Management Systems.
4.1 Every mining company should identify one or more mines and should undertake a
formal risk assessment process aimed at reducing the likelihood and impact of mishaps of
all kinds in mines. Subsequently risk assessment process should be extended to other
mines.
4.2 Risk assessment process should aim at effective management of risks, by identifying,
(i) which risks are most in need of reduction, and the options for achieving that risk
reduction,
(ii) which risks need careful on-going management, and the nature of the on-going
attention
4.3 The risk assessment exercise should follow an appropriate process.
4.4 Risk management plans shall be prepared on the basis of risk assessment and
implemented in the identified mines.
5.0 Quality Control for Improving Safety
29
5.1 Each mining company and the manufacturer/supplier shall satisfy themselves that
the product has valid approval where applicable and conform to relevant standards
where available at the time of supply.
5.2 Each large mining company may setup quality control cell or strengthen where the
same exist, identify critical items which require testing for quality assurance at the time
of procurement and during use and arrange testing of the same. Testing facilities may
be setup wherever feasible;
5.3 Any defect or failure of approved items or those having BIS certification may be
promptly brought to the notice of the appropriate authority for further action.
6.0 Communication System between DGMS Offices and Mine Management at Site.
6.1 Recognizing existence of a large variety of communication systems in mines, a
comprehensive review of the existing communication systems at all mines in all
mining companies should be undertaken and a consolidated status report prepared
for working out a realistic and effective system of communication.
6.2 In organized mining sector, an effective internal and external system of
communication besides P&T means shall be established both ways between the
mines and, Rescue Rooms/stations, hospitals and DGMS offices.
6.3 Each mining company in the organized sector shall formulate and implement a
comprehensive communication protocol clearly assigning duties and
responsibilities of persons at various levels.
6.4 In un-organized mining sector, effective communication system shall be
established in the following manner,
(i) In large mines effective wireless communication within the mine including
attendance rooms and managers’ office and residence; and,
(ii) P&T telephone at managers’ office and residence.
6.5 Steps shall be taken to strengthen communication system within DGMS offices
and amongst DGMS offices and mine sites besides other concerned agencies.
Appendix 4
Recommendations of New Kenda Court of Inquiry
1. Penalty for contravention of Regulation 87(4) (b) for non-provision of telephone is
inadequate.
2. Provision should be made for third separation door between D.C and U.C.
3. It should be made mandatory that every workman inside the mine must be acquainted with
the escape route. There must also be signs/markings to indicate existence of such route.
4. Rescue Rules should be amended to make it obligatory to keep rescue apparatus in a mine
which employs 350 or more persons underground in one shift.
5. DGMS may only nominally be attached to a suitable ministry of the Government of India,
but it should be autonomous in its functioning.
6. For effective fighting of fires, the role of controlling authority, emergency response
mechanism and method of fighting fire, need to be clearly defined. A comprehensive
regulation in this regard to be made after consideration of all these relevant factors. In this
regard, the provision for ventilation should also be further considered.
7. A large area was developed in the mine unsystematically. Even for development, the
Government should create an authority and frame rules regulating grant of such
permissions for development.
30
8. Efficient officers and cadres should be appointed in Rescue Organization. Age limit should
also be determined looking at the job they are required to do. Other facilities including
training should also be adequately provided for.
9. Many aspects of the mechanism of underground coal mine fires are not yet thoroughly
probed and known to the mine operators. It is suggested that special R&D activities be
initiated in this field encompassing all aspects of underground fire of Indian coal mines.
10. There is an immediate need for development of awareness among workers, supervisors
and management officials for identifying hazards due to fire in underground coal mines.
The Central Government may take appropriate action to meet this objective through
intensified programme of education and training.
11. The provisions of the Act regarding penalty for commission or omission of the provisions of
Coal Mines Regulations is inadequate in the sense that no distinct classification between
graver and lighter violations has been made. The legislation should be made either by way
of amending the regulations or a separate enactment declaring some commission or
omission in working mine as grave offence and providing for stricter punishment.
Appendix 5
Disaster at Gaslitan and recommendations of Court of Inquiry
Disaster at Gaslitan Colliery
Date of Accident: 26-09-1995
Number of persons killed: 64
Cause of accident: Inundation
Gaslitan mine is situated on the bank of river Katri. On 26th. September, 1995 the entire district
of Dhanbad experienced very heavy rainfall. The rain was also very heavy in and around Katras
town where the mine is situated. The heavy rain compounded by breach of several tanks and
ponds on the upstream side caused the water in the river Katri to rise rapidly, which soon
crossed the danger level and then touched the withdrawal level before the midnight of the
fateful day. The lurking danger however, went unnoticed as the guards for the purpose were not
posted and the mine officials did not come out to monitor the water level in the river. The
danger came to the notice only after midnight when the third shift river guard saw the river in
fury and found that water had crossed the danger level.
Rainfall from 00 hrs to 23 hrs (26.09.95) 285.49 mm.
Do ,, 08 ,, to 07 ,, (27.09.95) 360.66 mm
,, 19 ,, to 23 ,, (26.09.95) 87.12 mm
Standing orders :In consonance with DGMS Circular No. 2of 1978, the management had
framed standing orders in respect of action to be taken in case of abnormal rise of water level in
Katri river. The standing orders included amongst others, provision of river guards in all three
shifts who shall keep a check on the water level in the river and inform the attendance clerk or
the manager or any other official, should the water touch the danger mark. The guard was also
required to inform the manager in case of any breach in the embankment.
31
Interconnections: Gaslitan colliery consisted of two units namely Union Angarpathra and
Gaslitan. Solid barriers 15 to 45 metres existed between these units but stability of these
barriers could not be assessed as workings on the outbye side were packed and hence
unapproachable.
Inter-mine connections: Following inter-mine barrier exist between Gaslitan and adjoining
mines:
Angarpathra Colliery:
The workings of all seams starting from XIV seam to VIII B seam, except X top and X bottom
seams in Union Angarpathra unit were connected to Angarpathra Colliery through caved
goaves and in VIII B seam through galleries. It was however not connected with other units
because of faults.
Katras Choitudih Colliery:
Vertical barriers with Katri River as boundary existed from XV seam to XII seam. Vertical
barrier was not provided in XI seam and below. The stowed workings of 8.2 m thick X seam
were separated from overlying XI seam with a horizontal barrier of 20 m around 78 m R.L. It
was also suspected that a connection existed between two mines in XIV seam corresponding to
78 m RL.
Mudidih Colliery:
In XII seam a gallery had encroached into the common barrier between the two mines and it
formed a thin barrier but it was strengthened by a dam. In XV top and bottom seams also
galleries had encroached in the common barrier resulting in thin barriers. These galleries were
later isolated by dams (8 nos.)
Sequence of events:
On 26.09.1995 one depillaring district was being worked in X special seam in all three shifts. In
second shift 92 persons had marked their attendance. By 10.30 p.m. 28 persons came out of
the mine. At about oo hrs. Sri Domar Mahto Sirdar who had been deputed to keep watch on
water level in the river came to the pit top and informed that water level had touched the
warning level. He informed banksman Sri Bilas Mahto not to allow any persons to go down the
mine and to take out all the workers from underground workings.
He then accompanied by Sri Zibrail Mian went to the river bank and saw the water level
fluctuating around the danger mark. He then rushed to the bungalows of the manager and
safety officer to inform them, as the telephones were not working.
The manager and safety officer rushed to the mine. Safety officer went to no. 7pit and tried to
withdraw persons from 7 pit. He found that steam pressure in the boiler was not adequate. By
using bricks/girders as counterweight, persons from 7 pit were raised.
The manager went to No. 6pit and found that winding engine operator was experiencing
difficulty in operating the winding engine. Signals were continuously being received from
underground. At about 1.00 hr. an unsuccessful attempt was made to operate the winder. Soon
there was a loud sound in No.6 pit which shook all structures including the guide ropes. At this
time while attempts were being made to operate winding engine an overwind took place.
Subsequent dewatering and inspection of 6 pit showed that cage at the pit bottom together with
its suspension gear and rope had been swept away in a gallery by the force of rushing water to
a distance of about 40 m. At this stage manager arranged to send a signal to 6 pit bottom for
persons to proceed to 4 pit bottom which is second outlet of the mine.
From the statement of Sri Domar Mahto who was watching the water level in the river it
appears that some time after 00.45 hrs. the water overflowed the embankment and the
embankment breached.
The causes of accident can be briefly summarised as follows:
Unprecedented heavy rainfall within a short span of time which surpassed all previous
records caused abrupt rise in water of Katri.
The abnormal rise of water went unnoticed as no river guard was posted and the mine
officials did not exercise any vigilance to monitor the rise in water level in the river.
32
The embankment built against river breached and the flood water soon filled up adjoining
quarry and then breached a thick retaining wall built further away and the flood waters
entered the quarry having connections with underground workings resulting into accident.
Extraction of barrier between the quarry having no connection with belowground workings
and the quarry having connections resulting in direct passage of water from river to the
mine.
Steam at sufficient pressure was not available due to premature stoppage of boilers.
Failure to ensure that steam was constantly available to the winders.
Not running the winder to raise persons at the end of second shift when steam was
available, even on receiving the signals from belowground.
Not making any efforts to ensure that persons were not left belowground at the end of the
shift.
Failure to place the afternoon shift under supervision of assistant manager, or even an
experienced overman resulting in indiscipline and chaotic conditions to prevail at the
surface thereby failing to withdraw persons from belowground to surface at the end of the
shift.
OBSERVATIONS AND RECOMMENDATIONS
1. DGMS to be suitably strengthened.
2. Prosecution cases of violations of the Mines Act may be expedited. Necessary
amendments in Cr.P.C. and Mines Act may be made so that such cases are heard by
specified magistrates and disposed off within a time frame.
3. Before onset of monsoon mines situated on river banks should be inspected by DGMS
along with mine management.
4. The feasibility of reclamation of opencast mines including disused ones, near rivers and
major sources of water, particularly those having connections with belowground workings
either directly or through subsidence cracks and fissures may be examined to prevent
inundation in such mines.
5. Detailed precautionary measures against danger of inundation should be laid down while
working beneath or in the vicinity of rivers and major surface bodies, particularly during
rainy season. This may include framing and implementing of standing orders for safe
withdrawal of persons etc.
6. The need for forewarning of mines about possible impending heavy rains, similar to the
warning of impending cyclone issued in coastal areas, may go a long way in ensuring
safety of mine workers from inundation. The feasibility of linking coalfields to meteorological
laboratories for timely dissemination of information may be examined.
7. Mines having vertical shafts as the only means of exit may require captive generators. In
case of steam boilers basic precautionary measures like keeping the boilers under shed,
providing sufficient insulation around the boilers and pipe lines as well as attending the
boilers constantly particularly in adverse weather need to be religiously followed.
8. The need for an effective communication system over and above the signalling system
between the surface and belowground which shall remain in operation even with failure of
electricity and also rugged enough to remain operative in adverse condition has been felt
strongly. Suitable system may be developed.
9. Intermine barrier is an effective means to prevent transference of danger from one mine to
another. In mines where barriers have become ineffective due to interconnections or
otherwise, the same may be restored early, even artificially by building dams, explosion
proof stoppings and other methods.
10. All disused pits, potholes and surface subsidence existing in the vicinity of river or surface
source of water and where there is danger of inundation present, shall be sealed by
reinforced concrete seals or other suitable means.
Recommendations of technical assessor
1. Sanctity of mine boundary: Vertical barriers in different seams to be maintained with
adjacent mines. Where such barriers do not exist protective measures to be adopted.
33
2. Embankment: Guidelines regarding foundation design, material of construction, nature of
slope, and procedure of construction to be laid down. There is need to do so.
3. River channel: Due to mining of several seams the ground level adjacent to river courses
has been lowered. This needs to be considered.
4. H.F.L: The river cross-section changes with mining activities. Therefore, HFL also changes.
This aspect should be paid due attention.
5. Abandoned pits: All abandoned pits or pits proposed to be abandoned should be properly
secured at collar level.
Appendix 6
DGMS (Tech) Circular No. 04 of 2005 Dhanbad dated the 18th May, 2005
Subject: Recommendations of Godavarikhani No. 7 (LEP) Court of Inquiry,
To,
Owners, Agents & Managers of all belowground Coal Mines
The Court of Inquiry appointed under Section 24 of the Mines Act 1952 to inquire into the cause
and circumstances attending the accident that occurred in Godavarikhani No. 7(LEP) colliery of
M/s Singareni Collieries Co. Ltd. on 16th June,2003 causing loss of 17 lives due to inundation,
had made, inter-alia, the following recommendations:-
1. As it is not possible to check the efficacy of stowing once the mouth of a gallery or mouth of a
district is filled with sand, it is essential to device a system to ensure proper effective stowing
and fix the accountability. It is recommended that the Asst.Manager and Overman, apart from
the Surveyor, should record the actual amount of void filled up together with the efficacy of the
stowing. When stowing in a district is completed, the Asst. Manager and Manager should certify
in writing the actual status of stowing in the district. The volume of sand stowed in should
invariably be recorded at the time of closing the District.
2. Before starting a new district, clearance from the Internal Safety Organization must be taken
in writing by the local mine management.
3. Detailed planning for production in different districts must be done at corporate level and
projections given should not be altered at the mine level.
4. Owners must monitor important Safety functions, including stowing in districts at regular
intervals.
5. Safety in mines is a very complex phenomenon and support from the highest quarter is
needed for implementation of safety measures in the mines. If the person with the maximum
power does not have the highest responsibility for safety, there is always a possibility of
miscued stress on the production, sometimes at the cost of safety. So it is recommended that
the Chief Executive or the company should be nominated as the owner under Section 76 of the
Mines Act, 1952.
6. Key personnel in the mines like agents, managers and Surveyors, who have a strong bearing
on the safety in mine, should not be transferred frequently. Before positing such key personnel
due diligence should be undertaken to ascertain the suitability of the persons for the post, so
that they do not have to be transferred after a short time except on rare occasions.
7. During our deliberations we were of the view that information technology could be used for
efficiency, increasing production and also mine safety. But we are of the view that this is
altogether a different subject, although we are convinced that information technology can be
used for mine safety, but it needs a details study and experts need to be grafted into a study
team, which could study the subject. Singareni Collieries are being operated by adopting the
old age methods of mining almost 100 years and there are not significant changes either in
management or in mining. Information technology is being used successfully in every filed.
Therefore we have no doubt in our mind than it proper information technology is used mine
would be much safer. Proper implementation of this recommendation can bring about definite
improvement in the safety standards in the mines, especially against the danger of inundation.
You are requested to take suitable steps to implement the above-mentioned recommendations
of the Godavarikhani No. 7(LEF) Court of Inquiry in all mines under your control.
APPENDIX 7
34
Method of Examination following a Colliery Explosion
By
F.V.Tideswell
(Abstract of paper read before the Midland Counties Institution Of Engineers at Nottingham,
April 23, 1952)
It is important that during early operations of rescue and recovery, no vital evidence should be
destroyed, or opportunity to make valuable observations lost. One of the rescue team members
should be deputed to record immediate observations and mark objects necessarily disturbed.
The special investigation team should follow as closely as possible, without interfering with the
recovery. Finally, early collection of evidence from witnesses may assist the actual
underground investigations and vice versa.
General observations on mine explosions
Almost every recent explosion has begun by ignition of firedamp; within the last 20 years only
two have been ascribed to direct ignition of coal dust, though coal dust has seriously extended
the spread of explosions on many occasions. The explosive combustion may be initiated by a
wide variety of causes and once initiated continues as long as medium remains inflammable.
The effect is development of heat energy concentrated in the flame. The flame provides a
continuing igniting source, enabling the explosion to eat its way through that part of the medium
yet unburnt. The expansion due to heat develops pressure which pushes equally against the
gas already burnt and that remaining unburnt. The actual movement of gas depends on how
free it is to move.
If we take a simple and common case, that of a firedamp-air mixture ignited at the face of a
heading; the expansion can only push the flame front and the unburnt gas forward, and the
flame advances at a speed compounded of its speed through the inflammable medium and that
of the medium itself. Thus a flame tends to accelerate when passing from a closed to an open
end. Conversely, a flame moving from an open towards a closed end moves more slowly and
steadily and the movement of gas is greater behind the flame than in front. Thus release of
pressure in front of the flame accelerates the flame; behind the flame retards it.
Even with an explosion which has started near a closed end and is spreading outbye, there
may be considerable movement of burnt gas back from the flame towards the source of
ignition. This is particularly marked if the explosion increases rapidly in intensity and pressure.
Finally, as the burnt gases cool behind the flame, there is a general contraction which tends to
pull the flame back; this is usually less violent than the forward and backward pushes we have
already considered. These movements are of importance in considering the significance of
displacement of material in an explosion, and of deposition of coke.
The same considerations apply when coal dust takes part.
Generally a coal dust explosion is started by one of firedamp. If the layout is such as to cause a
violent blast of air in front of the flame (and it often is) and this blast raises a cloud of dust
significantly rich in coal dust to be inflammable, then the firedamp explosion will ignite the cloud
of dust and a coal dust explosion will follow, and will continue to propagate until the composition
or the density of the dust becomes unfavourable. The change in conditions of cloud tending to
extinguish the flame is unlikely to be sudden and the extinction of a coal dust explosion by a
deposit of stone dust must be regarded as usually a gradual process.
The dimension of the dust cloud formed ahead of the flame depends on the effective expansion
(in that direction) of the exploding medium upto that point. The spread of flame of a firedamp
air mixture on burning may be upto seven the original spread of the mixture. In the road
layout of a pit, such long projections of flame are unlikely to be realized, and three to four fold
projections or less are more likely. For dust explosions, where the coal dust is diluted
with stone dust, a much lower projection ratio is to be expected.
The main effects of explosion are:
Blast – causing disturbances and damage extending often
Burning – the spread of flame is customarily taken as defining the extent of explosion.
Afterdamp – the products of combustion mainly CO2, and CO, steam and nitrogen, with
smoke and dust, which first fill the area traversed by the flame, are sucked back on cooling
35
to occupy a volume of the order of that of the original explosive medium, and then diffuse or
are blown through the workings forming as great a dander as the original explosion.
Differentiation of firedamp and coal dust explosion
This differentiation to some extent is artificial, for there is every gradation from purely firedamp
explosion to one of a coal dust explosion alone. A dust cloud not inflammable in itself may be
made inflammable by the presence of firedamp in less than the concentration needed for its
own inflammation (5%). It is convenient to regard firedamp explosions those where the gas-air
mixture can propagate the flame without the assistance of any coal dust; as coal dust
explosions, those where gas is not so sufficient, but the dust cloud by itself is capable of
carrying on the explosion; and as joint gas-dust explosions, those where neither is adequate by
itself. In a mine explosion, any or all of these may occur at different stages of explosion.
It is not possible to say merely by examination of the residues left whether an explosion
is one of coal dust or whether it has been carried on mainly, or in part, by firedamp.
What can be done is:
To establish the path and spread of the explosion;
Observe closely for evidence of presence of inflammable dust in sufficient quantity in the air
during explosion, indicating that in the absence of firedamp, coal dust could have
propagated the explosion;
Estimate the possibilities of presence of firedamp. It is then usually possible to estimate,
with some certainty and moderate precision, the parts played by firedamp and coal dust
respectively in propaga6ting explosion.
In making such an estimate, the quantitative as well as qualitative aspects must be considered
and due regard must be paid to different mobilities and geographical accumulations in the mine
of coal dust and firedamp. The salient features of coal dust are:
It is likely to be distributed more or less uniformly along the potential path of the explosion;
it may be dispersed progressively by the advance blast of explosion, giving a dust cloud
filling a much longer length of roadway than was covered by the original deposit, so that a
succession of isolated accumulations of coal-rich dust may be as dangerous as a more
uniform deposit;
the wide range of concentration over which a cloud dust is inflammable, ranging from low
value of one twentieth ounce per cubic foot (if pure coal) to one hundred or more times that
value. Consequently, if a sufficiently coal rich dust is present, the chance of the flame of
explosion finding a continuously inflammable cloud in its path is great.
On the other hand, as regards firedamp:
its occurrence in high concentration is usually local;
Being a gas, it is swept along with the air ahead of the explosion and intimate mixing of gas
and air originally in consecutive long lengths of road cannot be expected;
the explosibility of mixtures of methane in air changes rapidly over a narrow range of
concentration rising from nil to maximum and falling again to nil as the proportion of
methane rises from 5 to 15%. Thus it is unlikely that any long length of roadway will offer a
continuously inflammable firedamp-air mixture to an advancing explosion, unless it was
nearly uniformly fouled initially. These considerations provide one reason why explosions of
firedamp do not usually spread so far as of coal dust.
Detailed Examination underground
The tracing of the course of a mine explosion to its source and determination of its nature are
difficult. There are two complementary methods of approach. One, the intuitive approach, is
based on experience and knowledge of the pit and of the mining operations in progress; the
other, the analytical approach which it is the peculiar duty of the scientist to follow, is based on
a dispassionate survey of all evidence recoverable. Both approaches are needed and must be
related.
Main types of observations made concern:
36
Violence – This may be bursting of doors or air-crossings by pressure, or the bending of
weak, locally fixed objects by dynamic pressure of the blast, but it is mainly due to
movement of objects by blast and their subsequent sudden arrest.
Heavy falls of roof are not signs of great violence. The nether roof may be lifted by the
explosion pressure, or its weight eased enough to loosen the supports and allow these to be
blown out. Generally arches, props and girders are pushed in the direction of the forward blast
of explosion but the contrary is often seen, interspersed with the former. A series of bendable
structures, e.g. signal supports or conveyor supports, bent consistently in one direction is a
useful indication of the direction of forward blast of explosion but can be misleading, because if
the explosion passes from a mild to an intense stage, a stronger blast may run back from the
flame.
The best guide to the general direction of spread of explosion is movement of heavy
objects, machinery, loaded tubs and heavy girders. These, if free to move, are
progressively accelerated by the forward blast of explosion and because of their inertia they are
not too seriously affected by the return forces, unless these are unusually strong. Light objects
are untrustworthy guides since they are at the mercy of small subsidiary forces.
It is desirable that any evidence of motion or bending should be separately and factually
recorded on the plan rather than that a general indication should be given expression of the
direction of force. It is often taken as a general guide that the evidence of violence is least
marked about the origin of the explosion. This is not invariably true, for the area may be
traversed subsequently by severe blast from the explosion as it intensifies. Movement damage
is greatest in the long roads and particularly when approaching release of pressure, but high
pressure may also build up there.
Evidence of burning – Generally evidence of flame is quite hard to find; the flame passes
so rapidly that heavy material is not noticeably affected. The materials most sensitive to
flame are the fibrous edges of torn paper, string and cloth, the raised pile of textiles, the
finest fibres of torn wood and hair on human skin. Eye is a poor judge of signs of burning. A
good magnifying glass is a help but it is usually necessary to examine the object under
microscope. A positive sign of scorching, however small, is a reasonable assurance
that flame has passed. Absence of scorching does not prove the contrary. Loose
scorched paper should be noted.
Generally serious burning is found towards the points of extinction of the explosion
where heated material has access to air sucked in again as hot products of explosion
retreat.
Coked dust – When a flame passes through a cloud of coal dust there is left a residue of
partially or heavily coked dust, which is ultimately deposited in the roadway. If the cloud is
dense, the coal dust pure and from a coking coal, and the explosion slow, very heavy
deposit of coke may be found in the roadways. But if the cloud is fairly thin and the coal
dust well diluted with stone dust, and not of good coking coal, then massive deposits of
coke will not be found. Particularly in a straight and comparatively smooth roadway and
with a medium to fast moving flame, it may be difficult to find any evidence of deposition of
coke though the explosion is known to be one of coal dust. Thus the absence of obvious
deposition of coked dust is not a proof or even an indication that coal dust has
played no part. Coked deposits have three origins:
i. Coal dust accumulated during normal working of the pit and coked insitu. This gives
useful evidence of availability of coal dust and the passage of flame over it; such deposits
usually show a thin crust of coke resting on almost unheated dust;
ii. Coal dust disturbed by explosion blast, in advance of flame, impacted on surfaces and
coked there; generally found quite near the source of dust – a loading point, a filled tub;
again there is a thin crust of coke;
iii. A coal dust cloud through which flame has passed and from which hot plastic particles
have been subsequently deposited as a nearly homogeneous deposit, which may be
loosely spattered, or a coherent crust, thick or thin. As a rule, when the flame is moving
37
steadily, or accelerating, this coked dust is thrown back by the flame and deposited
consistently on surfaces facing in the direction the flame has gone.
Samples of all deposits should be collected and examined under microscope.
Explosion dust –The deposited coked dust is a special case of what we call
’explosion dust’. The blast of the explosion raises ahead, in and behind the flame, a
cloud of dust, only a part of which is traversed by flame. This dust settles after the
explosion has died down. This dust is interesting because it gives the composition of the
dust dispersed during the explosion. It is often clearly recognisable as a bulky deposit
on what would normally be clean surfaces. Like paper, it is found nearer the origin of the
explosion than where it was when burnt.
Explosion dust may divided into four classes, in order of deposition:
Thermal deposit, an immediate deposit of fine dust from a hot medium on to a
cold surface;
Gravity-settled, or impacted, coarse dust, merging into;
Gravity-settled fine dust;
Slowly deposited ultra-fine dust, e.g. soot-like streamers;
Thermal deposit is the dark, smoky deposit often seen on stone sides and roof and often
taken to be evidence of passage of flame.
The sooty streamers which at first sight appear to indicate the presence of heavy, tarry
smoke and hence flame, are essentially composed of extremely fine and often unburnt dust
whose aggregation is doubtless assisted by steamy warm conditions, and they are found in
stagnant places where they can slowly aggregate and settle. The light-brown dust which
sometimes forms a crackled surface on the floor is doubtless similar. Neither should be
regarded as a sure sign of passage of flame.
Composition of road dust –It is customary to take strip samples from the roof and sides,
and floor over every 50 yards of the affected area and beyond, with a view to assessing the
composition of the road dust available to the explosion. Excluding the regions of heavy falls,
or of upsetting of coal in transport, such samples do give a rough guide to the general
composition of the road dust before the explosion. In some explosions, however wide
differences have been observed between the composition of the road dust as disclosed by
statutory sampling and the composition of dust cloud raised by the explosion, the latter
being much richer in combustible content due to preferential raising of coal dust.
Collection of specimens and samples – The observing and collection of samples is best
dealt with by staff specialising in such matters. Dust samples may be taken in envelopes but
preferably in tins or tubes. Specimen of any kind suspected of showing coked or scorching
should be guarded against crushing.
Broader Examination
Evidence of the presence of firedamp – It is seldom that there is factual evidence of the
presence of firedamp immediately before the explosion. On the other hand, the nature and
previous history of the place (e.g. a waste or a heading left unventilated) may be such as to
lead unreasonably to assumption that an explosive gas mixture was present. But the where
history or circumstance does not suggest the occurrence of gas in dangerous proportions, a
search may be made by drilling or by examining adjacent areas for possible feeders of gas.
The occurrence of firedamp in the afterdamp left by the explosion is not necessarily proof
that gas was there before, neither is a continued make of gas after explosion, for the
disturbance of the strata by the explosion may release gas previously not accessible. They
are, of course, evidence that gas was near at hand and may have been present.
Search for possible sources of ignition – It is not often that there is immediate and clear-
cut evidence of means of ignition. The general investigation may have led towards and
narrowed down the likely place of ignition, where search for a cause may be concentrated,
but it is usual and preferable additionally to survey carefully the whole of the affected area
for possible source of ignition. All lamps and electrical equipment are withdrawn for
examination (unless heavy and found satisfactory by examination on the spot), other
38
possible causes of ignition looked for include explosives, compressed air equipment, cutting
and other mining operations, mechanical faults, fires, contraband.
Position of equipment and victims – The positions of victims and equipment in relation to
what might have been expected in normal work may yield valuable information not only as to
the operations being carried on but also unusual happening about that time. The posture,
injuries, burns and carbon dioxide poisoning of victims may give evidence regarding the
course and nature of explosion.
General – By the time the results of preliminary examination have been collated, it is usually
possible to reach a reasonably based interim hypothesis as to the cause and nature of
explosion. Before a final conclusion can be reached it is necessary to consider the results of
detailed examination of all specimens and observations and to test impartially the favoured
and other hypotheses in the light of this full evidence. Only thus can the explosion be
reconstructed with any assurance.
Exercise
Q.1: State statutory provisions in respect of Emergency plan and sketch of accident site.
(First Class, 2000, 2002)
Q.2: Draw a scheme of emergency plan for a large belowground mine having dangers of
inundation and fire.
(First Class 2001)
Q.3: Inundation happens to a major hazard in belowground workings. As a manager, what
action would you take to identify and eliminate this hazard from your mine? Draw an action plan
for the same.
(First Class 2005)
Q.4: In an underground mine, the overman has reported probable explosion in a mechanised
development district and 16 persons are missing. Draw a list of action in order of priority that
you would take to deal with emergency and rescue/ recovery of missing persons.
(First Class 2004)
Q.5: What are the statutory provisions relating to “Emergency Plan”? Briefly explain the
essential elements of a good emergency plan and their rationale. How will you incorporate
modern technology advancements into emergency plan for a large colliery with belowground
workings.
(First Class 2005)
39
CHAPTER 4
Objective of risk management: It aims to reduce the likelihood and impact of mishaps of all kinds, reduce the
inherent potential for major accidents which could kill or injure persons or cause production and profit losses. Ninth
Conference on safety in mines recommended that risk management should be used as a tool for development of
appropriate health and safety management system.
Risk is the chance of some thing happening that will have an impact on objectives. The objectives may be to
produce mineral at a reasonable cost and with good productivity and safety etc. Therefore, any happening that affects
adversely the production, productivity or safety will be termed as “risk”. In the context of mine safety management, the
term ‘risk’ will have a limited meaning as anything happening that will have adverse effect on safety of the persons and
of the mine.
Where
Exposure means how often and how long are the persons exposed to hazard when talking of safety.
Hazard means a source of potential harm or a situation with a potential to cause harm, for
example, inaccurate surveying is a hazard causing the risk of inundation.
Tolerable risk: A risk that we are prepared to live with so as to secure certain net benefits in
the confidence that is being properly controlled, kept under review and further reduced as and when
possible.
Risk analysis: The use of available information to estimate the risk to individuals or property or the
environment from hazards.
Risk assessment: The process whereby risk management priorities are evaluated.
Risk Assessment
Risk assessment is to be performed on a regular basis. The goal for each risk assessment
session is to identify hazards, determine risk ratings and controls, and to review the
implementation of risk controls from previous risk assessment sessions.
40
The following workflow diagram illustrates the areas involved in performing a risk assessment
session.
Risk Identification:
This is the process of identifying hazards and their causes and determining what, how and why things may go
wrong. All major activities being carried on like mine design, surveying, excavation, blasting, support, stowing,
loading, transport, coal dispatch, generation, transmission and use of electricity, traveling etc. are considered
to find out hazards. A list of all possible risks is generated using brainstorming sessions, check lists, fault tree
analysis etc. Past accidents and incidents like fires, inundations, major roof falls, overwinds, occurrence of
gas etc. may also be considered to have an idea of the hazards/risks.
Normally the best process is to proceed step by step through a task. A number of other processes can also be utilized
like –
Notwithstanding whichever method is used for identification of hazards, they should all be noted down so
that a record of their existence is kept.
41
2. Activity: Travelling
The process of risk ranking is carried out by considering both the likelihood of the occurrence
of each hazard and potential consequence should the hazard occur.
The values used for likelihood, consequence and exposure or probability need to be agreed
by risk assessment team. It is, therefore, very important that members of the team are
knowledgeable and experienced persons
Scale of Consequence
Several dead 5
One dead 1
Continuous 10
Frequent (daily) 5
Seldom (Weekly) 3
Unusual (Monthly) 2.5
Occasional (Yearly) 2
Once in 5 years 1.5
Once in 10 years 0.5
Once in 100 years 0.02
42
Quite possible
An
43
Actions
Responsibility
Time frame
Training
Monitor
Review/audit
Conclusion
Management of safety issues based on assessment of risks not only integrates safety with
productivity but also can be used as a very good tool for reduction of costs. The systems stand
on the premise that all risks need not be eliminated and different control measures can be
adopted for different levels of risks. The key here is to aim for ALARA (as low as reasonably
achievable), which eventually depends on cost considerations. The system allows prioritisation
of allocation of scarce resources thereby cutting costs and reducing wastages. This assumes
great importance in the current Indian scenario.
The other merits of the system are that it is created by the mine operators themselves through
considerable brainstorming. This approach let the mine operators/users feel ownership of the
system, something that is not cast upon hem by experts, Govt. agencies or outsiders, and
hence chances of successful implementation is much more. In this system, grey areas are
minimized; responsibilities for action are pinpointed and scopes for auditing and improvements
are always present.
Exercise
44
Chapter 5
Underground Mining
A. Longwall Mining
Longwall is the future of underground mining in India. Attempts have been made from time to
time to extract seams by this method without much success. The failure has been either due to
collapse of faces, strata control problems or poor productivity due to various factors. The causes
of failure can be summarized as follows:
Poor planning.
Absence of total system approach.
Mismatch of equipment to the geotechnical environment.
Presence of hard strata posing problems of caving.
Inadequate coal clearance facilities.
Non-availability of spares.
Non-availability of workshop facilities.
Improper machine maintenance.
Non-availability of new panel due to poor development drivage.
Inadequate machine maintenance of machines and supports.
Lack of trained manpower.
Lack of experience.
Action/ strategies for success of Longwall mining in India
Selection of suitable supports
If we look at the history of Longwall mining in India, we would find many pitfalls. And the
reason is that before starting these faces, adequate study was not carried out to estimate
the load that would be coming on the workings at different stages (e.g. before and during
first weighting and then during periodic weighting), inadequate support resistance,
inadequate or no monitoring of important parameters like convergence, load etc. In order to
estimate load at different stages, it is essential to study physico-mechanical properties of
coal measure strata. In this direction we should know the mechanism of loading of face.
When a longwall face is worked by caving, immediate roof should cave in the void. The
success of longwall mining depends on cavability to a large extent. What is
cavability?
A roof may be considered to be ideally cavable when the following conditions are
satisfied:
The overlying rock fills in the goaf as soon as the supports are withdrawn.
The fallen rock debris fill in the goaf behind the last row of supports completely.
For complete filling of goaf by debris, a sufficient thickness ‘t’ of overlying roof should
be involved in the caving process. The value of ‘t’ may be worked out from the following
relationship:
t = h/(k-1)
Where h = height of extraction;
k = bulk factor of roof strata.
With k = 1.2, t = 5 h; with k = 1.5, t = 2 h
For hard and massive rocks, k = 1.2 and hence immediate roof upto 5 times the height
of extraction should be considered. However it would be safer to study the rocks up to
10 h.
45
Another very convenient method is to assess the cavability on the basis of data
collected from B&P depillaring panel. The area extracted in depillaring panel may be
taken as measure of cavability. The value of cavability index ‘I’ and the exposure
necessary in B&P depillaring before the occurrence of first weight.
46
------------------------
n
Where R =Effective support resistance
S = Span at Longwall face
S2 = Spacing between members of support system
K1 = Factor to take care of span variation (1.2)
K2 = Factor to compensate for leakage and low setting load (1.1)
n = Efficiency (0.8 to 0.9)
Example:
If R == 80 (from Nomogram)
h=2
S=4
S2 = 1.2
Then Capacity = 80x4x1.2
------------- 1.2x1.2 == 600 tonnes
0.8
47
B. Extraction of pillars by caving method using continuous miner and
shuttle car combination
A permission letter for extraction of pillars by caving method using continuous miner and
shuttle car combination contains standard conditions like those required under (a)
Regulations 100(5) read with DGMS technical circular 2 1988 regarding precautions
against air-blast, Regulation 112 (1) (c) regarding fencing, (b) Regulation 118 A (1)
regarding formation of panels, (c) Regulation 118(3)(c) regarding inspection of isolation
stoppings and (d) DGMS circular No. 4 of 1988 regarding subsidence survey. Conditions
regarding manner of extraction comprise the most important part of the permission. The
conditions may include the following:
i. Geological mapping of the panel shall be done to delineate presence of geological
disturbances in advance. Such disturbances shall be provided with additional
supports.
ii. Remote umbilical cord control shall be provided on the continuous miner so that
persons shall be employed under supported roof only in the slice under extraction.
iii. Each pillar shall be divided into two equal halves by driving a split not exceeding
6.6 m in width and 4.5 m in height. Each half pillar so formed shall be extracted by
driving slices at an angle of 600 with respect to centre of the split gallery. Such slice
shall not exceed 6.6 m in width and 4.5 m in height. A rib of about 2 m thickness
shall be left between slices. This may be extracted judiciously while retreating.
iv. The first slice in the half pillar shall commence at least 5 m away from the corner of
the pillar, so however that in case of an overhanging goaf the distance may be
increased to 7 m.
v. The maximum cut-off distance in split and slice shall not exceed 14 m and 10 m
respectively.
vi. Extraction shall be restricted to minimum pillars at a time such that only one pillar
shall be under splitting and only one under actual extraction at a time.
vii. Line of extraction shall be straight.
viii. Extraction of pillars shall commence from the dip and proceed systematically to the
rise.
ix. Once extraction of a slice commences, the continuous miner shall work non-stop till
the extraction of slice and rib is completed. In case the continuous miner stops for
more than 2 hours due to breakdown or other reason, extraction shall not
commence unless the stability of the slice has been evaluated and found
satisfactory.
x. DUST CONTROL: Cutting of coal shall not commence unless water-spraying
arrangements at the cutting picks is provided, maintained and is working. Suitable
mechanism to interlock the operation of water spraying and cutting shall be
provided and maintained at all times.
xi. OPERATION AND SUPERVISION: Each shift shall be under the supervision of an
assistant manager. The maintenance shift shall be under the charge of an
experienced engineer.
The Continuous miner and shuttle cars shall be operated by specially trained
competent operators.
xii. STRATA CONTROL and ground movement monitoring shall be kept under the
supervision of an assistant manager.
xiii. MONITORING: Scientific body having expertise and infrastructure shall be
engaged for monitoring strata behavior including caving characteristics, load on
supports and stresses developed over the pillars and suggest corrective measures.
xiv. STRATA MANGEMENT PLAN including detailed scheme monitoring shall be
drawn out in consultation with a scientific body. Rotary tell-tales at every junction
and convergence indicator shall be installed at every alternate pillar along the
central heading and other critical places. Stress capsules shall be placed to assess
48
the development of load in pillars. Caving behaviour may be studied with the help
of multipoint bore hole extensometers.
xv. Standard operating procedures for installation, operation and maintenance of
face machinery and equipment shall be framed based on the concept of risk
assessment and shall be adhered to.
xvi. A contingency plan for withdrawal of continuous miner safely in case of a
Breakdown or stoppage due to fall of roof or other reason shall be famed and put
into operation when required.
49
environment. Monitoring of parameters like strata load / pressure and convergence should
be carried out.
50
As far as possible extraction below fire area should be done with sand stowing. Caving
may be done if the parting is more than 15T and the parting is free from carbonaceous
matter.
Continuous monitoring for noxious gases should be done.
Exercise
Q.1: A moderately thick seam at shallow cover is proposed to be extracted for the first time
in a mine by longwall powered support. How would you make a statutory application for the
extraction and what informations are required? (First Class 2002)
Q.2: Draw up conditions for use of:
(a) LHD
(b) Belt conveyors belowground (First Class 2002)
Q.3: What are the statutory requirements before abandonment of belowground workings?
What are dangers from such workings and how can it be reduced?
(First Class 2002)
Q.4: A seam, 4 m thick and dipping at 1 in 12 is proposed to be worked by longwall caving.
Describe the preparatory work needed and prepare an application seeking permission
under Regulation 100 A of Coal Mines Regulations, 1957. (First Class 2000)
Q.5: An 8 m thick seam (third degree gassy) dipping at 1 in 7 is being extracted in 3 lifts by
Bord and Pillar method with sand stowing. While developing second/ third lifts over sand,
some of the faces give out large volumes of inflammable gas for several weeks. What are
the possible reasons for gas emission? State the dangers involved and precautions to be
taken during development.
(First Class August 1999)
Q.6: Draw a scheme of safe operating practice with continuous miner. How would you
implement it?
(First Class 2002)
Q.7: What are the safety problems associated with working thick seams by underground
methods? How can such problems be solved?
51
CHAPTER 6
OPENCAST MINING
General Safety Problems associated with opencast mines
Problems associated with mechanized opencast mines are as follows:
Technical problems
i. Slope stability
ii. Blasting related problems
iii. Transport related problems
iv. Those arising from machine operations.
v. Miscellaneous problems like fire, inundation or even coal dust explosion in
opencast mines quarrying out formed pillars.
Administrative problems
These include those arising from deployment of contractors’ workers.
Slope stability
In opencast mines, the sides are kept sloped or benched for ensuring safety against slides.
Slope designs have impact on safety as well as economy. Steeper slopes favour economy
but adversely affect safety. A balance has to be struck between safety and economy.
Types of slope failures:
i. Plane failure: A major discontinuity like a fault plane causes the slope to slide
along the weak plane.
ii. Circular failure: This type of failure normally takes place in weak material and
dumps. The failed surface assumes a concave shape.
iii. Wedge failure: When there are two discontinuities striking obliquely, the wedge
shaped pieces collapse.
iv. Toppling failure: There is no sliding but in weatherd ground, the entire slope
may topple.
v. Non-circular failure: Weak material with strong layer at base which prevents
complete circular failure.
vi. Falling: Any overhangs created by undercutting or otherwise may cause the
overhanging material to collapse.
Indications of damage in slopes/ potential failures:
i. Small recent failures
ii. Fresh erosion
iii. Recent movements
iv. Tension cracks
v. Recent seepage
vi. Floor heaving
vii. Reduction in R.L
viii. Change in drainage slopes
Factors affecting slope stability:
Natural factors
i. Physico-mechanical properties of rock
ii. Geological structures
iii. Hydrological properties
iv. Litho logy
v. Seismic activity
vi. Climatic conditions
Artificial factors:
i. Slope geometry including height, angle and curvature
52
ii. Mining method including rate of production, type of drilling and blasting and the
height of benches.
iii. Presence of old workings – this may require height of benches to be reduced.
BALANCING DIAGRAM
It indicates the position of a dragline with respect to O.B it can remove from that position and
the position where O.B will be dumped. The diagram indicates re-handling of O.B if required.
The balancing diagram shows sequence of operation for O.B. removal by the dragline. Many
such diagrams are drawn by trial and error method before most optimum scheme of operations
is selected for the available dragline. This can also be done with the help of computer
programme.
53
8Exercise
Q.1: Write short note on haul road gradient in opencast mines.
(First Class 2005)
Q.2: A large opencast mine is being planned in a virgin area. Briefly state and
discuss the statutory notices that are to be sent and permissions/ relaxations to
be obtained. What steps should be taken to select, recruit and train the
workmen, staff and officers?
(First Class 2004)
Q.3: The management of a large opencast mine has entrusted the work of
removal of overburden to a contractor. Deployment of contractor’s trucks and
workers for removal of overburden has led to increase of accidents. Discuss
the reasons for increase in accidents and suggest preventive measures.
(First Class 2001)
Q.4: What are the improvements necessary for better and safer use of
Opencast machinery?
(First Class 2002)
Q.5: What are the common causes of slope failures in opencast mines? How
can such failures be prevented?
54
Chapter 7
Blasting
Accidents and safety problems due to blasting
Large amount of explosive is used in opencast as well as belowground mines. In spite of
elaborate precautions given in the Coal Mines regulations, it has not been possible to eradicate
accidents due to use of explosives. As would be seen from Table 5, Chapter 2, there were 3, 5,
and 2 fatal accidents during the years 2003, 2004 and 2005 respectively during blasting
operations.
These accidents are mostly caused by fly rock. Elaborate precautions are given in Regulation
170 of the CMR, 1957. These accidents can be prevented by strict adherence to the provisions
of this regulation. In large opencast mines, the manager should prepare a code of practice for
safe use of explosives with due regard to these provisions.
General causes of fly rock are local geological disturbances, poor blast design, insufficient or
very high front row burden, inadequate stemming, excessive or low amount of explosive,
improper delay time and initiation sequence and explosive very close to the mouth of blast-hole,
etc. In case the fly rock is to be controlled within short distances, the blast round needs to be
muffled to inhibit the travel distance.
Apart from fly rock, blasting may some time cause ignition/ explosion of inflammable gas,
accidents due to inhalation of poisonous post detonation fumes, coal dust explosion while
extracting formed pillars and premature detonation while blasting in fire area. Precautions
against such miscellaneous dangers have been given in several circulars by DGMS, the
important ones being:
DGMS circular 2 0f 1985: Blasting in hot holes.
DGMS circular 4 of 1983: Precautions against coal dust explosion.
DGMS circular 4 of 1984: Precautions against blasting fumes.
DGMS circular 3 of 1980: Precautions against blown through shots while quarrying
pillars.
DGMS circular 7 of 1981: Precautions against inhalation of nitrous fumes.
Ground vibrations
The second most important problem relating to blasting is ground vibrations. When an
explosive charge is blasted in a hole, it is instantly converted into gases under high pressure
that exert intense pressure on the blast-hole walls. The rock around the blast-hole up to twice
the radius of the hole gets completely crushed. Expanding gases continue to work on the rock,
extending the cracks and moving the broken rock outward and upwards. These activities
consume a part of explosive energy. The remaining part of energy which is quite substantial
causes elastic ground vibrations. A seismic wave travels along the ground generating particle
motion on the surface. The velocity of oscillating rock particles is called particle velocity and
its maximum value is called peak particle velocity or PPV. Generally peak particle velocity is
recorded in three orthogonal directions (longitudinal/radial, transverse and vertical). PPV is
measured with the help of seismograph.
These vibrations can cause damage to the surface structures as these structures also tend too
vibrate. The damage that results will depend on inherent strength of the structure, its height and
strength and rigidity of the foundation. A kutcha hut will be more prone to damage than a pucca
building.
The US Bureau of Mines has developed a mathematical model which relates PPV to charge
weight and distance from the blast hole. The formula for site predictor equation is-
V = K (D/\ / Q)- b
Where V = PPV in mm/sec
D = radial distance from hole to monitoring station in m
Q = Maximum charge per delay (kg)
K and b are site constants.
D/\ / Q is called scaled distance.
55
For a new area in which the seismic characteristics are not known, the constants ‘k’ and ‘b’ are
determined by monitoring the ground vibrations at different distances for known quantity of
explosive per delay.
The value of PPV recommended by DGMS for various types of structures are given in
Technical circular 7 of 1997. The values for structures not belonging to the owners are given
below:
56
Vibrations induced by blasting on roof and pillars of underground coal mines
Controlled Blasting
Controlled blasting techniques are used to minimize over-break (or fracturing) beyond the
designed boundary. This is used both in opencast and below ground workings. This is done by:
Line drilling: Single line of unloaded, closely spaced holes are left between place of
blasting and the boundary.
Preshearing: A single row of holes, 5 to 10 cms in diameter are drilled, charged with 2.5
cms dia cartridges and fired before main blasting. The annular space in the holes is
filled with crushed stone.
Cushion Blasting: A single row of holes is drilled along the neat excavation line, loaded
with light, well distributed charges and fired after main excavation is removed.
Air overpressures
Air overpressure is the energy transmitted from the blast through the atmosphere in the
form of pressure waves consisting of wide range of frequencies, some of which are audible
and some are inaudible which result in annoyance problem. Air overpressure is measured
in decible (dB). Low frequency air vibrations (less than 20 Hz) cause air-blast while high
frequency air vibrations (20 Hz to 20 KHz) produce noise. Air overpressure may also result
in cracks in the plaster or breakage of window panes.
Minimising noise and airblast
Cover detonating cord with earth.
Use Nonel.
Avoid secondary blasting with plaster shooting.
Blasting should be done under favourable weather conditions like clear sky and
light wind.
Blasting may be done during period of high ambient noise.
Sleeping of holes
The Coal Mines Regulations, 1957 require that only those holes shall be charged which
are to be fired in a round. In large opencast mines, it causes practical operational
difficulties. Several rows of holes may be required to be charged at a time, out which
only few will be fired. The other charged holes are called “sleeping holes”. In large
Opencast mines using drag lines, sleeping may extend to even 15 days or so.
Following precautions shall be taken in case of sleeping holes:
1) Smoking or open flame including welding shall not be allowed within 30 m of
loaded holes.
2) At least two rows of unloaded holes shall be left between loaded holes and
holes under drilling.
3) The area of loaded holes shall be conspicuously marked by visible bright red
flags during day and by red fluorescent paint during night hours.
4) Entry to the area shall be cordoned off.
5) Blast-holes shall be stemmed immediately after loading and a short length of
D.F shall be kept exposed.
6) The bore hole and collar area shall be covered by soft stemming material so
that the detonating fuse is completely covered and does not come in contact
with discharge of static electricity and lightening.
7) Connections for blasting shall be done only day of blasting during day light.
57
8) Only detonating fuse shall be used in the blast hole. Detonator shall be
connected just before blasting.
9) No hole shall remain loaded beyond the period permitted by DGMS (Up to 15
days in case of dragline and up to 7 days in shovel benches).
10) Records of all sleeping holes shall be maintained and signed by the blasting
officer/ incharge.
Exercise
Q.1: What are the causes of damage to buildings and structures due to blasting in
opencast mines? What precautions should be taken to prevent such damage?
(First Class 2005)
Q.2: Write short notes on “Fly rocks in opencast mines, their causes and prevention”.
(First Class 2004)
Q.3: Write short notes on “firing of shots near surface structures”.
(First Class 2003)
Q.4: Draw up a set of conditions for;
(a) Use of SMS.
(b) Firing of shots in the shaft from mains.
(First Class 2001)
58
Chapter 8
Noise in Mines
Sound is described by three quantities namely frequency, wave length and amplitude. The
number of pressure variations per second is called frequency and is measured in hertz (Hz).
The normal hearing range of a healthy person extends from 20 Hz to 2000 Hz.
Wave length () Speed of sound Frequency
The next main quantity used to describe a sound is the size or amplitude of pressure
fluctuations. The weakest sound a human ear can detect has an amplitude of 20 micro Pascals
(Pa) - some 5109 times less than normal atmospheric pressure. If we measured sound in
Pascals we would end up in some large unmanageable numbers. To avoid this, another scale
called decibel scale is adopted and is logarithmic scale and uses hearing threshold of 20 Pa
as the reference level. This is defined as 0 dB. When we multiply the sound pressure measured
in Pa by 10, we add 20 dB to decibel level. So 200 Pa corresponds to 20 dB, 2000Pa to 40
dB and so on.
dB scale
20Pa =0 dB
200 Pa = 20dB
2000Pa = 40dB
20000Pa = 60dB
How the above scale is derived?
Hearing obeys, as all human senses, the law of differential sensitivity which states that the
increase in intensity necessary to produce the minimum perceptible increase in loudness is
directly proportional to the original intensity and the increase in loudness. Thus
dI dL X I
Or dL=KdI/I
Integrating both sides
L=Klog10I+C
Subjective change between two loudness perceptible to human ear =L-L 0
=K (Log10 I- Log10 I0)
=K Log10 I/I0
K=20, taking 20 Pa = 0
Thus the ear reacts to logarithmic change in level which corresponds to the decibel scale where
one decibel is the same relative change everywhere in the scale (e.g. doubling ‘I’ does not
make ‘L’ double but difference in loudness remains constant in successive doubling of intensity)
Decibel is the sound pressure in logarithmic scale reference to a pressure P 0 (20Pa) which
corresponds to the hearing threshold of average young person at on KHz frequency.
In terms of sound pressure level, audible sounds range from the threshold of hearing at 0 db to
the threshold of pain which can be over 130 dB.
59
Basic Sound Level Meter
A sound level meter is an instrument designed to respond to sound in approximately the same
way as the human ear and to give objective responsible measurements of sound pressure level
(SPL). The basic sound level meter consists of a microphone, a processing section and a
readout unit.
Several different types of processing may be performed on the signals. It is relatively simple to
build electronic circuit whose sensitivity varies with frequency in the same way as human ear,
thus simulating equal loudness contours. This has resulted in three different internationally
standardised characteristic terms the A, B, and C weightings.
The ‘A’ weighting network weights a signal in a manner which approximates to an inverted
equal loudness contour at low SPLs, the ‘B’ network corresponds to contour at medium and ‘C’
network to an equal loudness contour at high SPL. Now-a-days the ‘A’ weighting network is the
most widely used since ‘B’ and ‘C’ weightings do not correlate well with subjective tests.
After the signal has been weighted and/or divided into frequency bands the resultant signal is
modified, and the root mean square value determined in a RMS detector. The RMS value is
directly related to the amount of energy in the sound being measured.
ENERGY PARAMETERS
As sound is a form of energy, the potential of hearing damage of a given sound environment
depends not only on its level but also on its duration. So, to assess the hearing damage
potential of a sound environment, both the sound level and the duration of exposure must be
measured and combined to provide a determination of energy received. For constant sound
level, this is easy but if the sound varies, the level must be sampled repeatedly over a well-
defined sampling period. Based on these samples, it is then possible to calculate a single value
known as the ‘equivalent continuous sound level’ or ‘Leq’ which has the same energy content
and consequently the same hearing damage potential as the varying sound levels.
If the sound level varies in steps, ‘Leq’ can be calculated using measurements from sound level
meters and stop watch. However, if the sound level varies randomly, it is not easy to use
manual calculations to evaluate ‘Leq’. In such cases integrating sound level meters are used.
Such meters automatically calculate the ‘Leq’ of the sound being measured.
An alternative energy parameter to the Leq is ‘sound exposure level’ or ‘SEL’ which is defined
as the constant level acting for one second which has the same amount of acoustic energy as
the original sound. An SEL measurement is often used for describing the noise energy of a
single event, such as a vehicle passing by. As all SEL measurements are normalised to a one
second time interval, the energy content of different types of noise events can be easily
compared by using SEL measurements.
Types of noises
Continuous noise as in case of surface fan.
Impact noise (single impulse of short duration) as in blasting.
Repetitive noise as produced by a type writer.
Noise in mines
Noise is produced in mines generally due to operation of machines like mechanical ventilator,
booster fan, auxiliary fans, coal cutting, drilling and loading machines, transport machinery at
surface, opencast or belowground, crushing and loading operations and blasting operations etc.
Hazards associated with noise are as follows:
It interferes with communication. This may lead to safety problems besides operational
difficulties thereby affecting production and productivity.
It may affect hearing. Exposure to noise over a long period of time may lead to
temporary or permanent hearing loss.
Exposure to noise may also result in irritability, high blood pressure, headache,
neurological disorders, anxiety, fatigue and loss of working efficiency.
NOISE DOSE
Noise exposure of individuals who move between different noisy environments during the
working day can be obtained using ‘Noise Dose Meters.’ They can be carried in person’s
pocket. The International Standards Organisation (ISO) defines one method, which uses only
the energy criteria and makes no allowance for recovery of hearing. Thus an increase in sound
60
level from 90 dB (A) to 93 dB (A) must be accompanied by halving the permissible exposure
duration from 8 hours to 4 hours. In USA the Occupational Safety and Health Administration
(OSHA) defines another relationship which permits a 5 dB (A) increase in sound level for each
halving of allowable exposure period.
There are no statutory provisions in the Mines Act. However, DGMS has recommended through
Circular No. 17 of 1975 the following norms:
Warning level for 8 hours daily exposure - 85dB(A)
Danger limit for 8 hours daily exposure - 90dB(A)
Compulsory use of ear protection - 115dB(A)
No work - 140dB(A)
Noise abatement
Noise can be controlled by:
i. Reducing noise at the source
ii. Interrupting the path of the noise
iii. Providing protection to the workers (Ear muffs, ear plus, helmets).
Some of the techniques for noise abatement are:
a. Lubrication, maintenance and speed rating of the machines;
b. Proper design of equipment; use of silencers; damping sound by use of sound
absorbants;
c. Restricting time exposure of persons to noisy environment;
d. Controlled blasting, covering D.F with soil; blasting under favourable weather
conditions.
Exercise
Question 1: How noise is produced in mines? What are the harmful effects of noise? Suggest
ways and means to prevent such effects.
61
Chapter 9
Dust in Mines
Mining is a dusty occupation. Almost all operations like cutting, drilling, blasting, loading,
transport, screening or sizing produce dust. Whereas coal dust can be a source of explosion, all
types of dusts including coal dust pose serious health hazard causing respiratory diseases.
Dust is also an environmental pollutant.
There are detailed provisions in The Coal Mines Regulations, 1957 regarding precautions
against dust (Regulation 123). The regulation requires “Owner, agent and manager to take
such steps as are necessary for minimizing of emission of dust and for suppression of dust
which enters the air at any workplace belowground or on surface and for ensuring that the
exposure of workers to respirable dust is limited to an extent that is reasonably practicable,
but in any case not exceeding the limits that are harmful to health of persons.”
Respirable dust is the fraction of dust which poses greatest hazard to health. It has not been
defined in the regulations. In the Mines Regulations of U.S.A, the term Respirable dust has
been defined as “the dust collected with an approved safety device.”
What are the limits of such dust as are not harmful to health?
This has been clarified at sub-regulation (2). According to this sub-regulation, “a place shall not
be deemed to be in harmless state for persons to work or be therein if the 8 hours time-
weighted average concentration of airborne respirable dust in milligrams per cubic metre of air
sampled by a gravimetric dust sampler of a type approved by and determined in
accordance with the procedure as specified by the Chief Inspector by a general or special
order exceeds 3 where working is being made wholly in a coal seam or where free silica
present is less than 5 % and the value arrived at by dividing 15 with the percentage of free
respirable silica present in other cases.”
Thus sampling is to be done with an approved type of gravimetric dust sampler. One of the
approved types of sampler is MRE 113 A.
What are the prescribed intervals for sampling? This is given at sub-regulation (3) (a).
According to this regulation, sampling shall be done at an interval of 6 months.
If the concentration exceeds 50 % of the permissible limit then, sampling shall be done at 3
months interval;
If it exceeds 75 % of the permissible limit, then at monthly interval;
What action should be taken if the sampling shows that the concentration of respirable dust is
exceeding the permissible limit?
This is given in sub-regulation (4). This requires that in such a case immediate steps shall be
taken to minimize emission of dust and to notify the R.I.M. If the average concentration of
respirable dust in a series of 5 samples taken in 7 successive normal working shifts during
subsequent month exceeds one and a half times the permissible limits, the relevant operations
causing excessive dust shall cease.
However, purely as a contingency measure or as secondary means of work situation wherein it
is technically not feasible to reduce the respirable dust concentration below permissible limit or
during the time period necessary to install and commission any device or to institute any new
work practice for dust prevention or suppression, compliance with the permissible limit of dust
may be achieved by remote operation or by job rotation and failing which, by use of suitable
dust respirator.
Steps to prevent liberation and accumulation of dust in general and propagation of airborne
dust in particular are given in sub-regulation (6)
The Regulations also require manager to prepare a scheme for taking suitable action regarding
respirable dust.
DGMS has given detailed guide lines for conducting respirable dust surveys in Circular no. 1
of 2004.
62
Effect of dust on human health
The adult human lung, with surface area 40 to 120 square metres, comes in contact with about
10,000 to 20,000 litres of air daily and is exposed to the particles present in the air. Silica dust
causes Silicosis and coal dust causes coal workers’ pneumoconiosis (CWP)
The respiratory system is composed of two lungs. The air passages begin at the nose and
mouth, and include the windpipe (trachea) and its two branches known as bronchi. The bronchi
divide into five main branches and then subdivide finally reaching the terminal bronchi (or
respiratory bronchioles) deep within lungs. At the end of bronchioles is the countless tiny air
sacs known as alveoli.
Particulate matter inhaled is deposited in various regions of the respiratory system depending
on the particle size. The human respiratory system is illustrated in the figure on the next page.
The upper respiratory system consists of nasal cavity and trachea, while the lower respiratory
system consists of bronchial tubes and the lungs. Each bronchus divides into smaller and
smaller branches, terminating with a large number of tiny air sacs called alveoli. Large particles
that enter the respiratory system are trapped by the hair and lining of the nose and are driven
out by cough or sneeze. Particles larger than about 10 μ are quite effectively removed by upper
respiratory system. Smaller particles are captured by mucus and sent back to throat by tiny hair
like celia and removed by swallowing or spitting. Fine particles in the range 0.5 μ to 5 μ deposit
in bronchioles, which are lined with hair like structures called cilia and brought back to throat
with mucus but a few reach the alveoli. The health risk is due to the deposition of these
particles. The dust particles below 0.2 μ are most injurious and cause Pneumoconiosis. Lesser
the size, greater is the effect.
ILO has adopted the following definition of Pneumoconiosis:
“Any condition of the lungs resulting from inhalation of dust that may or may not be of any
clinical significance.”
Symptoms of Pneumoconiosis include shortness of breath, chronic cough, fatigue and in
advanced stage even fever. The symptoms depend upon the stage of the disease. In early
stage, there may not be any symptoms. The diagnosis at the early stages may be possible
through radiological techniques.
The precautions against the disease include the following:
I. Precautions to prevent/control formation and dispersion of respirable dust.
II.Strict adherence with the statutory norms of respirable dust laid down in Regulation 123
of CMR.
III. Monitoring of respirable dust at intervals provided under Regulation 123 of
CMR and to take measures including stoppage of work if the dust concentration
exceeds one and half time the limiting value.
IV. Job rotation if the dust concentration is excessive.
V. Provision of dust respirators as purely contingency measures.
VI. Medical examination of work persons as prescribed under Rule 29 B of Mines
Rules, 1955 for detection of the disease. If any person is found to be suffering from the
disease, further investigations may be done and remedial measures may be taken.
Exercise
Question: What are the causes of Pneumoconiosis? What are the precautions to be taken to
prevent it?
State statutory provisions relating to periodical medical examination and discuss relevance of
ILO classification of radiographs for detection of Pneumoconiosis. (First Class 2005)
63
Human respiratory system
64
Chapter 10
Recent developments in Mine Safety
Like any other field, there have been developments in mine safety in the recent past. The same
are briefly described below:
1. Identification of hazards, problem areas and analysis of accidents
The first step in improving safety standards is to identify the hazards. Earlier and even now,
some times the starting point is analysis of accidents in conventional way. However, this
may not give a complete picture of the problems, which are causing accidents and
incidents at the mine. Recent tools for proper assessment include risk assessment,
accident analysis and problem identification method. Risk assessment became a part of
Safety Legislation in U.K in 1992. Health and Safety risk assessment became a legal
requirement in South Africa in January 1997. In India, Ninth Safety Conference emphasized
on risk assessment.
Accident analysis and problem identification (AAPI) is a technique used in USA.
The technique is based on the fact that accidents are the result of absence of physical
barriers or presence of human barriers. Example of physical barriers are: roof supports,
fencing, cut-off switches etc. Human barriers are information, knowledge, tools and
equipment, and bad incentives.
Safety audit is another technique for identification of hazards.
2. Computer based Systems for analysis, detection and prevention of
hazards
Management Information System (MIS):
It is a computer based information system which provides information support for decision
making in an organization. In any organization a major portion of time goes in data collection,
processing and communicating it to the people concerned. This is applicable to data relating to
safety also. MIS has been of great help in collecting, processing, analyzing, storing, retrieving
and communicating the information in processed form to all concerned.
MINOS (Mines Operating System) - This is a computer based remote monitoring and control
for coal clearance, environmental monitoring, pumping and face monitoring.
The other information systems in use are MIDAS (Machine information display and Automation
System), IMPACT (Inbuilt Machine Performance and Condition Testing), and OPTIC (Operating
Performance and Technical Information Console).
3. Control of accidents due to ground movement:
Following are some of the recent developments for prevention of accidents due to ground
movement:
SSR based on geo-mechanical classification of strata (RMR). This includes,
classification of roof strata, calculating support resistance and devising support
pattern. In case of Longwall faces worked with powered supports, similar approach
is used but the empirical formulae used are different.
Use of roof bolts/ cable bolts for support of roof and sides.
Use of yielding supports including powered supports in Longwall faces.
Induced blasting/ hydro-fracturing of massive bed above caving panels. Attempts
were made in some of the mines to facilitate caving by blasting in the goaf behind
last line of supports. At Balrampur 10 & 12 Inclines of M/S SECL, blasting was
done by drilling holes from the surface over longwall panels worked by powered
supports, charging them in deck pattern and doing delay firing. In one panel,
charge per hole was 50 Kg whereas charge weight per delay was 150 Kg. Total
charge per round of blast was 650 Kg. In another panel 1200 Kg of explosive was
used in a blast. Yet another blast comprised 2192 Kg of explosives. It was
reported that as a result of induced caving by deep hole blasting from surface, load
on the powered supports had reduced by about 170 to 200 tonnes and loading
density by 43 tonnes/m2.
4. Prevention of methane ignitions/explosions
Classifications of seams according to gassiness.
Continuous environmental monitoring.
65
Methane drainage.
Use of ultra-safe explosives.
66
number of blasts are monitored by keeping geophone and microphone at various
distances. The data is stored in the machine. After the field study, data is down loaded
in a PC and regression analysis is done.
12. Use of Software for Mine Planning: CMPDI is using MINEX software for mine
planning. This is supplied by Surpec Minex group. Basic requirement for planning by
this software is bore hole data. Based on the data various models are made e.g.
Gridded model, Triangulations, Geometry data and Geological models etc. This
programme is very user friendly. Using the data, various layers can be made and
quantities of coal, O.B at various cut-off depths can be calculated. 3 - D sections of the
mine can be prepared.
13. Application of controlled blasting techniques. (Refer to Chapter 7)
14. Safety in opencast machines
ROPS/ FOPS: In USA, the Mines Safety and Health Administration (MSHA) require
provisions of seat belts and Roll Over Protected Structures on every equipment
where there is a danger of overturning.
FOPS or falling objects protective structures are overhead structures that provide
operators with protection from falling objects.
15. Application of computers in mine surveying:
Data entry: The system provides interface to the advanced survey instruments to
directly capture the survey data, thus eliminating the need for manual entry.
Traverse module: The system captures both traverse and offset data. After data
entry, the traverse is computed and plotted and offset p [points are stored for
further processing by ‘edit’ facility. For closed traverse, closing error can be
calculated and distributed Plotter and printer output can be taken through report
generation module.
Leveling module: It takes up raw data as recorded in the field book, calculates
reduced levels and updates data base. Coordinates can be accessed wherever
required.
What the system can provide:
Contours
Volume
Haul road design
Stowing range layout
Pumping layout
Updation of mine status
System requirement:
PC
Digitilizer
Plotter
Software
Benefits:
1. Fast calculation and plan generation
2. higher degree of accuracy
3. clearer plans
4. No problem of shrinkage.
Limitations:
A plan once plotted cannot be revised. Fresh plan
is to be prepared.
The peripherals need special attention.
The surveyor has to be specially trained.
Various softwares are available for the purpose. LISCAD Plus Surveying and Engineering
Environment (SEE) is one such surveying application developed for Microsoft Windows
operating system.
67
16. Global Positioning System (GPS): Twenty four man made satellites are orbiting earth
in different orbits at an altitude of about 23,000 km. These satellites constantly transmit
signals. Receivers at earth can determine distance from each satellite and can
calculate its latitude, longitude and altitude as at a particular time, position of each of
the satellites is precisely known. In mining, the system can be used for:
Mapping
Transportation fleet management
Tracking machinery and persons.
Exercise
Q.1: How can you make effective use of Electronics and information technology in mine safety?
(First Class 2003)
Q. 2: Discuss recent developments in mine safety.
68
Chapter 11
Answers to Questions of the year 2005
69
2. Precautions to control accidents due to dumpers and trucks prescribed. (6 th
Conference)
Occupational Health Services
1. Occupational Health Services at Company level should be established as soon as
possible. (3rd Conference)
2. The provisions regarding initial and periodical medical examination should be
implemented. (5th Conference)
3. Each mining company working mechanized mine to create a department of
Occupational Health services. (7th Conference)
4. Details regarding medical surveillance, precautions against dust, noise prescribed. (8 th
Conference)
Health
1. In mines where long and arduous travel is involved, arrangements should be made for
transport of men.
Accuracy of mine Plans
1. Accuracy of mine plans should be given importance. (5 th Conference)
2. A team of qualified surveyors should be appointed at are level to connect the mines to
national grid.
Prevention of disasters from fire
Detailed precautions against disasters from mine fires were prescribed. (9 th Conference)
Risk Management
General Safety
Risk assessment and risk management should be done at least in two mines in each company.
(9th Conference)
IMPACT:
Many of the recommendations have been now included in the legislation, e.g., workers’
participation in safety in mines, systematic support rules, precautions against danger of
inundation etc. The recommendations have certainly played important role in improving safety
and health standards in mines.
Answer:
Several disasters due to inundation have taken place in our coal mines from time to time.
These disasters have taken place both from surface and underground sources.
As a manager of a mine, I will take following action to identify and eliminate this hazard from my
mine:
1. Inundation from surface source
I will get an up-to-date and correct water danger plan made showing the latest HFL of
any water courses, lakes, ponds and tanks etc. The plan will also show:
Surface contours
Any subsidence
Any bore holes
Opencast workings, both new and old
Mine openings with R.L of the lowest level of the opening
Bore hole section showing clearly the hard and unconsolidated strata
Mine workings showing also the reduced levels
The plan will be carefully studied to show if there is any possibility of water entering the mine
from:
Mine openings
Quarry
Bore holes
70
Subsidence
Low lying areas having low depth of hard cover
While studying the danger, provisions of Regulation 126 of CMR will be kept in view. R.L of
mine openings will be raised at least 1.5 m and preferably 3 m above HFL of water course if
any. Bore holes will be closed. Subsided ground will be filled in if there is any danger of water
entering through it. If possible, quarries near river or jore side will be filled in if the same are
connected to workings belowground. The embankments against river or nullah side will always
be kept in good repair with river side pitched with stone.
The permissions granted for working beneath and within 15 m of the surface water sources will
be carefully studied to ensure that the conditions laid down in the permission letter are adhered
to. Such workings will be clearly demarcated belowground and inspected at regular intervals.
In addition to the above I will take following action:
Before onset of monsoon, review the situation; inspect the protective measures like
embankment.
Check danger level, warning level and withdrawal levels.
Check telephonic communication
Ensure that winding arrangements are properly maintained sop that they do not fail at
the time of emergency.
Liaison will be maintained with dam authorities (if there is any dam on the upstream
side) to ensure that information is received well in time before water is discharged from
the dam.
Danger from Underground sources
I will carefully study the underground plans of the mine and also the plans of adjacent mines
including abandoned/ discontinued mines. If there are any workings the extent of which is not
precisely known, all information will be gathered from the old workers, DGMS etc. If possible,
the workings will be dewatered. Otherwise, no work within 60 metres of such workings will be
done without permission under Regulation 127 from DGMS. While working in the area, apart
from the conditions laid down in the permission letter, following precautions will be taken:
A joint survey plan will be prepared.
A line indicating 120 metres barrier will be drawn. Precautions stipulated in Reg 127
will be observed while extending workings in this area.
Check surveys will be carried out by a survey team from the area level.
V notch will be installed to measure seepage of water. If any unusual seepage is
observed, work will be suspended.
In addition to the above, Risk assessment exercise will be carried out.
An emergency plan indicating action to be taken in the event of an emergency will be drawn
and implemented.
Action plan
Following is an action plan to prevent danger of inundation:
1. Preparatory arrangements
The embankment against river/ nullah will be maintained in good repair.
A pole indicating H.F.L, danger level and withdrawal levels will be fixed on river/
nullah side.
During rainy season (i.e. 15th June to 31 st October every year, guards will be
posted round the clock to keep watch on water level and condition of the
embankment.
Telephonic communication shall be provided fro river side to attendance room.
Escape routes shall be clearly demarcated in the workings of the mine.
Escape routes shall be shown on mine plans and posted at prominent places in
the mine.
2. Action
If the water level in the river touches warning level, the guard shall inform the
attendance clerk.
71
When the water level touches withdrawal level or if any breach is noticed in the
embankment or if any other dangerous condition is noticed the guard shall
inform the attendance clerk telephonically.
The attendance clerk shall inform the manager and the banks man.
The banks man shall inform the on setter,
The on setter shall inform the nearest official present.
The official shall withdraw all persons from the mine in an orderly manner
through escape routes.
Whenever any abnormal seepage of water is noticed, action for withdrawal of
persons as given above will be taken.
Dealing with emergency
A control room shall be set up at the surface.
In the event of emergency, action suggested by the consultative
committee shall be taken.
The decisions made and action taken shall be recorded in a register.
3. Resumption of work
Where work was stopped and persons were withdrawn, the place shall be thoroughly
examined by the manager or assistant manager before resumption of work. The results
of such inspection shall be recorded in a register kept for the purpose.
Q.3: Definitions
Please see Mines Act, CMR, and IER etc.
Q.4 (a) What are the statutory provisions relating to SSR? Explain the factors that you
will take into account while formulating SSR for your mine?
This is a direct question. Read Regulation 108 and reply
(b) What do you understand by the Term “RMR”? What is its application in strata
control?
Answer: “R.M.R” or rock mass rating is a system of classification of the roof strata on the basis
of geo-technical parameters. The purpose of this is to design support system. There are
different systems for such classification namely Bieniawski’s RMR system and CMRI/ISM
system. In India, we use the later system as recommended by Paul Committee.
Five parameters namely layer thickness, structural features, rock weatherability, strength of roof
strata and ground seepage are considered to determine the RMR of the roof. The roof is then
classified as very poor, poor, fair, good and very good depending on this value.
An empirical relation obtained between RMR and rock load is:
Likely rock load in tonnes/m2 = span in m x mean rock density x (1.7 – 0.037 RMR + 0.0002
RMR2)
Knowing the load bearing capacity of a support, we can determine the number of supports like
roof bolt required in a row and the distance between the rows.
Q.5: What are the statutory provisions relating to “Emergency Plan”? Briefly explain the
essential elements of a good Emergency Plan and their rationale. How will you
incorporate modern technology advancements into emergency plan for a large colliery
with belowground workings?
Answer
The statutory provisions regarding emergency plan are contained in Regulation 199A of CMR,
1957. The provisions are as follows:
72
Regulation 199A. Emergency Plan
1.The manager of every mine having workings belowground shall prepare a general plan of
action for use in time of emergency. The plan shall outline the duties and responsibilities of
each mine official and key men including the telephone operators, so that each person shall
know what is expected of him in case fire, explosion or other emergency occurs. All officials
and key men shall be thoroughly instructed in their duties so as to avoid contradictory
orders and confusion at the time when prompt and efficient action is required. The
emergency plan shall also provide for mock rehearsals at regular intervals.
2.The manager shall submit a copy of the aforesaid emergency plan prepared by him to the
Regional Inspector, within 60 days of coming into force of the Coal Mines (Amendment)
Regulations, 1985, or in the case of a mine which is opened or reopened thereafter, within
thirty days of such opening or reopening. The Regional Inspector may, by an order in
writing, approve of such action plan, either in the form submitted too him or with such
additions or alterations as he may think fit and action plan so approved shall be enforced in
the mine.
3. On receiving information of any emergency, the manager and in his absence the
principal official present on the surface, shall immediately put the emergency plan in
operation.
The essential elements of emergency plan are:
1. Sending information to different parts of the mine so that persons from unaffected parts
of the mine can be safely and quickly withdrawn.
2. Safe and orderly withdrawal of persons from unaffected part of the mine.
3. Rescue of trapped persons. Speed of rescue operations is important. This requires:
Early location of trapped persons;
Precise location of trapped persons;
Training of rescue workers in use of rescue capsules;
Special clothing for rescue persons near fire.
4. Recovery of dead bodies and their identification.
5. Prevention of further danger in mine.
6. Keeping press and public informed about the correct situation to avoid rumours.
The emergency plan to deal with disaster should come into action almost instantaneously at the
very onset of a disaster.
Following modern technology advancements may be incorporated in the emergency plan:
Besides the normal elements, an emergency plan may also contain the following:
Seismic sensing system for locating trapped persons.
Provision of underground shelters.
Remote sensing of in-mine conditions.
High penetration drill rigs.
Radio facilities.
Mobile van with borehole probing facilities.
Mobile winders.
Q.6: (a) What are the causes Pneumoconiosis? What are its symptoms? What are the
precautions to be taken to prevent it?
(b) State statutory provisions relating to periodical medical examinations and
discuss its relevance to ILO classification of radiographs for detection of
Pneumoconiosis.
Answer:
(a) ILO has adopted the following definition of Pneumoconiosis:
“Any condition of the lungs resulting from inhalation of dust that may or may not be of any
clinical significance.”
In other words, Pneumoconiosis is caused by inhalation of dust particles. Except asbestos,
these particles have to be of very fine size, generally below 5 micron and mostly below 2
micron.
73
Symptoms of Pneumoconiosis include shortness of breath, chronic cough, fatigue and in
advanced stage even fever. The symptoms depend upon the stage of the disease. In early
stage, there may not be any symptoms. The diagnosis at the early stages may be possible
through radiological techniques.
The precautions against the disease include the following:
1. Precautions to prevent/control formation and dispersion of respirable dust.
2. Strict adherence with the statutory norms of respirable dust laid down in Regulation
123 of CMR.
3. Monitoring of respirable dust at intervals provided under Regulation 123 of CMR and to
take measures including stoppage of work if the dust concentration exceeds one and half
time the limiting value.
4. Job rotation if the dust concentration is excessive.
5. Provision of dust respirators as purely contingency measures.
6. Medical examination of work persons as prescribed under Rule 29 B of Mines Rules,
1955 for detection of the disease. If any person is found to be suffering from the disease,
further investigations may be done and remedial measures may be taken.
(b) The statutory provisions regarding periodical medical examination are stipulated in
Rule 29 B of the Mines Rules. This states that the periodical medical examination of
every person employed in mines shall be carried out at intervals of not more than 5
years. (For asbestos mines, it is at shorter interval). The standards of medical
examination are laid down in Form ‘P’.
Provided that the periodical medical examination or X-Ray examination or both shall be
conducted at more frequent intervals if examining authority deems it necessary to confirm
a suspect case of a dust related disease.
ILO has classified the stages of Pneumoconiosis on the basis of chest radiographs. The
classification is made on the basis of size and shape of opacities detected in the chest
radiographs.
The standards of medical examinations laid down in the Mines Rules require a full size
chest radiograph large enough to include thoratic inlet and both costphrenic angles
obtained by an x-ray machine of at least 300mA (milli- Ampere) strength.
The periodical examination is very relevant for detection of the disease but it is suggested
that standards of the medical examination may clearly state that ILO classification may
be used for diagnosis of the disease.
Q.7: A large opencast mine is approaching a village hutments that can not be
vacated. What actions would you take to fulfill production targets with due regard
to safety? Draw a detailed plan of action for the same.
Answer:
Following are the likely dangers/hazards to the village and the persons living in the village
due to extension of O.C workings in the vicinity:
1. Dangers due to blasting operations including those due to fly rock, ground
vibrations, air-blast.
2. Dangers due to plying of vehicles.
3. Danger of persons falling in the quarry or drowning in water-logged quarries /
illegal mining.
Keeping the above hazards in view, following is the action plan for fulfilling production
targets with due regard to safety:
Hazards due to blasting
1. A careful technical study will be carried out to determine scale distance for
keeping the standards of ground vibrations as specified in DGMS circular 7 of
1997. Controlled blasting to ensure that besides controlling ground vibrations,
the fly rock is also minimum will be planned. Help of technical Institutions like
CMRI or ISM will be taken for the purpose.
2. Muffle blasting will be done to prevent danger of fly rock.
74
3. Blasting personnel will be specially trained in controlled blasting techniques.
4. A code of practice for blasting indicating the duties of various personnel will be
prepared and given to the persons concerned.
5. Blasting will be done at fixed hours and the village inhabitants will be informed
about it.
6. Warning about blasting operations will be given with the help of sirens having
distinct tone.
7. As far as possible blasting operations will be suspended if the weather is
cloudy with low clouds to prevent air-blast.
8. Blasting will be done when ambient noise level is high.
9. All blasts will be monitored and records thereof will be maintained.
10. Any complaint from the village will investigated by an assistant manager and
records thereof will be maintained.
Hazards due to vehicular traffic
1. Separate road for heavy vehicles will be provided. If possible, the road will be kept
fenced.
2. Traffic rules will be prepared and followed.
3. Traffic signals will be installed at strategic locations.
4. Only licensed vehicle operators will be employed.
5. No pedestrian will be allowed on the road used for heavy vehicles.
Q.8 (a) In an underground coal mine three persons of shotfiring crew including shotfirer,
several hours after returning home, complain of chest pain and breathing difficulty and
have to be hospitalized. One of them dies next day. What may be the possible causes of
this episode? How would you enquire into it? Discuss possible causes and statutory
contraventions.
(b) At the end of a working shift, the assistant manager is informed that one
underground worker is missing. What actions should be taken?
Answer:
Since all the persons of the shotfiring crew have the same symptoms, it is indicative of a
common problem relating to their work. Breathing difficulty is a classic symptom of Nitrous
fumes poisoning. Nitrous fumes are a constituent of products of blasting. Hence all the three
persons have been exposed to high concentration of nitrous fumes exceeding 5 p.p.m
concentration.
Possible causes of exposure to such high concentration and statutory contraventions may be
as follows:
a. Bad quality of explosive or very old explosive which did not detonate properly
producing high concentration of noxious gases. This is a violation of Regulation 159 of
CMR.
b. Use of very large quantity of explosive at a time producing excessive amount of fumes.
In contravention of Regulation 168(6), not adhering to proper pattern of shot holes.
c. Poor ventilation in the working places resulting in fumes not getting cleared there from
in contravention of Regulation 130 of CMR.
d. Entering the working places after blasting without waiting for fumes to clear in violation
of Regulation 176 of the CMR.
The matter will be investigated as follows:
75
Post-mortem report will be checked for the cause of death. Similarly the medical
examination report of other affected persons will be examined. If it is established that
the death was due to nitrous fumes then further investigations as follows will be carried
on.
Medical history of the persons affected will be checked to rule out any health problem
already existing.
Explosive from the batch of explosive used will be examined to find out date of
manufacture. It will be physically examined to check its condition. The magazine will be
inspected to see the storage conditions.
A sample of explosive will be sent for thorough analysis. The analysis results will be
compared with those given by the explosive manufacturer.
A sample of explosive will be sent to CMRI for checking the post detonation fumes
generated per Kg of explosive. It will be compared with the figures given at the time of
approval of the explosive.
The working places will be checked for ventilation.
The possibility of the shotfiring crew not following the waiting time norms will be
thoroughly examined by making calculations of the time required for each blast and
actual time taken. This will be cross checked with statements of the coworkers.
All the above results will then be thoroughly examined, analysed and correlated to
determine the exact cause.
(b) First of all we will make sure that the missing person has actually not come out of the
mine. For this purpose, we will search for him at his residence and enquire from his
neighbourers whether they have seen him. If it is established beyond doubt that he has not
come out of the mine, then we will search for him in the workings belowground.
There can be several possibilities as follows:
He might have lost way if he is not conversant with the mine workings.
He might have fallen ill.
He might have entered in an ill ventilated heading to answer call of the nature and
got affected due to deficiency of Oxygen.
He might have fallen asleep.
He might have strayed into disused part of mine.
First of all the entire district where he was employed will be searched to find out if he is
sleeping. Failing this, depending upon the extent of workings, a few search parties will be
made. They will be assigned different parts of the mine to search for. During these
operations, the search parties will carry with them hand plans, safety lamps, birds, and if
possible stretchers. They will thoroughly search for him in the part of mine assigned to
them.
If he is not found, the matter will be reported to the police and DGMS.
76
First Class Managers’ Certificate of Competency
December 2006
77
removed may be considered instead of output. In such mines, the assistant managers
may be appointed at the following scale:
78
According to Rule 118 of IER, the maximum voltage of circuit for remote control or
interlocking of apparatus shall be 30 volts.
(i) A.Transwitch unit is a composite Electrical Transforming Equipment
comprising (a) HV (3.3 KV) Primary control (b) FLP air cooled transformer
(315 KVA, 3.3 KV/5500V) (c) FLP L.V (550v) secondary control.
B. It is used in underground mines basically as a district transformer which feeds
power to face equipment like drill machines, face pumps, SDL/LDL, chain conveyor/
pony belt at desired voltage of 550 V.
C. The transwitch unit has a unique electrical protection system as the H.V side
C.B is vacuum break type with protective devices like over current relays, under
voltage relay and in case of a fault, tripping is through 110 V D.C.
The unit is mounted on flanges of transformer and is equipped with 3 poles off load
isolator. The L.V side C.B is mounted on L.V side of transformer flanges and consists
of sensitive earth leakage relay and a thermal over current relay, earth resistor mounting
relay with fault indication facility.
The neutral of transformer is earthed through resistor to limit earth fault current to 750
mA.
Q.3 (a) What are bye-laws? How are they framed?
(b) Frame a set of bye-laws for the use of continuous miner in degree one
seam.
ANSWER:
(a) Byelaws are sort of Regulations which are framed by the management of a particular mine
for the use of any particular machinery or for adoption of a particular method of work in a mine
e.g. several mines in the past had their own Byelaws in respect of use of locomotives.
Procedure for framing Byelaws – This is given in Section 61 of the Mines Act.
The owner, Agent or manager of a mine shall if called upon by the Chief Inspector or an
Inspector, frame and submit a draft Byelaws within 2 months.
79
- If management fail to submit bye-laws in 2 months or the draft bye-laws are not considered
sufficient, DGMS may propose a draft bye-laws or propose such amendments as are
considered necessary.
- The above draft/ amended draft will be sent to management for consideration.
- If the draft is agreed upon by the management, it will be forwarded to the Central
Government.
- If there is disagreement, the draft will be sent to Committee constituted under Section 12
for settlement.
- The settled draft will be sent to Central Government.
- The Central Government may make such modifications as it thinks fit.
- The Central Government shall give notice to the affected persons informing them of the
proposal. A period of at least 30 days shall be given for sending objections.
- Any objections received will be considered by the Government and the Byelaws in final
form will be approved.
- The mine management shall have copies of such approved Byelaws in English and in
prescribed languages posted at conspicuous places where the same can easily be seen by
mine employees.
- The Central Government may be an order in writing, annual a Byelaw as a whole or part.
(b) Byelaws for use of continuous miner in degree I gassy seam
CONSTRUCTION:
a) Motors and switches – FLP enclosure
b) FLP and I.S features to be strictly maintained
c) Cables to be connected through glands and bushes
d) Safety devices – horns, lights, LMD, remote control, AVA etc.
OPERATION:
a) Operation by authorized person
b) Operator to check lights, horn, AVA & other safety devices
c) Cable man to wear gloves
d) Before starting, operator to see that all persons in vicinity been warned
EXAMINATION:
a) Manager to frame standing orders
b) In every shift by competent foreman, every week by Engineer
VENTILATION:
a) Velocity: Not less than 30 m per sec;
b) Quantity: 284 Cu. M per min
c) Inflammable gas: Not more than 0.5 %
80
DUST CONTROL:
a) Complete set of picks
b) Speed : As specified by Manufacturer
c) Avoid cutting in stone
d) Interlocking cutting and water spraying
e) Strict dust Monitoring
SUPPORT:
a) Development galleries & splits: with resin bolt as per SSR
b) Goaf edges: 3 rows of roof bolts at 0.8 m between bolts and between rows;
length 1.8 m
c) In development and split headings, C.M will not be taken 3.2 m beyond last row
of roof bolts; in slice not 10 m beyond last row
d) Strata monitoring as per strata management plan drawn
IMPLEMENTATION:
a) Duties of person will be drawn and implemented
b) Adequate number of supervisors
c) Training
d) Proper records
e) Discussion in Safety committee meeting
GENERAL:
a) Cut off power at shift end
b) Park at safe place at shift end
c) Joints in trailing cable to be vulcanized
Q.4: An explosion has occurred in Degree III mine in a depillaring district with
stowing. How will you determine the cause of explosion and its point of origin?
How will you ascertain whether explosion has occurred due to inflammable gas or
coal dust or both. Assume your own conditions.
Answer:
The investigation into explosion must start as soon as possible. The rescue teams going
down the mine should be directed to collect air samples from different places, carefully
record the position and postures of victims on the plan, and note down vital information
like falls of roof and displacement of objects. These records should be supplemented by
detailed observations of the team conducting detailed investigation.
Origin of explosion
(a) Attempts will be made to trace the course of mine explosion to its source by
analysis of all evidences recoverable with regard to neighbourhood of source,
direction of progress of explosion and experience of the pit.
81
(b) Near the place of origin of the explosion, there is minimum violence. The
violence increases as the explosion wave progresses.
(c) Arches, girders and other heavy objects are thrown / bent in the forward
direction of the explosion wave.
(d) In coking coal mines, coked dust may be found in the headings and roadways in
which explosion wave traveled.
(e) In those places through which explosion wave has traveled, the hair of victims
may be singed. Similarly, the fibres of wooden supports and edges of torn paper
will show signs of singing.
(f) Postures of victims give indication of course of explosion; he would normally
try to run away from the danger.
(g) Position of lighter objects may not be relied upon as such objects may first be
displaced in the direction of the explosion wave but may subsequently be pulled
back due to back lash generated by cooling of gases.
Source of ignition
Tracing back the path of flame, we may be able to locate the area where the explosion
originated. The area will then be very carefully and minutely examined for:
(a) Contrabands
(b) Signs of any fire or spontaneous heating
(c) open machinery which might have caused electric spark
(d) signs of blown out or blown through shots if blasting has been done at any face
(e) signs of rubbing of parts of moving machine giving rise to frictional spark
(f) any burst or cut electric cables causing electric spark
(g) signs of any welding
(h) use of any Non-FLP enclosures of machines, use of defective FLP enclosures
or lights or signaling circuits or telephones which are not intrinsically safe. For
this purpose, the machines, light fixtures, telephone circuits etc shall have to be
tested thoroughly.
(i) Samples of explosives shall be tested to check whether the same were safe and
of permitted type.
Type of explosion
The nature of explosion can be inferred from the following:
(a) Projection ratio of flame: In case of firedamp explosion, the spread of flame
may be up to 3 to 4 times the original spread of inflammable mixture. For coal
dust explosion, flame does not project much beyond the coal dust cloud. If stone
dust barrier has prevented further spread, it may be safe to assume that it was a
coal dust explosion though possibility of it being initiated by a gas explosion
cannot be ruled out.
(b) Composition of afterdamp: In case of methane explosion, the ratio
(CO2 + ¾ CO – ¼ H2)/ O2 absorbed ≤ 0.5
In case of coal dust explosion, this ratio is ≥ 0.85
(c) Degree of violence: Coal dust explosions are more violent than gas explosions.
(d) Presence of explosive dust and gases: Presence of coked dust is evidence of coal
dust explosion. Non-coking coal dust may not produce coke. Bulky deposits of
uncoked explosion dust on surfaces which otherwise would have remained
82
clean is often recognizable as deposited explosion dust. Strip samples of dust
collected from the galleries will give useful information.
Q.5: Write short notes on:
I. Initial and periodical medical examination
II. Workmen’s Inspectors and their duties
III. Medical attention in case of injury
IV. Disability allowance and compensation for occupational diseases
Answer:
(I) Initial and periodical medical examination
Mining involves safety and health hazards. To ensure safety and health of the
persons employed in the mines, it is necessary that apart from precautions to
control and prevent such hazards, the health of the workforce is monitored to
detect any adverse impact of the polluted mine environment on their health. At
the same time it is essential to ensure that the persons to be employed in the
mine are physically fit to undertake arduous job and they do not have any health
condition which will get aggravated due to the effect of mine environment.
Accordingly provisions have been made in the Mines Rules 1955 for initial
medical examination of the persons to be employed and periodical medical
examination of specified category of persons once in 5 years in case of coal
mines and at shorter intervals in asbestos mines (Rule 29B). The medical
examination is carried out by a medical officer appointed for the mine or a
medical officer in the employment of the owner of the mine, if any, or by any
medical officer employed in the Coal Mines Welfare Fund or any other mines
welfare organization, failing which by any Central Government medical officer
not below the rank of an assistant civil surgeon.
The standards of medical examination are given in the Mines Rues. Emphasis is
on detection of respiratory diseases, hearing impairment, vision defects and
general health.
In case a person fails in the medical examination, he can appeal and will be
examined by an appellate medical board. If he is declared medically unfit, he
will not be allowed to work in the mine.
II. Workmen’s Inspectors and their duties
It has long been felt that Workers’ participation in Safety management can go a
long way in improving safety standards in mines. Accordingly provisions have
been made in the Mines Rules for appointment of workers’ representatives
called Workmen’s Inspectors.
According to Rule 29Q, for every mine where 500 or more persons are
ordinarily employed, the owner, agent or manager shall designate three W.I.
One of them has to be an Overman’s Certificate holder, and an Electrical
Supervisor’s Certificate holder and one a mine foreman. They are to be
designated in consultation with the trade unions.
The duties of such Inspectors are given at Rule 29R. They are required to work
as W.I for two days in a week for making inspections, to suggest remedial
measures, to accompany DGMS officers during complete inspections etc. They
submit their report in Form U.
83
Training of W.I: Every W.I has to undergo an orientation course of 30 lectures and
demonstration of two hours duration each.
Tenure of W.I: Tenure of a W.I is 3years. He can be re-nominated.
Suggestions for improvement:
Ninth Conference on Safety in Mines recommended that in mechanized mines where
employment is 100 or more, W.I should be appointed.
It is felt that W.I should be allowed to function as such on full time basis instead of two
days in a week.
III. Medical attention in case of injury
Mining is a hazardous occupation. Apart from natural causes, there can be chance of
injuries due to operation of machines or failure of any machine parts. Every year about
500 to 600 persons get seriously injured and several thousands receive reportable and
minor injury. If due care is not taken to treat these injuries immediately, the conditions
can aggravate and minor injuries can turn into reportable. Some serious injuries can
even result in death. This not only causes misery to the injured person but also results in
avoidable time and financial loss. Therefore, in the safety statute much emphasis has
been laid on medical attention in case of injury by way of First aid.
As per Rule 45 A, (I) every person receiving an injury in the course of his duty shall as
soon as possible, report the same to an official. Where he is not in a position to report, it
shall be the duty of the person who comes to know to report it to an official. The
official shall make arrangements for rendering first-aid to the injured. If in the opinion
of the official the injury is such as too require immediate attention of the medical
practitioner, he shall arrange for the medical practitioner to come. (ii) Under Rule 45,
Overman, Sirdar, Shotfirer etc are required to carry First-aid kits. If such an official
receives information of injury, he shall himself attend to injured person.
(iii) First-aid stations are required to be provided near work places. Attendant of such
First-aid station shall render such first-aid to the injured as may be required.
Q.8: A thick seam that was developed in two sections was being extracted by
opencast mining. There was active fire on a coal face and a shovel was under
operation at a distance of 50 metres on lower coal bench of the same seam.
Suddenly, water gas explosion occurred and the shovel was covered by hot
ash/dust etc. causing instantaneous death of the shovel operator. Write an enquiry
report of the accident suggesting out contraventions, responsibilities and
suggestions to prevent similar accidents in future. Assume your own conditions.
Answer
Enquiry Report
Mine: X Y
Owners: WCL
Agent: R.S.A Manager: K.B.S
Date of accident: 12-05-2007 Time of accident: 11.30 hours
Place of accident: Second coal bench in Quarry no. 2
Name of deceased: Raghu Designation: Shovel operator Age; 37 years
While a shovel was loading coal at the face of second coal bench in quarry No. 2, a
water gas explosion occurred in the underground workings in upper bench having
84
active fire. The shovel was covered by hot ash / dust ejected as a result of the explosion,
killing the shovel operator almost instantly.
Description of the mine:
In this mine Mayo seam, 15 metres thick was developed in the past in two sections
maintaining superimposition of workings. The seam was on fire. The pillars in the two
sctions along with parting were being quarried by mechanized opencast method. Fire in
the sea was kept under control by drowning the dip side workings and by keeping the
exposed openings covered with OB. Blasting was done in O.B as well as coal benches.
There were three benches in O.B and three in coal.
Occurrence of accident:
On 11-05-2007, the first shift started at 8 hrs. In the lower most coal bench two shovels
were deployed to load blasted coal. At about 11.30 hrs. there was a sudden loud blast in
the second coal bench followed by ejection of hot material which spread over a radius
of about 60 metres. One of the shovels working within a distance of about 50 metres of
the site of blast was engulfed in the hot material. The shovel operator named Raghu did
not get time to come out of the shovel and was killed almost instantly as a result of
severe burn injuries.
Rescue and recovery
The occurrence was sudden. The Overman RamNaresh and Sirdar Shiv Shanker who
were on the OB bench rushed towards the site of blast. When the environment cleared,
they could see the shovel covered with ash and dust. The immediately went there and
with the help of workers from O.B bench, took out Raghu. He was found dead.
Inspection, inquiry and conclusion
I inspected the quarry at 16 hours the same day. I recorded the statements of workers
and supervisors on 12-05-07.
During my inspection, it was observed that in the second coal bench there was active
fire and the galleries which had got exposed were not kept blanketed as required by
permission granted under Regulation 122 of CMR, 1957. A water pipe had been laid
right up to the coal face on this bench and water was constantly being pumped to
quench the fire. The fire was very active and flames were coming out from it. Water
going in the galleries formed steam and when it came in contact with red hot coal,
formed water gas resulting in an explosion. As a result of the explosion, hot ashes and
hot material was ejected which engulfed the shovel on the lower bench.
Regulation 119 (2) (b) require that adequate precautions shall be taken to prevent
danger to persons from any explosion of water gas. The circumstances under which
water gas formed in the instant case could easily be visualized by a mining engineer. It
was revealed that the manager had given instructions to deal with the fire in the manner
mentioned above. I, therefore hold him responsible for this accident.
A sketch plan illustrating the site of accident is enclosed.
85
-
Answers to
First Class Coal Mines Managers’ Examination, Dec 2008
Legislation
Q.1: In the present day context of large demand of coal, what are the
recommendations of 10th Conference for safety in mines with respect to:
(a) Mechanisation with a view to phase-out manual loading & to improve
standards.
(b) Reduction of risk from roof and side falls in coal mines.
---------------------------------------------------------------------------------------------------------
---Answer:
(a)The recommendations of 10th Safety Conference for safety in mines with respect to
mechanization to phase out manual loading and improve safety standards are as
follows:
1 Keeping in view the objective of phasing out manual loading, all coal companies
shall identify appropriate technology suitable for the prevailing geo-mining
conditions and introduce the same in such a manner so as to phase out manual
loading operations completely within a period of five years in coal seams with
gradient of 1 in 5 or less, and within a period of seven years in coal seams with
gradient steeper than 1 in 5.
2 While formulating the strategies for face mechanization in underground
workings, it shall be ensured that back up facilities like coal evacuation, support
system,
Ventilation arrangements etc. are compatible with face mechanization.
3 The scheme of face mechanization shall be based on proper scientific
investigation.
The scheme shall also include arrangements for monitoring strata behavior and
Environmental conditions.
4. Possibility of deployment of multi-skilled miners in the face shall be explored to
reduce the exposure at hazardous areas without affecting employment.
5. Suitable training for efficient & safe operation of machinery shall be imparted to
all concerned.
6 While planning for face mechanization, due considerations shall be given for long
term sustainability of the technology.
7 A policy document shall be framed by each coal mining company within a period
of
six months for addressing the implementation issues. It shall also be ensured that
all safety features are inbuilt into the system.
(b) Recommendations of 10th safety conference with respect to reduction of risk from
roof and side falls in coal mines are as follows:
1 In every coal mining company, STRATA CONTROL CELL shall be established at
corporate and area levels within a period of one year, to assist mine managers, for
formulation of Systematic Support Rules, monitoring strata control measures in a
86
scientific way to ensure efficacy of support system and for procurement/supply of
quality supporting materials. Such cell shall be manned by adequate number of
technical personnel headed by a senior official not below the rank of General
Manager at Corporate level and Dy. General Manager at Area level.
2 Roof bolting shall be used as a primary means of support for freshly exposed
roof in development as well as depillaring districts. For the roof category “Poor”,
having
value of RMR of 40 or less, or where there is excessive seepage of water from the
roof strata, roof bolts exclusively with resin capsules shall be used to ensure
adequate & immediate reinforcement of the strata.
3 Due emphasis shall be given to support the sides of galleries while framing
Systematic Support Rules.
4 Suitable steps shall be taken by the mining companies to inculcate a culture of
“no
work at face” other than supporting work, till the roof is supported by roof bolts up
to at least 0.6 meter from the face.
5 To ensure proper drilling for roof bolting in all types of roof strata, suitable fit-
for-use roof bolting machines shall be introduced in all mines within a period of
one year.
Such machines shall be capable of being operated from a distance or be provided
with suitable canopy to protect the supporting personnel during drilling or bolting
operations.
6 Risk assessment exercise shall be carried out in the mines for assessing the risk
from the hazards of roof & side falls and identifying the control mechanism with
specific responsibility for implementation. This exercise shall be reviewed at
regular intervals not exceeding a year.
7 Each company shall take steps to impart structured training to officers,
supervisors
and support personnel on roof bolting.
---------------------------
Q.2: What are the various problems of safety when a part of work in
opencast mine is outsourced? How will you ensure enforcement of Mines
Act, Rules and regulations by workers of hired contractor?
Answer: Following are the salient problems of safety when part of opencast mine is
outsourced:
a) Big contractors award part of jobs to petty contractors not having adequate
capacity or concern for safety.
b) Employees are purely temporary or migratory and not well conversant with
mining activities or laws.
c) More risk taking attitude as earning depend on output.
d) Contractors have little commitment for ensuring safety.
e) Sometimes safety is considered as a cost component only, ignoring the cost of
lives or working conditions.
f) Contractors’ workers are not given adequate training.
g) Supervision of various operations and places is not adequate.
87
The matter regarding the above problem was considered by 10th Safety conference.
Following recommendations emerged:
Contractor work vis-à-vis Safety
1 Employer’s responsibilities
(a) Suitable clauses (in consistence with risk of the work allotted) shall be included
intender document (including NITs) stating how the risk arising to men & material
from the mining operation / operations to be done by the contractors shall be
managed.
(b) Ensure that contractors are familiar with the relevant parts of the statute,
health and safety management system and are provided with copies of such
documents prior to commencing work.
(c) Ensure that contractor’s arrangements for health and safety management are
consistent with those for the mine owner. All the rules, regulations and bye-laws
as
applicable to the mine owner are also applicable to the contractor. Details of the
contractors’ workmen should be maintained in the owner’s Form-B Register.
Whereas, C, D & E Registers for contractor men may be maintained independently
by the owner. All the above Registers shall be kept in the mine office of the
manager.
(d) Ensure that contracts should preferably be of longer period (three years), so
that
there is adequate scope of management of safety by the contractor.
(e) Ensure that contractor’s provide the machinery, operator and other staff with
written safe work procedures for the work to be carried out, stating clearly the risk
involved and how it is to be managed.
(f) Monitor all activities of the contractors to ensure that contractors are complying
with all the requirements of statute and the system related to safety. If found
noncompliant of safety laws directing the contractor to take action to comply with
the requirements, and for further non-compliance, the contractor may be suitably
penalized. Clause to this affect may be a part of the agreement between the
employer and the contractor.
(g) Where a risk to health or safety of a person arises because of a non-
compliance
directing the contractor to cease work until the non-compliance is corrected.
2. Contractor’s responsibilities
(a) Prepare written Safe Operating Procedure (SOP) for the work to be carried out,
including an assessment of risk, wherever possible and safe methods to deal with
it/them.
(b) Provide a copy of the SOP to the person designated by the mine owner who
shall be supervising the contractor's work.
(c) Keep an up to date SOP and provide a copy of changes to a person designated
by the mine owner.
(d) Ensure that all work is carried out in accordance with the Statute and SOP and
for the purpose he may deploy adequate qualified and competent personnel for
the purpose of carrying out the job in a safe manner.
88
(e) For work of a specified scope/nature, develop and provide to the mine owner a
site specific code of practice.
(f) Ensure that all sub-contractors hired by him comply with the same requirement
as the contractor himself and shall be liable for ensuring compliance all safety laws
by the sub or sub-sub contractors.
(g) All persons deployed by the contractor for working in a mine must undergo
vocational training, initial medical examination, PME. They should be issued cards
stating the name of the contractor and the work and its validity period, indicating
status of VT & IME.
(h) Every person deployed by the contractor in a mine must wear safety gadgets
to be provided by the contractor. If contractor is unable to provide,
owner/agent/manger of the mine shall provide the same.
(i) The contractor shall submit to DGMS returns indicating – Name of his firm,
Registration number, Name and address of person heading the firm, Nature of
work,
type of deployment of work persons, Number of work persons deployed, how
many
work-persons hold VT Certificate, how many work persons undergone IME and
type
of medical coverage given to the work persons. The return shall be submitted
quarterly (by 10th of April, July, October & January) for contracts of more than
one
year. However, for contracts of less than one year, returns shall be submitted
monthly.
3. Employee’s responsibilities
(a) An employee must, while at work, take reasonable care for the health and
safety of people who are at the employee’s place of work and who may be
affected by the
employee’s act or omissions at work.
(b) An employee must, while at work, cooperate with his or her employer or other
persons so far as is necessary to enable compliance with any requirement under
the
act or the regulations that is imposed in the interest of health, safety and welfare
of
the employee or any other person.
Compliance with the above recommendations will go a long way in enforcement of
the statutory safety, health and welfare provisions in contractual work.
-----------------------------------------------------------------------------------------------------
-
Q.3: what is workers participation in safety management? How can this
help attain high safety standards? Suggest some deterrents for habitual
unsafe workers.
Answer: A worker invests his labour in and ties his fate to his place of work.
Therefore, he has a legitimate right to have a share in influencing the various aspects of
organisation’s policies. Since mine workers are exposed to the hostile environment of
89
their workplace, they have a right to have a say in management’s policies and actions in
safety matters. Further, because of their intimate knowledge of the safety hazards at
workplace, their association in safety matters is likely to improve safety standards. This
is the concept of workers’ participation in safety management.
In our mines workers participation in safety management is achieved through statutory
and non-statutory forums. The same are given below:
Statutory:
1. Workmen’s Inspectors appointed under Rule 29Q of the Mines Rules,1955
2. Safety Committees constituted under Rule 29T of the Mines Rules.
Non-statutory:
1. National Conferences on Safety in Mines.
2. Ttripartite safety committees of mining companies including CIL Safety Board.
Usefulness of Workers participation in safety management
1. Workers have intimate knowledge of their workplace and hence the hazards
present there. Hence, they can spot such hazards during inspections and help
improve safety standards.
2. Workmen can advise the management about the hazards better because of their
intimate knowledge of work place.
3. The participation keeps communication channel between workers and senior
management personnel open. Because of easy communication, there is least
delay in taking corrective steps.
4. The workers feel a sense of belonging with the mine and take pride in
improving conditions including safety issues.
5. Once workers are associated with safety management, they try to correct their
coworkers indulging in involuntary or voluntary unsafe acts.
Deterrents for habitual unsafe workers
It has been observed that in majority of the cases unsafe acts were involved in causation
of mines accidents. Therefore, focusing on behaviour of unsafe workers is essential to
achieve improved safety standards. This can be done as follows:
1. Counselling the unsafe workers by specialists like psychologists. A psychologist
can find out the psychology of the unsafe workers and give them correct advice.
2. An aptitude test may be conducted and if a worker is unsuitable for a job, he
may be assigned another job.
3. Such workers may not be rebuked or blamed in public. This is
counterproductive.
4. If it is found that the unsafe acts committed are due to lack of knowledge or
incorrect training, the worker should be retrained in correct way. Such retraining
may also be imparted whenever he meets an accident or near miss accident.
5. Help of workers representatives may be taken in confidence to know the root
cause of unsafe behaviour.
6. If the unsafe behaviour is the result of bad habits like use of alcohol, action
should be taken to remove the bad habits by taking help of workers
representatives.
7. Last but not the least if all above actions fail to yield results, punitive action
provided under the law may be taken to set an example.
90
---------------------------------------------------------------------------------------------------------
--
Q.4: Enumerate various types of instruments (along with objective, principle and
functioning of each) which are used for monitoring ground movement in deep
underground mines.
Answer:
---------------------------------------------------------------------------------------------------------
-
(Note for students: Please note that in the following answer various aspects of
ground movement monitoring have been given in detail for your benefit. You
should shorten it so that you may answer the question in about 25 to 30 minutes.)
91
(ii) Multi Point Bore Hole Extensometer
Principle –
It is a basic instrument designed to measure strata dilation i.e., bed
separation at strategic horizons, being placed inside a bore hole. It is a
remote sensing instrument can be used at both accessible and inaccessible
locations. It is very helpful to inculcate dead load in the roof mass and
subsequent design of support requirement of the workings.
It consists of anchors, rods, protective casing and transducers with
displacement sensors. The anchors are made pre set to strategic horizons
within a bore hole through anchor rods. Any dilation in these horizons cause
movement of anchors and there causes a resultant displacement of anchor
rods within transducer. Transducer, by the help of displacement sensors
cause change in frequency, which is inculcated by the Read Out Unit and
further converted to mille meters(mm).
Installation –
Usually a vertical bore hole of 5 – 10m depth is drilled and the multiple
sensors (4-6) are locked at predefined horizons. These anchors are
independently connected to the transducer at the mouth of the hole,
through
anchor rods. Change in reading due to dilation at any of such horizons may
be measured through Read Out Unit connected to transducer by wire.
Magnasonic extensometer
It consists of anchors, rods, protective casing and transducers with
displacement sensors. The anchors are made pre set to strategic horizons
within a bore hole through anchor rods. Any dilation in these horizons cause
movement of anchors and there causes a resultant displacement of anchor
rods within transducer. Transducer, by the help of displacement sensors
cause change in frequency, which is inculcated by the Read Out Unit and
further converted to mille meters(mm).
Installation –
Usually a vertical bore hole of 5 – 10m depth is drilled and the multiple
sensors (4-6) are locked at predefined horizons. These anchors are
independently connected to the transducer at the mouth of the hole,
through
anchor rods. Change in reading due to dilation at any of such horizons may
be measured through Read Out Unit connected to transducer by wire.
(iii) Magnasonic extensometer
Principle of operation – It is a basic instrument designed to measure strata
dilation or bed separation at strategic horizons, being placed inside a bore
hole. It is a remote sensing instrument can be used at both accessible and
inaccessible locations. It is very helpful to inculcate dead load in the roof
mass and subsequent design of support requirement of the workings. It is
designed to measure the distance between pairs of magnets up to 8m
depth to accuracy of 0.02mm.
Installation –
Usually a vertical bore hole of about 8m depth is drilled and the multiple
sensors are locked at predefined horizons. These anchors are magnetically
92
connected to the transducer at the mouth of the hole. Change in reading
due
to dilation at any of such horizons may be measured through Read out Unit
connected to transducer by wire.
2. Convergence
This is the closure of vertical gap between roof & floor, created either due
to
downward movement of roof or upward bulging of floor or both. This is a
phenomena, generally occurs during Dynamic Loading. This is an indicative
parameter deciding extent of advance support during extraction.
This can be inculcated by installation and analysis of out comes of
(i) Telescopic Convergence Indicators
(ii) Remote Convergence Indicators
(i) Telescopic Convergence Indicator
Principle of operation –
It is a simple instrument comprising two nos. of telescopic pipes to cover
the height of gallery on extension. The inner pipe has graduations over it.
Telescope end of the outer pipe acts as the reference point. Any relative
movement of graduations due to movement of pipes gives reading of
convergence directly.
Installation –
This instrument is designed to be used within workings only, where access
of
men is possible. For installation, the base end of the outer pipe is fixed to
the
floor of the gallery by some means at a strategic place and the top end of
the inner ( telescopic pipe) pipe is fixed to any point in the roof ( preferably
projected end of installed roof bolts), keeping the instrument perfectly
vertical.
Any convergence between roof and floor, causes relative movement of
pipes,
giving direct reading from the graduations of inner pipe.
( ii ) Remote Convergence Indicator
Principle of Operation –
This is a very useful and reliable instrument for measuring
convergence at accessible / inaccessible locations. This instrument can even
work efficiently in side the goaf till destruction by roof fall. So it is a very
useful instrument for prediction of roof fall. It may be vibrating wire
type or rheostat type. In case of vibrating wiretype, displacement of
stretched spring loaded, vibrating wire due to convergence causes change
in
frequency which can be further converted to mm by the help of read out
unit.
In case of Rheostat type instrument, displacement of stretched spring
loaded
rheostat can cause change in resistance due to convergence (Closure of
spring), which can be further converted to mm by the help of read out unit.
3. Stress and strain
93
Stresses are the ground pressure associated with every location in the
stratum. Principally these originate from the mechanism of dual equilibrium
of forces due to spinning actions of the Earth around the Sun and around its
own axis. Knowledge of magnitude and direction is important for safe strata
management. These are derived from several sources.
Stress Meter
Principle –
It is a vibrating wire type instrument, designed and developed for the
purpose of monitoring stress changes both in situ and induced due to
mining
operations at accessible and inaccessible locations. It is a predictive
equipment for inculcating stability of workings. The basic principle of this
equipment is that the change in natural frequency of a stretched wire is
proportional to the change of tension in the wire. In the vibrating wire type
stress meter, the gauge wire is stretched diametrically across the walls of a
hollow steel cylinder, which are inculcated as changes in natural frequency
of
vibration of the steel wire.
Installation –
It may be used both in horizontal or vertical bore holes at strategic depth
but
usually 3.5m depth to the sides / roof. It is tightly fixed into the bore hole
by
means of sliding wedge and platen assembly with the help of setting tools.
The change in frequency so measured is converted in to stress changes,
using Read Out Unit and calibration factor of the stress meter.
(i) Load Cell ( Mechanical Type )
(ii) Load Cell ( Electronic Type )
Electronic Load Cells
Principle-
It is potentiometer / resistance sensor based and is designed to measure
load on support system at accessible and inaccessible locations. This
instrument can even work efficiently in side the goaf till destruction by roof
fall. So it is a very useful instrument for prediction of roof fall.
This can be used with both positive and non positive support system. Load
on
support system in turn on the Load Cell causes change in frequency /
resistance, which can be inculcated from a safe distance through wires and
Read out Units and subsequent conversion to the required units.
Installation –
The instrument is made fixed either between roof and top of the positive
support or to the projected bottom end of the roof bolts and is connected to
the Read Out Unit through wires up to a safe distance. Accumulation of load
can be well read through the Read Out Unit with conversions.
Strain Gauge Rock Bolt -
Where roof bolting is a system of support, Strain Gauge Rock Bolt are very
helpful to measure distribution of axial loads and bending movement, along
the length of the bolt. This is very useful for the purpose designing bolt
94
length and grout strength.
Principle –
Strain / Bolt Load / Axial Load is measured using pairs of strain gauge
attached to the opposite sides of the roof bolt at specific intervals, along its
length. The arrangement is made in the common roof bolts with formation
of
grooves along the length for implanting strain gauges.
Installation –
It is same as that of normal rock bolts, but the lead wire at the mouth of
the
hole is kept open for connection to the Read Out Unit.
4. Movement along Joints, Slips & Cracks
Geological disturbances like joints, slips and cracks are the vulnerable
places,
where rock interfaces may cause relative movement, which in turn may
cause any collapse or failure of mass. So identification and inculcation of
even slightest relative movement along slips and joints is important for
prevention of strata failure at such places.
Instruments available for identification and inculcation of relative
movement
along slips / joints are;
(i) Crack Meter
(ii) Joint Meter
(i) Crack Meter
It is designed for measuring movements across surface cracks or joints
preferably in the roof. It can be used at both accessible / inaccessible
locations.
Principle –
It consists of an electrical transducer coil and two anchors. These anchors
are
pre fixed in the roof. Any change in the distance across the two anchors,
changes the tension corresponding to change in electrical signal, which can
be inculcated through Read Out Unit in the form of required physical units.
Installation –
The reference points in the roof are precisely located across the separation
to
be monitored, using an installation jig. Anchors are installed and the
reference points are fixed in the place. Once the span length is read, the
user
can calculate the variation between the two points by comparing the new
reading against the initial reading. Remote reading is possible through a
Read Out Unit.
(j) Joint Meter
It is designed for measuring movements across joints or slips ( Relative
movement of mass along slip planes ) preferably in the roof. It can be used
at both accessible and inaccessible locations.
Principle & Installation –
It is composed of a transducer, a sensor socket and sensor targets. The
95
targets and sensor sockets are grouted in the in small holes about the joint.
A thin wall section of the sensor socket is designed to break when the joint
opens. Also slightest movement about the joint changes the frequency
signal
which can remotely read by the ROU
------------------------------------------------------------------------------------
--
Q.5: Enumerate the provisions of Mines Rescue Rules, 1985
regarding any two of the following:
a. Establishment and location of rescue stations.
b. Appointment of rescue trained persons in mines, their
disposition and accommodation.
c. Apparatus and equipment to be provided in belowground
mine where no rescue room is located.
Answer: This is a direct question of Rescue Rules. One is supposed to write
the provisions of Rules 3, 19 and 11(3) read with Schedule III.
Q.6: Write short notes on any four of the following:
a) Angle of draw and its relevance in longwall mining.
b) Risk assessment as a tool to improve safety.
c) Vocational training as an effective tool in improving safety
and productivity.
d) Role of ISO in reducing accidents.
e) Direct and indirect costs of accidents.
f) Use of diesel locomotives.
Answer:
a. Angle of draw
V. Surface contours
96
Some authorities have quoted the values of angle of draw in our coalfields
varying from as low as 12 degrees to as high as 30 degrees.
Angle of draw is relevant while determining the total surface area that will
be affected and precautionary measures to be taken if there are any
surface features above area under extraction.
Fatality rates per thousand persons in our mines are stagnating for a long
time. It has now been thought that apart from reactive approach, there is a
need to adopt proactive approach to prevent or reduce accidents. Risk
assessment aims at this approach. Risks associated with different hazards
due to geological and working conditions, machinery and methods are
assessed in advance and such risks are given rating. Higher rated risks are
given due attention.
It aims to reduce the likelihood and impact of mishaps of all kinds, reduce the
inherent potential for major accidents which could kill or injure persons or cause
production and profit losses. Ninth Conference on safety in mines
recommended that risk management should be used as a tool for development
of appropriate health and safety management system
Risk assessment is to be performed on a regular basis. The goal for each risk
assessment session is to identify hazards, determine risk ratings and controls,
and to review the implementation of risk controls from previous risk assessment
sessions.
97
The risk assessment is done by a multidisciplinary team.
Ninth Safety Conference had recommended that every mining company
should conduct risk assessment in at least two mines. 10 th Safety
Conference recommended that every mine should employ a sound risk
analysis process and conduct risk assessment.
Experience in developed countries showed that risk assessment has been
useful in formulating safety improvement programmes. It is expected that
our mines too will benefit by adopting the system.
Mining is a hazardous occupation as it is a war against nature. Every year, about 150 to
200 persons get killed and about 500 are injured seriously in accidents in our coal
mines. An analysis shows that about 80% of the fatal accidents are caused by fault of
workpersons. Lack of adequate knowledge is one of the reasons for the unsafe acts.
Mines Vocational Training Rules have been framed to impart class room knowledge
and on the job training.
The importance of training has been realized by all concerned. This is reflected in the
fact that the matter has been discussed in several Safety conferences at national level.
Quality training prepares workers to carry out their job in a safe and efficient manner.
Thus they can save themselves, their coworkers and prevent damage to the mine
property.
Apart from avoiding miseries caused by fatal and serious accidents, to the workers and
their family members, prevention of accidents results in better production, productivity
and consequently reduction in cost of production. Every accident or incident results in
disruption of work. A study had earlier showed that in a particular mining company, the
loss in production as a result of every fatal accident was to the tune of 5000 t. In other
98
words, by preventing a fatal accident the company produced additional 5000 t with the
same facilities and manpower.
It would be seen from the above that VT plays a significant role in improving safety
and productivity.
99
Cost for replacing the damaged machinery or making the place safe.
It will be observed from the foregoing that if total cost of accidents is like an iceberg
with only a small portion of direct cost which is visible above water level while
majority of it (indirect cost) remains submerged and invisible.
F. Use of diesel locomotives
Diesel locomotives provide a very flexible mode of traction. However, there are certain
inherent limitations associated with it. These are:
a. Locomotive can be deployed on gentle gradients only.
b. It produces noxious gases
c. It is associated with risk of ignition in gassy environments.
Use of Locomotives is regulated by the provisions of Regulation 95 of CMR, 1957. The
salient provisions are:
1. Permission from DGMS for use belowground.
2. Locomotive not to be used on gradient exceeding 1 in 15.
3. None except the driver to ride on locomotive.
4. Locomotive to lead the train of tubs except during shunting operations.
So far as the use of diesel locomotives in particular is required,
It should be used only in main intake airway.
It should be provided with flame trap.
The engine should be properly maintained so that it does not
emit excessive amount of CO, NOX, SO2 and aldyhydes.
Air samples should be collected in the airways where diesel
locomotive works to check for noxious and inflammable
gases.
It should be provided with LMD to monitor presence of
inflammable gases.
Q.7: What are the the provisions of Electricity Rules with respect to:
a. Portable and transportable apparatus
b. Switch gears
c. Appointment and duties of electrical supervisor.
Answer: This is a direct question of Indian Electricity Rules and provisions of
relevant rules may be quoted.
Q.8: Spontaneous heating in advanced stage has been detected in a caving district.
i. How would you deal with the situation, and
ii. What are the statutory obligations that should be fulfilled?
Answer:
(i) Following action will be taken to deal with heating:
All persons other than those not required for dealing with the heating
will be withdrawn -Regulation 119(1).
Emergency plan will be set into action. Regulation199A
Location of heating: First the seat of heating will be located by checking
for indications like smoke, heat any flame if any.
10
As the heating is in advanced stage, the option of digging it out does not
appear to be feasible. Hence, one of the following options will be
considered:
a. Stowing: If sand stowing is done in the mine,
b. Drowning if the site is located on dip side and it can be done
without affecting other parts of the mine.
c. Sealing off. This is the most common and preferred option. The
affected district can be sealed off quickly by closing the
openings in preparatory stoppings. The operations will be
carried out under rescue cover in the presence of competent
persons taking due precautions to prevent danger to persons
from noxious, asphyxiating or inflammable gases, flame, steam
and ejected or rolling down hot material, explosion of water
gas- Regulation 119(2) (b).
d. After sealing off, all persons will be withdrawn from the mine.
It is preferable to wait for 24 hours before re-entering the mine.
In a gassy degree 2 or 3 mine this precaution is a must.
e. An inspection will be made by the under manager after sealing
off and if the workings are safe, only then normal employment
will be resumed.
1.
10
Afternoon Session
THE MINES ACT, 1952
FIRST CLASS
MINE MANAGEMENT, LEGISLATION & GENERAL SAFETY
1.
(a). Elaborate the terms “fixed cost”, “variable cost” and “marginal cost” in
respect of a coal mine for its financial viabilities. Assume your own conditions.
For any industry cost is the amount of resources given up generally in terms of money
or if not in terms of money, they are always expressed in monetary units. Fixed cost,
variable cost and marginal cost in respect of a coal mine for its financial viability is a
classification based on changes in activity or volume.
i) Fixed cost: It is a cost which does not change in total for a given time of period
despite wide fluctuations in output or volume of activity. This includes expenses
which must be incurred irrespective of the changes in use of direct materials and
do not vary directly with volume or rate of output.
Examples of fixed cost are rent, property taxes, supervising salary, depreciation,
advertising, insurance, welfare expenses, administrative cost, etc. fixed cost are
expressed in terms of time such as per day, per month or per year and not in terms
of unit. It is improper to say that fixed costs never change in amount. Rents,
insurance rates, taxes, salaries and other similar items may go up or down
depending on the circumstances. The basic concept is that the term “fixed” refers
to fixity (non-variability) related to specific volume (or relevant range); the term
does not imply that there will be no changes in fixed cost.
Fixed costs can be classified in the following categories for the purpose of
analysis:
1. Committed costs: P & M depreciation, taxes, insurance premium rate, rent
charges, etc.
2. Managed costs: Management & staff salaries etc.
3. Discretionary costs: R & D costs, marketing programmes costs, new system
development costs etc.
10
4. Step costs: Supervision costs etc.
Total fixed costs remain unchanged when activity changes within a relevant
range. Fixed costs per unit decline as activity increases.
ii)Variable cost: Variable costs are those cost that vary directly and proportionately
with the output.
Examples of variable costs are materials (explosives, power, spares, support
materials, POL, etc.), labour cost (salary and wages, OT, retirement benefits,
etc.).
Total variable costs change when activity changes. Variable costs per unit do
not change as activity increases.
iii) Marginal cost: Marginal costs are the increase or decrease in total costs
that result from producing as additional unit of product. These are also known as
incremental costs per unit. If fixed costs remain unchanged by increasing output
by one more unit, the marginal cost of the product will consists of variable cost
only.
Marginal costing is used to ascertain costs for increased production and to
separate fixed and variable elements to show volume-profit relationship. It is
essential in determining the profitability and to decide whether to increase the
production or not.
Assumptions:
The mine is a coal mine.
Cost of production – Rs. 1000/- per tonne.
Production of the mine is 1000 tonnes per day.
Fixed cost per tonne – Rs. 300/-
Variable cost per tonne – Rs. 700/-
Marginal cost per tonne – Rs. 700 provided fixed cost remains unchanged.
This shows that for increasing 10 tonne production in addition to 10000 TPD per tonne
total cost of production will be Rs. 1000 x 1000 + 7000 = 1007000.
Overall cost per tonne will be 1007000/1010 = 997.
This shows that as the volume increases, variable cost will decrease.
----------------------------------------------------------------
(b) What is the economic impact of mining? Define in your own terms and
enumerate “corporate social responsibilities”.
10
In addition to this following are other economic impacts
i) Minerals are at the foundation of industrial development in any country.
ii) The Project Affected People (PAPs) are given jobs and are also trained for self
employment as per provisions of Rehabilitation and Resettlement (R&R)
schemes.
iii) The mining and associated activities in mining areas bring about infrastructural
development, i.e., roads, schools, hospitals, etc.
iv) Due to mining and associated activities, ethnic people are exposed to various
developments and this increases their aspirations.
v) It develops environmental awareness amongst the employees and the villagers.
Objectives of CSR:
Taking responsibility by mining companies for impact of mining on society and taking
measures to minimise them or improve the conditions better than what they initially
were.
10
-----------------------------------------------------------------------
10
According to Regulation 110, whenever supports are to be withdrawn, the
withdrawal shall be done in accordance with the method which shall be specified in
Manager’s Standing Orders. The standing orders shall cover-
(a) The supply and use of appropriate tools and safety contrivances;
(b) the setting of extra supports to control the collapse of roof from which supports
are being withdrawn;
(c) the sequence of withdrawal of supports; withdrawal of a cog to precede
withdrawal of its corner props;
(d) safe positioning of persons engaged in operation and all persons present nearby;
(e) training of competent persons who are entrusted with the operation; and
(f) Supervision during withdrawal of supports.
--------------------------------------------------------------
10
It is a well known fact that apart from disruption in production, accidents in mines
result in increased cost of production or in other words there is cost involved in every
accident.
There are two components of this cost, namely one which is quite apparent like the
compensation to be paid and expenditure on medical treatment and the second which is
not apparent like loss of production, loss of productivity due to disruption of work and
loss of morale etc. The apparent part is called direct cost and the other part is indirect
cost. OSHA, U.S.A has estimated that in case of industrial accidents, the ratio of direct:
indirect cost varies from 1:1 to 1:20.
Direct cost: As has been mentioned, it is the cost on account of compensation and
medical expenditure. The minimum compensation to be paid is given in Workmen’s
compensation Act. However, the mining companies pay much more than that.
Indirect cost: It includes:
Higher insurance premium to the insurance companies.
Cost of rescue and recovery.
Cost on account of appointment of another person in case of fatal accident and
training him.
Cost on account of absenteeism and overtime wages resulting after accident.
Cost on account of loss of production and productivity due to accident.
Cost on account of accident investigation.
Cost on account of court case, if any instituted by regulatory authorities or
police.
Cost for replacing the damaged machinery or making the place safe.
It will be observed from the foregoing that if total cost of accidents is like an iceberg
with only a small portion of direct cost which is visible above water level while
majority of it (indirect cost) remains submerged and invisible.
-------------------------------------------------------------------------------------
Answer:
Such a high production from Bord and Pillar workings can be achieved by using
Continuous miner with shuttle cars and conveyor.
Assuming that the above mentioned machines are to be introduced, the important
preparatory work to be done will include:
(a) Transport facilities for transport of machinery belowground;
(b) Good workshop facilities for maintenance;
(c) Recruitment of competent operators;
(d) Training of operators and workers;
10
(e) Training of supervisors;
(f) Procurement of genuine spare parts;
(g) Providing adequate facilities for clearing of coal;
(h) Providing man-riding facilities to save time prevent fatigue;
(i) Providing adequate ventilation to meet the statutory requirements, including
changing the main mechanical ventilator of higher capacity;
(j) Providing adequate lighting;
(k) Procuring and providing adequate power at high voltage;
(l) Appointing and training adequate number of officials as per CMR;
(m)Getting statutory permissions, exemptions and relaxations from DGMS for
mechanized extraction of pillars (Reg 100) , widening of roadways (Reg99), use
of high voltage machines belowground (IER), etc;
(n) Strengthening of supports.
(o) Establishing R&D facilities for monitoring of strata control etc.
(p) Preparing safe operating procedures.
OPERATION:
e) Operation by authorized person
f) Operator to check lights, horn, AVA & other safety devices
g) Cable man to wear gloves
h) Before starting, operator to see that all persons in vicinity been warned
EXAMINATION:
c) Manager to frame standing orders
d) In every shift by competent foreman, every week by Engineer
VENTILATION:
d) Velocity: Not less than 30 m per sec;
e) Quantity: 284 Cu. M per min
f) Inflammable gas: Not more than 0.5 %
DUST CONTROL:
f) Complete set of picks
g) Speed : As specified by Manufacturer
h) Avoid cutting in stone
10
i) Interlocking cutting and water spraying
j) Strict dust Monitoring
SUPPORT:
e) Development galleries & splits: with resin bolt as per SSR
f) Goaf edges: 3 rows of roof bolts at 0.8 m between bolts and between rows;
length 1.8 m
g) In development and split headings, C.M will not be taken 3.2 m beyond last row
of roof bolts; in slice not 10 m beyond last row
h) Strata monitoring as per strata management plan drawn
IMPLEMENTATION:
f) Duties of person will be drawn and implemented
g) Adequate number of supervisors
h) Training
i) Proper records
j) Discussion in Safety committee meeting
GENERAL:
d) Cut off power at shift end
e) Park at safe place at shift end
f) Joints in trailing cable to be vulcanized
--------------------------------------------------------------------
(a) Special training to front line supervisors with reference to 10th Safety
Conference.
Front line supervisors like Overmen & Sirdars’ role is very important for improving
safety standards in mines as they are the officials who are required to take on the spot
decisions. For example, it is the overman in a depillaring district who will decide
whether it is safe to continue with withdrawal of supports in case the goaf is ‘talking’.
Hence it is necessary that these officials have adequate practical experience. Since the
mining techniques and safety management systems are changing rapidly, their past
experience of working under old conditions may not prove adequate. Hence it is
essential to keep them updated. This is possible through periodical training.
In this regards following recommendation of 10th Safety Conference is relevant:
“All front-line supervisory officials like Sirdars / Mates, Overmen /Foremen,
Surveyors, Electrical/ Mechanical supervisors/Chargemen / Foremen as well as persons
supervising other surface operations should be imparted structured training in safety
management, for at least two weeks, once in every five years, covering about 20%
strength every year.”
10
------------------------------------------------------
Fatality rates per thousand persons in our mines are stagnating for a long time. It has
now been thought that apart from reactive approach, there is a need to adopt proactive
approach to prevent or reduce accidents. Risk management aims at this approach. Risks
associated with different hazards due to geological and working conditions, machinery
and methods are assessed in advance and such risks are given rating. Higher rated risks
are given due attention.
Objective of risk management: It aims to reduce the likelihood and impact of mishaps of all kinds,
reduce the inherent potential for major accidents which could kill or injure persons or cause production
and profit losses. Ninth Conference on safety in mines recommended that risk management should be
used as a tool for development of appropriate health and safety management system.
2. The managements of every mining company should adopt the process of safety
management system and commit itself for proper formulation and
implementation of the same in totality.
Risk assessment is the most important part of risk management. This is to be carried out by a
multidisciplinary team in order to assess all types of risks arising out of method of work, natural
conditions and due to machinery etc.
Risk assessment is to be performed on a regular basis. The goal for each risk
assessment session is to identify hazards, determine risk ratings and controls, and to
review the implementation of risk controls from previous risk assessment sessions.
11
The following workflow diagram illustrates the areas involved in performing a risk
assessment session.
After risk assessment, the risks with high rates are tabulated and control measures are
determined. A control programme is then formulated indicating also the time frame and
responsibility.
A beginning has been made and it is expected that soon it will yield results and the
accident rates which are stagnating for the last several years will start declining.
-------------------------------------------------------------------------
11
in the split/ original gallery, as the case may be, at the start of the slice cut by
the continuous miner.
ii) Each such goaf edge shall have three parallel rows of roof bolts, 0.5m inside the
roadway except those in between slices where only two rows of roof bolts shall
be provided.
iii) One wooden prop shall be installed 2.0m inside of every primary breaker line
near the goaf edge on the rib side/ centre of the gallery as an indicator prop.
iv) Anchorage testing of 10% of the roof bolts shall be done and record shall be
maintained.
----------------------------------------------------------
Answer:
If the descending cage in which persons are traveling lands at a high speed, it is likely
to cause accident to persons traveling therein. Accident to persons in descending cage
may also occur in the event of over-winding.
It may occur due to following reasons:
a. Negligence of winding engine man
b. Failure of brakes
c. Breakage of rope
d. Accidental declutching of drum due to failure of the clutch lock
e. Maladjustment/ mal-calibration of automatic contrivance.
f. Making the automatic contrivance defunct.
g. Wrong calibration of speed indicator.
h. Overloading of cage/ cages.
Statutory provisions
Briefly, following are the provisions of CMR to prevent hard landing of cages:
Regulation 76:
a. Where drum clutches are provided, the following provisions shall have effect:
I. The operating gear of the drum shall be provided with locking gear to
prevent inadvertent withdrawal of the clutch.
II. Every engine used for lowering or raising persons shall have suitable
interlocking device so fitted that it is not possible –
(a) to unclutch any drum unless brakes of such drum are applied; or
(b) To release the brake until the drum clutch is fully engaged and securely
locked.
b. Unless the cage attached to the drum is resting at bottom of shaft, the drum shall
not be unclutched unless the winding engineman has assured himself
immediately beforehand that the brake is fully applied.
c. In every shaft the engine shall be fitted with an automatically recording speed
indicator.
11
d. In a shaft exceeding 100 meters in depth, there shall be provided an effective
automatic contrivance to prevent over speeding and over winding. It shall
prevent descending cage from being landed at pit bottom at a speed exceeding
1.5 m per sec and control movement of ascending cage in such a manner as
prevent danger to persons in it. The RIM may specify maximum speed by an
order in writing. The contrivance and brakes shall be tested by engineer or other
competent person, once in every 7 days by raising each cage in turn to pass the
last control point above the top most landing, and once in every thirty days by
attempting to land the descending cage at excessive speed. Results shall be
recorded in a register kept for the purpose.
e. Except where automatic contrivance is provided, a point shall be fixed and
marked on the indicator of the engine in such a way as to show when the cage is
at a distance of not less than twice the circumference of the drum from
completion of the wind. If persons are traveling in cage, W.E man shall not raise
the remaining distance at a speed exceeding 1.2 metres per second.
f. Not more the specified number of persons shall travel in cage.
g. No person shall carry any bulky material in the cages.
--------------------------------------------------------------------------------
6. Define arduous travel with respect to underground mechanised mine. What are
the statutory requirements before commissioning of such a system in your mine?
Enumerate how to ensure safety of the persons travelling belowground in one such
system.
An arduous travel with respect to underground mechanised mine may be defined as the
journey in which workers needs much effort or energy to reach their authorised
working place due to long travel distance and steep gradient.
An arduous travel may be considered where
1) The seam gradient is more than 1 in 4 and travelling distance to the work place
is more than 1.5 km.
2) The seam gradient is less than 1 in 4 but the travelling distance is more than 3
km.
11
(c) Maintained in good and safe condition.
---------------------------------------------------------------------------
11
Now-a-days Occupational health is an important part of mining in view the health
hazards created due to respirable dust, noise, fumes, vibrations etc in mechanized
mines. Though the workers undergo periodical medical examination as per the
statutory requirements at five yearly intervals, it is equally important to keep a
watch on occupational health status apart from watch on occupational health
hazards. There are no provisions in the statute for such surveys.
The matter has been considered by various safety conferences who made valuable
recommendations . The most important aspect is to have Occupational Health
Surveillance cell for which recommendation was made by sixth Safety Conference.
The Occupational Health Surveillance cell is required to have necessary appliances
like X-ray machines, equipment for audiometric tests, appliances for doing lung
function tests etc. In addition it has to be manned by competent and qualified
manpower trained in the latest techniques of occupational health surveys.
Indeed it is very important to make occupational health surveys at intervals to know
the occupational health problems so that corrective steps can be taken in time. If the
occupational diseases like Pneumoconiosis and hearing loss are allowed to go
beyond certain limits, it may be too late and the damage may be permanent.
---------------------------------------------------------------------
(b) Objective of Tripartite & Bi-partite meetings. How far it is useful in increasing
the status of safety of a mine.
Mine management and workers are the stake holders in management as far as safety
in mines is concerned. Therefore, it is necessary the stake holders should meet from
time to time to discuss and sort out the safety and occupational health issues. That is
exactly the objective of bi-partite meetings between management and mine workers.
These meetings provide forum for safety and health promotional measures.
Apart from the above two stake holders, the Central Government too has very valid
part to play in promotion of safety as the Safety, health and Welfare of mine
workers is a central subject and is regulated through the Mines Act, 1952. It is
therefore, necessary that there should be regular interaction between the mine
management, DGMS on behalf of Central Government and the mine workers to
discuss and resolve the issues pertaining to mine safety and occupational health in
mines. That is the objective of tri-partite meetings. This too is a safety promotional
forum.
Indeed very important part has been played by these meetings in promoting safety
in mines. Important amendments of statute have emerged through the
recommendations of various safety conferences. The mining companies have been
sort out in the past many safety problems through bi-partite meetings. These
meetings will continue to play important role in future too.
--------------------------------------------------------------
11
Speed is vital for rescue of workers trapped in mines due to accidents and incidents
like explosions, fires or even roof falls. Hence there has to be a set of standing
orders or emergency response plan drawn and rehearsed well in advance so that the
rescue operations can be carried out with utmost speed and urgency. Regulation 199
A of CMR requires such a plan in underground mines. The provisions are as
follows:
4) The manager of every mine having workings belowground shall prepare a general
plan of action for use in time of emergency. The plan shall outline the duties and
responsibilities of each mine official and key men including the telephone
operators, so that each person shall know what is expected of him in case fire,
explosion or other emergency occurs. All officials and key men shall be thoroughly
instructed in their duties so as to avoid contradictory orders and confusion at the
time when prompt and efficient action is required. The emergency plan shall also
provide for mock rehearsals at regular intervals.
5) The manager shall submit a copy of the aforesaid emergency plan prepared by him
to the Regional Inspector, within 60 days of coming into force of the Coal Mines
(Amendment) Regulations, 1985, or in the case of a mine which is opened or
reopened thereafter, within thirty days of such opening or reopening. The Regional
Inspector may, by an order in writing, approve of such action plan, either in the
form submitted too him or with such additions or alterations as he may think fit and
action plan so approved shall be enforced in the mine.
6) On receiving information of any emergency, the manager and in his absence the
principal official present on the surface, shall immediately put the emergency plan
in operation.
----------------------------------------------------------------
11
To meet the energy demand of the country, coal production is to be increased manifold.
This can be possible by mechanising the industry. Due to the non-availability of trained
experienced manpower, many mining activities are being outsourced. Outsourcing has
become attractive due to the following reasons –
1) It is difficult to manage the manpower directly on roll of the company.
2) Specialised agencies can do the job faster, maintaining quality and at cheaper
cost with higher productivity.
3) Outsource of production activities in mines reduces the requirement of capital to
be invested on equipments.
Inspite of above advantages there are many disadvantages and risks to the safety of
persons. The outsourcing agency may be tempted to engage under aged persons
(below 18 years).
As a manager I would take following steps to prevent employment of persons
below 18 years of age.
1. I shall form a committee consisting of personnel & mining executive to judge
the age of the person by physical appearance of the employee.
2. Age of the person shall be checked from the board certificates of education.
These certificates may be verified from the issuing authority.
3. In case of the workers possessing driving license, high school certificate, the
age may be verified.
4. In case of any doubt, medical examination of the worker by certifying surgeon
shall be arranged for ascertaining the age.
5. Condition of heavy penalties shall be included in the work order of the
contractor in case he is found to be engaging workers below 18 years of age.
(1) No person below eighteen years of age shall be allowed to work in any mine or part
thereof.
(2) Apprentices and other trainees, not below sixteen years of age, may be allowed to
work, under proper supervision, in a mine or part thereof by the manager:
Provided that, in the case of trainees, other than apprentices prior approval of the
Chief Inspector or an Inspector shall be obtained before they are allowed to work.
If an inspector has reason to believe that any mine worker is not an adult or an
apprentice/ trainee is either below 16 years of age or is not to fit to work in a mine, he
may require medical examination of such a person by a certifying surgeon.
(3) No person below 18 years of age shall be allowed to be present in any part of mine
above ground where any operation connected with or incidental to any mining
operation is carried on, if notified by Central Govt. except apprentices and trainees.
11
Section Offence Punishment Punishment
awarded to
67 Contravention of provisions Imprisonment - 3 Person
regarding employment of months or fine - contravening
labour Rs. 1000/- or both provisions
68 Employment of persons below Fine - Rs. 500/- Owner, agent or
18 years of age manager
74 Repeated conviction for the Double the Owner, agent or
same offence committed again punishment of first manager
within 2 years of previous contraventions
conviction
******************************************************
11