EQUIPMENT LIST

GAS GATHERING STATION (GGS)

. . . . . . EQUIPMENT LIST
GAS GATHERING STATION

AL-SHAER GGS REHABILITATION PROJECT

CLIENT'S PRJ. NO. : CE-1802 CLIENT: EBLA PETROLEUM COMPANY , SYRIA

0 ISSUED FOR REVIEW RK OHU ZR . 21/07/2018


EBLA PETROLEUM ASAS JOB NO. : EBCO-003 DOC : CE-1802-PR-300-LST-0003-00 SH. 01/05 REV. 0
COMPANY
REV DESCRIPTION DRWN CHK'D APP'D APP'D DATE DOCUMENT SIZE : A3 ELECTRONIC FILE : CE-1802-PR-300-LST-0003-00
Project : AL-SHAER GGS REHABILITATION PROJECT
Client : EBLA PETROLEUM COMPANY

Client's Project No. : CE-1802 GGS - AL-SHAER


EQUIPMENT LIST
ASAS Job No. : EBCO-003 Rev :0
Document No. : CE-1802-PR-300-LST-0003-00 Date : 21/07/2018 02 OF 05
Equipment Summary - Gas Gatherinq Station (Process and Utilities)
Vessels
Sour
Size Design Design Operating Operating
Corrosion Allowance Service Equipment
No Type Quantity Tag Description Material Lining Cladding Insulation weight Remarks (Note 4) Rev.
Pressure Temp. Pressure Temp. NACE
IDxTT (mm)
(barg) (°C) (barg) (c) (mm) MR0175 MT(Note 1)
1 Horizontal 1 302-V-001 Production Separator 2700x12800 95.2 -15/82 25.39-86.64 7.7-41 KCS n/a no Duplex SS yes yes 122 Max slug volume 15m3 (Mainly Water arid condensate), Heat tracing up to HHLL
2 Horizontal 1 305-V-001 TEG Drain Vessel 2000 x 7700 (Boot =575 x 500) 3.5 -15/82 0 20 KCS 3 no no yes no 10.9 blanketted vessel, installed below ground in a pit
3 Vertical 1 321-V-001 Fuel Gas KO Drum 1500x4500 35 -29 / 82 24 29.0 KCS 1.5 no no yes Yes 15.6 c/w SS316L internals. PSV on vessel set at 30 barg, Heat tracing up to HHLL.
4 Vertical 1 325-V-001 Wet Air Receiver 1000x3000 12 -15/82 8.0-9.5 15-50 KCS 1.5 Epoxy no yes no 6 c/w SS316L internals. PSV on vessel set at 10.2 barg, Heat tracing up to HHLL.
5 Vertical 1 325-V-002 Instrument Air Receiver 3300 x 9450 12 -15/82 4.5 - 9 15-50 KCS 1.5 Epoxy no no no 29 PSV on vessel set at 10.2 barg
6 Horizontal 1 331-V-001 Flare KO Drum 3000x12600 3.5 -62/175 0.7 129.9 SS316L n/a no no yes no 31 vessel includes heater element, see 331-H-001
7 Horizontal 1 333-V-001 Closed Drain Drum 2500 x 9000 (boot 575 x 500) 3.5 -15/82 0-1.75 4-45 KCS 6 no Boot: SS316L Yes No 22.2
8 Vertical 1 334-V-001 Produced water degassing drum 1300x4200 5 -45/82 1.5-2.0 8-42 DSS n/a no no Yes No 1.8
9 Scraper Launcher 1 701-Y-001 Trunkline Scraper Launcher 16" minor barrel 95.2 -15/82 65 -77 9-50 KCS 3 no no no yes 2.85 Fixed Scraper Launcher
Towers
1 Packed Column 1 305-C-001 Gas Dehydration Column Top : 1400, Bottom : 1650, Overall t/t 12600 95.2 -17/82 67.2-85.2 7.4-50 KCS 3.0 (above cladding)/ 0.0 (below cladding) no SS316L (partial) yes yes 78.9 Packed column and Integral separation section, traced to HHLL (separation section).
Filters
Sour
Duty Design Design Operating Operating
Corrosion Allowance Service Equipment
No. Type Quantity Tag Description Material Lining Cladding Insulation weight Remarks Rev.
Pressure Temp. Pressure Temp. NACE
flow (m3/hr) / filtration spec
(barg) (°C) (barg) (°C) (mm) MR0175 MT
Duplex SS Internals. The filter Is to be externally electrically traced and Insulated (Freezing
1 Solids Filter 2 302-F-001 A/B Condensate Solid Filters 36.7 m3/hr (rated) liquid feed 142 -28/82 87.9 7.9-41.1 DSS n/a no no yes yes 1.7
water protection). No HIC Required.
Duplex SS Internals. The boot of the vessel is externally electrically traced and Insulated
2 Liquid Coalescer 1 302-F-002 A Condensate Coalescer 36.7 m3/hr (rated) liquid feed 142 -28/02 87.3 8-41.12 DSS n/a no no yes yes 2.5
(Freezing water protection). No HIC Required
3 Solids Filter 1 305-F-001 TEG Make-up Filter 5 m3/hr (rated) liquid feed 10 -15/82 3.2 -4/45 KCS 1.5 no no Yes no 0.2 SS316L Internals
4 Glycol Filter 1 305-F-003N Glycol Cartridge Filter removal of 5 microns and above 10.4 -29/204
5 Glycol Filter 1 305-F-002N Glycol Charcoal Filter 10.4 -29/204
Tanks
Sour
Size Design Design Operating Operating
Working Capacity Corrosion Allowance Service Equipment
No Type Quantity Tag Description Material Lining Cladding Insulation weight Remarks Rev.
IDxH Pressure Temp. Pressure Temp. NACE
(m3) (mm) (mbarg) (°C) (barg) (°C) (mm) MR0175 MT
1 Cone Roof 1 305-T-001 TEG Storage Tank 28 4000 x 3000 180/-2.5 -15/82 0.02 0/45 CS 1.5 no no no no 8.7

Glass flaked
Reinforced
Internal sacrificial cathodic protection to be provided against lining failure. Duplex SS
2 Cone Roof 1 334-T-001 Produced Water Storage Tank 732 10500 x 9600 180/2.5 -15/82 0.07 8/45 KCS 1.5 Epoxy no yes no 49.1
Internals.
(GFRE)
(full)

Notes
1) Equipment weights are indicative only for details refer vendor drawing / equipment drawings
2) Final motor rating for all pumps, compressors and packages items to be confirmed by mechanical based on ve
3) Final dimensions for all pumps to be confirmed by mechanical based on vendor information.
4) Skid dimensions are indicative only . Please refer vendor drawings for details.
Project : AL-SHAER GGS REHABILITATION PROJECT
Client : EBLA PETROLEUM COMPANY

Client's Project No. : CE-1802 GGS - AL-SHAER


EQUIPMENT LIST
ASAS Job No. : EBCO-003 Rev :0
Document No. : CE-1802-PR-300-LST-0003-00 Date : 21/07/2018 03 OF 05
Equipment Summary - Gas Gatherinq Station (Process and Utilities)
Electric Heaters
Sour
Design Pressure Design Temperature Material Corrosion
Duty Service Equipment
No Type Quantity Tag Description Allowance Lining Cladding insulation weight Remarks Revision
TS ss TS SS TS/SS NACE
(kW) (barg) (barg) (°C) (°C) (mm) MR0175 MT
Electric Heater elements within vessel and including
1 Electric Heater 1 321-H-001 A Fuel Gas Heater 85 n/a 95.2 n/a -15/85 KCS/- 1.5 no no yes yes 0.5 0
thyristor control, SS316L Internals
Compressors
Sour
Design Inlet Outlet Inlet Outlet Max Design Corrosion
Design Service Equipment
No Type Quantity Tag Description Material Allowance Lining Cladding Insulation weight Remarks Revision
Flowrate Power Pressure Pressure Temp. Temp. Temp. NACE
(kW) (barg) (barg) (°C) (°C) (°C) (mm) MR0175 MT
Air Compressor
1 HOLD 2 325-X-001 A/B Package(Including 325-K-001 HOLD HOLD HOLD HOLD HOLD HOLD HOLD HOLD HOLD HOLD HOLD HOLD HOLD HOLD HOLD 0
A/B)
Pumps
Sour
Design Design Inlet Outlet Inlet Outlet Max. Design Corrosion Service Equipment
No, Type Quantity Tag Description Flowrate Material Allowance Lining Cladding Insulation weight Remarks Revision
Power Pressure Pressure Temp. Temperature Temperature NACE
Am3/hr (kW) (barg) (barg) (°C) (°C) (°C) (mm) MR0175 MT
Vertically submerged pump mounted on drain vessel. L=
1 Vertical Centrifugal 1 x 100% 305-P-001 TEG Drain Pump 5 Rated 5.5 0.09/3.73 (Max) 2.08 15 n/a (-) 15/82 SS316L n/a no no no no 0.53 0
2830 mm.
2 Horizontal Centrifugal 1 x 100% 305-P-002 TEG Make-up Pump 5 Rated 5.5 -0.05/0.5 (Max) 3.2 (-)4/ 45 n/a (-)15/82 KCS 1.5 no no yes no 0.17 Dimension: 1000 mm Lx390mm Wx432 mm H 0
Vertically submerged pumps mounted on vessel, L =
3 Vertical Centrifugal 2x100% 333-P-001 A/B Closed Drain Drum Pump 5 Rated 3.70 0.14/3.66 (Max) 1.94 4-45 n/a (-)15/82 SS316L n/a no no no no 0.46 0
3365 mm.
Project : AL-SHAER GGS REHABILITATION PROJECT
Client : EBLA PETROLEUM COMPANY

Client's Project No. : CE-1802 GGS - AL-SHAER


EQUIPMENT LIST
ASAS Job No. : EBCO-003 Rev :0
Document No. : CE-1802-PR-300-LST-0003-00 Date : 21/07/2018 04 OF 05
Equipment Summary- Gas Gathering Station (Process and Utilities)
Packages & Auxiliary Units
Sour
Design Design Operating Design Operating Corrosion
Service Equipment Weight
No Type Quantity Tag Description Material Duty Allowance Lining Cladding Insulation Remarks Rev.
Capacity Pressure Pressure Temp. Temp. NACE
(MMSCFD) (barg) (barg) (°C) (°C) (mm) MR0175 MT

Package Includes all associated fired reboiler,


Empty weight ( with heat exchangers, pumps, columns, vent gas
all equipment/ pipng blowers. Number of skids: No. 3: one for Flash
TEG Regen System with
TEG etc installed): and filters/one reboiter etc. Each Skid size (L X
Stripping Gas Column for
1 Process Package 1 305-X-001 Regeneration SS/CS 111 - - - - yes SKID"A":17 MT; W X H) mm. 0
regeneration of Rich TEG to
System NOTE 5 SKID 'B“ for SKID ‘A’ for flash and filters: 9 x 3 x
approx. 99 9wt% purity.
reboiler : 55 MT;SKID 4.3m. SKID "B" for reboiler 13x3.5x 16.2
"C" :16 MT m (without stack and still column).
Skid"C" for blower 6x 3 x 2.6 m

Sour
Design Design Operating Design Operating Corrosion
Service Equipment Weight
No Type Quantity Tag Description Material Duty Allowance Lining Cladding Insulation Remarks Rev.
Capacity Pressure Pressure Temp. Temp. NACE
(MMSCFD) (barg) (barg) (°C) (°C) (mm) MR0175 MT
Air Compressor
Package (incl. Air compressor and related
2 Rotary Screw 2 (1W+1S) 325-X-001 Hold Hold Hold Hold Hold Hold Hold Hold Hold Hold 0
325-K-001 A/B) accessories
NOTE 6
Instrument Air
3 instrument Air Dryer 2 (1W+1S) 325-X-002 A/B DryerPackage Hold Hold Hold Hold Hold Hold Hold Hold Hold Hold Hold 0
NOTE 7
SS316L Stainless steel stack, 24" ID 30m high with
Flare Package Process:
(Stack)/ CS HP Flare Package, Vertical baffle seal, tip and 3 pilots, package also
6 Flare 1 331-X-001 (incl 331-B-001 106230 Kg/hr 3.5 0.1-0.5 175/-62 Tip: 120.57 no 10 Approx. 0
(Ignition Stack Includes flare tip Ignition panel. Smokeless
Flare Stack) By Vendor
Panel) operation (blowers/snuffing) not required.

Notes:
1) Equipment weights are indicative only for details refer vendor drawing / equipment drawings
2) Final motor rating for all pumps, compressors and packages items to be confirmed by mechanical based on vendor information
3) Final dimensions for all pumps to be confirmed by mechanical based on vendor information.
4) Skid dimensions are indicative only . Please refer vendor drawings for details.
Project : AL-SHAER GGS REHABILITATION PROJECT
Client : EBLA PETROLEUM COMPANY

Client's Project No. : CE-1802 GGS - AL-SHAER


EQUIPMENT LIST
ASAS Job No. : EBCO-003 Rev :0
Document No. : CE-1802-PR-300-LST-0003-00 Date : 21/07/2018 05 OF 05
Equipment Summary Gas Gathering Station (Process and Utilities)
5) The following equipment are also included within the TEG Regeneration package:
Design Pressure Operating Pressure Design Temp. Operating Temp. Dia TL/TL Length Sour Service Equipment weight
Quantity Tag Description Material Duty Design Capacity
(barg) (barg) (°C) (°C) (mm) (mm) NACE MR0175 (MT)
1 305-H-001 TEG Reboiler CS Design(450 Kw) 3.5/FV 0.12 280/-15 204 1400 5800 yes 13.9
1 305-V-005 TEG surge drum CS 3.5 /FV 0.12 240/-15 197 1400 6000 No 6
1 305-C-002 TEG still column SS 3.5/FV 0.12 280/-15 200 508 4008 yes 0.8
1 305-E-001 Cold lean/rich glycol heal exchanger SS Plate side 10.34/-1 200/-15 120/73 No 0.6
508 406
CS Shell side 10.34/-1 200/-15 12/62 yes
1 305-E-002 Hot lean/rich giycol heat exchanger SS Plate side 10.34/-1 240/-15 194/103 no 1.2
508 1094
CS Shell side 10.34/-1 180/-15 62/150 yes
1 305-V-003 Vent gas KO drum SS 3.5/FV 0.12 121 /-15 80 600 2500 yes 0.4
1 305-E-003 TEG reflux condenser SS tube side 3.5/FV 0.12 230/-15 91.6 yes 0.8
508 1657
Shell side 10 5 230/-15 62 yes
1 305-C-003 TEG stripping column CS 3.5/FV 280/-15 406 2200 yes
2 305-P-003N A/B Glycol circulation pumps 9.6m3/hr max diff. 86
2 305-PM-003N A/B Motor for Glycol circulation pumps 37kw
1 305-V-004 N Fuel gas KO drum CS hold hold hold hold hold hold hold hold
2 305-K-001 A/B Burner air fan 1500 nm3/hr diff: 0.0392
2 305-KM-001 A/B Motor for burner air fan 3 kw
2 305-F-004 A/B Fuel gas filters 10 6 100/-15 50 168.3 1360 No 0.11
1 305-V-002N Glycol flash drum CS 13.8 4 -29/204 70 1219 4572
1 305-E-004 Dry gas/Lean TEG exchanger CS Shell side 95.2 88.5 130/-17 104.7/55 No
510 4081 4.8
CS tube side 95.2 74.4 130/-17 51.9/54.6 yes
6) For the Air Compressor Package,all design capacities all hold.
7) Following are the details of air filters Included in the instrument Air Dryer package:
Operating Operating Corrosion
Design Capacity Design Pressure Design Temp.
TYPE Quantity Tag No. Description Material Duty Pressure Temp, Allowance
(MMSCFD) (barg) (barg) (°C) (°C) (mm)
Air Filters 4 325-F-001 Instrument Air Dryer Package (Prefilter) CS Coalescer Filter/Cartrige Filter HOLD HOLD HOLD HOLD HOLD HOLD
Air Filters 4 325-F-002 Instrument Air Dryer Package (Afterfilter) CS Coalescer Filter/Cartrige Filter HOLD HOLD HOLD HOLD HOLD HOLD
Air Filters 4 325-F-003 Instrument Air Dryer Package (Prefilter) CS Coalescer Filter/Cartrige Filter HOLD HOLD HOLD HOLD HOLD HOLD
Air Filters 4 325-F-004 Instrument Air Dryer Package (Afterfilter) CS Coalescer Filter/Cartrige Filter HOLD HOLD HOLD HOLD HOLD HOLD