Professional Documents
Culture Documents
SCO/SJO
To
CONCERNED LINE SUPERINTENDENT
Please effect SCO/SJO and install the necessary meter(s) and turn on the
supply and report as below:-
PARTICULARS
Size of Service --------------------- length of service at (in fet) ---------------------------------
Connected to ---------------------------------------------- Phase -------------------------------------
insulation test (between phase) ----------------------- (to earth )--------------------------------
--------------------------------------------------------------------------------------------
-------------------
Meter No. Make Const Amps Volts Phase Remarks
--------------------------------------------------------------------------------------------
-------------------
--------------------------------------------------------------------------------------------
-------------------
Requistion No. and date
-------------------------------------------------------------------------------
connection made by
------------------------------------------------------------------------------------
supply connected (date)----------------------------------------
time----------------------------------