Professional Documents
Culture Documents
Body Preparation
70
D70 :
cm m R
360 3.6 1.8
d70 : 20 0.2 0.1
T1 : 875 8.75
T2: 260 2.6 Luas Area 10.17876 m2
A1 : 125 1.25
A2 : 125 1.25
A3 : 125 1.25
A4 : 125 1.25
A5 : 125 1.25
A6 : 125 1.25
A7 : 125 1.25
60 A4
A4 :
A5 :
A6 :
123
123
1.23
1.23
123 1.23
T1
A7 : 79 0.79
A3
Anasirul/Satubi
Anasirul/Satubi
OCK OPNAME PALET
SIZE PALLET
JUMLAH
105X105 110X110 170X170
Anasirul/Satubi
Anasirul/Satubi
FORM STOCK OPNAME "POWDER SILO"
Div. Body Prept.
Capacity Real Capacity BERAT JENIS DIMENSI Volume Tonase "SILO PROFILE"
Batch Silo
(Ton) (Ton) r ( Kg/m3) D (m) d (m) T (m) t (m) (m )
3
(kg)
1 70
2 70
3 70 Volume Silinder :
4 70 �𝑆𝑖�= 〖� /4 ( � 〗 ^2 𝑥
�1)
5 70
6 70
7 70
8 70 Volume Kerucut Terpancun
9 70
�𝐾𝑒�.= 〖� /3 �2( ((�/2) 〗 ^2+ (�/2
10 70 T1 〖 (�/2) 〗 ^2 ) )
11 70 D
12 70
13 70 �𝑆𝑖�= 〖� /4
( � 〗 ^2 𝑥 �1)
14 70
15 70
16 70
17 70
18 70
19 70
20 70
21 70
22 70 T2
23 70
24 70 D
A1 60
A7 60 d
A13 60
A19 60
Keterangan :
T1
D: Diameter Tabung Silinder Silo (m)
d: Diameter Kerucut Bawah (m)
T1 : Tinggi Silinder Silo (m)
T2 : Tinggi Kerucut Tergantung (m)
d
SILO PROFILE
Body Preparation
D
60
D60 :
cm m R
A7 320 3.2 1.6
d60 : 16 0.16 0.08
^2 𝑥 T1 : 817 8.17
A6
T2: 260 2.6 Luas Area 8.042
A1 : 123 1.23
A2 : 123 1.23
A5
ancung : A3 : 123 1.23
(�/2)) 𝑥 (�/2)+
60 A4
A4 :
A5 :
A6 :
123
123
1.23
1.23
T1 123 1.23
A7 : 79 0.79
A3
70
A0
T2
70 T2
A7
d
A6
Keterangan :
70
A5
cm m R
D70 : 360 3.6 1.8
A4 d70 : 20 0.2 0.1
T1 : 810 8.1
T2: 260 2.6 Luas Area 10.17876 m2
A3 A1 : 60 0.6
A2 : 125 1.25
A3 : 125 1.25
A2 A4 : 125 1.25
A5 : 125 1.25
A6 : 125 1.25
A1 A7 : 125 1.25
5.4
DENSITAS TANAH ( r )
BERAT (kg)
NO JENIS BAHAN BAKU
1 2 3 4 5
5 SA 4 32.68
7 SB 9 26.59
10 CFL 29.81
12 CST-10 31
DENSITAS BATUBARA ( r )
BERAT (kg)
NO JENIS BAHAN BAKU
1 2 3 4 5
1 Batubara 19.84 16.97 20.17 19.08 17.42
RA ( r )
Berat Rata2 BERAT JENIS BERAT JENIS
(kg) r ( Kg/m3) Ton/m3
18.70 847.74 0.85
SILO ( r )
BERAT JENIS
Ton/m3
0.99
16 cm
14 cm
15.8 cm
13.8 cm
m3