SILO PROFILE

Body Preparation

70
D70 :
cm m R
360 3.6 1.8
d70 : 20 0.2 0.1
T1 : 875 8.75
T2: 260 2.6 Luas Area 10.17876 m2
A1 : 125 1.25
A2 : 125 1.25
A3 : 125 1.25
A4 : 125 1.25
A5 : 125 1.25
A6 : 125 1.25
A7 : 125 1.25

Vcyl = 89.06 m3 0.99 88.17


Vcon = 9.34 m 3
0.99 9.25
Vtot = 98.40 m3 0.99 97.42 Ton

72% 70 9.25 60.75 0.99 61.37 6.03 4.8


Ton m 3
m
90% 88.56 m 3
87.7
9.34
79.22 m3 7.78 m 6.2
SILO PROFILE
Body Preparation
D
60
D60 :
cm
320
m
3.2
R
1.6
A7
d60 : 16 0.16 0.08
T1 : 817 8.17
A6
T2: 260 2.6 Luas Area : A = 8.042
A1 : 123 1.23
A2 : 123 1.23
A5
A3 : 123 1.23

60 A4
A4 :
A5 :
A6 :
123
123
1.23
1.23
123 1.23
T1
A7 : 79 0.79
A3

Vcyl = 65.71 m3 0.99 65.05 Ton


Vcon = 7.34 m3 0.99 7.26 Ton
A2 Vtot = 73.04 m 3
0.99 72.31 Ton

A1 Untuk mendapatkan kapasitas 60 Ton,


maka tinggi Powder pada Silo dapat dihitung sbb :
Kapasitas yg diinginkan - Isi Kerucut = Isi Silinder Silo
60 --- 7.26 = 52.74 Ton
A0 Volume powder pada Silinder Silo :
52.74
T2 = 53.27 m3
0.99
Level pd Silinder Silo = Volume Silinder/Luas Area Silinder
53.27
d = 6.62 m dari atas kerucut
8.04
m2
STOCK OPNAME PALET STOCK OPNAME P
SIZE PALLET SIZE PALLE
HARI/TGL JUMLAH HARI/TGL
100X100 105X105 110X110 170X170 100X100
RABU, 27-09-2017 RABU, 27-09-2017
KAMIS, 28-09-2017 KAMIS, 28-09-2017
JUMAT, 29-09-2017 JUMAT, 29-09-2017
SABTU, 30-09-2017 SABTU, 30-09-2017
JUMLAH JUMLAH

Ngoro, 30 September 2017


Repair Palet,

Anasirul/Satubi

STOCK OPNAME PALET STOCK OPNAME P


SIZE PALLET SIZE PALLE
HARI/TGL JUMLAH HARI/TGL
100X100 105X105 110X110 170X170 100X100
RABU, 27-09-2017 RABU, 27-09-2017
KAMIS, 28-09-2017 KAMIS, 28-09-2017
JUMAT, 29-09-2017 JUMAT, 29-09-2017
SABTU, 30-09-2017 SABTU, 30-09-2017
JUMLAH JUMLAH

Ngoro, 30 September 2017


Repair Palet,

Anasirul/Satubi
OCK OPNAME PALET
SIZE PALLET
JUMLAH
105X105 110X110 170X170

Ngoro, 30 September 2017


Repair Palet,

Anasirul/Satubi

OCK OPNAME PALET


SIZE PALLET
JUMLAH
105X105 110X110 170X170

Ngoro, 30 September 2017


Repair Palet,

Anasirul/Satubi
FORM STOCK OPNAME "POWDER SILO"
Div. Body Prept.
Capacity Real Capacity BERAT JENIS DIMENSI Volume Tonase "SILO PROFILE"
Batch Silo
(Ton) (Ton) r ( Kg/m3) D (m) d (m) T (m) t (m) (m )
3
(kg)
1 70
2 70
3 70 Volume Silinder :
4 70 �𝑆𝑖�= 〖� /4 ( � 〗 ^2 𝑥
�1)
5 70
6 70
7 70
8 70 Volume Kerucut Terpancun
9 70
�𝐾𝑒�.= 〖� /3 �2( ((�/2) 〗 ^2+ (�/2
10 70 T1 〖 (�/2) 〗 ^2 ) )
11 70 D

12 70
13 70 �𝑆𝑖�= 〖� /4
( � 〗 ^2 𝑥 �1)
14 70
15 70
16 70
17 70
18 70
19 70
20 70
21 70
22 70 T2
23 70
24 70 D
A1 60
A7 60 d
A13 60
A19 60

�𝐾𝑒�.= 〖� /3 �2( ((�/2) 〗 ^2+ (�/2)) 𝑥 (�/2)+ 〖 (�/2) 〗


Volume Silo = Volume Silinder + Volume Kerucut ^2 ) )

Volume Silo = �= 〖� /4 ( � 〗 ^2 𝑥 〖� /3 �2( ((�/2) 〗 ^2+ (�/2)) 𝑥 (�/2)+ 〖 (�/2) 〗 ^2 x) )r (kg)


�1)+

Keterangan :
T1
D: Diameter Tabung Silinder Silo (m)
d: Diameter Kerucut Bawah (m)
T1 : Tinggi Silinder Silo (m)
T2 : Tinggi Kerucut Tergantung (m)

Ngoro, 30 September 2017


Petugas Stock Opname, A0
T2
Body Preparation Dept.

d
SILO PROFILE
Body Preparation
D
60
D60 :
cm m R
A7 320 3.2 1.6
d60 : 16 0.16 0.08
^2 𝑥 T1 : 817 8.17
A6
T2: 260 2.6 Luas Area 8.042
A1 : 123 1.23
A2 : 123 1.23
A5
ancung : A3 : 123 1.23
(�/2)) 𝑥 (�/2)+
60 A4
A4 :
A5 :
A6 :
123
123
1.23
1.23
T1 123 1.23
A7 : 79 0.79
A3

Vcyl = 65.71 m3 0.99 65.05


Vcon = 7.34 m3 0.99 7.26
A2 Vtot = 73.04 m3 0.99 72.31 Ton

60 7.26 52.74 0.99 53.27 6.62


Ton m 3
m
A1

70
A0
T2
70 T2

A7
d

A6

Keterangan :

70
A5

cm m R
D70 : 360 3.6 1.8
A4 d70 : 20 0.2 0.1
T1 : 810 8.1
T2: 260 2.6 Luas Area 10.17876 m2
A3 A1 : 60 0.6
A2 : 125 1.25
A3 : 125 1.25
A2 A4 : 125 1.25
A5 : 125 1.25
A6 : 125 1.25
A1 A7 : 125 1.25

Vcyl = 82.45 m3 0.99 81.62


Vcon = 9.34 m3 0.99 9.25
Vtot = 91.79 m3 0.99 90.87 Ton

77% 70 9.25 60.75 0.99 61.37 6.03 10.0


Ton m3 m
90% 82.61 m3 81.8
9.34
73.27 m3 7.20 m 12.0
m2

5.4
DENSITAS TANAH ( r )
BERAT (kg)
NO JENIS BAHAN BAKU
1 2 3 4 5

1 SPO (Selep) 31.96

2 SPO (Non-Selep) 35.57

3 SPO (revisi) 35.58 32.23 31.65 32.43 32.1

4 CSN 29.5 33.65 29.11

5 SA 4 32.68

6 CB 8 27.91 27.16 27.09

7 SB 9 26.59

8 PRB 2 (dalam) 33.82

9 PRB 2 (luar) 32.22

10 CFL 29.81

11 SC 4 24.44 24.29 23.98

12 CST-10 31

13 POWDER AFFAL 26.44

14 GLAZE AFFAL 28.01

15 TILE AFFAL 27.93

DENSITAS BATUBARA ( r )
BERAT (kg)
NO JENIS BAHAN BAKU
1 2 3 4 5
1 Batubara 19.84 16.97 20.17 19.08 17.42

DENSITAS POWDER SILO ( r )


BERAT (kg) Berat Rata2 BERAT JENIS
NO JENIS BAHAN BAKU
NO JENIS BAHAN BAKU
1 2 3 (kg) r ( Kg/m3)
1 Powder 21.78 21.78 987.58

VOLUME TANAH DALAM EMBER


Diameter atas : D = 32 cm R=
Diameter bwh : d = 28 cm r=
Tebal ember : t = 0.2 cm R-t=
Tinggi ember : H = 32 cm r-t=

Volume ember : V = 22053.81 cm3 = 0.02205


NAH ( r )
Berat Rata2 BERAT JENIS BERAT JENIS
(kg) r ( Kg/m3) Ton/m3
31.96 1449.18 1.45

35.57 1612.87 1.61

32.80 1487.18 1.49

30.75 1394.47 1.39

32.68 1481.83 1.48

27.39 1241.81 1.24

26.59 1205.69 1.21

33.82 1533.52 1.53

32.22 1460.97 1.46

29.81 1351.69 1.35

24.24 1098.98 1.10

31.00 1405.65 1.41

26.44 1198.89 1.20

28.01 1270.08 1.27

27.93 1266.45 1.27

RA ( r )
Berat Rata2 BERAT JENIS BERAT JENIS
(kg) r ( Kg/m3) Ton/m3
18.70 847.74 0.85

SILO ( r )
BERAT JENIS
Ton/m3
0.99

16 cm
14 cm
15.8 cm
13.8 cm

m3

Ngoro, 28 September 2017


31-Oct-17 Stock Opname Div. Body Prept.
BERAT JENIS DIMENSI Volume Tonase (Ton) SELISIH
NO JENIS BAHAN BAKU JML ACTS (KG) ACTS (TON) Status %
r (Ton/m3) P1 (m) P2 (m) T (m) L (m) (m3) Maks. Riil ACTS
1 SPO 1.49 18 13 7.5 18 2092.5 3117.83
5149.44 3117.83 2,484,105 2,484.105 633.720 Surplus 26%
2 SPO (Selep) 1.45 0 0.00
3 CSN (Inside) 1.39 7 6 7.5 18 877.5 4819.281 1223.65
1223.65 2,286,107 2,286.107 1,062.461 Defisit 46%
4 CSN (Outside) 1.39 0 0.00
6 CB 8 (Inside) 1.24 18 17 7 18 2205 4291.699 2738.19
3162.89 5,333,410 5,333.410 2,170.517 Defisit 41%
7 CB 8 (Outside) 1.24 6 6 3 19 342 424.70
9 PRB 2 (Inside) 1.53 11 7 6.5 9 526.5 5299.851 807.40
1280.75 1,103,989 1,103.989 176.765 Surplus 16%
10 PRB 2 (Outside) 1.46 11 7 3 12 324 473.35
11 CFL 1.35 10 8 4 9 324 4671.453 437.95 437.95 281,254 281.254 0.157 Surplus 0%
12 SC 4 1.10 12 10 7.5 18 1485 3798.07 1631.98 1631.98 3,850,147 3,850.147 2,218.164 Defisit 58%
13 SA-4 (Inside) 1.48 7 6 5 6 195 288.60 288.60 129,375 129 159.225
14 POWDER AFFAL 1.20 7 3 3 15 225 269.75 269.75 - 269.749
15 GLAZE AFFAL 1.27 2 1 1 3 4.5 5.72 5.72 - 5.715
16 TILE AFFAL 1.27 11 5 4 17 544 688.95 688.95 - 688.948

Div. Body Prept. Div. Body Prept.


BERAT JENIS DIMENSI Volume Tonase SELISIH SELISIH
NO JENIS BAHAN BAKU JML ACTS TON %
r (Ton/m ) 3 P1 (m) P2 (m) T (m) L (m) (m3) Maks. Riil ACTS Maks.
1 Batu Bara (Inside) 0.87 10 8 4 12 432 375.84
751.68 375.84 1,597,034 1,597 1,221.19 Defisit 76%
2 Batu Bara (Outside) 0.87 0