Input Data:
S1
Factor of safty for Loads x1 L1 L2
b1
F.S = 10 % 1
1 2
Fcu= 250 Kg/cm2 Fixed Length (L) for R.C footing: 12.95
Fy= 3600 Kg/cm2 Fixed depth (t) for R.C footing : 0.7
Solution:
Design of P.C :
y= 5.720 m L FREE= 13.85m
L/2= 6.920 m
e= 0.445 m OK
M= 234.80 m.t
B= 4.95 m
Assume
t= 0.5 m
xB= 0.3 m
Check of P.C :
q max= 9.9339 t/m2 Safe
q min= 6.53972 t/m2 Safe
M= 0.89405 m.t
ơ= 21.4572 t/m2 Safe كجم
Design of R.C :
L1 = 12.95 m
B1 = 4.35 m
q max= 11.3041 t/m2 Safe
q min= 7.44175 t/m2 Safe
110 165
0.4 0.6
1 3 3.5 3
1 2 4 5
S.F.D
64.2
47.03
33.03
0 -1.99 -1.37
Q1 Q2 Q3 Q0 Q4 Q5 Q0 Q6 Q7
-63.4 -67.5
-77.33
B.M.D
10
66.
7
4 47.02
38.11
8
21.28 9
15.38
1
0
0 2 2 4 5 6 8 1
3
-16.41 -16.07
-19.32 6
-27.1
Design of Rec. Strip footing
Up To 4 columns
Fixed Length
S2 S3
L3 L4 x2
0.5
3 4
m X1= 1
m X2= 0.5
5.72m
R
S.F.D
72.48
64.2
47.03
-1.37 -1.51 0
Q4 Q5 Q0 Q6 Q7 Q0 Q8 -24.42
Q9 Q10
-67.5
-77.33
M1 M2
Max Moment= 66.48 m.t 38.11
Min Moment= 27.1 m.t
B.M.D
10
66.48
7
47.02
8
21.28 9
15.38 11
10.87
13
12 0
-6.12
6 8 10 12 14
6.07
6
-27.1
F. No. 3
DIM:
110 165
0.7
12.95
12.95
0.3
1 C1 4.35 C2
0
2.025 2.025
12.95
12.95
Reinf. :
0.5
C3 C4 4.95
0 0.5
1.975 1.925
كمر مدفون
خرسانه :التكلفه 'kg/m
الوزن لكل متر
م3 = حجم الخرسانه العاديه 32.06 ###
م3 = حجم الخرسانه المسلحه 39.44 ###
###
م3 71.5 = الحجم الكلى ###
###
م2 = مساحه الخرسانه المسلحه56.34 ###
###
###
###
=sum