You are on page 1of 14

930 WHEEL LOADER 79J03733-UP (MACHINE) POWERED BY 3304 ENGINE(HE...

Page 1 of 14

Shutdown SIS

Previous Screen

Product: WHEEL LOADER


Model: 930 WHEEL LOADER 79J
Configuration: 930 WHEEL LOADER 79J03733-UP (MACHINE) POWERED BY 3304 ENGINE

Disassembly and Assembly


920 & 930 WHEEL LOADER POWER TRAIN
Media Number -REG00975-01 Publication Date -01/12/1977 Date Updated -10/10/2001

Torque Converter
SMCS - 3100-16; 3100-15 

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb... 11/10/2018
930 WHEEL LOADER 79J03733-UP (MACHINE) POWERED BY 3304 ENGINE(HE... Page 2 of 14

Disassemble Torque Converter

start by: 

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb... 11/10/2018
930 WHEEL LOADER 79J03733-UP (MACHINE) POWERED BY 3304 ENGINE(HE... Page 3 of 14

a) separation of torque converter from transmission

1. Put the torque converter and housing in position on blocks as shown.

2. Remove the bolt, retainer (2) and gear (1) from the housing.

3. Fasten a hoist to torque converter housing (3) with two 3/8"-16 NC forged eyebolts. Remove 
housing (3) from the torque converter. The weight of the housing is 160 lb. (72 kg).

4. Remove bolt (5), the retainer and gear (4) from housing (3).

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb... 11/10/2018
930 WHEEL LOADER 79J03733-UP (MACHINE) POWERED BY 3304 ENGINE(HE... Page 4 of 14

5. Remove ring (6) that holds bearing (7) to gear (4).

6. Use a hammer and a punch to remove bearing (7) from gear (4) as shown.

7. Turn housing (3) over.

8. Turn gear (9) by hand until the access holes are in alignment with bolts (8). Remove the three bolts 
(8) and washers.

9. Remove gear (9) from housing (3). If necessary use a hammer and punch to remove gear (9) as 
shown.

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb... 11/10/2018
930 WHEEL LOADER 79J03733-UP (MACHINE) POWERED BY 3304 ENGINE(HE... Page 5 of 14

10. Remove ring (10) from gear (9).

11. Use a hammer and punch from the opposite side of gear (9) to remove retainer (12) and bearing 
(11).

12. Remove pilot (13) from the torque converter housing.

13. Remove the bolt and retainer (14) from the torque converter shaft.

14. Turn the torque converter over and remove ring (15) from the carrier. Remove bolts (18).

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb... 11/10/2018
930 WHEEL LOADER 79J03733-UP (MACHINE) POWERED BY 3304 ENGINE(HE... Page 6 of 14

15. Install four 5/16"-18 NC forcing screws and remove impeller (17) from housing (19). The bearing 
and one half of its inner race will come off the opposite end of shaft (16) when the impeller is 
removed.

16. Hit the end of shaft (16) with a soft faced hammer as shown to remove the second half of the inner 
bearing race.

17. Remove turbine (20) from impeller (17) and shaft.

18. Remove ring (23) from shaft (16) with tool (A).

19. Remove six bolts (22), the two plates under bolts (22) and guide wheel assembly (stator) (21).

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb... 11/10/2018
930 WHEEL LOADER 79J03733-UP (MACHINE) POWERED BY 3304 ENGINE(HE... Page 7 of 14

20. Remove impeller (17) and the gear as a unit from shaft (16).

21. Remove bolts (24) and the two plates to remove the gear from impeller (17).

22. After gear (25) is removed from the impeller, use tool group (B) and a press to remove the bearing 
from the gear.

23. Remove shaft (16) and the bearing from carrier (26) with a soft faced hammer.

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb... 11/10/2018
930 WHEEL LOADER 79J03733-UP (MACHINE) POWERED BY 3304 ENGINE(HE... Page 8 of 14

24. Use tool (A) to remove ring (27) that holds bearing (28) on shaft (16).

25. Use a press and tool (C) to remove bearing (28) from the shaft.

26. If necessary, remove seal ring (29) and pin (30) from shaft (16).

27. If necessary, remove sleeve (32) and pins (31) from carrier (26).

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb... 11/10/2018
930 WHEEL LOADER 79J03733-UP (MACHINE) POWERED BY 3304 ENGINE(HE... Page 9 of 14

Assemble Torque Converter

NOTICE

Before the torque converter is assembled, see Torque Converter


Clearance Checks. These clearances must be correct for the torque
converter to operate with efficiency.

1. Install pins (1) and sleeve (2) in carrier (3). Install the sleeve until it makes contact with the 
counterbore in the carrier. Make sure the tab on sleeve (2) fits in the groove of the carrier.

2. Install the pin in the end of shaft (5). Install seal ring (6) on shaft (5).

3. Heat bearing (4) to a maximum temperature of 275°F (135°C). Install the bearing on shaft (5). Use 
tool (A) and install the ring that holds bearing (4) to shaft (5).

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb... 11/10/2018
930 WHEEL LOADER 79J03733-UP (MACHINE) POWERED BY 3304 ENGINE(H... Page 10 of 14

4. Put carrier (3) in position on the bearing and shaft (5) as shown. Install ring (7) to hold the bearing 
in carrier (3).

5. Use tool (B) and a press to install bearing (9) in gear (10). Install the bearing until it is even with 
the surface of the gear shown.

6. Put impeller (8) in position on gear (10) and install the eight bolts and two plates to hold them 
together. Tighten the bolts to a torque of 20 ± 1 lb.ft. (25 ± 1 N·m).

7. Install impeller (8) and the gear in position on carrier (3) as shown.

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb... 11/10/2018
930 WHEEL LOADER 79J03733-UP (MACHINE) POWERED BY 3304 ENGINE(H... Page 11 of 14

8. Put guide wheel assembly (stator) (11) in position in impeller (8). Install the two plates and six 
bolts that hold stator (11). Tighten the bolts to a torque of 20 ± 1 lb.ft. (25 ± 1 N·m).

9. Use tool (A) to install the ring that holds turbine (12) in position on shaft (5). Install turbine (12) on 
shaft (5).

10. Heat one half of the inner race, for the bearing assembly, to a maximum temperature of 275°F 
(135°C). Install the race on shaft (5) with the groove up as shown.

11. Install the impeller, turbine and shaft in housing (13) as shown. Tighten the bolts that hold the 
impeller to the housing to a torque of 20 ± 1 lb.ft. (25 ± 1 N·m).

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb... 11/10/2018
930 WHEEL LOADER 79J03733-UP (MACHINE) POWERED BY 3304 ENGINE(H... Page 12 of 14

12. Turn the torque converter assembly over. Install the ring on bearing (14) and install the bearing in 
housing (13) as shown. Make sure the bearing is in correct contact with the inner half of the race.

13. Heat the other half of the inner bearing race to a maximum temperature of 275°F (135°C). Install 
the inner half of the race with the groove toward the inside until it makes contact with the first inner 
race installed.

14. Install the retainer and bolt on the end of the shaft. Tighten the bolt to a torque of 81 ± 4 lb.ft. (111 
± 5 N·m).

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb... 11/10/2018
930 WHEEL LOADER 79J03733-UP (MACHINE) POWERED BY 3304 ENGINE(H... Page 13 of 14

16. Put retainer (17) on gear (18).

15. Install pilot (15) on housing (13). Tighten the bolts to a torque of 36 ± 2 lb.ft. (46 ± 3 N·m).

17. Heat bearing (16) to a maximum temperature of 275°F (135°C). Install bearing (16) on gear (18). 
Install the ring that holds bearing (16) in position.

18. Install gear (18) in torque converter housing (19) as shown. Tighten the three bolts that hold the 
gear retainer to the housing.

19. Heat bearing (20) to a maximum temperature of 275°F (135°C). Install bearing (20) on gear (21). 
Install the ring that holds bearing (20) in position.

20. Put gear (21) in housing (19) as shown. Install the lock and bolt in location (22) to hold gear (21) 
in position.

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb... 11/10/2018
930 WHEEL LOADER 79J03733-UP (MACHINE) POWERED BY 3304 ENGINE(H... Page 14 of 14

21. Fasten a hoist to housing (19) with two 3/8" - 16 NC forged eyebolts. Put housing (19) in position 
on the torque converter assembly so that the bolt holes in the housing are in alignment with the bolt 
holes in the carrier.

NOTE: Make sure the teeth of gear (18) are engaged correctly with the teeth of the gear fastened to 
the impeller or housing (19) can not be installed all of the way on the torque converter. 

22. Install the bolts and washers that hold housing (19) to the carrier. Tighten the bolts to a torque of 
40 ± 5 lb.ft. (55 ± 7 N·m).

23. Install gear (23) on the torque converter shaft as shown. Install the retainer and bolt to hold gear 
(23). Tighten the bolt to a torque of 81 ± 5 lb.ft. (111 ± 7 N·m).

end by: 

a) connection of torque converter to transmission

Copyright 1993 - 2018 Caterpillar Inc.   Thu Oct 11 14:43:42 UTC+0800 2018
All Rights Reserved.
Private Network For SIS Licensees.

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb... 11/10/2018

You might also like