Professional Documents
Culture Documents
1(20)
IMPLEMENTATION PROPOSAL
File
401319991.doc
Prepared (also subject responsible, if other) Document Number
XXX System
Implementation Proposal (Template)
Abstract: This document covers the system architecture for the XXX System
Table of Contents
1 INTRODUCTION..............................................................................................................4
1.1 SCOPE..........................................................................................................................4
1.2 DESIGN BASE...............................................................................................................4
2 TECHNICAL SOLUTION...............................................................................................5
2.1 SYSTEM ARCHITECTURE..............................................................................................5
2.2 DATA MODEL...............................................................................................................5
2.3 TRAFFIC.......................................................................................................................5
2.4 LEGAL REGULATIONS..................................................................................................5
2.5 CHARGING / ACCOUNTING...........................................................................................6
2.6 OPERATION, ADMINISTRATION, MAINTENANCE..........................................................6
2.7 INTERNAL PROTOCOLS................................................................................................7
3 PLATFORM IMPACTS...................................................................................................7
3.1 PLATFORM TECHNOLOGY CHOICES.............................................................................7
3.2 SYSTEM FUNCTIONS....................................................................................................7
3.3 PORTABILITY................................................................................................................7
3.4 CO-LOCATION..............................................................................................................8
4 DEVELOPMENT ENVIRONMENT.............................................................................8
4.1 GENERAL.....................................................................................................................8
4.2 LANGUAGES.................................................................................................................8
4.3 TOOLS..........................................................................................................................8
4.4 APPLICATION IMPLEMENTATION..................................................................................8
5 SECURITY IMPACTS.....................................................................................................9
5.1 APPLICATION ACCESS SECURITY.................................................................................9
5.2 OPERATING SYSTEM SECURITY...................................................................................9
5.3 DATABASE SECURITY..................................................................................................9
5.4 MIDDLEWARE SECURITY.............................................................................................9
5.5 TOOLS SECURITY.......................................................................................................10
© Mobile Arts AB 2018 This document contains confidential information that remains the property of Mobile Arts AB, and may
not be copied, circulated, or distributed without prior written consent of Mobile Arts AB.
Date Revision
2(20)
2005-09-15 A
Document Number
6 CHARACTERISTICS IMPACTS.................................................................................10
6.1 SUPPORTED CONFIGURATION TYPES.........................................................................10
6.2 AVAILABILITY / REDUNDANCY..................................................................................10
6.3 LOAD BALANCING AND PRIORITY.............................................................................10
6.4 CAPACITY..................................................................................................................10
6.5 RESPONSE TIMES.......................................................................................................10
6.6 CAPABILITIES.............................................................................................................11
7 HANDLING IMPACTS..................................................................................................11
7.1 BACKUP AND RECOVERY...........................................................................................11
7.2 COMPATIBILITY INFORMATION...................................................................................11
7.3 OPTIONS.....................................................................................................................11
7.4 ADAPTATIONS............................................................................................................11
7.5 INSTALLATION AND UPGRADES.................................................................................12
8 CUSTOMISATION POSSIBILITIES..........................................................................12
10 COMPETENCE DEVELOPMENT..........................................................................12
10.1 TRAINING...................................................................................................................12
10.2 PROTOTYPING............................................................................................................12
11 COSTS..........................................................................................................................13
11.1 DEVELOPMENT COSTS...............................................................................................13
11.2 SYSTEM TEST COSTS.................................................................................................13
11.3 DOCUMENTATION COSTS...........................................................................................14
11.4 EQUIPMENT COSTS....................................................................................................16
12 DOCUMENT INFORMATION................................................................................17
12.1 GLOSSARY.................................................................................................................17
12.2 REVISION INFORMATION............................................................................................17
13 REFERENCES............................................................................................................18
14 STATUS INFORMATION.........................................................................................19
14.1 STATEMENT OF COMPLIANCE....................................................................................19
14.2 OPEN QUESTIONS......................................................................................................20
14.3 Risk Analysis.............................................................................................................20
© Mobile Arts AB 2018 This document contains confidential information that remains the property of Mobile Arts AB, and may
not be copied, circulated, or distributed without prior written consent of Mobile Arts AB.
Date Revision
3(20)
2005-09-15 A
Document Number
List of Figures
Error! No table of figures entries found.
List of Tables
Table 1, Development Costs.....................................................................................................13
Table 2, System Test Costs........................................................................................................13
Table 3, Marketing Document Costs.........................................................................................14
Table 4, Specification Document Costs....................................................................................15
Table 5, Testing Document Costs..............................................................................................15
Table 6, Operation Document Costs.........................................................................................16
Table 7, Statement Of Compliance...........................................................................................19
© Mobile Arts AB 2018 This document contains confidential information that remains the property of Mobile Arts AB, and may
not be copied, circulated, or distributed without prior written consent of Mobile Arts AB.
Date Revision
4(20)
2005-09-15 A
Document Number
1 Introduction
1.1 Scope
Define shortly the scope for the implementation proposal e.g. in terms
of:
- Which parts of a system are covered and which are not
- The type of functionality and/or characteristics covered and not
covered
- The intended level of implementation detail provided
© Mobile Arts AB 2018 This document contains confidential information that remains the property of Mobile Arts AB, and may
not be copied, circulated, or distributed without prior written consent of Mobile Arts AB.
Date Revision
5(20)
2005-09-15 A
Document Number
2 Technical Solution
2.3 Traffic
© Mobile Arts AB 2018 This document contains confidential information that remains the property of Mobile Arts AB, and may
not be copied, circulated, or distributed without prior written consent of Mobile Arts AB.
Date Revision
6(20)
2005-09-15 A
Document Number
© Mobile Arts AB 2018 This document contains confidential information that remains the property of Mobile Arts AB, and may
not be copied, circulated, or distributed without prior written consent of Mobile Arts AB.
Date Revision
7(20)
2005-09-15 A
Document Number
3 Platform Impacts
3.3 Portability
© Mobile Arts AB 2018 This document contains confidential information that remains the property of Mobile Arts AB, and may
not be copied, circulated, or distributed without prior written consent of Mobile Arts AB.
Date Revision
8(20)
2005-09-15 A
Document Number
3.4 Co-location
4 Development Environment
4.1 General
4.2 Languages
4.3 Tools
© Mobile Arts AB 2018 This document contains confidential information that remains the property of Mobile Arts AB, and may
not be copied, circulated, or distributed without prior written consent of Mobile Arts AB.
Date Revision
9(20)
2005-09-15 A
Document Number
5 Security Impacts
© Mobile Arts AB 2018 This document contains confidential information that remains the property of Mobile Arts AB, and may
not be copied, circulated, or distributed without prior written consent of Mobile Arts AB.
Date Revision
10(20)
2005-09-15 A
Document Number
6 Characteristics Impacts
Describe new /modified principles for availability used in the system e.g.
regarding:
- Redundancy
- Fail-over and fail-back
Describe new /modified principles for load balancing used in the system
e.g. regarding:
- Load balancing criteria
- Overload protection
- Priority considerations within and between protocols
6.4 Capacity
© Mobile Arts AB 2018 This document contains confidential information that remains the property of Mobile Arts AB, and may
not be copied, circulated, or distributed without prior written consent of Mobile Arts AB.
Date Revision
11(20)
2005-09-15 A
Document Number
© Mobile Arts AB 2018 This document contains confidential information that remains the property of Mobile Arts AB, and may
not be copied, circulated, or distributed without prior written consent of Mobile Arts AB.
Date Revision
12(20)
2005-09-15 A
Document Number
6.6 Capabilities
7 Handling Impacts
Describe new /modified principles for backup and recovery used in the
system e.g. regarding:
- Robustness
- Export/import mechanisms
7.3 Options
7.4 Adaptations
© Mobile Arts AB 2018 This document contains confidential information that remains the property of Mobile Arts AB, and may
not be copied, circulated, or distributed without prior written consent of Mobile Arts AB.
Date Revision
13(20)
2005-09-15 A
Document Number
© Mobile Arts AB 2018 This document contains confidential information that remains the property of Mobile Arts AB, and may
not be copied, circulated, or distributed without prior written consent of Mobile Arts AB.
Date Revision
14(20)
2005-09-15 A
Document Number
8 Customisation Possibilities
10 Competence Development
10.1 Training
Identify any training needs within the organization, e.g. in terms of:
- Methodology
- Tools
- Programming languages
- Operating systems
- Databases
- Signalling
- Hardware
- Application specifics
10.2 Prototyping
© Mobile Arts AB 2018 This document contains confidential information that remains the property of Mobile Arts AB, and may
not be copied, circulated, or distributed without prior written consent of Mobile Arts AB.
Date Revision
15(20)
2005-09-15 A
Document Number
11 Costs
List each impacted product, and for each impacted product, list the
impacts on high level and estimate the cost for each such impact.
List each tested system, and for each tested system, list the testes on
high level and estimate the cost for each such test.
© Mobile Arts AB 2018 This document contains confidential information that remains the property of Mobile Arts AB, and may
not be copied, circulated, or distributed without prior written consent of Mobile Arts AB.
Date Revision
16(20)
2005-09-15 A
Document Number
© Mobile Arts AB 2018 This document contains confidential information that remains the property of Mobile Arts AB, and may
not be copied, circulated, or distributed without prior written consent of Mobile Arts AB.
Date Revision
17(20)
2005-09-15 A
Document Number
List each impacted testing document, and for each impacted document,
list the impacts on high level and estimate the cost for each such
impact, e.g. for:
- Function Test Specification
- System Test Specification
- Acceptance Test Instruction
© Mobile Arts AB 2018 This document contains confidential information that remains the property of Mobile Arts AB, and may
not be copied, circulated, or distributed without prior written consent of Mobile Arts AB.
Date Revision
18(20)
2005-09-15 A
Document Number
© Mobile Arts AB 2018 This document contains confidential information that remains the property of Mobile Arts AB, and may
not be copied, circulated, or distributed without prior written consent of Mobile Arts AB.
Date Revision
19(20)
2005-09-15 A
Document Number
12 Document Information
12.1 Glossary
12.1.1 Used Concepts
For each new revision: State the revision date and document status, and
describe on high-level the modifications.
Revision: Date: Current status and principal changes since previous revision:
© Mobile Arts AB 2018 This document contains confidential information that remains the property of Mobile Arts AB, and may
not be copied, circulated, or distributed without prior written consent of Mobile Arts AB.
Date Revision
20(20)
2005-09-15 A
Document Number
13 References
List the name, number and revision for each document reference.
[1] Document Name, Revision, Number
http://www.document_source.nu
© Mobile Arts AB 2018 This document contains confidential information that remains the property of Mobile Arts AB, and may
not be copied, circulated, or distributed without prior written consent of Mobile Arts AB.
Date Revision
21(20)
2005-09-15 A
Document Number
14 Status information
© Mobile Arts AB 2018 This document contains confidential information that remains the property of Mobile Arts AB, and may
not be copied, circulated, or distributed without prior written consent of Mobile Arts AB.
Date Revision
22(20)
2005-09-15 A
Document Number
List and describe on high-level any risks identified with respect to the
development project.
State also for each risk possible actions to minimise the risk.
© Mobile Arts AB 2018 This document contains confidential information that remains the property of Mobile Arts AB, and may
not be copied, circulated, or distributed without prior written consent of Mobile Arts AB.