Review/Approval Request for Construction
Execution Plan (Method Statement)
NO, riset6-201016-101
Project Nano | GARDABANII COMBINED-CYCLE POWER PLANT PROJECT
‘To. GARDABANE TPP 2 ULC
Ye have prepared project construction execution plan (nethod statment) for
Method statonent for 201 GT Lifting according to related regulations of the
contract and reviewed & approved by our superior technical person in charge.
Please review and spprove.
Attached Herewith:
Method statenent for 20107 lifting.
ose
Subcontractor (SH
HSE Manager,
Construction Manager:
Date: (2. 042018
Conment by Owner
[GARONBNNT TEP 2 (Oknse’ 8) (Stamps ARDABANL TPP 2 (Owner’ 82 (Sten)
Professional engineers: Project Wanoger:
Dates aesGARDABANI TTP 2 POWER
PLANT
CONTENT,
4
INDRODUCTION
41 SCOPE OF DOCIMENT
42 PARTIES
MANAGEMENT OF OPERATIONS
2.4 THECABAENGINGER & PROJECT MANAGER
22 CARAOPERATION SUPERVISER
23. MANAGEMENT OF CHANGE
2.4 Category 1 (Mine Deviation
2.2 Category 2~ Ojo) Deviation
24 SITE SAFETY
25 TOOLBOX TAKKRECORD
PREREQUISITES ANDINITIAL CONDITIONS
34 GENERAL
22 RESPONSIBILES
33 CONTROL OF O7ERATION
34 ORCANOGRAM
‘OPERATIONAL PROCEDURES
4:1 PRE-OPERATION PREPARATORY WORKS.
42. INSTALLATION PROCEDURE
‘421. GAS TURBINE UNLOADING & SPH INLAND TRANSPORT
422. GENERATOR UNLOADING & SPIT INLAND TRANSPORT
423 SET UP OF INSTALLATION EQUIPMENT
424 INSTALLATION OF GAS TURBINE & GT GENERATOR
PROJECT DRAWINGS AND REFERENCE DOCUMENTS LIST
APPENDICES
[APPENDIX ‘A = PREGLIFT CHECKLIST
APPENDIX‘ ~ PRE-TRAVEL CHECKLIST
[APPENDIX 'C'~ON-FOUNDATION WORK CONTINGENCY PLAN
APPENDIX ~ RISK ASSESSMENTS
‘Doc Tile; METHOD OF SWIEMENT FOR GTEGTO MSTALLATON
Doe. No: AS-07-2018-GARDABAN!
Revsien =A
Page 2
"
2
6OARDABANI TTP 2 POWER
PLANT
1 INDRODUCTION
4.4 SCOPE OF DOCUMENT
“This method statement covers the instalaton of 2 Gels of GTEGTG at Gardaban TPP2
Combed Cycle Pone’ Project located at Gardatani Georga, and is subject fo our nora
tems ac conditions of carrage
“This method statement represents the procedue to be followed, drawings, back up
‘engineering an rick avsesemenis to ensre the safe and professional insalition ofthe
‘Gas Ture Sos.
“Te intial characterises ofthe Gas Turbine Ses are a flow:
Thi
Dimonsion (m) Shipping
oy Deceptin Length | Woah | Fag | weight 0)
‘Gas Turbines ‘9900 | 3.524 | 4600 | 920
‘Gas Turbine Generator ‘2770 | 9.408 | 600°] 1200
“This document may be updated and revised upon receipt of futher information, Cent
comments and revisor,
[A operations are subject to our standard lems and condtons of cariage. Inchded inthe
‘relminary seope of wk forthe projets
“+ Suppl of all equipment forthe istalsion of he Gas Turbine Sets
Supply of enginesng suppor forall lavant operations and procedurs.
Itis the im of tia Metiod Statement to deine and dosesbe the equipment and sale
procedures, which ae lobe employed by CABAAMISNAK Projet Cargo & Heavy Lit
andl tne operations in eomptance’ wit) We folowing leilatve and guiance
‘deeumentation
LEGISLATION
Heat and Safty Wont 631 2
‘APROVED CODES OF PRACTICE
‘Alona Sees Dein (ASO) Eton, EN 10025, TSEN T3414 EN 1265-4
omen
“CABAAIASNAK GENERAL TERM and CONDITIONS, CABARMIGNAK HSEO PROCEDURES
‘Doo Tile: METHOD OF SRTEMENT FOR GTAGTE STALLION Revision A
Doe, No: A-01-2018-GARDABAN! Page 3