You are on page 1of 41
Review/Approval Request for Construction Execution Plan (Method Statement) NO, riset6-201016-101 Project Nano | GARDABANII COMBINED-CYCLE POWER PLANT PROJECT ‘To. GARDABANE TPP 2 ULC Ye have prepared project construction execution plan (nethod statment) for Method statonent for 201 GT Lifting according to related regulations of the contract and reviewed & approved by our superior technical person in charge. Please review and spprove. Attached Herewith: Method statenent for 20107 lifting. ose Subcontractor (SH HSE Manager, Construction Manager: Date: (2. 042018 Conment by Owner [GARONBNNT TEP 2 (Oknse’ 8) (Stamps ARDABANL TPP 2 (Owner’ 82 (Sten) Professional engineers: Project Wanoger: Dates aes GARDABANI TTP 2 POWER PLANT CONTENT, 4 INDRODUCTION 41 SCOPE OF DOCIMENT 42 PARTIES MANAGEMENT OF OPERATIONS 2.4 THECABAENGINGER & PROJECT MANAGER 22 CARAOPERATION SUPERVISER 23. MANAGEMENT OF CHANGE 2.4 Category 1 (Mine Deviation 2.2 Category 2~ Ojo) Deviation 24 SITE SAFETY 25 TOOLBOX TAKKRECORD PREREQUISITES ANDINITIAL CONDITIONS 34 GENERAL 22 RESPONSIBILES 33 CONTROL OF O7ERATION 34 ORCANOGRAM ‘OPERATIONAL PROCEDURES 4:1 PRE-OPERATION PREPARATORY WORKS. 42. INSTALLATION PROCEDURE ‘421. GAS TURBINE UNLOADING & SPH INLAND TRANSPORT 422. GENERATOR UNLOADING & SPIT INLAND TRANSPORT 423 SET UP OF INSTALLATION EQUIPMENT 424 INSTALLATION OF GAS TURBINE & GT GENERATOR PROJECT DRAWINGS AND REFERENCE DOCUMENTS LIST APPENDICES [APPENDIX ‘A = PREGLIFT CHECKLIST APPENDIX‘ ~ PRE-TRAVEL CHECKLIST [APPENDIX 'C'~ON-FOUNDATION WORK CONTINGENCY PLAN APPENDIX ~ RISK ASSESSMENTS ‘Doc Tile; METHOD OF SWIEMENT FOR GTEGTO MSTALLATON Doe. No: AS-07-2018-GARDABAN! Revsien =A Page 2 " 2 6 OARDABANI TTP 2 POWER PLANT 1 INDRODUCTION 4.4 SCOPE OF DOCUMENT “This method statement covers the instalaton of 2 Gels of GTEGTG at Gardaban TPP2 Combed Cycle Pone’ Project located at Gardatani Georga, and is subject fo our nora tems ac conditions of carrage “This method statement represents the procedue to be followed, drawings, back up ‘engineering an rick avsesemenis to ensre the safe and professional insalition ofthe ‘Gas Ture Sos. “Te intial characterises ofthe Gas Turbine Ses are a flow: Thi Dimonsion (m) Shipping oy Deceptin Length | Woah | Fag | weight 0) ‘Gas Turbines ‘9900 | 3.524 | 4600 | 920 ‘Gas Turbine Generator ‘2770 | 9.408 | 600°] 1200 “This document may be updated and revised upon receipt of futher information, Cent comments and revisor, [A operations are subject to our standard lems and condtons of cariage. Inchded inthe ‘relminary seope of wk forthe projets “+ Suppl of all equipment forthe istalsion of he Gas Turbine Sets Supply of enginesng suppor forall lavant operations and procedurs. Itis the im of tia Metiod Statement to deine and dosesbe the equipment and sale procedures, which ae lobe employed by CABAAMISNAK Projet Cargo & Heavy Lit andl tne operations in eomptance’ wit) We folowing leilatve and guiance ‘deeumentation LEGISLATION Heat and Safty Wont 631 2 ‘APROVED CODES OF PRACTICE ‘Alona Sees Dein (ASO) Eton, EN 10025, TSEN T3414 EN 1265-4 omen “CABAAIASNAK GENERAL TERM and CONDITIONS, CABARMIGNAK HSEO PROCEDURES ‘Doo Tile: METHOD OF SRTEMENT FOR GTAGTE STALLION Revision A Doe, No: A-01-2018-GARDABAN! Page 3

You might also like