25.11.

2018:Mouda Rake Unloading Report Mouda: (A) SHIFT


CHP RELEASE CYCLE REMARK
U/L U/L Rake Total CHP Time Unloading U/L Rate NET CHP T RAKE Rake RAKE REL CYCLE DEMURR MGR
Rake NO. OF QUANTITY
Date SIDING WT NO STARTS ENDS Waiting Interrupti in Hrs Time (Wgn/Hr) (hr) IN break OUT TIME AGE TIME
No WGN (MT)
(US) (UE) Time on Time (CHPT)= (ULT)= (ULR)= NCHPT= (RI) clear (RO) RCT= (hr) (MGRT) Unloading Constraints System Constraints
(RWT) (IT) UE-US CHPT-IT WGN/ULT RCT- MGRT Time RO-RI
(BC)

5 32 06:25 08:45 00:00 00:20 02:20 02:00 16.00 06:25


25.11.2018 141 NTPC-BNDG 02:20 05:30 09:20 03:50 00:00 01:30 3723.60
2 25 06:15 08:25 00:00 00:10 02:10 02:00 `12.5 06:15

HUGE BOULDERS , JCB WORK REQUIRED AFTER EACH


5 30 25 wagons unloaded
WAGON
25.11.2018 142 08:55
2 28 25 wagons unloaded

1 41 15 wagons unloaded
25.11.2018 143 09:50
6 16 manual

Monthly Total Time Till date (Nov'2018) 183:37 793:50 613:35 802:05 149:00 180:20 Total Monthly Coal Receipt
5,25,686
Monthly Avg Time Till date (Nov'2018) 00:41 03:00 04:24 05:43 01:03 01:17 (NOV '2018)
SCE - GROUP-B Total Daily Coal unloaded
Daily Total Time 5:46 29:58 29:20 36:35 7:00 7:15
(00-24 hr) 21,937
Daily Avg Time 00:31 02:43 04:53 06:05 01:10 01:12

Date RAKE RECEIVED RAKE UNLOADED Balance


(00: to 24:00 hrs) (00: to 24:00 hrs)
24.11.2020 3 1+2 2
25.11.2018:Mouda Rake Unloading Report Mouda: (A) SHIFT
CHP RELEASE CYCLE REMARK
U/L U/L Rake Total CHP Time Unloading U/L Rate NET CHP T RAKE Rake RAKE REL CYCLE DEMURR MGR
Rake NO. OF QUANTITY
Date SIDING WT NO STARTS ENDS Waiting Interrupti in Hrs Time (Wgn/Hr) (hr) IN break OUT TIME AGE TIME
No WGN (MT)
(US) (UE) Time on Time (CHPT)= (ULT)= (ULR)= NCHPT= (RI) clear (RO) RCT= (hr) (MGRT) Unloading Constraints System Constraints
(RWT) (IT) UE-US CHPT-IT WGN/ULT RCT- MGRT Time RO-RI
(BC)

Major PTW on 24.11.2018 DEPT PTW STATUS


1 WT#2, PM of all motors EMD Cancelled
2 PM of WT#1 dribble conv MMD Cancelled
3 PM of SAC#1 MMD Cancelled
4 CONV 3A(PM) MMD Cancelled
5 BF#1 motor-WTC EMD Cancelled
6 WTDSS-2 leakage MMD Cancelled
7 S/R#1 boom conv. PM MMD Cancelled
8 conv 11A PM MMD Cancelled
9 FG#29 Chute puncture. MMD Cancelled
10 conv 5A take up plateform rectification MMD Cancelled
11 conv 28, thruster brake not working MMD Cancelled
12 conv 1A LHS Cable laying. C&I Cancelled
13 FG#52 PM MMD issued
14 BF#4 PM MMD Cancelled
15 CONV 1A-HOLD BACK DAMAGED MMD Cancelled
16 CONV 13A-HOLD BACK REMOVAL MMD issued
17 WT#6 main pump disch. Leakage MMD issued
18 VSF#1 ,2 : Chute puncture MMD Cancelled
19 Con 8B : Receiving chute puncture MMD Cancelled
20 FG#5 to Con 3B : Chute puncture MMD Cancelled
21 Con 9A : Receiving chute puncture Cancelled
18 Crusher#7 VGF # 7 disc damaged MMD OLD ISSUED
19 EBD 2,6,1,5,3,7 platform erection work MMD OLD ISSUED

WT1 WT2 WT3 WT4 WT5 WT6


Availability
Available Available Available Available Available Not Available
status
Hydraulic Hose pipe leakage
Remark
25.11.2018:Mouda Rake Unloading Report Mouda: (A) SHIFT
CHP RELEASE CYCLE REMARK
U/L U/L Rake Total CHP Time Unloading U/L Rate NET CHP T RAKE Rake RAKE REL CYCLE DEMURR MGR
Rake NO. OF QUANTITY
Date SIDING WT NO STARTS ENDS Waiting Interrupti in Hrs Time (Wgn/Hr) (hr) IN break OUT TIME AGE TIME
No WGN (MT)
(US) (UE) Time on Time (CHPT)= (ULT)= (ULR)= NCHPT= (RI) clear (RO) RCT= (hr) (MGRT) Unloading Constraints System Constraints
(RWT) (IT) UE-US CHPT-IT WGN/ULT RCT- MGRT Time RO-RI
(BC)

DAILY AVG. ULR OF WAGON TIPPLER WISE


RAKE NO WT-1 WT-2 WT-3 WT-4 WT-5 WT-6

ULR WGNS ULR WGNS ULR WGNS ULR WGNS ULR WGNS ULR WGNS

129 16.22 20 14.71 38


130 14.29 25 16 32
131 15.6 26 15.36 32
132 13.26 21 12 30
133 12.35 35 13.14 23
134 10.34 25 13.66 33
135 14.12 20 10.00 33
136 9.13 44
137 12.48 26 13.33 20
138 19.33 58
139 23 35
140 32 20
20 72 124 126 173
WT WISE
16.22 13.07 13.32 14.40 13.89
AVG ULR

AVAILABILITY STATUS OF STREAM


SR NO NAME OF STREAM STATUS REMARKS (OUTAGE OF EQUIPMENTS) DAILY ZERO HOUR REPORT (NIGHT SHIFT): 24.11.2018
1 A-Stream (AVL/ AVL
NOT AVL) TOTAL RAKES RECEIVED 05 NO. RAKES (136-140)
Stage- 1
B-Stream AVL COAL RECEIVED IN MT 18,541
A-Stream AVL TOTAL DEMMURAGE 7 HRS
DIR LOADING Stage- 2
B-Stream AVL COAL RECLAIMED IN MT 7,061
(BUNKERING)
Stage1 25,602
Conv-31 AVL COAL CONSUMED IN MT
to Stage2
Stage1 Conv-30 AVL CHP APC (STAGE-I) IN MU. 0.0370
to Stage2
2 Stage- 1 A-Stream AVL CHP APC % OF STATION APC 1.76%
STACKING Stage-1 B-Stream AVL BUF %(STAGEI/ STAGEII) 42%
Stage- 2 A-Stream AVL Station APC 2.0730
3 A-Stream AVL

Stage- 1
B-Stream AVL

Stage-2 Stream AVL

RECLAIMING Stage- 2
to Stage-
Stream AVL
1
Bunkers
Stage- 1
to Stage-
Stream AVL
2
Bunkers