QUARTERLY
BY JEFF ALEXANDER
2 Industry/Municipality
Cooperation for Kentucky
Wastewater Treatment
An acute wastewater
treatment problem is
resolved when a food
processing facility installs
a pretreatment system
in just four months and
a city is persuaded to
take a second look at its
treatment plant capacity.
4
Marketing Terry Peckham
Communications
Manager
7
acquisition deal.
To speak with a Brown and
Caldwell representative,
call us at (800) 727-2224
or visit our web site at
www.brownandcaldwell.com.
Quarternotes Choosing the best way
to comply with GASB;
Brown and Caldwell provides a unique collaborative
environmental engineering and process helps convert
consulting services to public a Wyoming refinery
agencies, the federal to recreational and
government, and industry. commercial use;
the kaolin industry
Quarterly is published by overcomes internal
12
Brown and Caldwell, P.O. Box 8045, competition to shape
Walnut Creek, CA 94596-1220; MACT standards.
tel. (925) 937-9010.
Subscriptions are free.
© Brown and Caldwell 2000.
Please contact the editor
at (925) 210-2452 or
lbernstein@brwncald.com
Academic Institutions Traditionally less regu-
lated by environmental
for permission to reprint.
Learn Hard Lessons agencies, colleges and
universities can avoid
fines, demonstrate lead-
Brown and Caldwell is an equal
opportunity employer supporting
work force diversity.
Through EPA Enforcement ership, improve public
relations, and reduce
operating costs through
compliance efforts.
Wesley Eckenfelder:
PERSISTENT
Pioneer Craig Goehring: In the mid-1950s, who were your
peers in teaching and advancing environmental or
sanitary engineering?
Wes Eckenfelder: Back then, probably Ross McKinney,
a major researcher with the University of Kansas. There
weren’t many people in the ’50s who were doing process
design for industrial wastewater. On the international scene,
there was Wuhrman in Switzerland, Downing in England,
and Von der Emde in Germany. I organized the first inter-
national conference at Manhattan College in 1955 and got
T his issue honors Dr. W. Wesley Eckenfelder, one of
the three people named 20th-Century Pollution Control
the world’s primary movers to come and give a paper or
two. We published the proceedings in 1956.
Pioneers by “Environmental Protection” magazine this past CG: Did the conference have a particular focus?
December. Along with recognizing Wes, that magazine WE: We had roughly 100 people, with all of the major
honored J. J. Thomson and Arthur J. Dempster, early leaders from England, Germany, Switzerland, and Japan.
developers of the mass spectrometer, and Rachel Carson, It was principally focused on biological factors. We held
author of “Silent Spring,” the book credited with beginning a second conference in ’57 and another in ’60. There was
the modern American environmental movement. no international association in those days. It was the first
Wes is a trailblazer in the wastewater industry. He time equations and formulations were discussed, and
has personally trained thousands of graduate-level students it was probably the thing that propelled me to publish
and practicing professionals in the science and art of indus- “Biological Waste Treatment” in 1960. That was the first
trial wastewater treatment, and his textbooks are standards book on biological waste treatment and the first time all
worldwide. He started his first environmental consulting these equations appeared.
business in 1949; has consulted with more than 150
industrial companies; developed several biological treatment CG: Any thoughts on your early impact on the industry?
systems specifically for industrial applications; authored or WE: I designed one of the first activated sludge plants for the
edited 27 books; is the recipient of 26 national and interna- pulp and paper industry in 1953. Prior to that, it was primary
tional honors; and co-founded the International Association treatment and then into the river. We ran pilot studies for
for Water Pollution Research and Control (IAWPRC) in 1962. about eight months because there was no information around
Today, as a senior technical director for Brown and at that time. The plant was designed by Gibbs and Hill; I did
Caldwell, Wes continues to educate, innovate, and develop the process design. The plant went on line in 1955 or 1956.
practical solutions. In the nearly two years since Brown Interestingly, not only is it still operating, but it’s treating
and Caldwell acquired Eckenfelder Inc., we’ve found that triple the load for which it was originally designed.
the firm’s 30-year track record in serving top industrial
companies perfectly complements Brown and Caldwell’s CG: You started with pilot tests to get reaction rates.
environmental practice. A shared value has propelled our Were you using process equations?
ongoing combination: a pioneering spirit. WE: They were really crude at that point. Then around
When Wes and I sat down to talk for Quarterly in late 1955 or ’56, we were the first to come up with an aerated
December, he started by telling me of a new idea for improv- lagoon design. In fact, Donald O’Connor from Manhattan
ing biological-nutrient removal in a low-dissolved-oxygen College and I published a paper that included equations
environment. He described field measurements planned at which were the forerunner of the kind of mathematics that
a local plant to test the process modification, a low-cost we’re using now.
treatment solution to comply with pending state regulations.
That this was first on his agenda says it all: Rather than CG: So you were looking for repeatability, ways to
discussing his 50-year career and the recent honor from expand the process. Was there a chemical engineering
“Environmental Protection,” this internationally acclaimed first-rate reaction equation that you were building from?
pioneer was more interested in doing just that—pioneering. WE: I got to know a biochem professor at Columbia who was
You can reach Wes at weckenfelder @ brwncald.com. in the process of developing equations for the fermentation
industry. I figured, this is the same kind of thing we do in
— CRAIG GOEHRING, P.E., CEO
CONTINUED ON PAGE 13
1
BROWN AND CALDWELL QUARTERLY
An acute
wastewater
treatment problem
is resolved when a
Win-Win
Industry/ Municipality Cooperation Leads to
food processing
facility installs a
pretreatment system
in just four months When both look at pretreat- Division of Water had of the plant upset. The City
and a city is persuaded A ment and capacity options threatened the City with a ordered the food processor
to take a second food together, they can maximize moratorium on new sewer to install a pretreatment
look at its treatment process- existing capital investments connections.The City had system that would reduce
ing plant, and minimize new ones. responded by assigning its BOD load by 70 percent.
plant capacity. the City of That saves money for private its consultant to evaluate Estimated cost: $3.5 million.
Murray, Ky., industry and the city.” possible plant upgrades
and Brown and that would meet the
Caldwell recently proved Division of Water’s pub- Quickly installing
again that industry and A problem with lished design values. industry pretreatment
municipalities can meet City effluent Then an acute non- “The food processing plant
wastewater treatment targets sends up a red flag compliance event occurred called on Brown and Caldwell
more quickly and inexpen- Satisfactory wastewater treat- in the City’s only—and to design and build the
sively when they collaborate ment at the publicly owned, effluent-dominated—creek, pretreatment system and
in their search for solutions. Murray, Ky., facility was prompting the Division of negotiate the pretreatment
The solution in this defined largely according to Water and other agencies permit with the City and
case hinged on conducting “Recommended Standards to get involved. state,” explains Project
a comprehensive assessment for Wastewater Facilities,” The most likely cause Manager Houston Flippin.
of the municipal treatment known as the Ten State of the event was a sludge “We were able to negotiate
plant capacity, and the Standards, which had been blanket carryover from the a 45 percent reduction
design and installation of a embraced by the Kentucky treatment plant’s secondary in BOD load within six
pretreatment system at the Division of Water. In 1994, clarifier, which in turn months—and a delay of
food processing facility that the City facility was rated to was caused by two factors. the 70 percent reduction
reduced its biochemical treat an annual average BOD One was inadequate sludge requirement until we could
oxygen demand (BOD) load of 10,328 pounds per wastage due to the City’s comprehensively evaluate
load on the City by more day (lb/day), at a wastewater inability to land-apply the the actual treatment capacity
than 50 percent. flow of 4 million gallons sludge over a prolonged of the City’s facility.”
“Cooperative problem- per day (mgd). Actually, the wet-weather period (the City Meanwhile, Brown and
solving between industry plant treated an annual wasn’t prepared to dispose Caldwell evaluated design
and municipalities about average BOD load of 12,300 of the sludge in a landfill). alternatives for the pretreat-
discharge compliance makes lb/day. The food processor’s The second factor was the ment system and performed
sense,” comments Jeff share of that load was poor sludge settleability that bench-scale testing. An aer-
Pintenich, the project principal approximately 5,000 lb/day plagued the City plant. ated equalization tank was
in charge. “The municipality (roughly 40 percent), at an Nevertheless—because selected for design, which
has a large investment in average flow of 0.2 mgd. it generated 40 percent of began in October 1998.
facilities and is considered Because the City treat- the City treatment plant’s Only four months later, the
the expert in treatment. ment plant’s operating load annual average BOD load— pretreatment system started
Industry is the expert on was more than 90 percent the food processor was up. It consisted of on-line
producing its products. of its rated capacity, the implicated as the instigator CONTINUED ON PAGE 4
2
WINTER 2000
The former aerobic digesters
of the Murray, Ky., municipal
wastewater treatment plant.
As part of minor modifications
recommended by Brown and
Caldwell, these digesters were
converted to sludge thickeners
to promote more effective use
of a newer aerobic digester.
This and other modifications
stemmed from Brown and
Caldwell’s six-week program
to re-evaluate the City plant’s
capacity, which was thereby
increased by 25 percent
(PHOTOS BY JASON MULLEN).
3
BROWN AND CALDWELL QUARTERLY
Win-Win, C ONTINUED FROM PAGE 2
With two months to close
waste-load monitoring through turbidity analysis, a escrow, RMC Nevada sought an
lift station, a force main, and a 570,000-gallon aerated accurate analysis of a site’s
equalization tank with jet aeration, defoamer addition, mineable resource—along with
nutrient addition, and process-control systems. The interim Phase I ESAs and a review of
pretreatment limits were met immediately. Later, they were operating permits—to assess
exceeded, with more than 50 percent of the BOD load whether it should finalize
reduced by the new system. Installed cost: $1.8 million. the acquisition deal.
To calculate the volume of a quarry site’s mineable resource over time for its possible purchase, Brown and Caldwell
used topographic images (bottom) to help develop three-dimensional topographic models (top) and conceptual pit designs
(middle). The pit designs incorporate five different constraining surfaces, property boundaries, geologic data, assumptions
regarding pit slopes, and other site information. The design illustrated here depicts a 2 horizontal:1 vertical pit slope. 5
BROWN AND CALDWELL QUARTERLY
Against the Clock, C ONTINUED FROM PAGE 4
Meanwhile, nearby forest fires were layout and constraints—specifically, its survey. The geologic model allowed
producing smoke and haze that threat- mineable resource, the Washington Brown and Caldwell to estimate the
ened to indefinitely delay aerial survey- Hill rhyolite. The rhyolite is crushed, shape, vertical and horizontal extent,
ing, which was needed to gain essential processed, and used to produce and variability of rhyolite on the
topographic data. concrete and asphalt. 858-acre site.
As the fires kept burning, Hebert Field mapping, exploratory Next, the team developed mining
and Project Manager Rob Matter assem- drilling, and detailed site examination scenarios, harnessing Surpac 2000 and
bled the team: from the Phoenix office, proceeded through September. A sub- SurvCADD to prepare conceptual pit
Jim Robison, senior mining engi- designs for the identified
neer, Janice Petticrew, environmen- extraction scenarios. The
tal scientist, and Bill Simmons, sen- pit designs accounted for
‘‘
ior design engineer; from the Boise, a number of variables:
Idaho, office, Geologist Rob
Mullener; and from the Carson
With three- five different constraining
surfaces, a 200-foot offset
City, Nev., office, Geologists Brad inside the property line,
Hart and John Bennett. Each team
member would contribute expert-
dimensional model- the rhyolite contact with
an underlying andesite
ise—gained from environmental
assessments, mining projects, and ing software, we can rock body, the encroach-
ing highwall pit slopes,
geologic mapping—that would the assumed structure of
yield a whole view greater than the
sum of its parts.
render surface the andesite, the existing
topography, wash loss,
QUARTERNOTES
The bargaining chip was delivered
to RMC on September 24, not two
months from the preliminary site
inspection, in the form of the promised
draft report.
It showed that the recoverable
resources of the 858-acre parcel were
much more limited than the the seller
had asserted. Instead of 1 billion tons
of mineable rhyolite, approximately
136 million tons of product was recov-
erable using a 2 horizontal:1 vertical pit
slope, and approximately 117 million
tons of product was recoverable using
a 3 horizontal:1 vertical pit slope,
according to the due-diligence team’s
Guidebook Navigates
estimate. Assuming the current produc- Texas’ New Rules
tion rate of 1 million tons per year, the
team determined the site’s mine life to on Environmental
be approximately 100 years.
ESAs for both sites uncovered
Risk Assessment
no significant environmental problems The Lone Star State has finalized new rules for risk assessment of contaminated
present that would prevent the deal sites and cleanup using natural attenuation. And a new guidebook is available
from closing. Also, the permit review from Brown and Caldwell to help industry users understand and apply the wide-
showed that conditions for continued ranging regulations.
operation of the site were acceptable In development since 1996, the Texas Risk Reduction Program (TRRP) Rules
to RMC. reflect the state’s reputation for doing things in a big way. ”They are the most
Although Brown and Caldwell’s comprehensive rules for risk-based corrective action promulgated by a state
estimated volume of recoverable rhyo- so far,” says Austin Cooley, P.E., Houston-based environmental program
lite was far lower than the seller’s
manager for Brown and Caldwell. “And in the past, many states have followed Texas’
claim, RMC had previously drawn its
lead in this area.”
own line in the sand: 100 million tons
Brown and Caldwell helped develop the new program, participating in all meet-
of rhyolite to be extracted with reason-
able confidence. Brown and Caldwell’s ings of the Texas Natural Resource Conservation Commission’s TRRP working group
analysis reassured Bonnell that the and providing extensive written comments on the rules. The company also trained
minimum could be mined. And the Commission staff in risk assessment and natural attenuation evaluation methods.
team’s other findings added the final Brown and Caldwell’s 30-page “Texas Risk Reduction Program Guidebook”
pieces to the puzzle of what the two summarizes the regulations in a comprehensible way, addresses their framework,
parcels really offered. and discusses their most important elements. A section on “Frequently Asked
“RMC Nevada is very pleased that Questions” is included. For a copy, send $5 to Kelly Ansley, Brown and
Brown and Caldwell met our timeline,” Caldwell, 1415 Louisiana, Suite 2500, Houston, Texas 77002, or call (713) 646-1134.
says Bonnell. “The team’s efforts
helped us support our position and
our purchase price. The transaction Salo Elected to WEF Board of Directors
closed successfully.” John Salo, senior vice president in Brown and
Caldwell’s Atlanta office, was elected to the Water
Contact Brian Anderson in the Boise, Environment Federation (WEF) Board of Directors at the
Idaho, office at (208) 336-1340 for Annual Conference in New Orleans in October 1999. One of
more information on construction two directors from Georgia, he will serve a three-year term.
materials services. In 1998, Salo received WEF’s Arthur Sidney Bedell
Award, the most prestigious award that can be given to
honor an individual member, “in acknowledgement of
extraordinary personal service.”
CONTINUED ON PAGE 9
7
BROWN AND CALDWELL QUARTERLY
Choosing the Best
Way to Comply with
(Gasp!) GASB 34
Governmental Accounting Standards Board Statement 34 (GASB) isn’t
Norris Co-Authors Two Books a problem waiting somewhere in the distant future. It’s here. Roughly
on Subsurface Cleanup 84,000 agencies will need to comply with the new rules for financial
reporting—many of them in the fiscal year beginning July 1, 2001, and
and Bioremediation the rest over the following two years, depending on their revenues.
Forward-thinking agencies are starting now to prepare for GASB
34. But choosing the best way to comply may not be easy: Compliance
strategies will have effects reverberating well beyond the CFO’s office.
F
Two approaches to accounting for fixed assets
The new rules require public agencies to identify all their fixed assets,
establish each asset’s value, and determine its service life. Agencies
then must calculate and report the depreciation of these assets—or
ocusing on the Department of mittee helped lead to the
report activities and expenditures to maintain assets—as part of the
Energy’s (DOE’s) environmental influential book “In Situ
cost of doing business.
practices and technologies, a Bioremediation—When Does It
Many agencies will find this difficult because of incomplete fixed
new publication from the Work?” That volume introduced
asset records, poor knowledge of historical costs, or unknown asset
National Research Council the term “intrinsic remediation”
service lives.
examines current issues in and served as the basis for the
Once depreciation is reported as a utility cost, current rates may
subsurface remediation. U.S. EPA’s monitored natural
not appear to be in line with the cost of providing service. For instance,
“Groundwater and Soil Cleanup: attenuation protocols.
if payments on debt principal, rather than depreciation, have been the
Improving Management of Also co-authored by Norris
basis for current rates, the sudden substitution of depreciation will
Persistent Contaminants” is “Accelerated Bioremediation
skew the apparent gain or loss from operations, perhaps dramatically.
is co-authored by Robert D. Using Slow Release Compounds,”
Offering an alternative to reporting depreciation, GASB sets out a
Norris, Ph.D., Brown and recently published by Battelle
"modified approach"—which it encourages infrastructure agencies to
Caldwell’s Nashville-based Press. The book presents
adopt—requiring that agencies periodically assess the condition of
technical director of in-situ selected papers from a confer-
their fixed assets and report activities and expenditures to maintain
remediation. ence series on bioremediation
the assets. This rigorous approach to GASB 34 compliance is not
The Council formed a com- technologies sponsored by
strictly required, but bond rating agencies will probably favor it for two
mittee in 1997 to review how the Battelle—a Columbus, Ohio-
reasons: It avoids the distorting effects of reporting depreciation based
DOE develops technologies to based non-profit technology
on historical costs; and it demonstrates good stewardship of assets in
characterize, remediate, and organization—from 1993 to
a way that simply reporting depreciation does not.
contain contaminants on its 1999. Norris and co-editor
Many infrastructure agencies will choose to adopt programs to
sites, evaluate the technologies, Steve Koenigsberg,
periodically assess and report asset conditions in accord with GASB
and critique the DOE’s manage- Ph.D., highlight the key issues
34’s modified approach. These agencies will need to develop scales to
ment of their technology devel- involved in the use of slow-
rate asset condition, methodologies to document asset condition, and
opment program. The resulting release oxygen and hydrogen
a GASB 34-compliant asset management system. Of course, they also
book details the department’s compounds to clean up various
groundwater and soil problems contaminants.
and the changing regulatory Contact the National
environment. It then examines Academy Press at www.nap.edu
DOE responses to dense, or (888) 624-8373 to order
non-aqueous-phase liquids “Groundwater and Soil Cleanup.”
(DNAPLs), metals, and radionu- To obtain “Accelerated
clides and recommends Bioremediation Using Slow
technical approaches. Release Compounds,” contact
Norris’ efforts on another Norris at (615) 255-2288 or
National Research Council com- bnorris@brwncald.com.
8
WINTER 2000
After a strategy has been formulated, Brown and Caldwell may
help implement it, working with agencies as program or project man-
agers in several key areas:
10
WINTER 2000
Kaolin Industry promulgated for 78 categories of examining the EPA’s approach problem as a whole, weighing
Aims to Shape emission sources. Over the next
three years, 66 standards cover-
to various air pollutants as well
as indicators, emissions levels,
the risks and rewards of different
technical issues, and then
MACT Regulations ing 96 source categories are to
be issued. If federal MACT
required monitoring, final
compliance requirements,
developing strategic paths). The
company’s team includes special-
standards aren’t issued on time, and industry costs. ists in mining, testing, permitting
The kaolin industry is helping states can put forth equivalent Smith cites the outcome and compliance, health and risk
to shape new federal standards air emissions regulations. that befell the portland cement assessment, decision and strategic
for maximum achievable control MACT standards have industry as one the kaolin analysis, modeling, economic
technology (MACT) to limit air pol- raised considerable concern industry wants to avoid: Two analysis, and process engineering.
lution. The clay products MACT, among private industry because manufacturer associations are
which includes kaolin, is due to be
promulgated by May 15, 2002. DOE
“The economic impact
of this regulation on the kaolin
Commends
manufacturing industry could Clarke for
be enormous, as much as Pit 9 Drilling
eight or nine figures,” says
Craig Smith, Ph.D., a Safety Review
Brown and Caldwell air regula- In an unusual recognition of
tions expert based in Atlanta. timely and high-quality work,
“We hope to reduce that impact the Department of Energy
by supporting the development gave a Corporate Award to
of regulations that fit this indus- James Clarke, Ph.D., of
try, not the other way around.” Brown and Caldwell, and his
Smith leads the strategic fellow team members from four
response of the China Clay other firms, for their independent
Producers Association (CCPA), technical review of proposed
which consists of five compa- sonic drilling in Pit 9 at the Idaho
nies that produce 60 percent of National Engineering and
the world’s kaolin. A type of clay Environmental Laboratory.
used in high-grade paper, paints, The Department had received
additives, and pharmaceuticals, conflicting advice about whether
kaolin deposits in North America sonic drilling into the pit’s buried
are concentrated in Georgia. The waste–which contains potassium
clay processing industry also and sodium nitrates and petrole-
includes alumina, bentonite, um hydrocarbon oils –could result
fuller’s earth, and ball clay. in explosion or fire. The 1-acre pit
“Brown and Caldwell is the so far, their limits have required suing the EPA, disputing its pre- also contains barrels, boots, rags,
quarterback, running the plays to capital-intensive emissions con- scribed monitoring technology and debris contaminated with
get the CCPA through a myriad trols. Emissions may be reduced and its ability to regulate certain plutonium and other hazardous
of regulatory issues,” explains through elimination, process pollutants, while the Sierra Club chemicals generated during
Smith. "A big part of our work is modifications and substitutions, is suing the EPA as well, alleging nuclear weapons production at
facilitating meetings by a group new operating procedures, that it has not gone far enough the Rocky Flats site in Colorado
which is bound by a common and/or "end-of-the-pipe" controls. in reducing hazardous air pollu- and dumped in the late 1960s. The
goal, but made up of ardent Costs for the latter have run into tants. Meanwhile, the EPA Department planned to sample it via
competitors. This group contin- the millions of dollars. estimates that the portland sonic drilling as part of a cleanup
ues to develop honesty and Smith is drawing on his cement MACT standard will project that had been plagued by
openness among themselves— work with other industries that lead to industry compliance technical and legal delays.
which is critical to achieving have responded to MACT stan- costs of $240 million per year. The independent panel con-
consensus on strategic issues.” dards development, including For the kaolin industry, cluded in November 1999 that
An outgrowth of the 1990 gasoline storage and organic Brown and Caldwell formulated the potential for explosion or fire
amendments to the Clean Air liquid distribution companies. In a decision analysis process that from sonic drilling is "beyond
Act, and administered by the particular, he has analyzed the wouldn’t predetermine the extremely unlikely" if the panel’s
U.S. Environmental Protection efforts of others to influence course of action. A more typical recommendations are followed.
Agency (EPA), MACT regula- MACT regulations development, approach would be linear Recently, 20 subsurface probes
tions will eventually cover more including the portland cement, (collecting information and then were installed using sonic drilling
than 174 industrial categories. phosphate fertilizer, and lime responding to the EPA) rather throughout the full depth of Pit 9,
To date, 43 standards have been industries. This has involved than global (looking at the without incident.
11
BROWN AND CALDWELL QUARTERLY
Academic
Institutions
Learning Hard Lessons
Through EPA Enforcement
Sounding a clarion bell heard period prevented the site from being
I
Issues and Ideas
12
WINTER 2000
Most coveted honor:
C ONTINUED FROM P AGE 1 “The Imhoff-Koch Medal from the
13
BROWN AND CALDWELL QUARTERLY
The Short Course on Pulp
and Paper Activated Sludge
The new Short Course on Pulp and Paper Activated Sludge targets sludge settling
problems, both filamentous and non-filamentous. Structured for experienced
operators and managers of activated sludge plants, this fast-paced, hands-on
workshop covers tools and techniques to efficiently troubleshoot and correct
secondary clarifier problems.
The Short Course on Pulp and
■ Differentiate between performance problems caused by operational control Paper Activated Sludge is
decisions and those caused by design problems presented by Paul Klopping,
senior vice president for
■ Learn a powerful new technique for measuring sludge settling characteristics
Industrial Water Quality at
Brown and Caldwell. Klopping
■ Understand statistical process control and the use of selectors and biological helped develop TAPPI’s
modeling to improve operations reliability Activated Sludge Plant
Operations Short Course
and was awarded “finest faculty”
Course components: Cost: $595 status by TAPPI each year
Overview of Biological Treatment from 1994 through 1999.
Activated Sludge Process
Control Tests
Upcoming workshops:
Controlling Recycle Sludge Flow
Nutrients and Nitrification/Denitrification July 11-12, 2000
Controlling Waste Sludge Flow St. Paul, Minnesota
Controlling Aeration Register Today:
Sludge Settling Problems September 27-28, 2000
Troubleshooting Case Histories Nashville, Tennessee
(800) 727-2224
www.brownandcaldwell.com/sludgeworkshop
PRESORT
P.O. BOX 8045 BULK RATE
WALNUT CREEK U.S. POSTAGE
CALIFORNIA 94596-1220 PAID
PERMIT NO. 11882
SAN FRANCISCO, CA
ADDRESS CORRECTION REQUESTED