1 EXECUTIVE SUMMARY
This is the first Information Systems (IS) strategy formulation document for the
Municipality of Tigbauan which is prepared as guidelines to meet our ISSP target. This
document is envisioned to be user friendly and deals with key IT requirements that will
support the municipality to function better, effectively and competent. This Information
Systems strategic document will emphasize the importance of moving from the traditional
approach of treating IT as the separate tools that are not linked to the municipality’s goals. It
will also focus on ensuring that business processes of the municipality are supported by the
Information Technology.
expenditures
to direct the efforts of the IT department over the period of the plan
4|Page
Information Systems Strategic Plan 2017 - 2019
2 LGU PROFILE
5|Page
Information Systems Strategic Plan 2017 - 2019
2.4 Personnel Inventory
Number of Employees
Permanent 115
Temporary None
Co-terminus 5
Casual None
Job order 92
Elected 11
Total 223
6|Page
Information Systems Strategic Plan 2017 - 2019
3 LGU VISION-MISSION STATEMENT
7|Page
Information Systems Strategic Plan 2017 - 2019
3.4.2 Mission Statement
The ICT Mission is to automate the departments of the LGU to enable it to provide a
more efficient and enhanced system of delivery of basic public services to the people.
8|Page
Information Systems Strategic Plan 2017 - 2019
4 LGU AND ITS ENV IRONMENT (GRAPHICAL
INTERFACE)
Province DILG
Gov’t
Regulatory
Bodies
Government
Units
LGU
General
Public
NGO’s
Service Legislative
providers Bodies
9|Page
Information Systems Strategic Plan 2017 - 2019
5 RESOURCE ANALYSIS (CURRENT)
Programmed Microsoft
Accounting For accountable transactions
Excel
11 | P a g e
Information Systems Strategic Plan 2017 - 2019
5.2 Existing Hardware
Printer (3N1)
Department
Geotagging
Switches
Internet
Scanner
Desktop
Camera
Laptop
printer
Router
Copier
Fax
Office of the Mayor 5 2 2 1 1 0 0 1 1 1 1 0
HRMO 3 0 3 0 0 0 1 0 1 0 1 0
MPDO 5 4 3 0 0 0 1 0 2 0 2 2
Budget Office 3 2 2 0 0 0 1 0 0 0 0 0
Engineering 3 2 0 1 2 2 1 0 1 0 1 0
Assessor 3 1 2 0 1 0 1 0 1 0 1 0
LCR 3 1 3 0 0 1 0 0 1 0 1 0
Treasury 12 2 2 8 0 0 0 0 1 3 1 0
Accounting 3 3 3 3 0 0 0 0 0 0 1 0
DILG 1 0 1 0 0 0 0 0 0 0 0 0
SB Office 8 5 6 4 0 1 1 0 2 1 2 0
MAO 3 1 2 0 0 0 1 0 1 0 0 0
MSWDO 2 1 3 0 0 0 0 0 0 0 0 0
MHO 7 5 4 2 1 1 1 0 1 0 1 0
MENRO/TOURISM/CAO
1 2 1 0 0 0 1 0 0 0 0 0
/GAD
PNP (Police) 8 0 2 0 0 0 0 0 1 0 1 1
BFP 2 1 1 1 0 0 0 0 1 0 1 0
Total 72 32 40 20 5 5 9 1 14 5 14 3
12 | P a g e
Information Systems Strategic Plan 2017 - 2019
5.3 Existing Applications (Conceptual Framework)
13 | P a g e
Information Systems Strategic Plan 2017 - 2019
5.4 Existing ICT Structure
Payment System
RPT System
e-BPLS
14 | P a g e
Information Systems Strategic Plan 2017 - 2019
5.5 Existing Network layout
16 | P a g e
Information Systems Strategic Plan 2017 - 2019
DEPARTMENT NEEDS POSSIBLE ICT SOLUTIONS
Microsoft Applications Install Microsoft Application
(MSWord, MSExcel,
MSPowerpoint) Install Internet Connection
DILG
Internet Connection for
Communication and web search
purposes
Electronic Archiving of all Provide comprehensive
incoming information system to archive
communications/Public incoming communications and
SB OFFICE Documents public documents at the same
Software Upgrade for speedy time generates report for SB
generation of SB Office Office.
Documents/Records
Tourism Records Archiving Provide archiving system and
TOURISM System upgraded hardware to handle
the installed software
MENRO Records Archiving Provide archiving system and
MENRO System upgraded hardware to handle
the installed software
CAO Records Archiving System Provide archiving system and
CAO upgraded hardware to handle
the installed software
GAD Records Archiving System Provide archiving system and
GAD upgraded hardware to handle
the installed software
Budget Management System Provide Budget and Expense
Monitoring System (BEMS)
Internet Connections and upgrade hardware to handle
BUDGET OFFICE
Landline Telephone the installed software.
Installation of Internet and
landline telephone
Comprehensive Data Banking: Provide comprehensive
PWDs, Senior Citizens, Indigent Information system to cater
families, Clients data banking and electronic
MSWDO archiving of all MSWDO’s
Electronic Archiving of all transactions and upgrade
documents (Masterlist of Senior hardware to handles the
Citizens. PWDs-Te,plated installed software.
Documents)
LCR archiving system Provide archiving system and
upgraded hardware to handle
Currently there is a DOS based the installed software
system that needs to be upgraded
LCR IT personnel to encode all the
to Windows
documents even just for a
Assistance in speeding up data contractual basis only until the
entry backtracking of documents are
done.
Computerized PPSAS Financial Provide software and IT
ACCOUNTING Statement and Brgy. FS Personnel
Bank Reconciliation System
17 | P a g e
Information Systems Strategic Plan 2017 - 2019
DEPARTMENT NEEDS POSSIBLE ICT SOLUTIONS
Computerized Issuance of Provide software for electronic
Sanitary Permit processing of Sanitary Permit
Inventory for Medicines and
Provide software for inventory
Medical Supplies
of Medicines and Medical
Computerization of Laboratory
Supplies
Services (Sputum, Stool, Urine
& CBC) Provide software electronic
MUNICIPAL HEALTH
System for Birthing Center processing of Laboratory
OFFICE
Services (Deliveries, Discharge, Services
Payment, Etc.)
Provide software for electronic
processing of Birthing Center
Services
Provide software and IT
Personnel
Updated software and hardware Provide technical assistant to
for the existing computers for update the hardware and
PNP fast and efficient performance software regularly
Internet connection Install at least 10mbps Internet
connection
Software for data gathering, Provide Permanent IT Staff to
updating, banking and retrieving. handle delicate tasks and
operate new software needed
Comprehensive Data Banking for municipal development and
(i.e. CLUP, CDP, LSP, LDIP, planning
MPDO AIP)
Provide licensed GIS connected
software for easy generation of
reports.
Provide Data banking software
Comprehensive data Encoding of Provide software and IT
Treasury
all accountable forms personnel
Business Establishment Profiling Provide software and IT
(Comprehensive Data personnel
Engineering
Encoding/Banking of Business
Establishments)
18 | P a g e
Information Systems Strategic Plan 2017 - 2019
6.2 Relationship of ICT Needs to Strategic Thrust
19 | P a g e
Information Systems Strategic Plan 2017 - 2019
6.3 SWOT ANALYSIS
20 | P a g e
Information Systems Strategic Plan 2017 - 2019
7 INFORMATION SYSTEMS STRATEGY
21 | P a g e
Information Systems Strategic Plan 2017 - 2019
7.1.1 List and description (cont’d)
Target
Priority Name Description
Date
A software that is used for data entry, data
tracking and the data information requirements
5 HRMS or HRIS of an organization's human resources (HR) January-18
management, payroll and bookkeeping
operations, etc.
22 | P a g e
Information Systems Strategic Plan 2017 - 2019
7.1.1 List and description (cont’d)
23 | P a g e
Information Systems Strategic Plan 2017 - 2019
7.1.2 Diagram of Key Systems
24 | P a g e
Information Systems Strategic Plan 2017 - 2019
Diagram of Key Systems (cont’d)
25 | P a g e
Information Systems Strategic Plan 2017 - 2019
Diagram of Key Systems (cont’d)
26 | P a g e
Information Systems Strategic Plan 2017 - 2019
7.2 Proposed Hardware
Geotagging
Department
Switches
Upgrade
Memory
Desktop
Internet
monitor
Camera
Printer
Laptop
Router
(3N1)
Fax
Office of the Mayor 1 1 1 0 0 0 0 0 0 0 0
ICT Office 3 1 1 0 0 2 0 3 0 1 0
BPLO 1 0 0 0 0 0 0 0 0 0 0
HRMO 1 1 1 0 0 0 0 0 1 0 0
MPDO 2 2 2 0 0 0 0 0 0 0 0
Budget Office 1 1 1 1 1 1 2 0 2 1 0
Engineering 0 0 0 0 0 0 0 0 0 0 0
Assessor 2 1 2 1 0 0 0 0 0 0 0
LCR 2 1 0 1 0 0 4 0 0 0 0
Treasury 5 2 5 0 0 0 0 0 0 0 0
Accounting 0 0 0 0 0 0 0 0 0 0 0
DILG 0 1 0 1 0 1 0 0 0 1 0
SB Office 2 2 2 1 1 0 0 0 0 0 0
MAO 3 2 2 1 0 0 0 0 0 0 0
MSWDO 1 0 0 0 1 0 0 0 0 1 0
MHO 2 0 1 0 1 1 0 0 0 0 0
MENRO/TOURISM/CAO/GAD 1 0 1 1 0 1 0 0 0 1 1
PNP (Police) 0 2 1 2 0 0 1 0 0 1 0
BFP 2 1 2 1 1 0 2 0 0 1 0
Total 29 18 22 10 5 6 9 3 3 7 1
7.3 PC Software
All software in the municipality should be running properly, licensed or open source. LGU
departments must also consider free and open source software (FOSS) to save money from
expensive licensed applications. For example, instead of using Microsoft office in almost all
computer works, they may consider open office which is very similar in all operations but
can be get for free.
27 | P a g e
Information Systems Strategic Plan 2017 - 2019
7.4 Proposed Infrastructure
28 | P a g e
Information Systems Strategic Plan 2017 - 2019
7.5 Proposed Network Layout
A schematic of the network layout is shown below.
29 | P a g e
Information Systems Strategic Plan 2017 - 2019
7.6 ICT Strategy for Public Access
30 | P a g e
Information Systems Strategic Plan 2017 - 2019
7.8 Timelines
TARGET DATE
# ACTION PLAN
Week Month Year
1 Implementation of e-BPLS 1st January 2017
2 Municipality Website 1st April 2017
st
3 Institutionalize ICT Dept. 1 June 2017
rd
4 Orientation/Introduction of the plan 3 June 2017
Canvass of hardware and software needed for network
5 3rd June 2017
installation
6 Create PO for the hardware and software needed 4th June 2017
7 Purchase needed hardware and software 1st July 2017
8 Acquisition of hardware and software 2nd July 2017
9 Installation and setup of Server Room 4th July 2017
nd
10 Set up and preparation of hardware per department 2 August 2017
nd
11 Installation and setup Network Connections 2 August 2017
Testing/Initial run of Network Connections and hardware
12 3rd August 2017
installations
Actual Run of Network Connections and hardware
13 4th August 2017
installations
14 Creation of Miscellaneous Systems 1st September 2017
Initial Deployment of Miscellaneous Systems (Testing
15 3rd October 2017
Phase)
16 Start of Miscellaneous Systems 4th October 2017
17 Creation of HRMS or HRIS 1st November 2017
rd
18 Initial Deployment of HRMS or HRIS (Testing Phase) 3 January 2018
th
19 Actual Run of HRMS/HRIS 4 January 2018
20 Purchase of Biometric System 4th January 2018
21 Acquisition of Biometric hardware 1st February 2018
22 Testing Phase of Biometric System 3rd March 2018
23 Actual Run of Biometric System 4th March 2018
24 Creation of Payroll System 1st April 2018
25 Testing Phase of Payroll System 3rd May 2018
th
25 Actual Run of Payroll System 4 May 2018
31 | P a g e
Information Systems Strategic Plan 2017 - 2019
26 Creation of Budget Expense Monitoring System (BEMS) 1st June 2018
27 Testing Phase of BEMS 3rd July 2018
28 Actual Run of BEMS 4th July 2018
29 Creation Revenue Collection System (RCS) 1st August 2018
30 Testing Phase RCS 3rd October 2018
31 Actual Run of RCS 4th October 2018
st
32 Creation of Executive Information System (EIS) 1 November 2018
th
33 Turn Over and Actual Run of EIS 4 November 2018
th
34 System for Business Establishment Profiling 4 April 2019
th
35 Fire Code Fees Assessment 4 May 2019
th
36 Document Management System 4 August 2019
th
37 Motorized Tricycle Operator's Permit System (MTOPS) 4 October 2019
th
38 Document Management System 4 December 2019
Target
Priority Name Description
Date
32 | P a g e
Information Systems Strategic Plan 2017 - 2019
6.8.1 Proposed Application (Cont’d)
Target
Priority Name Description
Date
Able to capture all sources of revenue through the
issuance of computer generated receipt.
The Residence Certificate System (RCS) will be able to
capture database of residence applying for residence
certificates, Report of Collection, and Deposit and
Abstract Collection.
33 | P a g e
Information Systems Strategic Plan 2017 - 2019
Proposed Application (Cont’d)
Target
Priority Name Description
Date
The RCS captures and maintains a database of all
Revenue Collection revenue collections and bank deposit transactions. It
9 October-18
System (RCS) also generates the required standard reports on
collections and deposits.
34 | P a g e
Information Systems Strategic Plan 2017 - 2019
7.8.2 Proposed Hardware
ICT Unit
NUMBER OF UNITS
EXISTIN PROPOSED ACQUISITION
ITEM
G YEAR 1 YEAR 2 YEAR 3 TOTAL
Server Unit 2 2
Sever Rack (Main Data
1 1
Frame)
Firewall Unit 1 1
Layer 3 (managed Switch) 1 1
Layer 2 (Un-managed
2 2
Switch)
UPS (6KVA) 1 1
Router 12 12
UPS (6KVA) 2 2
Desktop Computer 2 2
Aircon 2 2
HR Office
NUMBER OF UNITS
EXISTIN PROPOSED ACQUISITION
ITEM
G YEAR 1 YEAR 2 YEAR 3 TOTAL
Desktop Computer 2 2
Biometric units 2 2
Budget Office
NUMBER OF UNITS
EXISTIN PROPOSED ACQUISITION
ITEM
G YEAR 1 YEAR 2 YEAR 3 TOTAL
Desktop Computer 1 1
Treasurer’s Office
NUMBER OF UNITS
Agriculture office
NUMBER OF UNITS
35 | P a g e
Information Systems Strategic Plan 2017 - 2019
7.8.3 Proposed Network upgrades
Summary
NUMBER OF UNITS
36 | P a g e
Information Systems Strategic Plan 2017 - 2019
8 ICT STRATEGIC ROADMAP
37 | P a g e
Information Systems Strategic Plan 2017 - 2019
9 DEVELOPMENT AND INVESTMENT PROGRAM COSTS
AMOUNT (max
NEED QTY REMARKS
canvas via internet)
Renovation of ICT Area 250,000.00 including office equipment
Server PC 2 160,000.00
Monitor (Server) 2 46,000.00
Accessories 2 10,000.00 Keyboard, mouse, headset
UPS 5 50,000.00 atleast 6KVA
Computer Set for ICT
3
WorkStation 150,000.00 complete set w/accessories
Firewall 1 370,000.00
Layer 3 managed switch 1 50,000.00
Server rack 1 50,000.00
Main Data Frame 1 150,000.00
Intermediate Data Frame 1 120,000.00
Layer 2 Switch 2 40,000.00
Aircon 2 70,000.00
Cables, tools and materials 200,000.00 4 patch panel, cable organizer
Configuration, Design,
Installation, Testing,
Design and Professional Fee 600,000.00 consultancy
Windows 2016 Sever 1 50,000.00
SQL Database 1 300,000.00
Windows 10 1 11,000.00
Router 12 120,000.00
Biometric System 1 50,000.00
New Set of Computer (Work FOR NEW APPLICATIONS
5
Station) 250,000.00 TO BE DEPLOYED
Microsoft Office 10 110,000.00
TOTAL►► 3,207,000.00
38 | P a g e
Information Systems Strategic Plan 2017 - 2019
ITEM DESCRIPTION/ FINANCIAL REQUIREMENTS
ACTIVITY YEAR 1 YEAR 2 YEAR 3
C. ICT SERVICES
C.1 Application Systems Development 100,000 300,000 100,000
C.2 Database Build-up
C.1. Other Consulting Services
G. OTHER RESOURCES
G.1. Non-ICT Resources 20,000 20,000
G.2. Civil Works
39 | P a g e
Information Systems Strategic Plan 2017 - 2019
10 PROGRAM BUSINESS CASE (COST/BENEFIT ANALYSIS)
Most people making an investment decision compare the benefits with the investment (i.e. the return on Investment or ROI). Typically,
the higher the benefits (or Return) in comparison to the investment, the more likely that investment will be made. It is therefore
important to not only identify the benefits expected to result from a proposed investment, but to quantify them also.
This section therefore compares the benefits expected to accrue from each investment proposed for the program. This then enables the
LCE to evaluate whether he/she should spend the LGU’s funds on initiatives within this Program, or on other investments competing for
the same funds.
eBPLS Initiative
Costs
Hardware and Network Procurement 1,545,000.00 1,477,000.00 185,000.00 3,207,000.00
eGOV4MD Enrollment and Trainings 50,000.00 100,000.00 50,000.00 300,000.00
Others… 50,000.00 100,000.00 50,000.00 200,000.00
Total Costs 1,645,000.00 1,677,000.00 285,000.00 3,707,000.00
40 | P a g e
Information Systems Strategic Plan 2017 - 2019
11 IMPLEMENTATION OF THE ISSP
41 | P a g e
Information Systems Strategic Plan 2017 - 2019
12 APPENDIX A – DEVELOPED SYSTEMS
For Deployment
STATUS
42 | P a g e
Information Systems Strategic Plan 2017 - 2019
12.2 Real Property Tax System (RPTS)
43 | P a g e
Information Systems Strategic Plan 2017 - 2019
13 APPENDIX B - DEVELOPMENT OF THE ISSP
Municipality of Tigbauan developed its ISSP with the assistance of a CESO Volunteer Adviser.
The following strategic planning process was followed. The stakeholders included the LCE and all
the senior departmental managers.
13.1 Background
NCC developed an ISSP template for National government departments that wish to apply for IT
equipment. It was not designed for LGUs. A new template for LGUs was promised over 3 years
ago and it has not materialized yet. Consequently the following process was used to develop a more
relevant strategic plan for Municipality of Tigbauan.
13.2 Steps in creating a plan
There are many types of plans used in human service organizations. While the essence of all plans
are the same – answering questions such as where are we going and how are we going to get there –
we give them different names depending on what the plan is for.
There are strategic, service, financial, project, operational, evaluation, team, client, etc. The ISSP is
a plan which integrates many of the above into one sustainable plan for the LGU.
Deals with fundamental questions like: who is the client? Who should be the client?
Provides a framework for day to day planning;
Typically involves a time frame of 3 to 5 years;
Is an activity that must involve all levels of management in the organization?
There are many strategic planning models. The proposed model follows ten steps; however the
weighting may vary depending on the nature of the organization and its needs.
44 | P a g e
Information Systems Strategic Plan 2017 - 2019
13.2.1 Definition of the purpose and mission of the organization
The starting point is the Mission and Vision statement of the municipality. If there is an existing
ICT unit that has a Mission and Vision statement, that can be included as well.
13.2.2 Identification of the current aims, objectives and strategy of the organization
Objectives are statements of what the LGU intends to achieve. The strategy is how the objectives
are going to be achieved.
13.2.3 Environment Analysis
The purpose of this is to identify the way changes in the environment can influence the
organization. The detailed environment diagram in this ISSP is from Lubao, and has been used as
most LGUs are similar. However, it should be revisited for continued validity at each update of the
ISSP.
13.2.4 Resource Analysis
This would be an assessment of the existing infrastructure, hardware, software and human resources
within the LGU to implement the ISSP. What additional resources will need to be purchased and
what staff hired. This generally includes an analysis of the organizations strengths and weaknesses.
13.2.5 Stakeholder Analysis
Who are the stakeholders? What are their needs? Wants? Expectations? Key stakeholders include
funding bodies (mayor and council), clients, staff, management committee and volunteers. Their
views and needs will have an influence on the plans that are developed.
13.2.6 Identification of strategic opportunities and threats
These are the opportunities and threats that arise outside the organization.
13.2.7 Identification of Strategic Choices
In general the choices have been made to implement Open Source Software (eBPLS, eRPTS). For
other required systems, options include commercial packages, in-house development, or
outsourcing. Since outsourcing is more expensive it is not likely to be a choice made by the LGUs.
13.2.8 Strategic Decision Making
The NCC ISSP template just lists the computers and applications that form the wish list and a
costing and distribution over three years. LGUs treat this as part of their project funding. They
need to consider long term sustainability and include ICT as part of their budget or operations and
management. In other words they need to institutionalize ICT and allocate it as a line item in their
annual budget.
13.2.9 Implementation
45 | P a g e
Information Systems Strategic Plan 2017 - 2019
A champion needs to be identified to head up the ICT team and push for the plan implementation.
This needs to be a person from senior management. In addition an ICT committee could be
recommended that would provide more lobbying power for the plan implementation.
13.2.10 Evaluation
It is recommended that the ICT Manager or ICT Committee evaluate the level of success of the plan
and adjust as required annually.
46 | P a g e
Information Systems Strategic Plan 2017 - 2019
47 | P a g e
Information Systems Strategic Plan 2017 - 2019
48 | P a g e
Information Systems Strategic Plan 2017 - 2019
49 | P a g e
Information Systems Strategic Plan 2017 - 2019
50 | P a g e
Information Systems Strategic Plan 2017 - 2019
51 | P a g e
Information Systems Strategic Plan 2017 - 2019