Professional Documents
Culture Documents
Método Shell: Sol 1 Sol 2 Sol 3 Sol 4
Método Shell: Sol 1 Sol 2 Sol 3 Sol 4
W= 8.00E+06
Po = 4.5
Pt = 3
∆P = 1.5
CBRbase = 80.00%
CBRsub-bas 40.00%
CBRsubra. 4.00%
T°= 15°C
25000 Kg/cm2
E=
3.50E+05 psi
Mr= 4.00E+07 N/m2
S2 -F1 - 100
CARTA: HN - 15 2.5
Solución Asfalto BG 80% BG 40% BG 20%
Sol 1 380 mm - - -
Sol 2 270 mm 400 mm - -
Sol 3 270 mm 120 mm 280 mm -
Sol 4 270 mm 120 mm 110 mm 170 mm
CARTA: HN - 53 5
Solución Asfalto BG 80% BG 40% BG 20%
Sol 1 290 mm - - -
Sol 2 120 mm 450 mm - -
Sol 3 120 mm 210 mm 240 mm -
Sol 4 120 mm 210 mm 80 mm 160 mm
Interpolando :
RESULTADOS 4
Solución Asfalto BG 80% BG 40% BG 20%
Sol 1 326 mm - - -
Sol 2 180 mm 430 mm - -
Sol 3 180 mm 174 mm 256 mm -
Sol 4 180 mm 174 mm 92 mm 164 mm