2. Start Arc machine, set the current and check earthing cable connections. 3. Before starting the welding process wear personal protective equipment. Always use reputed welding rods. 4. Make liquid soap. 5. Check Air pressure gauge. 6. Arrange the toolings for Top Cover assembly. Make the dedicated space for your Spanners & nut/ bolts. 7. Do oiling to the Nut Runner. Open holes of top cover to be closed by using Gaskets.Take care that there should not be leakage. 8. Fit the Air inlet / Outlet pipes to tank 9. As per required drawing set the pressure & use Torch for leak testing. 10. If any leakage found , make it correct & do the finishing operation over particular area. 11. Make the list of all leakages. 12. Do the Tank Inspection.