D PEKERJAAN BETON
1 Cor sloof 15/20 cm; K-175 m3 0.42
2 Cor pelat lantai t =10 cm; K-175 m3 1.20
3 Cor kolom 15/15 cm; K-175 m3 0.45
4 Cor ringbalk 10/15; K-175 m3 0.52
G PEKERJAAN PENGECATAN
1 Pengecatan kusen m2 3.09
2 Pengecatan dinding m2 60.12
3 Pengecatan plafond m2 25.93
4 Pengecatan Pintu Panil Kayu m2 10.00
5 Pengecatan Krepyak jendela m2 2.66
H PEKERJAAN LAIN-LAIN
1 Pembersihan Kembali Ls 1.00
Rencana
Rencana Kumulatif
TIME SCHEDULE
Jumlah BULAN
Harga Satuan
Harga Bobot 1
(Rp.) (Rp.) 1 2 3 4
0.158% 0.158%
2.473% 2.473%
1.437% 1.437%
0.184%
3.470%
2.299%
4.507%
4.847%
0.166%
2.509%
1.082%
0.539%
0.143%
0.888%
2.164% 100%
0.060% 11%
1.002% 100%
0.256% 100%
0.184% 100%
0.297% 100%
0.877% 100%
0.015% 100%
3.414% 100%
4.823% 100%
0.317% 100%
4.946% 100%
2.874% 100%
0.184% 100%
3.470% 100%
2.299% 100%
4.507% 100%
4.847% 100%
8.863% 100%
6.458% 100%
0.779% 100%
2.709% 100%
5.211% 100%
1.274% 2.548% 100%
1.846% 100%
0.000%
0.000% 0.166% 100%
0.000% 2.509% 100%
0.000% 1.082% 100%
0.000% 0.539% 100%
0.143% 100%
0.000%
1 2 3
0.888%
4
100%
5 6 7 8 9
4.057%
54.488%
100%
90%
80%
70%
60%
50%
40%
40%
30%
20%
10%
0%