You are on page 1of 1

STAGE MANAGER PRESHOW

CHECK LIST
Production: _______________________ Date: __________
Stage Manager: ____________________
(Fill in times according to your performance schedule.)

Time: ________ Time: _________


(15 minutes before actor call) (15min before House open)
_____ Sign in _____ Give "15 minutes to house is
_____ Unlock theatre doors open, please" call
_____ Turn on theatre work lights _____ Check that all running lights
_____ Unlock dressing and makeup are in working order
room and green room _____ Have actors check properties
_____ Turn on dressing room lights _____ Synchronize watches with
_____ Unlock booth house manager
_____ Unlock properties cabinet
_____ Put ghost light away Time: __________
_____ Find out who will be the (10min before House open)
technician on call. _____ Make sure all checks are
complete
Time: ________ _____ Turn off work lights
(10 minutes after actor call) _____ Note that lighting and sound
_____ Check that all actors have pre-set are up
signed in. CALL LATECOMERS _____ Be sure light board has
IMMEDIATELY. control of house lights
_____ Sign in all running crews. _____ Give "Stage is closed, please,"
CALL LATECOMERS IMMEDIATELY. call
_____ Check all headsets (booth, _____ Do final visual check of stage
backstage) _____ Give "Places" for crew call
_____ Check monitor system
(dressing room, green room, booth) Time: ___________
_____ Make sure all crew checks (5min before house open)
have begun _____ Give go or hold to house
_____Dimmer check manager
_____Sound check _____ Make sure work lights are off
_____Costume check and that masking is down
_____Check the following yourself: _____ Listen for crew on headset to
_____Set sign on
_____Properties
_____Furniture

You might also like