Replace master ins.char = when you used one mic in different plan after that you changed the
control indicators of mic then it will directly reflects in every inspection plan where ued this mic.
If set this while doing migo it will ask number of containers mandatory.
InspTypeForInspStock:
If you didn’t set this setting even if you assign class character to mic then also results wont update
in batch class char.
QM in Procurement:
Control Keys
Certificate Required: If you set this while doing migo it will ask you certificate.
Certificate for each PO: It will ask certificate for each PO of that material which assigned this
certificate in material master.
Certificate per GR item: If set this certificate need to confirm for each migo