DRIFT CHECK – LEMON TREE HOTEL

ETBAS software was used to analyze the structure. The drift output from the software are represented
below. The code has stated that the factor of 1 to be used for drift calculation, But I have presented with
a factor of 1.2, so in order to get the results for factor 1 we have divided the values by 1.2. Below are the
graphical output for the drift check from Etabs.

MAIN BUILDING

1. Load combination ( 1.2(DL+LL+EQX)

As per the software-


Maximum drift for 1.2(DL+LL+EQX) = 0.00193
Maximum drift for 1.0(DL+LL+EQX) = 0.0016 < 0.004, Hence the drift is within permissible Limits
2. Load combination ( 1.2(DL+LL-EQX)

As per the software-


Maximum drift for 1.2(DL+LL+EQX) = 0.000522
Maximum drift for 1.0(DL+LL+EQX) = 0.00043 < 0.004, Hence the drift is within permissible
Limits
3. Load combination ( 1.2(DL+LL+EQY)

As per the data


Maximum drift for 1.2(DL+LL+EQX) = 0.003481
Maximum drift for 1.0(DL+LL+EQX) = 0.0029 < 0.004, Hence the drift is within permissible Limits
4. Load combination ( 1.2(DL+LL-EQY)

As per the data


Maximum drift for 1.2(DL+LL+EQX) = 0.002993
Maximum drift for 1.0(DL+LL+EQX) = 0.0025 < 0.004, Hence the drift is within permissible Limits