You are on page 1of 1

CROSS SECTION BM 21

41,00 KEMENTERIAN RISET TEKNOLOGI DAN PENDIDIKAN TINGGI


UNIVERSITAS LAMBUNG MANGKURAT
FAKULTAS TEKNIK
PROGRAM STUDI S1 TEKNIK SIPIL
40,00 BANJARMASIN
2018

SKETSA CROSS SECTION


39,00
U

38,00

37,00
SKALA 1 : 100

40,215
40,000
39,825

40,17

40,08

40,08
39,58
39,58

39,94
ELEVASI TANAH ASLI

39,2
0 1 2 3 4 cm
ORIGINAL GROUND LEVEL
0 1 2 3 4 m

JARAK (m)
2 1,57 0,48 0,8 0,9 7 1
DISTANCE (m) KETERANGAN

12,75
TOTAL JARAK (m) 4,05

4,85
3,57

5,75
0,000
0,000

Potongan Melintang Permukaan


2

KUMULATIF (m) Tanah

d (BM21)
5 (BM21)

4&3 (BM21)

2&1 (BM21)

a&b (BM21)
BM (BM21)

c (BM21)
NOMOR PATOK

INSERT PETA : KAMPUS ULM BANJARBARU


CROSS SECTION BM 24

41,00

40,00

39,00
Koordinat BM UTM
Datum : WGS 1984
Proyeksi : UTM
38,00 Zona : 50 s
Sumber : Survei Lapangan Praktikum IUT di Banjarbaru

37,00
40,580
40,905
40,615
40,905

KELOMPOK VIII DISETUJUI OLEH


40,455
39,955
40,755

40,795

40,895
39,950
40,925

ELEVASI TANAH ASLI


39,975

40,365
40,855
39,955
ORIGINAL GROUND LEVEL
Ahmad Anshori
JARAK (m) (1610811210004)
2 1,56 0,51 0,93 0,9 6,88 1,64 0.39 1
DISTANCE (m) Hernanda Aditya Pratama
(1610811310011)
11,97

13,61
5,09

TOTAL JARAK (m)


4,07
3,56
0,000

14
2

KUMULATIF (m) Muhammad Rizki Ramadhan


(1610811310024)
g&h(BM24)
5 (BM24)

i (BM24)
(BM24)
(BM24)

(BM24)

(BM24)

(BM24)
(BM24)

NOMOR PATOK Alma Nadila Irsanti


a&b

c&d
4&3

2&1

e&f
BM

(1610811220005)

Mothea Safitri
(1610811320015)

Trie Nadha Aprilia Faris Ade Irawan S.T, M.Eng.


(1610811320037) NIP. 19840701 201504 1 003

You might also like