Living Room 12 12 8 1 384 144 150 2.56 150 0.96 A-101 Room Finish Calculator
0 0 150 0 150 0
0 0 150 0 150 0 Enter Area Measurements in Colored Areas to obtain Net
Footages
0 0 150 0 150 0
0 0 150 0 150 0 Room Length 12 Feet
0 0 150 0 150 0 Room Width 12 Feet
0 0 150 0 150 0 Room Height 8 Feet
0 0 150 0 150 0
0 0 150 0 150 0 Results
0 0 150 0 150 0 Floor Area (net) 144 Square Feet
0 0 150 0 150 0 Floor Base (net) 48 Linear Feet
0 0 150 0 150 0 Wall Area (net) 384 Square Feet
0 0 150 0 150 0 Ceiling Area (net) 144 Square Feet
0 0 150 0 150 0
0 0 150 0 150 0
0 0 150 0 150 0
0 0 150 0 150 0
0 0 150 0 150 0
0 0 150 0 150 0
0 0 150 0 150 0
0 0 150 0 150 0
0 0 150 0 150 0
0 0 150 0 150 0
0 0 150 0 150 0
0 0 150 0 150 0
0 0 150 0 150 0
0 0 150 0 150 0
0 0 150 0 150 0
0 0 150 0 150 0
0 0 150 0 150 0
Total 384 144 4500 2.56 4500 0.96
Date: 2/16/2011 CLIENT Page 1 of 1
PROJECT NAME
The Author of these Worksheet Templates makes no guarantees to the accuracy of any estimates based on the
formulas or formats provided in these Worksheets and takes no responsibility for their use.
0 0
0 0
0 0
0 0 Room Finish Calculator
0 0
0 0 Enter Area Measurements in Colored Areas to obtain Net
Footages
0 0
0 0 Room Length 20 Feet
0 0 Room Width 12 Feet
0 0 Room Height 8 Feet
0 0
0 0 Results
0 0 Floor Area (net) 240 Square Feet
0 0 Floor Base (net) 64 Linear Feet
0 0 Wall Area (net) 512 Square Feet
0 0 Ceiling Area (net) 240 Square Feet
0 0
0 0
0 0
0 0 After takeoff is complete, Sort on Flooring Type to
0 0 group like areas together.
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
Total 0 0
Page 1 of 1 Company Name 4:29 AM on 2/16/2011
PROJECT ESTIMATING Excel Estimating Worksheets Samples 2-16-11
Clear Notes:
Square Feet Square Yds
Valu Type Flooring Width Length Square Feet Width Gross Length Length Adj
es Per Area Required
EACH AREA MUST BE CONSIDERED AND MANUALLY ADJUSTED TO ENSURE ACCURACY.
Wood 1 Living Room 16 16 256
Wood 1 LR Closet 4 7 28 Sample measurements are included to demostrate how the table works. Remove all numbers before
Wood 1 LR Ext 4 7 28 312 12 30 2 42.7 starting.
Vinyl 2 StairTreads 4 1 4
Vinyl 2 Stair Riser 4 1 4
Vinyl 2 Number of Stairs 8 64 12 6 0 8.0
TOTAL GROSS SQUARE FOOTAGE: 1575 TOTAL GROSS SQUARE YARDS: 277.9
Results
Floor Area (net) 144 Square Feet
Floor Base (net) 48 Linear Feet
Wall Area (net) 384 Square Feet
Ceiling Area (net) 144 Square Feet
Date: 2/16/2011 CLIENT Page 1 of 1
PROJECT NAME
The Author of these Worksheet Templates makes no guarantees to the accuracy of any estimates based on the
formulas or formats provided in these Worksheets and takes no responsibility for their use.
PROJECT NAME
The Author of these Worksheet Templates makes no guarantees to the accuracy of any estimates
based on the formulas or formats provided in these Worksheets and takes no responsibility for
their use.
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
Total 636 636
The Author of these Worksheet Templates makes no guarantees to the accuracy of any estimates based
on the formulas or formats provided in these Worksheets and takes no responsibility for their use.
Concrete Calculator
Slabs
Slab Length Feet
Slab Width Feet
Slab Thickness Inches
Type Total:
Net Amount Required: 0 Cubic Yards
Walls
Wall Length Feet
Wall Height Feet
Wall Thickness Inches
Type Total:
Net Amount Required: 0 Cubic Yards
Type Total:
Net Amount Required: 0 Cubic Yards
Spread Footing
Footing Quantity EA
Footing Length Feet
Footing Width Feet
Footing Depth Feet
Type Total:
Net Amount Required: 0 Cubic Yards
Beams
Beam Length Feet
Beam Width Inches
Beam Height Inches
Type Total:
Net Amount Required: 0 Cubic Yards
Square Columns
Column Quantity EA
Column Height Feet
Column Size Inches
Type Total:
Net Amount Required: 0 Cubic Yards
Round Columns
Column Quantity EA
Column Height Feet
Column Diameter Inches
Type Total:
Net Amount Required: 0 Cubic Yards
The Author of these Worksheet Templates makes no guarantees to the accuracy of any
estimates based on the formulas or formats provided in these Worksheets and takes no
responsibility for their use.
Concrete Continuous Footing Quantity Take-off Worksheet NOTE: REMOVE SAMPLE MEASUREMENTS
BEFORE STARTING PROJECT TAKE-OFFS.
Project: Date:
measurement. Page:
Take-off by: Checked by: SFCA = Square Foot of Contact Area
Footing Footing Footing Excavation Excavation Concrete Rebar No. Rebar Rebar Backfill
Formwork
Description Length Width Depth Depth Volume Volume Size Hoz Weight Weight Volume Backfill Volume is based on adding 30% for
(LF) (LF) (LF) (LF) (CY) (SFCA) (CY) (#) Bars Per LF (Ton) (CY) Compaction
Section 2A 15 2 2 4 8.9 68 2.2 4 6 0.00034 0.03 8.7 Horizontal Rebar Size & Rebar Weights must be
entered manually from the Chart Below:
0.0 0 0.0 0.00 0.0
0.0 0 0.0 0.00 0.0 Rebar Weights:
Size Weight in Tons per LF
0.0 0 0.0 0.00 0.0
#3 .00019 tn lnft
0.0 0 0.0 0.00 0.0 #4 .00034 tn lnft
#5 .00052 tn lnft
0.0 0 0.0 0.00 0.0
#6 .00075 tn lnft
0.0 0 0.0 0.00 0.0 #7 .00102 tn lnft
#8 .00134 tn lnft
0.0 0 0.0 0.00 0.0 #9 .00170 tn lnft
0.0 0 0.0 0.00 0.0 #10 .00210 tn lnft
0.0 0 0.0 0.00 0.0 Vertical Rebar, Cross Ties, Wire & other Concrete
Accessories must be calculated manually
0.0 0 0.0 0.00 0.0
0.0 0 0.0 0.00 0.0
0.0 0 0.0 0.00 0.0
0.0 0 0.0 0.00 0.0
0.0 0 0.0 0.00 0.0
0.0 0 0.0 0.00 0.0
0.0 0 0.0 0.00 0.0
0.0 0 0.0 0.00 0.0
0.0 0 0.0 0.00 0.0
0.0 0 0.0 0.00 0.0
0.0 0 0.0 0.00 0.0
0.0 0 0.0 0.00 0.0
0.0 0 0.0 0.00 0.0
0.0 0 0.0 0.00 0.0
0.0 0 0.0 0.00 0.0
0.0 0 0.0 0.00 0.0
0.0 0 0.0 0.00 0.0
0.0 0 0.0 0.00 0.0
0.0 0 0.0 0.00 0.0
0.0 0 0.0 0.00 0.0
0.0 0 0.0 0.00 0.0
0.0 0 0.0 0.00 0.0
0.0 0 0.0 0.00 0.0
Total 20.7 156.0 5.2 0.1 20.2
The Author of these Worksheet Templates makes no guarantees to the accuracy of any
estimates based on the formulas or formats provided in these Worksheets and takes no
responsibility for their use.
Pad Pad Pad Excavation Excavation Concrete Rebar No. Rebar Rebar Backfill
Formwork
Description Length Width Depth Depth Volume Volume Size Hoz Weight Weight Volume Backfill Volume is based on adding 30% for
(LF) (LF) (IN) (LF) (CY) (SFCA) (CY) (#) Bars Per LF (Ton) (CY) Compaction
Pad 2 15 20 4 4 14.8 760.00 3.7 4 6 0.00034 0.03 14.4 Horizontal Rebar Size & Rebar Weights must be
entered manually from the Chart Below:
0.0 0.00 0.0 0.00 0.0
0.0 0.00 0.0 0.00 0.0
Rebar Weights:
0.0 0.00 0.0 0.00 0.0 Size Weight in Tons per LF
#3 .00019 tn lnft
0.0 0.00 0.0 0.00 0.0
#4 .00034 tn lnft
0.0 0.00 0.0 0.00 0.0 #5 .00052 tn lnft
#6 .00075 tn lnft
0.0 0.00 0.0 0.00 0.0 #7 .00102 tn lnft
0.0 0.00 0.0 0.00 0.0 #8 .00134 tn lnft
#9 .00170 tn lnft
0.0 0.00 0.0 0.00 0.0 #10 .00210 tn lnft
0.0 0.00 0.0 0.00 0.0
0.0 0.00 0.0 0.00 0.0
0.0 0.00 0.0 0.00 0.0 Vertical Rebar, Cross Ties, Wire & other Concrete
Accessories must be calculated manually
0.0 0.00 0.0 0.00 0.0
0.0 0.00 0.0 0.00 0.0
0.0 0.00 0.0 0.00 0.0
0.0 0.00 0.0 0.00 0.0
0.0 0.00 0.0 0.00 0.0
0.0 0.00 0.0 0.00 0.0
0.0 0.00 0.0 0.00 0.0
0.0 0.00 0.0 0.00 0.0
0.0 0.00 0.0 0.00 0.0
0.0 0.00 0.0 0.00 0.0
0.0 0.00 0.0 0.00 0.0
0.0 0.00 0.0 0.00 0.0
0.0 0.00 0.0 0.00 0.0
Total 26.7 1008.00 6.7 0.1 26.0
The Author of these Worksheet Templates makes no guarantees to the accuracy
of any estimates based on the formulas or formats provided in these Worksheets
and takes no responsibility for their use.
Total
Steel Decking Quantity Take-off Worksheet
Project: ___________________ Date: ___________________
Clear Values from previous calculations for ea Page: ____ of _____
Take-off by: _______________ Checked by: __________
Deck Length Deck Width Overhang Lap Deck Area
Reference Gauge Pitch
(LF) (LF) (LF) (LF) (SF)
Total
The Author of these Worksheet Templates makes no guarantees to
the accuracy of any estimates based on the formulas or formats
provided in these Worksheets and takes no responsibility for their
use.
Total
HVAC Equipment Quantity Take-off Worksheet
Project: _______________Date: ______________
Clear Values from previousPage ___ of ________
Section: ______________ Takeoff by _________
System Item Capacities/Dimensions Quantity
Total
The Author of these Worksheet
Templates makes no guarantees to the
accuracy of any estimates based on the
formulas or formats provided in these
Worksheets and takes no responsibility
HVAC Piping Quantity Take-off Worksheet
Project: __________________ Date: ______________
Clear Values from previous calculations for each new measuremenPage ___ of ________
Section: ___________________ Takeoff by _________
Pipe Diameter
System Misc.
1/8" 1/4" 3/8" 1/2" 3/4" 1" 1-1/4" 1-1/2" 2" 2-1/2" 3" 4" 5" 6" 8" 10" 12" 15"
Total
The Author of these Worksheet Templates makes no guarantees to the accuracy of
any estimates based on the formulas or formats provided in these Worksheets and
takes no responsibility for their use.
Total
The Author of these Worksheet Templates makes no guarantees to th
based on the formulas or formats provided in these Worksheets and
their use.
Total
The Author of these Worksheet Templates makes no
guarantees to the accuracy of any estimates based on the
formulas or formats provided in these Worksheets and takes
no responsibility for their use.
Total
The Author of these Worksheet Templates makes no guarantees to the accuracy of any estimate
formulas or formats provided in these Worksheets and takes no responsibility for thei
Project: Date:
Total
The Author of these Worksheet Templates makes no guarantees to the accuracy of any estimates
based on the formulas or formats provided in these Worksheets and takes no responsibility for
their use.
Project: Date:
ew measurement. Page: of
Take-off by:: Checked by:
LR N. Frame 2 34 8 2 X 4 181.33
X 0.00
X 0.00
X 0.00
X 0.00
X 0.00
X 0.00
X 0.00
X 0.00
X 0.00
X 0.00
X 0.00
X 0.00
X 0.00
X 0.00
X 0.00
X 0.00
X 0.00
X 0.00
X 0.00
X 0.00
X 0.00
X 0.00
X 0.00
Total
The Author of these Worksheet Templates makes no guarantees to the accuracy of any estimates
based on the formulas or formats provided in these Worksheets and takes no responsibility for their
use.
Project: Date:
w measurement. Page: of
Take-off by:: Checked by: